Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource...

33
Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource Geologist CSA Global Pty Ltd. 25/06/2014 www.csaglobal.com Dr. Alexander Boytsov Senior Vice-President Thys Heyns Senior Vice-President Uranium One Inc. Presented by:

Transcript of Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource...

Page 1: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium

Deposit (Kazakhstan)

Dr. Maxim Seredkin

Senior Resource Geologist

CSA Global Pty Ltd.

25/06/2014 www.csaglobal.com

Dr. Alexander Boytsov

Senior Vice-President

Thys Heyns

Senior Vice-President

Uranium One Inc.

Presented by:

Page 2: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Introduction

25/06/2014 www.csaglobal.com 2

Roll-front sandstone uranium deposits can be extracted using in situ recovery methods with low operational costs

Page 3: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Introduction - South Kazakhstan

25/06/2014 www.csaglobal.com 3

The production share from the Kazakhstan roll-front sandstone-hosted uranium deposits mined using the ISR method comprises 36% of the world total

CSA Global was retained by Uranium One to Resource Estimates for Budenovskoye deposit

CSA Global has completed modelling and significantly improved the method of modelling roll-front deposits.

Page 4: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Introduction - uranium deposits

25/06/2014 www.csaglobal.com 4

Budenovskoye is a World class deposits

Source of Initial data:

www.cameco.com, www.uranium1.com,

www.world-nuclear.org, www.armz.ru,

www.paladinenergy.com.au, www.bhpbilliton.com

Page 5: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Structure of roll-front deposits

25/06/2014 www.csaglobal.com 5

The mineralised bodies consist of several morphological elements: noses, wings and residual parts. Mineralised bodies are surrounded by radium halos.

Typical cross section of roll-front

Page 6: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Structure of roll-front deposits

25/06/2014 www.csaglobal.com 6

Example mineralised body in cross section at the Budenovskoye

Lower wing

Upper wing

Residual bodies

Nose

Page 7: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Structure of roll-front deposits

25/06/2014 www.csaglobal.com 7

Roll-front sandstone-hosted uranium mineralisation is spatially and genetically associated with a regional redox front

The distribution of nose parts marks the redox front

The wing and residual parts of rolls are distributed in the rear part of roll-fronts.

Budenovskoye deposit

plan view

Page 8: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Determination of U grades

25/06/2014 www.csaglobal.com 8

sampling

Ra(eU)

U

Rn degassing factor

assaying

K, Th

Ra(eU)

U

Ra halos definition

control method

REF

eU modify

gamma logging

prompt fission neutron logging

Page 9: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Determination of lithology

25/06/2014 www.csaglobal.com 9

electrical logging:

granulometric analysis

hydrogeological drilling

sampling

RL - resistivity logging ,

SP - spontaneous polarisation logging

RL (&SP) vs. grain size

definition of permeability

permeability vs. grain size

RL (&SP) vs. permeability

Page 10: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Why use indirect methods?

25/06/2014 www.csaglobal.com 10

Because screens (filters) need to be set immediately after drilling of operational wells.

Express wireline methods:

• gamma or prompt fission neutron logging

uranium mineralisation

• electrical logging

permeability of the host sediments.

Page 11: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Definition of mineralised intervals

25/06/2014 www.csaglobal.com 11

typ

ical

cro

ss s

ect

ion

Page 12: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Definition of mineralised intervals

25/06/2014 www.csaglobal.com 12

Anomalous intersections (eU > 0.01%)

Initial gamma logging

oxidized sediments

initial reduced sediments

Page 13: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Verification of mineralised intervals

25/06/2014 www.csaglobal.com 13 N

o s

amp

les

for

assa

yin

g

No

sam

ple

s fo

r as

sayi

ng

No

PFN

logg

ing

No

PFN

logg

ing

Page 14: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Definition of uranium grades

25/06/2014 www.csaglobal.com 14

typical cross section

Page 15: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Definition of uranium grades

25/06/2014 www.csaglobal.com 15

initial reduced sediments

oxidized sediments

residual

intervals

wing

intervals

wing

intervals

Page 16: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Definition of impermeable rocks

25/06/2014 www.csaglobal.com 16

Nu

mb

er o

f sa

mp

les

Dependence of electrical resistivity with grain size

Dependence of permeability

with grain size

Dependence of electrical resistivity

with permeability

Page 17: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

25/06/2014 www.csaglobal.com 17

Definition of impermeable rocks

RL

SP

Impermeable sediments

Permeable sediments

RL - resistivity logging ,

SP - spontaneous polarisation logging

Page 18: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Interpretation of roll-front

25/06/2014 www.csaglobal.com 18

cross section

Page 19: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Interpretation of roll-front

25/06/2014 www.csaglobal.com 19

cross section

Page 20: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Wireframe modelling

25/06/2014 www.csaglobal.com 20

Nose parts modelling

(lines - stratabound redox front) Wing parts modelling

Residual parts modelling Impermeable sediments modelling

2 km

Page 21: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Wireframe modelling

25/06/2014 www.csaglobal.com 21

2 km

Mineralisation in the

Mynkuduk horizon

Mineralisation in the

Inkuduk horizon

Page 22: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Why grade x thickness (GT)?

25/06/2014 www.csaglobal.com 22

Leaching uranium from blocks with different GT

Because for ISR deposits it is important to use a metal accumulation index (grade x thickness or “GT”) to define the cut-offs for resource estimation.

The mineralised interval with 0.04% U x 10 m is better for ISR than 0.10% U x 3 m.

Page 23: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Definition GT in block model

25/06/2014 www.csaglobal.com 23

Initial block model – grades of U, % - cross section Two-dimensional gridded models – grade of U, % - cross section

Two-dimensional gridded models – GT of U, % - cross section 3-D block model – GT of U, % - cross section

Page 24: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Definition GT in block model

25/06/2014 www.csaglobal.com 24

Stratabound oxidation

zone

2 km

GT distribution at the Budenovskoye deposit – plan view

Page 25: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Mineral Resources CIM compliant

25/06/2014 www.csaglobal.com 25

Page 26: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Depletion of uranium

25/06/2014 www.csaglobal.com

Screens (filters) in operational and observation wells

Borders of operational blocks

In ISR operations, the host rock remains undisturbed while the valuable component is dissolved by the leaching solution

For a mine it is considered sufficient to volumetrically delineate contours of production blocks and to deduct the depleted metal (recovery and in situ loss) from the Mineral Resources. Grades and GT will decrease proportionally because the volume of rock mass remains.

200 m

Mineralised bodies – nose parts

Mineralised bodies – wing parts

Mineralised bodies – residual parts

Operational blocks

Operational blocks and mineralised bodies

2 km

Page 27: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Block model vs. production blocks

25/06/2014 www.csaglobal.com 27

Comparison of mineralised intervals in operational wells with mineralised bodies based on exploration drill holes

100 m 5 m

Page 28: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Mineral Resources as of 30/06/13

25/06/2014 www.csaglobal.com 28

Category Volume Tonne Productivity (GT) Grade Mineral Resources

‘000 m3 ‘000 m3 m x % kg / m2 U, % U3O8, % Tonnes M lb

Measured 43,227 73,487 0.46 7.8 0.072 0.085 52,646 136.88

Indicated 38,692 65,777 0.46 7.8 0.088 0.104 58,484 152.06

Measured & Indicated

81,921 139,265 0.46 7.8 0.080 0.094 111,131 288.94

Inferred 58,177 98,901 0.37 6.2 0.095 0.111 93,623 243.42

Mineral Resources based on 0.04 m% (grade x thickness) cut-off per hole

Mineral Resources based on CIM definition

Depletion estimated using losses 10%

Measured Mineral Resources based on exploration drilling density of 50 m x 200 m (excluding residual mineralised bodies)

Indicated Mineral Resources based on exploration drilling density of 50-100 m x 400 m (excluding residual mineralised bodies) and 50 m x 200 m for residual mineralised bodies

Inferred Mineral Resources are based on exploration drilling density of 100-800 m x 400-1600 m

Mineral Resources include Mineral Reserves

Page 29: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Mineral Resources 2013 vs. 2012

25/06/2014 www.csaglobal.com 29

0

20,000

40,000

60,000

80,000

100,000

120,000

Measured Indicated Inferred

RPA, 2012

CSA, 2013

RPA’s resource estimation was based on conservative transformation of GKZ resources to CIM Mineral Resources: Operational blocks -> Measured, C1 -> Indicated, C2 -> Inferred. CSA’s resource estimation is based on geological modelling including latest exploration data

Ura

niu

m, t

on

ne

s

8,1

37

52

,64

6

18

,25

0

58

,48

4

38

,37

6

11

1,1

31

+ 4

4,5

09

(+4

47

%)

+ 4

0,2

34

(+2

20

%)

+

72

,75

5 (

+18

8%

)

Page 30: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Conclusion

25/06/2014 www.csaglobal.com 30

Using the improved methodology of geological modelling and resource estimation discussed in this presentation,

the average differences between resource estimates based only on exploration drill holes and estimates using all production wells are less than 5 %,

whereas the classical approach of resource estimation based on cut off grade commonly gave differences in the order of 20 —90%.

Page 31: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Summary

25/06/2014 www.csaglobal.com 31

Work by CSA and Uranium One has: • developed an advanced and unique modelling methodology

for in situ recovery deposits, • modelled one of the largest and most complex sandstone-

hosted uranium deposits in the world, • successfully reconciled our resource modelling against

production results, • Seen the adoption by the mine of our modelling in order to

optimise production, where, • It is expected there will be a significant positive economic

impact from using our improved resource estimation approach,

• Geological model can be used for operational modelling with good economical effect,

• Measured and Indicated Resources were increased by 84,743 tU (321%)

Page 32: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Authors

Dr Maxim Seredkin Senior Resource geologist, CSA Global Pty. Ltd.

Over 17 years’ geological experience in exploration, deposit modelling and resource estimation for a range of commodities, but particularly uranium.

25/06/2014 www.csaglobal.com 32

Dr Alexander Boytsov Senior Vice President, Exploration, Uranium One Inc.

37 years of broad and advanced practical national Russian and international experience in uranium deposits exploration, resource estimation, mining, and processing.

Thys Heyns Senior Vice President, Senior Vice President, New Business &Technical service, Uranium One Inc.

30 years of broad and advanced practical international experience in gold, uranium and other deposits, exploration, resource estimation, and mining.

Page 33: Geological 3D Modelling and Resource Estimation of ... · Geological 3D Modelling and Resource Estimation of Budenovskoye Uranium Deposit (Kazakhstan) Dr. Maxim Seredkin Senior Resource

Contact CSA Global

25/06/2014 www.csaglobal.com 33

CSA Global (Head Office) Level 2, 3 Ord Street West Perth, WA 6005

PO Box 141, West Perth WA 6872

T +61 (0) 8 9355 1677 F +61 (0) 8 9355 1977 E [email protected]