Grp Sectional Tanks - Hot Press Moulded - Supaflex...

4
Trickley Coppice Farm, Coppice Lane Middleton, Tamworth, Staffordshire, B78 2BU Tel: 0121 323 4000 Fax: 0121 323 4400 Email: [email protected] www.purewaterstorage.co.uk Grp Sectional Tanks - Hot Press Moulded Trickley Coppice Farm, Coppice Lane Middleton, Tamworth, Staffordshire, B78 2BU Tel: 0121 323 4000 Fax: 0121 323 4400 Email: [email protected] www.purewaterstorage.co.uk Purewater Sectional tanks incorporate hot press moulded Grp panels ensuring maximum dimensional stability and consistency of quality. • WRAS approved. • Manufactured to BS EN 13280:2001. • Manufactured in compliance with an ISO9001:2001 quality control system. • Manufactured in a metric modular format allowing water storage from 125 litres to 2 million litres. • Factory Pre-insulated including insulated base option, providing a U value of 0.8w/sq.m/deg C. • Available with either internal or externally flanged base arrangement, with fully self draining base option. • Incorporating the industry’s largest sized man-way access providing an 830 x 830mm aperture. • Incorporating the Purewater one-piece raised float valve housing panel complete with screened spill over weir providing an AB air gap and 830 x 830mm opening to provide access to the float valve. • Assembled on site by our own fully skilled and equipped engineers, ensuring 100% control of installation. • Purewater DO NOT utilise outsourced labour to assemble sectional tanks • A vast range of sectional tanks are available in a number of formats. Purewater Sectional Cold Water storage tanks are designed in a modular format which allows a comprehensive range of tank size and configuration. They comprise of individual bolt-up panels which are assembled on site. In order to calculate the capacity of the tank, simply multiply the length x width x height. Remember that tanks are always stated as length x width x height. For example, a 2 x 2 x 1m tank is not the same as a 2 x 1 x 2m tank. Designed for two specific applications: • For storing water in large capacities - from 250 litres up to 2,000,000 litres. • To allow the site assembly of a water storage tank where access restrictions or other conditions deny the installation of one and two piece tanks.

Transcript of Grp Sectional Tanks - Hot Press Moulded - Supaflex...

Trickley Coppice Farm, Coppice Lane Middleton, Tamworth, Staffordshire, B78 2BU

Tel: 0121 323 4000 Fax: 0121 323 4400 Email: solutions@purewaterstorage.co.ukwww.purewaterstorage.co.ukwww.purewaterstorage.co.uk

Grp Sectional Tanks - Hot Press Moulded

Trickley Coppice Farm, Coppice Lane Middleton, Tamworth, Staffordshire, B78 2BU

Tel: 0121 323 4000 Fax: 0121 323 4400 Email: [email protected]

Purewater Sectional tanks incorporate hot press moulded Grp panels ensuring maximum dimensional stability and consistency of quality.

•WRASapproved. •ManufacturedtoBSEN13280:2001. •ManufacturedincompliancewithanISO9001:2001 quality control system. •Manufacturedinametricmodularformatallowingwater storage from 125 litres to 2 million litres. •FactoryPre-insulatedincludinginsulatedbaseoption, providingaUvalueof0.8w/sq.m/degC. •Availablewitheitherinternalorexternallyflangedbase arrangement, with fully self draining base option. • Incorporatingtheindustry’slargestsizedman-way accessprovidingan830x830mmaperture. • IncorporatingthePurewaterone-pieceraisedfloatvalve housingpanelcompletewithscreenedspilloverweir providinganABairgapand830x830mmopeningto provideaccesstothefloatvalve. •Assembledonsitebyourownfullyskilledandequipped engineers, ensuring 100% control of installation. •PurewaterDONOTutiliseoutsourcedlabourto assemble sectional tanks •Avastrangeofsectionaltanksareavailableina number of formats.

PurewaterSectionalColdWaterstoragetanks are designed in a modular format whichallowsacomprehensiverangeoftanksizeandconfiguration.Theycompriseofindividualbolt-uppanelswhichareassembled on site.

Inordertocalculatethecapacityofthetank, simply multiply the length x width x height.Rememberthattanksarealwaysstated as length x width x height. For example, a 2 x 2 x 1m tank is not the same as a 2 x 1 x 2m tank.

Designed for two specific applications:

•Forstoringwaterinlargecapacities- from 250 litres up to 2,000,000 litres. •Toallowthesiteassemblyofawater storage tank where access restrictions or other conditions deny the installation of one and two piece tanks.

Trickley Coppice Farm, Coppice Lane Middleton, Tamworth, Staffordshire, B78 2BU

Tel: 0121 323 4000 Fax: 0121 323 4400 Email: solutions@purewaterstorage.co.ukwww.purewaterstorage.co.ukwww.purewaterstorage.co.ukwww.purewaterstorage.co.uk

Internally Flanged Base Tanks (IFB)

Themostcosteffectivesectionaltankformatsuitablefor: • Positioningontoaflat,solid,levelsurfaceandcontinuousfoundation. • Applicationswherethereissufficientworkingroomallaroundthetank. Comprising: • Internallyflangedbase,externallyflangedsides,internallyflangedroof. • Insulatedtothesidesandcoveronly. • IFBtanksaresuitableforpositioningontoaflat,levelandcontinuous foundation,normallyastructuralconcreteslab.Iftheexistingfoundation isnotwithintherequiredtolerancesPurewatercanprovidefoundation materials. • IFBtanksrequireaminimumof500mmworkingclearanceallaroundthe tank,aminimumof600mmabovetheman-wayheightand/or350mm aboveanyraisedfloatvalvehousing.

Externally Flanged Base Tanks (EFB)

Suitable for: • Positioningontoraisedsupports,typicallytoprovideapositiveheadof pressure to an adjacent pump set or similar equipment. •Whereaninsulatedbaseisrequired. •Wherethereissufficientworkingroomallaroundthetank. Comprising: • Externallyflangedbase,externallyflangedsides,internallyflanged roof. • Insulatedtothebase,sidesandcover. • EFBtanksaresuitableforpositioningontoraisedsupportsat1000mmor 500mmcentresdependingonthetanksizeandconfiguration,foundation normally comprises of brick built or concrete dwarf walls. •Raisedsupportsmustbeaminimumof500mmhigh. • EFBtanksrequireaminimumof500mmworkingclearanceallaround thetank,aminimumof600mmabovetheman-wayheightand/or 350mmaboveanyraisedfloatvalvehousing.

Totally internally Flanged Tanks (TIF)

Suitable for: • Applicationswherethereisminimalworkingroomavailable;allpaneljoint flangesareaccessedfrominsidethetank. • Positioningontoaflat,levelandcontinuousfoundation,normallya structural concrete slab. Comprising: • Internallyflangedbase,Internallyflangedsides,internallyflangedroof. • Insulatedtothesidesandcover. • TIFtanksaresuitableforpositioningontoaflat,levelandcontinuous foundation, normally a structural concrete slab. • TIFtanksrequireaminimumof50mmworkingclearanceallaroundthe tank,aminimumof600mmabovetheman-wayheightand/or350mm aboveanyraisedfloatvalvehousing.

Trickley Coppice Farm, Coppice Lane Middleton, Tamworth, Staffordshire, B78 2BU

Tel: 0121 323 4000 Fax: 0121 323 4400 Email: [email protected]

Panel Specification• Panelsaremanufacturedfromhigh quality SMC material hot pressed moulded to a temperature of 150°C ensuring maximum dimensional stability. • Panelsareavailableinametric format, panels being 1000 x 1000mm, 1000 x 500mm & 500 x 500mm. • Individualpanelsaredimensionally accuratewithdefinedsharpcorners, and are precision factory drilled. • Truncatedpaneloptionformaximum strengthandtoprovidefullmetre spanbaseconfiguration. • FactoryPre-insulatedusingCFCfree polyurethanefoamprovidingaU valueof0.8w/sq.m/degC • FullyWRASapproved. •ManufacturedunderISO9002 approval. •MaximumsizeManwayaccesspanel with 830 x 830mm aperture. •One-pieceraisedfloatvalvehousing panel complete with screened spill overweirtoensureABtypeairgap configuration.

Trickley Coppice Farm, Coppice Lane Middleton, Tamworth, Staffordshire, B78 2BU

Tel: 0121 323 4000 Fax: 0121 323 4400 Email: [email protected]

Grp Sectional Tanks - Hot Press Moulded

Tank Foundation Requirements: •Wherefoundationtolerancesarenotwithinspecification,oriferectingmetric configurationtanksonanexistingimperialconfiguredsupport,Purewatercan supply the necessary steelwork to enable installation of the tank. •Steelworkcanbeshimmedbyourownengineerspriortoinstallationofthetank. •Marinegradeplybaseboardscanalsobesuppliedtoenableinternallyflanged base tanks to be installed on supports when no suitable foundation exists. •Allfoundationareasareinspectedandcheckedusinglasermeasuringequipment prior to tank installation.

Internally Flanged Base Tanks ForthesuccessfulinstallationofPurewaterinternallyflangedbasesectionaltanksthe following are required: •Thefoundationareamustbeaminimumof450mmgreaterinlengthandwidththan the internal dimensions of the tank. •Thefoundationmustbeconstructedsoastobecapableofsupportingthetank maximum weight when full. •Thefoundationmustbeflat,level&continuousandbenomorethat±2mmover anygivenmetreandnomorethat±6mmover6metresinanydirection. •Thefoundationmustbefreeofanylocalhigh&lowspots,protrusionsanddebrisof and kind. Access for IFB Tanks PurewaterIFBsectionaltanksrequireaminimumof500mmworkingclearanceallaroundthetank,aminimumof600mmabovetheman-wayheightandaminimumof350mmaboveanyraisedfloatvalvehousing.

Externally Flanged Base Tanks ForthesuccessfulinstallationofPurewaterexternallyflangedbasesectionaltanksthe following are required: •Thesupportsmustbeconcrete,brickorsteelandbeconstructedsoastocapable of supporting the tank maximum weight when full. •Supportsmustruninonedirectiononly,beamaximumof150mmwideandbeat either1000mmor500mmcentresdependingontheheightandconfigurationofthe tank. •Supportsmustbeparallelandflatandbenomorethat±2mmoveranygivenmetre andnomorethat±6mmover6metresinanydirection. •Thefoundationmustbefreeofanylocalhigh&lowspots,protrusionsanddebrisof any kind. Access for EFB Tanks Purewater EFB sectional tanks require a minimum of 500mm working clearance allaroundthetank,aminimumof600mmabovetheman-wayheight,aminimumof350mmaboveanyraisedfloatvalvehousingandaminimumof500mmaccessheight to the underside of the tank.

Totally Internally Flanged Tanks ForthesuccessfulinstallationofPurewatertotallyinternallyflangedsectionaltanksthe following are required: •Thefoundationareamustbeaminimumof50mmgreaterinlengthandwidththan the external dimensions of the tank •Thefoundationmustbeconstructedsoastobecapableofsupportingthetank maximum weight when full. •Thefoundationmustbeflat,level&continuousandbenomorethat±2mmover anygivenmetreandnomorethat±6mmover6metresinanydirection. Access for TIF Tanks PurewaterTIFsectionaltanksrequireaminimumof50mmworkingclearanceallaroundthetank,aminimumof600mmabovetheman-wayheightandaminimumof350mmaboveanyraisedfloatvalvehousing.

Trickley Coppice Farm, Coppice Lane Middleton, Tamworth, Staffordshire, B78 2BU

Tel: 0121 323 4000 Fax: 0121 323 4400 Email: solutions@purewaterstorage.co.ukwww.purewaterstorage.co.ukwww.purewaterstorage.co.uk

Complimentary Services

Purewater also offer the followingservices:

• Sitesurveypriortoworks commencing. • Stripoutofexistingtanksand equipment. • Foundationinspectionusing laserlevelequipment. • Pre-commissioncleaningand chlorination including samplesandcertification. • Fullcommissioningoftanks and equipment. • Acomprehensiverangeof floatvalvesandother connections

Access Manway

ThePurewaterone-pieceman-waypanelhasaconsiderable830x830mmaccessaperture.Thisensuresmaximumspaceforeaseofmovement,andprovidesthelargestaccesshatchavailableintheindustry.

Raised Float Valve Housing

• Purewatersectionaltanksaresuppliedwithaone-pieceRaisedFloatValve Housing panel which forms part of the roof structure in the same way as a standard roof panel. The inspection hatch opening is a considerable 830 x 830mmofferingthesameaccessbenefitsasthestandardman-way. • Allfloatvalvehousingsaresuppliedcompletewithscreenedspilloverweirsto ensureABairgapcompliance. • AllPurewaterspilloverweirsareshroudedtoreducelightingress,helpingto preventthegrowthofalgaeandotherorganisms.

Fixings

AllinternalfixingsareA4gradestainlesssteel,externalfixingsareeithergalvanisedorA4gradestainlesssteel.

Bracing System

• Bracingwhererequiredisprovidedbyhighgradeboxsectionsteeluprights locatedateachverticalpaneljoint.Uprightsarefixedusingthreadedstainless steeltierodsandfurthersecuredwithanglebracketstotheoutsideofthetank.All externalsteelcomponentsarehotdipgalvanised. •Ouruniquebracingsystemallowsformaximumunobstructedmovementwithinthe tank,thesystemalsoprovidingunequalledsimplicityforfuturecleaningoperations. • Fortankswithinternaldivisions,Purewaterusestainlesssteelforalluprightsand associatedreinforcementtodividerpanelsthroughout.

Internal divisions

• Internaldividerscanbefitted,providingtwocompartmentsenablingeasy maintenance of the tanks without interruption of water supply. •DividersareconstructedfromGrptankpanelsandaresupportedbystainlesssteel bracingandfixings.

Tank assembly

AssemblyofPurewaterSectionaltanksiscarriedoutbyourownhighskilledengineers.Afullfoundationinspectionisundertakenbeforeassemblycancommence.Specificationcallsforexactingtolerancesthereforelaserlevelequipmentis used, ensuring precision and accuracy from the start. Ourengineerscanfitallnecessaryfloatvalves,connectionsandotherancillaryitemstothetank.Purewaterwillaccuratelyinstallfloatvalvesensuringcorrectpositioningofthevalveinrelationtooverflowsandspilloverscreenunits,thusensuringcorrectairgapconfiguration. Purewaterguaranteetoworksafely,efficientlyandwithrespecttoothersiteworkers.Ourengineerswillremoveallrelatedpackagingandsimilarwasteitems,ensuringaclean area when the job is completed.