Green Streets and Porous Pavement: Lessons for
Sustainability, Savings, and Success
EVAN N. PRATT, P.E.WASHTENAW COUNTY, MI Water Resources Commissioner
![Page 2: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/2.jpg)
TODAY’S LEARNING OBJECTIVES:
• SUSTAINABILITY: (AT LEAST) FIVE TECHNIQUES FOR STREET RUNOFF INFILTRATION
• SAVINGS: WHAT TO COMPARE & COSTS
• SUCCESS: POST-CONSTRUCTION PERFORMANCE
![Page 3: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/3.jpg)
EVAN’S FOCUS AREAS:
• WHY SHOULD ROW INFILTRATION BE 1ST CHOICE?• TECHNIQUES:
– Porous Pavements– Infiltration Beds/Planters in the ROW– 3 New ways to infiltrate road drainage
• SAVINGS: WHAT YOU’VE NEVER HEARD ABOUT POROUS O/M
• SUCCESS = FEEDBACK LOOP AND ADAPTATION.
![Page 4: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/4.jpg)
![Page 5: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/5.jpg)
EVOLUTION OF WATER QUALITY• 1972 – CLEAN WATER ACT• 1970s-80s -- INDUSTRIAL POLLUTION TARGETED• Late 1980’s – present – SEWER OVERFLOWS• Late 1990’s – PHASE I TARGETS MS4 POINT/NON• 2000’s – present PHASE II – KEY QUESTIONS:
– What is Non-Point Source (NPS) Pollution? – Will Public Education Take care of NPS?– Who can have the biggest impact on NPS?
![Page 6: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/6.jpg)
WALT KELLY DEBUNKS “NON-POINT SOURCE”• ANN ARBOR, MI: POP. ~115,000: 27.7+ SQ. MI.• ROW = 2.9 SQUARE MILES IMPERVIOUS AREA
• =10.5% of total City area
• = 25.9% of total impervious area in the City but generates 54% of runoff*
• LARGELY UNTREATED!!
• =54% OF NPS POLLUTION – IT IS US!!*Roger Bannerman, Wisconsin DNR
![Page 7: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/7.jpg)
(Drapper et al [Source: Kobringer, N.P. 1984. Volume I. Sources and Migration of Highway Runoff Pollutants- Executive Summary. FHWA/RD-84/057. Federal Highway Administration, Rexnord, EnviroEnergy Technology Center, Milwaukee, WI])
Constituent Primary Sources
Particulates Pavement wear, vehicles, atmosphere, maintenance, snow/ice abrasives, sediment disturbance
Nitrogen, Phosphorus Atmosphere, roadside fertiliser use, sediments
Lead Leaded gasoline, tire wear, lubricating oil and grease, bearing wear, atmospheric fallout
Zinc Tire wear, motor oil, grease
Iron Auto body rust, steel highway structures, engine parts
Copper Metal plating, bearing wear, engine parts, brake lining wear, fungicides and insecticides use
Cadmium Tire wear, insecticide application
Chromium Metal plating, engine parts, brake lining wear
Nickel Diesel fuel and gasoline, lubricating oil, metal plating, brake lining wear, asphalt paving
Manganese Engine parts
Bromide Exhaust
Cyanide Anticake compound used to keep deicing salt granular
Sodium, Calcium De-icing slats, grease
Chloride De-icing salts
Sulphate Roadway beds, fuel, de-icing salts
Petroleum Spills, leaks, blow-by motor lubricants, antifreeze, hydraulic fluids, asphalt surface leachate
PCBs, pesticides Spraying of highway right of ways, atmospheric deposition, PCB catalyst in synthetic tires
Pathogenic bacteria Soil litter, bird droppings, trucks hauling livestock/stockyard waste
Rubber Tire wear
Asbestos* Clutch and brake lining wear
* No mineral asbestos has been identified in runoff, however some breakdown products of asbestos have been measured
![Page 8: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/8.jpg)
CITY =54% OF NPS POLLUTION
• HOW TO HANDLE THIS??
• OPPORTUNISTIC INFILTRATION– CURB NOTCHES/RAINGARDENS, BUMP-OUTS, ETC
– FIND SAND -- PERFORATED PIPE, CISTERN SHAFTS
– BASE UNDER POROUS/IMPERVIOUS PVMT
• MINIMIZE SWIRL CHAMBERS!!
![Page 9: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/9.jpg)
TSS Removal Efficiencies
SOURCE: 2005 DATA REPORT, UNH STORMWATER CENTER
![Page 10: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/10.jpg)
Top 5 TSS Removal Efficiencies
• POROUS PAVEMENT– 100%• GRAVEL WETLAND – 100%• STORAGE BASIN INFILTRATION– 100%• TREE FILTER – 93%• BIORETENTION – 92%
![Page 11: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/11.jpg)
Case Study: Boulder HillsPelham, NH
• 2009 -- 900’ OF PRIVATE RESIDENTIAL PAVING IN NE• SITE GOAL OF ZERO DISCHARGE• 55+ ACTIVE ADULT COMMUNITY• SANDY SOILS (NOT A MUST)
![Page 12: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/12.jpg)
The Design
![Page 13: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/13.jpg)
COST AVOIDANCE
• 1616’ CONCRETE CURB• 785’ PIPE• 8 CATCHBASINS• 2 DETENTION BASINS & 2 OUTLET STRUCTURES• SAVED 1.3 ACRES IN LAND CLEARING/CONSUMPTION• CONVENTIONAL = $789,500 vs. LID SWM= $740,300 • INFILTRATION COST SAVINGS = $49,000 = (6.2%)• O/M DISCUSSION LATER – ALSO LESS
![Page 14: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/14.jpg)
Comparison of Unit Costs
![Page 15: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/15.jpg)
Performance of Porous Asphalt
Willard Beach Park: Porous vs. Regular Asphalt Battle Creek, MI
Entrance to Pringle Creek Community: Porous vs. Regular AsphaltSalem, OR
![Page 16: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/16.jpg)
Other Project Benefits
• GLARE REDUCTION SUBSTANTIAL
• BETTER TRACTION THAN HMA
• SOUND REDUCTION USE BY CALTRANS, OTHERS
• ELIMINATED ICING & CRASHES IN ANDERSON CO, OH
• LESS SALTING NEEDED - $$ AND ENVIRONMENTAL
• LESS MOSQUITO BREEDING AREA
• REDUCES THERMAL IMPACT TO STREAMS
![Page 17: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/17.jpg)
POROUS vs. REGULAR ASPHALT
POROUS REGULAR
vs.
PAVER &TRANSVERSEJOINTS
![Page 18: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/18.jpg)
PREVENTING PITFALLS OF POROUS
KNOW YOUR MIX DESIGN -- MULTIPLE OPTIONS IF LOADING OR RAVELING ARE CONCERNS
SUB-BASE COMPACTION IS IMPORTANT TOO
CHOKER LAYER IS KEY TO A WORKING PLATFORM
NO SANDING FOR WINTER MAINTENANCE!!
THE MYTH OF “MORE EXPENSIVE MAINTENANCE”
![Page 19: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/19.jpg)
HOW POROUS O/M IS MUCH LESS
• WHAT IF YOU HAD PAVEMENT THAT NEVER CRACKED?
![Page 20: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/20.jpg)
HOW POROUS O/M IS MUCH LESS
…AND IS SUPPOSED TO HAVE WATER IN THE BASE
![Page 21: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/21.jpg)
HOW POROUS O/M IS MUCH LESS
• WHAT IF YOU HAD PAVEMENT THAT NEVER CRACKED?
• AND PAVEMENT THAT DIDN’T FAIL DUE TO WET BASE?
• WHO IS UNDER AN NPDES PERMIT?
• SWEEPING COSTS ARE ACTUALLY SIMILAR
• A MILE OF POROUS CAN COST $57,750 LESS IN O/M
![Page 22: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/22.jpg)
HOW POROUS O/M IS MUCH LESS
![Page 23: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/23.jpg)
HOW POROUS O/M IS MUCH LESS
• *$57,750/MILE HMA PAVEMENT MAINTENANCE COSTS– YEAR 0-4 – NO COSTS
– YEAR 5: FIRST CRACK SEALING; $750
– YEAR 6-10: LIMITED PATCHING; $6,000 ($2,000/LANE MILE)
– YEAR 6-10: 2ND CRACK SEAL; $3,000, CHIPSEAL; $15,000
– YEAR 10-15: 3RD/4TH CRACK SEAL; $12,000
– YEAR 16-20: MAJOR PATCHING, POSSIBLE SEALCOAT; $21,000
– 4x ANNUAL STREET SWEEPING, $1,000/YR--IF PERMIT REQ’S.
*YOU MAY WISH TO REVISE COSTS BASED ON YOUR AGENCY PRACTICES
BASED ON 20 YEAR CYCLE FOR 1 MILE RESIDENTIAL STREET WITH 36’ PAVEMENT WIDTH
![Page 24: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/24.jpg)
HOW POROUS O/M IS MUCH LESS
• POROUS PAVEMENT MAINTENANCE COSTS:– 2x ANNUAL STREET SWEEPING, $1,000/YR REGEN VACUUM
– NO CRACK SEALING
– NO PATCHING DUE TO FROST HEAVE OR BASE FAILURE
– NO RESURFACING DUE TO CRACKING, ETC
• TOTAL LIFE CYCLE COST SAVINGS:– $57,750 IF STREET SWEEPING IS DONE ON HMA ANYWAY
– $37,750 IF NO HMA STREET SWEEPING
BASED ON 1 MILE RESIDENTIAL STREET WITH 36’ PAVEMENT WIDTH
![Page 25: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/25.jpg)
REPAIRS AND REPLACEMENT
• UTILITY CUTS, OTHER PATCHING NEEDS
• BASE FAILURES TYPICALLY RARE – BETTER BASE
• CAN REPAIR WITH REGULAR HMA
• CAN REPAIR BY HEATING AND RE-ROLLING
• TO REPLACE – MILL TO CHOKER COURSE
![Page 26: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/26.jpg)
INFILTRATION TOOLKIT: 1. POROUS MIX DESIGNS ARE NOT ALL THE SAME2. HMA WITH PAVERS OR POROUS IS AN OPTION3. INFILTRATION UNDER TRADITIONAL HMA
Easy Street, Ann Arbor, MI
![Page 27: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/27.jpg)
INFILTRATION TOOLKIT #1:
• MIX DESIGN IS IMPORTANT (STRENGTH & DURABILITY GOALS) – AZ-87 30,000vpd
• KEY VARIABLES: – AGG SIZE– FIBER/ADDITIVE– ASPHALT CONTENT
• SEE RESOURCES FOR MIX DESIGN INFO – WASHINGTON DOT, UNH
![Page 28: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/28.jpg)
TOOLKIT #2: SYLVAN AVE, ANN ARBOR, MI
• Reconstructed in 2010• Approx. 825’ long; and 20’ wide.• Scope: Full reconstruction; full replacement of
sidewalks, curb & gutter; construction of permeable HMA section; some infiltration at east 200’ of project, but remainder had an impervious line to prevent flooding of adjacent basements; installation of underdrains below sidewalks with tees to allow connection of sump pumps from individual properties.
• Construction Cost: $385,000
![Page 29: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/29.jpg)
TOOLKIT #2: SYLVAN AVE, ANN ARBOR, MI
![Page 30: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/30.jpg)
INFILTRATION TOOLKIT #2:
![Page 31: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/31.jpg)
INFILTRATION TOOLKIT #2:
Permeable HMA 4” or as designed
Permeable Asphalt Typical Cross Section
![Page 32: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/32.jpg)
INFILTRATION TOOLKIT #2:
POST CONSTRUCTION INFILTRATION
WORST INTENSITY* RAIN IN SE MI: 0.23 in/hr for the 5 minute, 1,000-year storm
5 MIN, 10-Yr storm = 0.11 in/min = .55 in/hr
2 ASPHALT STREETS: 0.25 to 9 in/min = 15 to 540
1 CONCRETE ALLEY: 0.8 to 14 in/min = 48 to 840
3 POROUS LOTS: 11 to 60 in/min = 660+ in/hour
*June 2013 NOAA Atlas 14
![Page 33: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/33.jpg)
INFILTRATION TOOLKIT #3: NO POROUS PAVEMENT
• CITY OF ANN ARBOR, MI 2013 INFILTRATION PAVING
• TRADITIONAL HMA WITH SITE-SPECIFIC BASE INFILTRATION
–FOREST STREET–FOURTH AVENUE–MADISON STREET
![Page 34: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/34.jpg)
West Madison Street Cross Section
![Page 35: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/35.jpg)
![Page 36: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/36.jpg)
FOREST STREET X-SECTION 1
![Page 37: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/37.jpg)
FOREST STREET X-SECTION 2
![Page 38: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/38.jpg)
FOREST STREET LEACHING BASIN
![Page 39: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/39.jpg)
FOURTH AVE. PLAN AND PROFILE
![Page 40: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/40.jpg)
FOURTH AVE. X-SECTION 1
![Page 41: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/41.jpg)
FOURTH AVE. LEACHING BASIN
![Page 42: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/42.jpg)
INFILTRATION TOOLKIT #3: NO POROUS PAVEMENT
• HMA PAVEMENT WITH POROUS BASE
• STRATEGIC INFILTRATION AREAS IN ROW
![Page 44: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/44.jpg)
Street Trees and Planter Design• Tree planting areas often too small• Tree planting areas typically raised• Can be lowered to accommodate stormwater• Many design alternatives
![Page 45: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/45.jpg)
IN CONCLUSION…• UP TO 54% OF POLLUTANTS FROM STREETS• INFILTRATION IS BEST, MOST SUSTAINABLE• MANY OPTIONS FOR INFILTRATION
![Page 46: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/46.jpg)
Acknowledgements
Thank you to the City of Ann Arbor and the University of New Hampshire Stormwater
Center for their support.
![Page 47: Green street maintenance and innovative design](https://reader036.fdocuments.in/reader036/viewer/2022070313/554ad842b4c905ba058b4738/html5/thumbnails/47.jpg)
References/Resources
• http://tinyurl.com/streetrunoff• Porous Pavement Presentation, City of Puyallup, WA– Extra focus on mix
design and aggregate selection for asphalt, choker, and base courses.• Roseen Robert, Thomas Ballestro, et al. Sustainable Stormwater
Management in Road Environments: Porous Asphalt for Local Roads (2010). Accessed 1 Apr. 2013. (University of New Hampshire Stormwater Center)
• City of Ann Arbor. Willard Street Permeable Pavement Project (2012), Madison, Fourth, and Forest Paving Projects (2013). (734) 794-6430
• Resource 3 is a detailed listing of contacts at agencies that have porous pavement installations, and other helpful resources accessed for this presentation.