GOES-R Program Calibration and Validation

1
GOES-R Program Calibration and Validation Robert A. Iacovazzi, Jr.* (1), Edward C. Grigsby (1), Steve Goodman (2), Changyong Cao (3), Jaime Daniels (3), and Kathleen McIntyre (1) NASA (1), NOAA/NESDIS/GOES-R (2), and NOAA/NESDIS/STAR (3) E-mail[email protected] Physical Address - NASA GSFC, Code 410.0, 8800 Greenbelt Rd, Greenbelt, MD 20771 PRE-LAUNCH INSTRUMENT CALIBRATION and L1B ALGORITHM DEVELOPMENT Government Validation of Vendor Cal Testing GOES-R Flight Project and Calibration Working Group (CWG) Give feedback regarding vendor cal test plans and readiness Analyze vendor cal test reports for fidelity US National Institute of Standards and Technology (NIST) • Support design of Système international d'unités (SI) traceable calibrations of ABI and EXIS • Establish SI-traceability to primary standards through NIST supported testing • Independently validate mission-critical component performance, e.g., SRF • Review vendor cal plans and test setups to ensure they meet NIST best practices Laboratory Instrument Calibration (Cal) • Verify instrument cal and product requirements are satisfied • Determine values of semi-static L1b algorithm input parameters • Ensure instrument performance is well understood Radiometric Characterization & Calibration Spectral Response Function (SRF) Image Navigation & Registration Spatial Resolution & Response Response linearity and dynamic range Signal-to-Noise, NEDN, and Coherent Noise Radiometric repeatability to a stable and uniform scene Irradiance to radiance transfer (VNIR) External/Internal calibration target comparison (TIR) Polarization (VNIR) Optical and electronic cross talk In-flight electronic calibration Blooming Quantization step size Hot, marginal and dead pixels Envelope Uniformity over the focal plane detector array Out-of-band response Uncertainty Inference of possible SRF shifts System-level and integrated component- level consistency Navigation (including star sensing) Frame-to- frame, within frame, swath- to-swath, and channel-to- channel registration System modulation transfer function Spatial response uniformity (e.g., response vs. scan angle) Ringing from a sharp edge Near and far field scatter Ghosting Pointing knowledge Instrument manufacturers design and perform cal tests, and this table lists cal-related ABI testing carried out by Exelis. L1b Tiger Team Mandate Proactively identify and mitigate risks L1b Tiger Team Meetings Instr . Vendo r L1b Dev Gov’t Instr Manage r Gov’t CWG/Flig ht L1b Validato n L1b Alg and Test Data and RFA Responses Porta l RFA & RFA Respons es L1b Alg Reviews and RFA Gov’t GS Manage r L1b Alg and Test Data and RFA Responses RFA & RFA Respons es L1b Alg and Test Data and RFA Respons es L1b Alg and Test Data and RFA Responses L1b algorithm implementation process (RFA – Request for Action) Key L1b Algorithm Quality Assurance • Evaluate L1b algorithm completeness • Identify, track, and resolve L1b algorithm issues • Assess Ground Segment vendor L1b algorithm implementation • Develop instrument calibration data and product metadata definitions GS Vendo r L1b Imple m On-Board Cal Devices Vicarious Targets Space-based Inter- Calibration ABI IR Cal (NEDT[@300K]: 0.1K all but 13.3 mm, 0.3K for 13.3 mm) – Blackbody VNIR Cal (SNR 300:1 @ 100% Albedo) - Solar Diffuser Self-Emission - Space View Electronics Linearity - Electronic Stimulus VNIR Cal - Moon, Stars, Deserts, Test Sites, Deep Convective Clouds (DCCs), Rayliegh Scattering, etc. MTF, B2B Reg - Moon VNIR/IR Cal - GEO and LEO Imagers Spectral Cal Hyperspectral Sounders GLM None Response Cal - DCCs, Deserts, Sun-glint Response Cal - GEO and LEO Imagers EXIS Response Linearity - Light Sources Dark Measurements and Flatfields - Off-point Mechanism Electronics Linearity - Electronic Stimulus Response Flatfield - Sun Response Cal GEO Solar Sensors SUVI Aliveness - Light Source Dark Measurements and Flatfields - Off-point Mechanism Out-of-band Rejection - Glass/Analysis Filters Electronics Linearity - Electronic Stimulus Response Flatfield - Sun Response Cal - EXIS and other GEO Solar Sensors (e.g., SDO/EVE) SEISS Electronics Linearity - Electronic Stimulus None Response Cal GEO Particle Sensors MAG Electronics Linearity - Electronic Stimulus None Response Cal - GEO Mag Sensors POST-LAUNCH CALIBRATION/VALIDATION (CAL/VAL) GOES-R observatory on-orbit cal/val assets Calibration Processes to transform raw GOES-R instrument data into L1b measurements … the fundamental building blocks for all L2+ products. Validation - Provides user confidence that GOES-R data can be used for their intended purpose, e.g., weather forecasting or numerical weather prediction. Example comparison between GOES-R CWG and Vendor cal test analyses: Ratio of CWG to Exelis cal coefficients for ABI reflective channels. Before (left) and after (right) Government- Vendor reconciliation of scan mirror reflectance value used in ABI test data analysis. Post-Launch Testing (PLT) Cal/Val • Validate that instrument cal and product performance supports a system that meets its intended purpose in its intended environment as outline in the GOES-R Concept of Operations • Resolve instrument cal and product performance anomalies to the degree possible as they arise • Create a “state-of-the-cal” snapshot for long-term instrument/product performance trending GOES-13 Hemispheric Image Tiles Product quality evaluation Ch. 2 Ch. 3 Ch. 5 Ch. 4 Ch D et A verage G O ES-10 Prelaunch (K ) G O ES-10 O n- O rbit(K ) 2 A 0.1163 0.0933 B 0.1259 0.1007 3 --- 0.1480 0.1324 4 A 0.0725 0.0703 B 0.0771 0.0757 5 A 0.1573 0.1516 B 0.1568 0.1506 On-board calibration system evaluation Determine and Correct Scan-Angle Dependent Radiance (e.g., Beaucom et al., Proceedings of SPIE, 1999) Instrument Noise, Blackbody Temp and Cal Slope Monitoring GOES-13 eclipse season stray light before fix (left) and after fix (right) (Courtesy of J. Paul Douglas, OSPO) On-orbit calibration and L1b anomaly resolution GOES-10 Ch. 4A

description

GOES-R Program Calibration and Validation. Calibration – Processes to transform raw GOES-R instrument data into L1b measurements … the fundamental building blocks for all L2+ products. - PowerPoint PPT Presentation

Transcript of GOES-R Program Calibration and Validation

Page 1: GOES-R  Program Calibration and Validation

GOES-R Program Calibration and ValidationRobert A. Iacovazzi, Jr.* (1), Edward C. Grigsby (1), Steve Goodman (2), Changyong Cao (3),

Jaime Daniels (3), and Kathleen McIntyre (1)NASA (1), NOAA/NESDIS/GOES-R (2), and NOAA/NESDIS/STAR (3)

[email protected] Physical Address - NASA GSFC, Code 410.0, 8800 Greenbelt Rd, Greenbelt, MD 20771

PRE-LAUNCH INSTRUMENT CALIBRATION and L1B ALGORITHM DEVELOPMENT

Government Validation of Vendor Cal TestingGOES-R Flight Project and Calibration Working Group (CWG)• Give feedback regarding vendor cal test plans and readiness• Analyze vendor cal test reports for fidelityUS National Institute of Standards and Technology (NIST)• Support design of Système international d'unités (SI) traceable calibrations of ABI and EXIS• Establish SI-traceability to primary standards through NIST supported testing• Independently validate mission-critical component performance, e.g., SRF• Review vendor cal plans and test setups to ensure they meet NIST best practices

Laboratory Instrument Calibration (Cal)• Verify instrument cal and product requirements are satisfied• Determine values of semi-static L1b algorithm input parameters• Ensure instrument performance is well understood and documented

Radiometric Characterization & Calibration

Spectral Response

Function (SRF)

Image Navigation & Registration

Spatial Resolution &

Response• Response linearity and dynamic

range• Signal-to-Noise, NEDN, and

Coherent Noise• Radiometric repeatability to a stable

and uniform scene• Irradiance to radiance transfer

(VNIR)• External/Internal calibration target

comparison (TIR)• Polarization (VNIR)• Optical and electronic cross talk• In-flight electronic calibration• Blooming• Quantization step size• Hot, marginal and dead pixels

• Envelope• Uniformity over

the focal plane detector array

• Out-of-band response

• Uncertainty• Inference of

possible SRF shifts

• System-level and integrated component-level consistency

• Navigation (including star sensing)

• Frame-to-frame, within frame, swath-to-swath, and channel-to-channel registration

• System modulation transfer function

• Spatial response uniformity (e.g., response vs. scan angle)

• Ringing from a sharp edge

• Near and far field scatter

• Ghosting• Pointing

knowledgeInstrument manufacturers design and perform cal tests, and this

table lists cal-related ABI testing carried out by Exelis.

L1b Tiger Team Mandate Proactively identify and mitigate risks

associated with implementing L1b algorithms

L1b Tiger Team Meetings

Instr. Vendor

L1b Dev

Gov’t Instr

Manager

Gov’t CWG/Flight

L1b Validaton

L1b Alg and Test Data and

RFA Responses

Portal

RFA & RFA Responses

L1b Alg Reviews and RFA

Gov’t GS ManagerL1b Alg and

Test Data and RFA

Responses

RFA & RFA Responses

L1b Alg and Test

Data and RFA

Responses

L1b Alg and Test Data and RFA Responses

L1b algorithm implementation process (RFA – Request for

Action)

Key L1b Algorithm Quality Assurance

• Evaluate L1b algorithm completeness

• Identify, track, and resolve L1b algorithm issues

• Assess Ground Segment vendor L1b algorithm implementation

• Develop instrument calibration data and product metadata definitions

GS Vendor

L1b Implem

On-Board Cal Devices Vicarious Targets Space-based Inter-Calibration

ABI

• IR Cal (NEDT[@300K]: 0.1K all but 13.3 mm, 0.3K for 13.3 mm) – Blackbody

• VNIR Cal (SNR 300:1 @ 100% Albedo) - Solar Diffuser

• Self-Emission - Space View• Electronics Linearity - Electronic Stimulus

• VNIR Cal - Moon, Stars, Deserts, Test Sites, Deep Convective Clouds (DCCs), Rayliegh Scattering, etc.

• MTF, B2B Reg - Moon

• VNIR/IR Cal - GEO and LEO Imagers

• Spectral Cal – Hyperspectral Sounders

GLM None Response Cal - DCCs, Deserts, Sun-glint

Response Cal - GEO and LEO Imagers

EXIS• Response Linearity - Light Sources• Dark Measurements and Flatfields - Off-point Mechanism

• Electronics Linearity - Electronic Stimulus

Response Flatfield - Sun Response Cal – GEO Solar Sensors

SUVI

• Aliveness - Light Source• Dark Measurements and Flatfields - Off-point Mechanism

• Out-of-band Rejection - Glass/Analysis Filters • Electronics Linearity - Electronic Stimulus

Response Flatfield - Sun Response Cal - EXIS and other GEO Solar Sensors (e.g., SDO/EVE)

SEISS Electronics Linearity - Electronic Stimulus None Response Cal – GEO Particle Sensors

MAG Electronics Linearity - Electronic Stimulus None Response Cal - GEO Mag Sensors

POST-LAUNCH CALIBRATION/VALIDATION (CAL/VAL)

GOES-R observatory on-orbit cal/val assets

Calibration – Processes to transform raw GOES-R instrument data into L1b measurements … the fundamental building blocks for all L2+ products.

Validation - Provides user confidence that GOES-R data can be used for their intended purpose, e.g., weather forecasting or numerical weather prediction.

Example comparison between GOES-R CWG and Vendor cal test analyses: Ratio of CWG to Exelis cal

coefficients for ABI reflective channels.

Before (left) and after (right) Government-Vendor reconciliation of scan mirror reflectance value used in ABI test data analysis.

Post-Launch Testing (PLT) Cal/Val• Validate that instrument cal and product performance supports a system that meets its intended

purpose in its intended environment as outline in the GOES-R Concept of Operations• Resolve instrument cal and product performance anomalies to the degree possible as they arise• Create a “state-of-the-cal” snapshot for long-term instrument/product performance trending

GOES-13 Hemispheric Image Tiles

Product quality evaluation

Ch. 2 Ch. 3 Ch. 5Ch. 4

Ch Det Average GOES-10 Prelaunch (K)

GOES-10 On-Orbit (K)

GOES-9 On-Orbit (K)

2 A 0.1163 0.0933 0.1065 B 0.1259 0.1007 0.1090

3 --- 0.1480 0.1324 0.1231 4 A 0.0725 0.0703 0.0710

B 0.0771 0.0757 0.0705 5 A 0.1573 0.1516 0.1725

B 0.1568 0.1506 0.1825 On-board calibration system evaluation

Determine and Correct Scan-Angle Dependent Radiance (e.g., Beaucom et al., Proceedings

of SPIE, 1999)

Instrument Noise, Blackbody Temp and Cal Slope Monitoring

GOES-13 eclipse season stray light before fix (left) and after fix (right) (Courtesy of J. Paul Douglas, OSPO)

On-orbit calibration and L1b anomaly resolution

GOES-10 Ch. 4A