GR Types Contd

download GR Types Contd

of 27

Transcript of GR Types Contd

  • 7/28/2019 GR Types Contd

    1/27

    1) Project Cost management processes

    a. Estimate cost developing an approximation of proj costb. Determine Budget Aggregation of indic=vidual activity cost or work package cost

    c. Control cost - Monitoring status of project to update project budget.

    2) The ability to influence cost is greatest at the early stages making early scope definition critical.

    3) Cost management plan has the following

    a. Level of accuracyb. Units of measure

    c. Organizational process link

    d. Control thresholde. Rules of performance measurement

    f. Reporting formats and frequency

    g. Process descriptions

    4) Samples Unit of measures for Resourcesa. Staff hours

    b. Staff daysc. Staff weeks

    d. Lump sume. Currency

    NOTE : First 4 are considered to eliminate effect of currency fluctuation

    5) Some earned Value techniques

    a. Weighted milestonesb. Fixed formula

    c. Percent complete

    6) Ways and Times for measuring costs of Aquired items

    a. When acquisition decision is made

    b. When acquisition is commited

    c. Order is placedd. Item is delivered

    e. Actual cost is incurred

    f. Actual cost is recorded

    7) Project Cost management should be concerned about

    a. Cost of resources needed to complete the project

    b. Recurring cost of usingc. Recurring cost of maintaining

    d. Cost of Supporting the product , service , or result of the project

    8) General management techniques used in predicting and analyzing the prospective financial

    performance of the projecta. Return on Investment

    b. Discounted cash Flow

    c. Investment payback analysis

  • 7/28/2019 GR Types Contd

    2/27

    9) Estimation degree

    a. Rough Order of estimation - +-50%b. Definitive - +-10%

    10) Types of resource costa. Labor

    b. Material

    c. Equipment

    d. Servicese. Facilities

    f. Special Category Inflation allowance

    g. Special Category Contingency Costs

    11) Types of cost

    a. Direct Cost b. Indirect Cost Costs that cannot be directly traced to a specific project

    Accumulated and Allocated Equiatbly between multiple projects

    Allocation follows some Approved & documented accounting procedure12) Time Sensitive costs -

    a. Union Labour with regularly expiring collective bargaining agreementsb. Materials with seasonal cost variations

    13) Cost Inputs from Human resource paln

    a. Project staffing attributes

    b. Personnel ratesc. Rewards and Recognition

    14) Cost associated with Risk- Risk mitigation cost

    15) Cost contingency reserves can be

    Used

    ReducedEliminated

    16) basis of estimate is also important output of estimate cost

    17) Funding limits/constraints etc can be got from the Project scope statement

    18) Budget reserve Analysis establishesContingency reserves

    Management resreves

    19) Management reservesa. Budgets reserved for Unplanned changes to project scope and cost

    b. Need prior approval from management for spending

    c. Not part of cost baselined. Part of project budget

    e. Not included as part of EVM

    20) Funding limit reconciliation

    a. Expenditure vs Commitment of Fund

    21) Cost performance baseline

  • 7/28/2019 GR Types Contd

    3/27

    a. Summation of approved budget by time period

    b. Typically displayed as a S curve ( Time vs Cumulative Values)c. In EVM technique its called as performance measurement baseline (PMB)

    22) Project Fundinga. Total Funding requirements

    b. Periodic funding requirements (quarterly, annual)

    23) Project Cost Control includesa. Influence the factors that creates change to the cost baseline

    b. Ensure all change requests are acted in a timely manner

    c. Managing the actual changes when and as they occurd. Ensuring cost expenditure go beyond funding

    e. Monitor cost performance to isolate and understand variances from the approved cost

    baselinef. Monitoring work performance against funds expended

    g. Preventing unapproved changes from being included

    h. Informing appropriate stakeholders of all approved changes and appropriate costi. Acting to bring expected cost runs within acceptable limits

    24) 3 key dimensions developed and monitored in EVM

    a. Planned valueb. Earned Value

    c. Actual Cost

    25) Total PV of a project is BAC

    26) Types of variances

    a. Schedule Variance = EV - PVb. Cost variance = EV AC

    i. ( any negative CV is non-recoverable)

    27) Performance Index

    a. Schedule performance index = EV/PV

    i. < 1 less work was completed than planned

    ii. > 1 more work is completed than plannedb. Cost performance index = EV/AC

    i. < 1 Cost overrun for work completed

    ii. > 1- Cost underrun for work completed

    28) Forecasting EMV

    a. EAC Estimate at Completion

    b. ETCc.

    29) Forecasting the EAC involves making estimates or predictions of condition or events in theprojects future based on the information and knowledge available at the time of the forecast.

    30) Ways of claulating EAC

    a. EAC = AC + bottom-up ETCb. EAC = AC + BAC - EV ( when current cost performance will become better in the

    future )

    c. EAC = BAC/ Cumulative CPI ( when current cost performance continues in the future)

  • 7/28/2019 GR Types Contd

    4/27

    d. EAC = AC + {( BAC EV) / ( cumulative CPI X Cumulative SPI ) } considering bothe

    SPI and CPI

    31) TCPI = (BAC-EV)/(BAC-AC) = Work remaining / Funds remaining

    TCPI =(BAC EV) / (EAC AC)

    32) Performance reviews

    a. Compare cost performance over time

    b. Schedule activities or work packages overrung or Underrunning budgetc. Estimated funds needed to complete the project

    33) Info got in Performance review if EVM is useda. Variance analysis planned vs expected

    b. Trend Analysis improve vs detiortate

    c. Earned Value performance baseline vs actual

    34) Percentage of acceptable variance will decrease as more work is accomplished

    Quality management

    35) Quality management processesa. Plan Quality identify Quality requirement , standards and documenting how they will

    complyb. Perform QA Auditing to see if its followe

    c. Perform Quality control Monitor and record results of executing Quality activities,

    recommend corrective actions

    36. Quality vs grade

    Quality is the degree to which a set of inherent characteristics fulfill requirementsGrade is same functional use but different technical characteristics

    37. Precion vs AccuracyPrecison less scatter

    Accuracy closer to the true value

    38. Quality management approaches bya. Proprietry

    i. Deming PDCA

    ii. Juran iii. Crosby

    b. Non proprietry

    i. TQM

    ii. Six Sigmaiii. Failure mode and Effect Analysis (FMEA)

    iv. Design reviews

    v. Voice of Customervi. Cost of Quality

    vii. Continuous Improvement

    39) Modern Quality management and project management recognize the importance ofCustomer Satisfaction

    Conformance to requirements

    Fitness to usePrevention over Inspection

  • 7/28/2019 GR Types Contd

    5/27

    Quality is planned, designed and built in not inspected

    Cost of preventing mistake is much less than correcting them when found by inspectionContinuous Improvement

    Deming/Shewhart PDCA

    TQM and Six Sigma improve project management and product qualityProcess Improvement Models

    Malcolm balridge

    OPM3

    CMMIManagement Responsibility

    40) Quality Policy OPAa. Use performing organizations policy as is

    b. If no formal policy or multiple performing organization Project management team

    creates onec. Make it aware to all stake holders thru distribute information

    41) Beneifits of Qualitya. Less rework

    b. Increased productivityc. Lower costs

    d. Increased stakeholder/customer satisfaction

    42) Cost of quality

    a. Cost of Conformancei. Prevention Cost (Build a Quality project)

    1. Training

    2. Document processes3. Equipment

    4. Time to do it right

    ii. Appraisal Cost (Assess The Quality)1. testing

    2. Destructive testing loss

    3. Inspections

    b. Cost of non conformancei. Internal Failure Cost ( Failure Found by the Project)

    1. rework

    2. Scrapii. External Failure Cost ( Failure found by the Customer)

    1. Liabilities

    2. Warranty Work

    3. Lost business

    43. Control Charts

    Upper and Lower Specification limit by requirementUpper and Lower Control limit By Project manager and Stakholders- Take corrective action

    44) For repetitive processes the control limits are generally +-3 sigma

    45) Process is out of control when

    Data Point exceeds a control limit7 Consequitive points are above or below the mean

  • 7/28/2019 GR Types Contd

    6/27

    46) Uses of Control chartsa. Monitor various type of output variables

    b. Used most frequently to track repetitive activities required for manufacturing

    c. Monitor Cost and Schedule varianced. Monitor Volume and frequency of Scope Changes

    e. Other management results to Monitor Project management processes

    47 ) benchmarkingCompare Actual or Planned project practices to those of comparable projects

    Within the same org or outside

    Within the same application area or different

    48) Benchmarking helps to

    Identify best practicesGenerate ideas for Improvements

    Provides a basis for measuring performance

    49) DOE

    A statistical method .. Change more than 1 variable at a timeIdentify which factors influence which variable of a process or product

    Used to determine number and type of test to be conductedReduces Sensitivity of product performance to source of variations

    50) Statistical SamplingChoose a population of Interest

    Sample frequency

    Sample size

    51) Flow Charting

    Graphical rep of a processShows relationship among processes

    Help anticipate Quality problems that occur better test cases

    52) All Flowcharts showActivities

    Decision Points

    Order of processing

    53) Additional Quality Planning Tools

    Brainstorming

    Affinity Diagram logical groupingNominal group technique

    Force Field Analysis Diagram of the forces for and against change

    Matrix diagram - factors vs causes or objectivesPrioritization matrices rank a diverse set of problems and/or issues by importance

    54) Quality MetricsA project or product attribute defining a operational definition

    How a Quality control process will measure it

    55) Sample of Quality metrics

  • 7/28/2019 GR Types Contd

    7/27

    On-time performance

    Budget controlDefect frequency

    Failure rate

    AvailabilityReliability

    Test Coverage

    56) Process boundariesPurpose of process

    Start and end of process

    Inputs and OutputsData Required

    Owner / Stakeholder

    57) Quality Audit

    Identify best practices and share them

    Identify gap/short comingsProactively improve process

    Highlight contribution of each audit

    58) Quality Audits can beScheduled or Random

    Internal or External

    59) Quality Audits can confirm the implementation of approved change requests including corrective

    action, preventive action, defect repair

    60) Process Analysis

    Examine Problems experienced

    Constraints experiencedNon value added activities

    61) Root Cause analysis

    Identify the problemDiscover underlying causes

    Develop preventive actions

    62) Prevention vs Inspection

    63) Sampling

    Attribute Sampling ( result conforms or does not)Variables Sampling measures degree of conformity)

    64) Tolerance vs Control limit

    65) Ishikawas 7 basic tools of Qality

    Cause and Effect DiagramC

    F

    HP

  • 7/28/2019 GR Types Contd

    8/27

    R

    SS

    66) HistogramX axis attribute or characterisc

    Y frequency

    Common cause of problems - Tallest

    66) Pareto

    Histogram ordered by freq of occurrence

    Rank ordering to focus corrective action80/20 ANALYSIS

    67) Run ChartData poimts plotted in the order they cocur

    Show History and pattern of variation

    ShowTrends in a process over time

    Variation over timeDeclines or improvements over time

    68) Trends Analysis

    Use Run charts

    Involves mathematical technique to forecast future outcomes based on historical infoUsed to monitor

    Technical performance

    Cost and Schedule performance

    69) Scatter Diagram

    Shows relationship between 2 variablesStudy and identify relationship between 2 variables

    Plot Dependent variable

    Plot Independent variable

    The Closer they are are to the diagonal line the more closely they are related

    70) lessons learnt are documented throught the project life cycle but at a min during closure

    71) Validated Deliverables

    - Deliverables checked for correctness

    Validated Change

    - Changed or repaired items are inspected- Accept if ok

    - Reject if not Send to rework

    - Provide notification of the decision

    72) HR management process

    Develop Human resource Plan - identifying and documenting project Roles and RespRequired Skills

    Reporting relationships

    Creating a Staff Managmengment PlanAcquire team Confirming Availability and obtaining the team

  • 7/28/2019 GR Types Contd

    9/27

    Develop project team Improve Competencies, team interaction, And overall team environment

    Manage Project team Track team member performance, providing feedback, resolving issues,managing changes to optimize project performance

    73) Other names for Project management team

    a. Core team

    b. Executive team

    c. Leadership team

    74) Role of Project Sponsor

    a. Assists the Project management team ini. Project Funding

    ii. Clarifying Scope

    iii. Monitoring progressiv. Influencing others in order to benefit the project

    75) Human resource factors that impact the project

    a. Team environmentb. Geographical location of team members

    c. Communication among stakeholdersd. Internal and External politics

    e. Cultural issues

    f. Organizational Uniqueness

    76) The Management team should make sure that the project team does the following regarding

    professional ethicsa. Aware of

    b. Subscribe to

    c. Ensure all team members follow

    77) Things in the HR plan

    a. Project roles and responsibilities

    i. Roles (Designation)ii. Authority (Rights)

    iii. Responsibilities

    iv. Competencies (skill and capacity)b. Project Organization Chart

    c. Staffing management plan

    i. Staff acquisition

    ii. Resource Calendars ( resource histogram)iii. Staff Release plan ( Monitor cost, boost morale)

    iv. Identification of training needs ( Increase competencies, certifications)

    v. Plans for Rewards and Recognitionvi. Compliance Consideration ( Union contract, govt regulation, other HR policies)

    vii. Safety issue (protection)

    d. Team building strategies

    e. Impact of the staffing management plan on the organization

    78) Types of Roles and responsibility charts

  • 7/28/2019 GR Types Contd

    10/27

    a. Hierarchical

    b. Matrixc. Text-oriented

    79) Places where we can find Roles and responsibilitiesa. Organizational Chart

    b. Subsidary plans like

    i. Risk, - Risk Owners

    ii. Quality or Who is responsible for QA , QCiii. Communication - Who is responsible for communicating

    80) Types of Hierarchichal Type Resource Charts

    a. WBS

    b. OBSc. RBS

    81) Types of matrix resource Chartsa. RAM responsibility Assignement Matrix

    i. High level Ram Bu groupsii. Low level RAM By Roles, resp, authority

    82) Types of RAM

    a. RACI

    b. By leadsc. By resource designation

    83) usual information contained in Text oriented forma. responsibilities

    b. authority

    c. competenciesd. qualifications

    84) Other names of text type formats

    a. Position Description formb. Roles-Responsibility-Authority forms

    85) Networking is thea. Formal and Informal interaction

    b. With others in an

    i. Organization

    ii. Industryiii. Professional Environment

    c. Constructive Way to understand political and Interpersonal factors that effect staffing

    management

    86) Human Resources networking Activities

    a. Proactive Correspondenceb. Luncheon meeting

    c. Informal Conversation

    d. Meetings and Eventse. Trade Conferences

  • 7/28/2019 GR Types Contd

    11/27

    f. Symposia

    87) Uses of Networking

    a. Useful technique at the beginning of project

    b. Effective way to enhance Project management professional development during theproject and after it ends

    88) Organizational theory provides information regarding the way in which people, team and

    organizational units behave

    89) Uses of knowing Organizational theory

    a. Shortens the time cost and effort needed to create HR plan outputs

    b. The likelihood the plan is effective increases

    90) Resource Histogram

    a. X axis , resource or by calendar

    b. Y axis max number of hours available

    91) Apply following resource leveling strategies when bars go beyond max hours availablea. Add More resources

    b. Modify schedule

    92) factors that may affect the Project management team in team members selection

    a. Collective bargaining agreementsb. Use of Subcontractor personnel

    c. Matrix project environment

    d. Internal or External reporting relationshipse. Other reasons

    93) factors to be considered during project acquiringa. PM should negotiate and influence in acquiring

    b. HR acqusiotion results in proj success failures

    c. Should settle for alternative resources if not available

    94) Acquire Project team

    a. Pre Assignement (selected in advance )

    i. Becos they were promised as a part of a competitive proposalii. Project needs some expertise

    iii. Staff assignments defined in the charter

    b. Negotiation

    i. Negotiate with Functional managerii. Negotiate with Performing organization

    iii. Negotiate with External orgs, Contractors,

    c. Acquisitioni. Hire Individual Consultants

    ii. Sub contract

    d. Virtual teams

    95) Virtual teams becos

    a. Teams in Diff geo areasb. Expert in diff geo area

  • 7/28/2019 GR Types Contd

    12/27

    c. Work from home

    d. Disabilitiese. Different shifts

    f. Save Travel Expenses

    96) Important Considerations for Virtual teams

    a. Communication Planning - most imp

    b. Set expectation

    c. Facilititate communicationd. Develop protocol for resolving conflict

    e. Include people in-decision making

    f. Share credit in success

    97) technology used in Virtual teams

    a. e-mailb. Audio conferencing

    c. Video conferencing

    d. Web-Based meetings

    98) Types of Project Staff assignment documentation

    a. Project team directoryb. Memos to team members

    c. Names inserted in proj management plan ( like Organization Charts and schedules)

    99) factors to concentrate to create reliable Resource calendars/ schedule

    a. Good Understanding of each persons schedule conflictb. Including Vacation times

    c. Including Other Project time

    d. Document team members availability

    100) High Team performance can be achieved using

    a. Open and Effective communicationb. Developing trust among team members

    c. Managing conflicts in a constructive manner

    d. Encouraging Colobarative problem solvinge. Encouraging Colaborative decision-making

    101) PM roles to foster teamworka. Create an environment which facilitates team work

    b. Motivate team by providing challenges and opportunities

    c. Provide timely feedbackd. Provide timely support as needed

    e. Recognize and reward good performance

    102) Objectives of developing team

    a. Improve Knowledge and skills of team members

    b. Improve feeling of trust and agreement among team membersc. Create a dynamic and cohesive team culture

  • 7/28/2019 GR Types Contd

    13/27

    d. Allows cross training

    e. Allows mentoring

    103) Develop project team Tools and techniquesa. Interpersonal skill (soft skills)

    b. Training

    c. Team Building activities

    d. Ground Rulese. Co-location

    f. Recognition and rewards

    104) soft skills

    a. Empathy

    b. Influencec. Creativity

    d. Group facilitation

    e. Understand sentimentsf. Anticipate actions

    g. Acknowledge their concersh. Followup on their issues

    105) Training

    a. Formal vs Informal

    b. Scheduled vs Unplannedi. Scheduled : as per HR plan

    ii. Unplanned

    1. as a result of observation2. As a result of conversation

    3. as a result of Project performance appraisals during managing

    106) Team Building activities

    a. Simple 5 minute agenda in a status review meeting

    b. Professionaly facilitated experience

    107) To build effective project teams, PM should

    a. Obtain Top management support

    b. Obtain Commitemnt of team membersc. Introduce appropriate rewards and recognition

    d. Create a team identity

    e. Manage conflict effectively

    f. Promote trust and open communication among team membersg. Provide good ledership

    108) 5 stages of team developmenta. Forming

    b. Storming

    c. Normingd. Performing

    e. Adjourning

    109) Duration of a team development stage depends on

  • 7/28/2019 GR Types Contd

    14/27

    a. Team size

    b. Team dynamicsc. Team leadership

    110) Ground Rulesa. Acceptable behaiour

    b. Decreases misunderstanding and increases productivity

    c. Helps discover values important to one another

    d. All team members enforce it

    111) Co locationa. Temporary only during strategic important times in the project

    b. Entire Project

    112) Co location strategies

    a. Team meeting roomb. Places to post schedules

    c. Other conveniences that enhance Communicationd. Other conveniences that enhance a sense of community

    113) Rewards and recognition

    a. Should satisfy need values by the individualb. Consider Cultural differences

    c. Reward only desirable behaviour

    d. Should not be Win-Lose or zero Sum awards ie be acheivble by all

    114) Types of rewards

    a. Tangiblei. Money

    b. In Tangible

    i. Opportunity to Grow, accomplish

    ii. Opportunity to apply their professional skills to meet new Challengesiii. Public recognition of Good performance

    115) Team assement fill up later bored116) Manage Project team tools and techniques

    a. Observation and Converstaion

    b. Project Performance appraisals

    c. Conflict managementd. Issue Log

    e. Inter personal skills

    117) Objectives for conducting Performance appraisals

    a. Clarification of roles and responsibilities

    b. Constructive feedback to team membersc. Discovery of unknown or Un resolved issues

    d. Development of individual training plans

    e. Establish specific goals for the future

  • 7/28/2019 GR Types Contd

    15/27

    118) Sources of Conflict

    a. Scarse resourcesb. Scheduling priorities

    c. Personal work styles

    119) Ways to reduce conflict

    a. Team ground rules

    b. Group norms

    c. Solid project management practices like communication planning and role definition

    120) Conflict resolution

    a. First Project team membersb. If escalated , PM should facilitate resolution

    121) Addressing Conflicts

    a. Early

    b. In privatec. Direct colborative approach

    d. If distruptive follow formal procedures including disciplinary action

    122) Characteristics of conflict and conflict management processa. Natural and forces a search of alternatives

    b. Is a team issue

    c. Openness resolves conflictd. Focus on issues not personalities

    e. Focus on present not past

    123) factors that Influence Conflict resolution methods

    a. Importance

    b. Intensityc. Urgency / Time pressure

    d. Position of players involved

    e. Motivation to solve it on a long term or short term basis

    124) 6 GENERAL TECHNIQUES for resolving conflict

    a. Withdrawing/Avoiding

    b. Smoothing/Accomodating = emphasize areas of agreementc. Compromising brings some degree of satisfaction

    d. Forcing

    e. Collaborating Multiple viewpoint, perspectives then consensus

    f. Confronting/Problem Solving Examine alterantiave , give and take , open dialog

    125) Issue log

    a. Issueb. Responsible person

    c. Target Date

    d. Issue resolution

    126) Interpersonal skills

    a. Leadershipb. Influencing

  • 7/28/2019 GR Types Contd

    16/27

    c. Effective Decision making

    127) Key influencing skills see page 240

    128) Staffing changesa. By Choice or Uncontrolled

    b. Includes

    i. Moving people

    ii. Outsourcing some workiii. Replacing team members who leave

    129) Communication Management includes the timely and appropriate

    a. Generation

    b. Collectionc. Distribution

    d. Storage

    e. Retrievalf. Ultimate disposition

    Of project information

    130) Project Communication Management processesa. Identify stake holders Identifying and Documenting their I I I

    b. Plan communication Determine stakeholder Information needs and Defining a

    communication approachc. Distribute Information Making information available as planned

    d. Manage Stakeholder Expectations Communicate and Working with stakeholder to meet

    their needs and addressing issues as they occure. Report performance Collect and Distribute Performance Info(status report, forecasts,

    Progress measurement)

    131) Type of Communication

    a. Type 1

    i. Internal Within the project

    ii. External Other Projects, media, public , Customerb. Type 2

    i. Formal Reports , memos , briefings

    ii. Informal email, ad-hoc discussionc. Type 3

    i. Vertical Up and Down the org

    ii. Horizontal With peers

    d. Type 4i. Official Newsletter, Annual report

    ii. Unofficial Of the record communication

    e. Type 5i. Wriiten

    ii. Oral

    f. Type 6i. Verbal

    ii. Non verbal Voice Inflections, Body Language

    132) Stakeholder handling strategy

  • 7/28/2019 GR Types Contd

    17/27

    a. Maximize positive influences

    b. Mitigate potential negative impacts

    133) Stake Holder Analyis

    a. Identify all stake holders Their III, Roles, departments, Knowledge level, expectationi. Done by Interviewing

    b. Classify them

    i. Power Interst

    ii. Power Influenceiii. Influence Impact

    iv. Salience

    1. Power (ability to influence their will)2. Urgency ( Need for Immediate attention)

    3. legitimacy ( Involvement is appropriate)

    c. Asses how they respond in various situation in order to plan to influence them

    134) Power Interest grida. Low Interest Low Power Monitor

    b. Low Interest High Power keep Satisfiedc. High Interest Low Power Keep Informed

    d. High Interest High Power Manage Closely

    135) Getting Expert Judgement

    a. Individual Consultationi. One on One meeting

    ii. Interview

    b. Panel formati. Focus groups

    ii. Surveys

    iii. Etc

    136) Stake holder register has

    a. Identification Info

    b. Assesment infoc. Stake Holder Classification

    i. Internal / External

    ii. Supportor/ neutral/ resistor

    137) Stake Holder management strategy

    a. Key stakeholders

    b. Level of participation desiredc. Stake holders and their management (as groups)

    138) Plan Communicationa. Who needs what

    b. When

    c. Who will give it to themd. How will it be given to them

    139) Problems dues to Improper Communicationa. Delay in message delivery

  • 7/28/2019 GR Types Contd

    18/27

    b. Communication of sensitive info to wrong audience

    c. Lack of communication

    140) Types of Communication

    a. Effective Info is providedi. In the right time

    ii. Right format

    iii. Right Impact

    b. Efficienti. Providing only the information which is needed

    141) Plan Communication Tools and Techniquesa. Communication Requirement Analysis

    b. Communication Methods

    c. Communication technologyd. Communication Models

    142) Communication requirement Analysis

    a. N * (n-1)/2b. Who gets what

    143) Communication Methods influencing factors

    a. Urgency

    b. Staffing ( Expertise and Experience)c. Availability ( Access to)

    d. Duration

    e. Project Environment (face to face or virtual)

    144) Communication Model Components

    a. Sender b. Receiver

    c. Medium

    d. Message

    e. Noisef. Encode

    g. Decode

    h. Feedbacki. Feedback message

    j. Acknowledge

    k. response

    145) Example of Noise

    a. Distance

    b. Unfamiliar technologyc. Lack of background information

    146) Communication model responsibilitiesa. Sender - Information is clear and Complete so that the receiver can receive it correctly

    Confirming its properly understood

    b. Receiever Information is received in its entiretyUnderstood correctly

  • 7/28/2019 GR Types Contd

    19/27

    Acknowledged

    147) Communication methods

    a. Interactive - meetings, phone calls, video confrencing

    b. Push - letters, memos, reports, email, faxes, voice mails, press releases etcc. Pull Intranet, online learning, knowledge repositories

    148) When pull communication is useda. Large Volumes of Info

    b. Large Audiences

    c. Access at their own discretion

    149) Contents of a Communication management plan 0- refer page 257

    150) Effective Information Distribution techniques

    a. Sender receiver Modelsb. Choice of media

    c. Writing styled. Meeting management technique

    e. Presentation techniquef. Facilitation techniique

    151) Distribute Information Communication methods

    a. Individual/Group meeting

    b. Video and Audio conferencesc. Computer Chats

    d. Remote communication

    152) Information Distribution Tools

    a. Hard-copy documents

    b. Electronic communication and conferencing toolsc. Electronic tools for Project management

    153) Types of Logsa. Issue Log

    b. Change Log

    154) Variance analysisa. Verify Quality of Info

    b. Determine variance

    c. Determine the impact of the variances

    155) Categories of forecasting methods

    a. Time Series methods Use historical data for future out comeb. Causal/econometric - Forecast using influencing underlying factors

    c. Judgemental method Intuitive judgement, opinion and probability estimates

    d. Other methods

  • 7/28/2019 GR Types Contd

    20/27

    156) Eg of Time Series Method

    a. Earned valueb. Moving average

    c. Extra polation

    d. Linear predictione. Trend estimation

    f. Growth Curve

    157) Eg of causal/ Econometrica. Regression analysis using linear or non linear regression

    b. ARMA autoregressive moving average

    c. Econometrics

    158) Eg of judgemental methods

    a. Composite forcastsb. Surveys

    c. Delphi method

    d. Scenario buildinge. Technology forecasting

    f. Forecast by analogy

    159) Eg of other methodsa. Simulation

    b. Probabilistic forecasting

    c. Ensemble forecasting

    160) Objectives of risk management

    a. Increase the probability and impact of positive eventsb. Decrease the probability and Impact of negative events

    161) Risk management processesa. Plan risk management

    b. Identify risks

    c. Perform Quality Risk Analysis

    d. Perform Quantitative risk Analysise. Plan Risk responses

    f. Monitor and Control risks

    162) cause of risk

    a. requirement

    b. assumption

    c. constraintd. condition

    163) Risksa. In the future

    b. Uncertain

    c. Has impact on atleast one project ojectived. Has one or more causes

    e. Has one or more impacts

    164) Project or Org Environment factors that could contribute to risk

  • 7/28/2019 GR Types Contd

    21/27

    a. Immature project management practices

    b. Lack of integrated management systemsc. Concurrent multiple projects

    d. Dependency on external participants who cannot be controlled

    165) Risk tolerance

    a. Helps determine Threats allowed

    b. Should balance with rewards

    166) Plan Risk Tool Planning meeting and Analysis

    a. Held by project teams

    b. To develop Risk management planc. High level plans for conducting risk management activities discussed

    d. Risk management Cost elements discussed

    e. Risk schedule activities discussedf. Risk management responsibities assigned

    g. Organizational templates tailored or generated to specific project

    167) Risk management plan

    a. Methodolgyb. Roles and responsibilities

    c. Budegtingd. Timing

    e. Risk categories ( eg as a RBS)

    f. Definition of Risk Probability and Impactsg. Probability and Impact Matrix prioritize to high moderate low

    h. Revised Stakeholder Tolerances

    i. Reporting formatsj. Tracking

    168) RBSa. Identified project risks

    b. Arranged by category and subcategory

    c. That identifies the various areas and causes of potential risks

    169) Identify Risk

    a. Determine which risks affect the project

    b. Documenting their characteristics

    170) Identify Risks Tools and Techniques

    a. Documentation reviewsb. Information gathering technique

    c. Checklist Analysis

    d. Expert Judgemente. Diagramming techniques

    f. Assumption Analysis

    g. SWOT analysis

    171) Documenattion review Review of Documents

    a. Plansb. Assumptions

  • 7/28/2019 GR Types Contd

    22/27

    c. Previous project files

    d. Contractse. Other information

    172) Information gathering techniquesa. Brainstorming

    b. Interviewing

    c. Root Cause Analysis

    d. Delphi technique

    173) Root cause analysis

    a. Identify a problemb. Discover the underlying causes that lead to it

    c. Develop preventive action

    174) Delphi Technique

    a. Facilitator prepares a questionnaire

    b. Circulated to anonymously to Risk expertsc. Get Responses

    d. Responses are summarizede. Recirculated to experts for further comments

    f. Repeat till consensus is reached

    175) Brainstorming

    a. Free form ideas contributed by participantsb. Structured mass interviewing like Nominal Group tech

    176) Checklist Analysis prepare checklist froma. Historical Info

    b. Lowest level of RBS

    177) Assumption Analysis Risks identified from Assumptions

    a. Inaccuracy

    b. Instability

    c. Inconsistencyd. Incompleteness

    178) Diagramming techniques

    a. Cause and Effect diagram

    b. System or Process flow chart

    c. Influence Diagram

    179) SWOT analysis

    a. Identify strength and weakness of organization ( Performing or Wider business) throughtechniques like brainstorming

    b. Analyze Opportunities from strengths

    c. Analyze Threats from weaknessd. Analyze degree to which strengths offset Threats

    e. Analyze degree to which opportunities may overcome wekness

    180) Risk register

  • 7/28/2019 GR Types Contd

    23/27

    a. List of identified Risks

    i. EVENT IMPACTii. CAUSE,EVENT - EFFECT

    b. List of potential Responses

    181) Projects having more uncertainities / risks

    a. State of the art

    b. First of its kind

    c. Highly complex

    182) Qualitative Risk Analysis Tools and Techniquesa. Risk probability and Impact Assesment

    b. Probability and Impact matrix

    c. Risk data Quality Assesmentd. Risk categorization

    e. Risk Urgency Assesment

    f. Exper Judgement

    183) P&I Risk ratinga. Diff rating for cost, schedule, scope

    b. Overall rating for each riskc. Organization rating

    d. Project rating

    184) Risk responses

    a. Hig risk Threats

    i. Priority actionii. Aggressive responsive strategies

    b. Low risk threats

    i. Add to watch listii. Add a contingency reserve

    c. High Risk Opportunities

    i. Targetted

    d. Low risk Opportunitiesi. Monitored

    185) Risks categorizationa. By Source (using RBS)

    b. By Areas of Project affected (Using WBS)

    c. Other useful category (By Project Phases)

    186) Quantitative Risk Analysis Numerically analyzing the effect of identified risks on

    overall project objectives

    187) Perform Quantitative Risk analysis should be repeated after ( to check if risks have been

    reduced)

    a. Plan Risk responsesb. Monitor and Control Risks

    188) Quantitative risk Analysis Tools and techniquesa. Data gathering and Representation techniques

  • 7/28/2019 GR Types Contd

    24/27

    b. Quantitative Risk analysis and Modelling techniques

    c. Expert Judgement

    189) Data gathering and Representation techniquesa. Interviewing ( eg give an estimate of optimistic, pessimistic and most likely estimates)

    b. Probability Distributions

    190) Quantitative Risk analysis and Modelling techniquesa. Sensitivity Analysis

    i. Which risks have the most impact

    b. Expected Monetary Value Analysis

    c. Modelling and Simulation

    191) Types of Proabaility Distribution

    a. Continuous Probability Distribution

    i. Betaii. Triangular

    b. Discrete Distributionc. Uniform Distribution

    d. Normal Distributione. Lognormal Distribution

    192) Tornado diagram

    a. Compare Uncertain and certain/Stable Variables

    b. Compare relative importance and Impact

    193) EMV

    a. Analysis Under Uncertainityb. Opportunities Positive

    c. Threats negative

    d. EMV = Sum of (Value of each Possible Outcome (Impact) * Probability of accurance)

    e. Eg decision tree analysis

    194) Modelling and Simulation see page 299

    195) Rissk responses have to bea. Appropriate

    b. Cost effective

    c. Realistic

    d. Agreed upone. Owned by 1

    f. Timely

    200) Plan risk responses Tools and techniques

    a. Strategies for Negative risks

    b. Strategies for Positive Risksc. Contingent response Strategies

    d. Expert Judgement

    201) Strategies for negative Risks

  • 7/28/2019 GR Types Contd

    25/27

    a. Avoid

    b. Transferc. Mitigate

    d. Accept

    202) Avoid

    a. Involves changes to PM Plan

    b. Shut down project

    203) Transfer

    a. Ownership of Response to third partyb. Management of response to third party

    204) Eg of Risk transference toolsa. Insurance

    b. Performance Bonds

    c. Warrantiesd. Guarantees

    e. Contracts

    205) Mitigatea. Reduction in probability

    b. Reduce Impact

    206) Eg of Mitigation Options

    a. Adopting less Complex processs

    b. Conducting more testsc. Choosing a more stable supplier

    d. Prototype development

    207) Mitigation strategies

    a. Reduces severity of Impact

    b. Targets factors that determine severity

    208) Accept

    a. Passive Acceptance

    i. No actionii. Just document the risk

    iii. Wait for it to happen

    iv. Project team handles it when it happens

    b. Active Acceptence

    i. Establish a Contingency reserve

    ii. Reserve can be Time, Cost,. Or Resources

    209) Strategies for Positive Risks or Opportunities

    a. Exploit - make sure it really happens probabilityb. Share

    c. Enhance

    d. Accept

  • 7/28/2019 GR Types Contd

    26/27

    210) eg of Exploit

    a. assign talented resource to finish fastb. assign talented resource to lower cost

    211) Sharinga. Allocate or share ownership with someone who is best able to capture the opportunity

    b. All parties gain from the action

    212) Eg of Sharing Actionsa. Forming Risk-sharing partnerships. teams

    b. Special purpose companies

    c. Joint ventures

    213) Enhance

    a. Increase Impactb. Identify and maximize key drivers

    214) Accept Opportunitiesa. Take advantage when it comes

    b. Dont pursue

    215) Contingent response strategiesa. Execute only under some conditions

    b. Event triggers should be defined an Tracked

    216) Types of Risks

    a. Known Risks

    b. Unknown Rosksc. Residual risks

    d. Secondry Risks

    217) Types of Risk Plan

    a. Contingency Plan

    b. Fall back Plan

    218) Eg of Enhance

    a. Adding more resources to finish early

    219) Monitoring and Controlling Risks

    a. Implementing Risk response plan

    b. Tracking identified risksc. Monitoring residual risks

    d. Identifying new Risks

    e. Evaluating Risk process effectiveness throughout the project

    220) assessed Risk

    a. Can Changeb. Can retire

    221) Risk Response Ownersa. Reports periodically to the PM on the effectiveness of the plan

  • 7/28/2019 GR Types Contd

    27/27

    b. Reports any unanticipated effects

    c. Reports correction needed to handle the risk appropriately

    222) Monitor and Control Risks Tools and techniques

    a. Risk Reassesmentb. Risk audits

    c. Variance and Trend analysis

    d.

    223) Risk Reassesment

    a. Identify new risks

    b. Reassess Current Risksc. Closing of Outdated Risks

    224) Risk Audit

    225) Corrective Risk Actionsa. Contingency plans

    b. Workarounds not planned initially