GEO –INVESTIGATION REPORT

24

Transcript of GEO –INVESTIGATION REPORT

Page 1: GEO –INVESTIGATION REPORT
Page 2: GEO –INVESTIGATION REPORT

CERTIFICATE

This is to certify that the samples are collected from the proposed OPGC PROPOSED FOR

SOIL INVESTIGATION WORK FOR CONSTRUCTION OF CHP AREA AT MINE’S END

The laboratory tests have been performed under the supervision of qualified personal, as

per the Indian standards and that this report is prepared on the basis of these tests results

and expert experience.

FOR: CADD CONSULTING ENGINEERS PVT. LTD

Page 3: GEO –INVESTIGATION REPORT

INTRODUCTION

It is intended to investigate the sub soil strata at the OPGC PROPOSED FOR SOIL

INVESTIGATION WORK FOR CONSTRUCTION OF CHP AREA AT MINE’S END

OBJECT

The object of the Geo – technical investigation is to:-

Optimize the foundation system, assuring the safe bearing capacity of the soil.

Determination of type, size and depth of foundation.

Analyzing the soil properties.

Suggesting an economically viable of foundation system to be adopted for the proposed

structures.

SCOPE OF WORK It consists of the following:-

Visual reconnaissance of the site.

Field and laboratory investigation.

Engineering judgment based on the current practice.

LIMITATIONS OF INVESTIGATION

The scope of Geo- technical Sub soil investigation is confined within the framework of

agreement and Technical specification with the client. However all the field and laboratory

experiments will be carried out as per the relevant Indian standard code of practice?

Page 4: GEO –INVESTIGATION REPORT

THE DETAILED GEO-TECHNICAL INVESTIGATION WORK TO BE CARRIED OUT

CONSISTS OF TWO PARTS.

1. FIELD INVESTIGATION

Location of bore holes.

Boring /drilling up to specified depth below G.L.

Conducting standard penetration test.

Collection UDS samples.

Collecting DS samples.

Determining the depth of water table.

Study of site condition and surroundings.

Taking observation of surrounding structure.

Transportation of all soil samples to laboratory.

2. LABORATORY INVESTIGATION :-

Grain size analysis.

Determination of moisture content.

Unconfined compressive strength.

Determination of Bulk density.

Determination of dry density.

Determination of Void ratio.

Determination of liquid limit.

Determination of plastic limit & plastic index.

Determination of specific gravity.

Determination of shear parameters & settlement calculation.

Determination of DFS test.

LOCATION The proposed site of construction OF OPGC PROPOSED FOR SOIL INVESTIGATION WORK

FOR CONSTRUCTION OF CHP AREA AT MINE’S END

Page 5: GEO –INVESTIGATION REPORT

FIELD WORK

1. SELECTION OF BORE – HOLES :-

1) 7,Nos number of bore hole was selected by the Engineer – In – Charge in order to

obtain comprehensive sub-soil data for this site up to specified depth below G.L. For

detailed laboratory investigation SPT is conducted in suitable intervals and Disturbed

/undisturbed soil samples from the above bore hole were collected at different levels

from as per the instruction of the client with observation of the ground water level

during investigation.

2. BORING :-

2) The sub-soil exploration work at the proposed site was carried out using 150mm

diameter rotary calyx rig boring equipments.

3. STANDARD PENETRATION TESTS :-

3) Standard penetration tests we are conducted in different levels in a continuous manner

using a spilt – spoon sampler. The SPT sampler was lower inside the bore hole after

drilling the required level and is driven by a 65 kg. Hammer with a free fall of 750mm.

In three stages 150mm each and the numbers of blows for each 150mm penetration

was recorded. The details of location and SPT value [N] is shown in bore log data.

4. GROUND WATER TABLE :- 4) During the field work ground water level was observation in bore hole and the level of

ground water table are shown in bore log data.

Page 6: GEO –INVESTIGATION REPORT

LABORATORY TESTS The laboratory – tests were conducted on selected SPT / disturbed / undisturbed soil samples collected from the bore holes drilled at the proposed site. The tests include grain size analysis, natural moisture content, D.F.S specific Gravity, liquid limit, plastic limit, plasticity index test and shear test. Particles size distribution tests on representative soil sample were also carried out. The laboratory test confirming to the requirement of I.S and specification were conducted on the soil, sample. The results of all these tests are given in test result sheet separately.

GRAIN SIZE ANALYSIS: The grain size analysis of different soil samples were done as per the requirement of IS: 2720(Pt- IV) 1975 – method of test for soil, Grain size analysis. The details of the test results are shown test result sheet separately in tabular as well as graphically. The result of grain size analysis is used to classify the soil in various depths of bore holes.

NATURAL MOISTURE CONTENT: The natural moisture content were determined as per IS: 2720(Pt –II) – 1973 – Method of test for soil, determination of water content.

DETERMINATION OF BULK DENSITY: The Bulk densities were determined in the laboratory from the UDS samples at different levels and the result are shown separately in tabular form.

DETERMINATION OF DRY DENSITY: The dry density of the UDS/DS samples was determined at the known moisture content and bulk density.

DETERMINATION OF SPECIFIC GRAVITY: The specific gravity of the UDS/DS sample was determined at different levels and the results are shown separately.

DETERMINATION OF VOID RATIO: The void ratios of the UDS/DS samples were determined at different levels and the results are shown separately.

LIQUID LIMIT & PLASTIC LIMIT: [AS PER IS : 2720 Pt – IV] : The liquid and plastic limit of soils were other index properties of soil have also been determined as per the relevant IS code of practice. The liquid and plastic limits of soil samples have been determined in the laboratory and results are shown separately.

DETERMINATION OF SHEAR PARAMETERS: Un consolidated and un drained Tri-axial shear tests were carried out from soil samples collected as per IS : 2720 Pt – IX 1971 with three different cell pressures of 1,2,3kg/sq.cm using Tri – axial shear testing machine and result are shown separately in tabular and graphical manner.

Page 7: GEO –INVESTIGATION REPORT

P R E F A C E

The general soil profiles and the geological stratification have been determined

OPGC PROPOSED FOR SOIL INVESTIGATION WORK FOR CONSTRUCTION OF CHP

AREA AT MINE’S END . The objective of this investigation is to ascertain the

characteristics of Sub-soil to present necessary information for sub-surface. It

was endeavored to study in detail the sub-surface conditions at the project site.

.

The field and laboratory works have been conducted as per relevant Bureau of Indian

standards.

Page 8: GEO –INVESTIGATION REPORT

FIELD OPERATIONS In an attempt for optimization in the design of foundation for the proposed building to be

constructed at this site, Geo-technical investigation was done. The entire investigation work had

been divided mainly into two parts (i) Field Work & (ii) Laboratory tests

● Field work determines the types of sub- soil deposit and their characteristics.

● Laboratory tests help in determining the relevant geo-technical properties of the sub-surface

deposited leading to finalization of foundation depth of the structure basing on Bearing capacities

of the foundation strata as well as Influence zone

GROUND WATER TABLE & TERMINATION DEPTH

SL. NO

BORE HOLE NO.

GROUND LEVEL

CHANAGE (M)

TERMINATION DEPTH IN

MTR.

WATER TABLE FROM THE G.L IN

MTR.

1 01 - - 10M 2.0 M

2 02 - - 10M 2.2M

3 03 - - 10M 2.0M

4 04 - - 10M 3.0M

5

05 - - 10M 1.80M

6

06 - - 10M 2.2M

7

07 - - 10M 2.3M

BORING & SITU TESTS

Wash boring method was adapted to bores in the soil up to specified depth as mentioned above

below the G.L for BH -01 to 05 The SPT were conducted at regular intervals and the samples were

brought to the laboratory with proper identification and labeling standard split spoon sampler was

used for conducting standard penetration test. The number of blows required to drive the sampler for

the 1st, 2nd and 3rd 15cm depths were recorded. The total number of blows required to drive the split

spoon sampler due to the free fall of a 663kg. Hammer trough distance of 75cm for the 2nd, and 3rd

15cm penetration were taken together as the field N-value (penetration resistance) of the soil.

Page 9: GEO –INVESTIGATION REPORT

NOTATIONS C Cohesion Ф Angle of internal fraction of soil DS Disturbed Sample UDS Undisturbed Sample NMC Natural Moisture Content NP Non plastic soil G Special gravity G Gravel Content M Slit Content C Clay Content LL Liquid Limit PL Plastic Limit Pl Plasticity index Cc Compression index K Coefficient of permeability UCS Unconfined Compression N SPT Value BH Bore Hole Suffix The Number of Bore Holes Nc,Nq,Nγ Bearing Capacity Factor Sc,Sq,Sγ S hape factors γ Density of soil D Depth of foundation FS Factor of safety Cv Coefficient of consolidation UU Unconsolidated untrained triaxial test CU Consolidated drained triaxial test GC Clayey Gravels GP Poorly Graded Gravels GW Well Graded Gravels SC Clayey Sand SM Silty Sand SW Wel Graded Sand SP Poorly Graded Sand CH Clays of High Plasticity Cl Clays of Intermediate Plasticity CL Clays of Low Plasticity MH Slits of High Plasticity MI Silts of intermediate Plasticity ML Silts of Low Plasticity

Page 10: GEO –INVESTIGATION REPORT
Page 11: GEO –INVESTIGATION REPORT

GUMUDAENGINEERING PROPERTIES OF SOIL PROJECT: SANGHUMUDA (BH NO- 4)

\

Sl.

No

.

Sl.

No

.

soil

sam

ple

colle

cted

at

Typ

e o

f sa

mp

le

colle

cted

at

Grain size analysis Atterberg’s Limits in %

Fie

ld M

ois

ture

Co

nte

nt

in %

Bu

lk D

ensi

ty in

gm

/cc.

D

ry D

ensi

ty in

gm

/cc.

C

oh

esio

n (

C)

Kg

f/cm

²

An

gle

of

shea

rin

g

resi

stan

ce (

Ø)

In d

egre

e

Sp

ecif

ic G

ravi

ty

Vo

id R

atio

D.F

.S. i

n %

Fie

ld S

.P.T

. val

ue

Gro

up

of

soil

Fin

e G

rave

l in

%

Fin

e G

rave

l in

%

(10m

m t

o 4

.75m

m)

Co

arse

san

d in

%

(4.7

5mm

to

2.00

mm

)

Med

ium

san

d in

%

(2m

m t

o 0

.425

mm

)

Fin

e sa

nd

in %

(0.4

25m

m t

o

0.07

5mm

)

Silt

& C

lay

in %

(0.0

75m

m t

o

0.00

1mm

)

Liq

uid

Lim

it in

%

Pla

stic

Lim

it in

%

Pla

stic

ity

Ind

ex in

%

1 1.5 SPT 41 5 13 18 23 25 NP NP 9 - - - - 2.64 - - 26 GM

4.5M TO 5.0M CORE RECOVERY = 34% & RQD = 26%

5.0M TO 6.0M CORE RECOVERY =48 % & RQD = 33%

6.0M TO 7.0M CORE RECOVERY = 54% & RQD = 37 %

7.0M TO 8.0M CORE RECOVERY = 68% & RQD = 48 %

8.0M TO 9.0M CORE RECOVERY = 75 % & RQD = 55 %

9.0M TO 10.0M CORE RECOVERY = 83% & RQD = 74 %

Page 12: GEO –INVESTIGATION REPORT

NAME OF THE WORK : SOIL INVESTIGATION WORKS FOR SANGHUMUDAData for the safe Bearing capacity calculation:

(NonCohesive Soil)

SPT 'N' = 42 (assumed) unconfined compressive strength qu = N/7.5 kg/cm2

= 29 C = qu/2 = 0.00 T/sq.m

Depth = 1.5 M Ø = 35 degree

Width = 2.0 M yt = 1.92 gm/cc

If the Ø <29 the Local shear failure condition is to be considered and Ø>36 General shear failure

condition is to be considered.

LOCAL SHEAR FAILURE CONDITION

Ø' = tan^ (-1)(0.67x tanØ) = 25.0 Degree

C' = 0.67C = 0.00 T/sq.m

AS PER IS :6403-1981,TABLE-1 = 2.62 (from lab test)

Nc' = 20.720 G = 2.62

Nq' = 10.660 q = Yt X Df

Nγ' = 10.880 = 1.92 X 1.50 = 2.88 T/M² `

By = Width X Yt

2.0 X 1.92 = 3.8 T/M²

AS PER IS :6403-1981,TABLE-2

Sc = 1.0 Sq = 1.0 Sy = 1.0

AS PER IS :6403-1981,5.1.2.2

dc = 1.29 dq = 1.14 dγ = 1.14 (Since ø > 10)

AS PER IS :6403-1981,5.1.2.3

ic = 1 iq = 1 iγ = 1 W = 1.0

1.0

Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

= x 20.72 x 1.0 x 1.29 x 1

+ 2.88 x 9.66 x 1.0 x 1.14 x 1

+ 0.5 x 3.8 x 10.88 x 1.0 x 1.14 x 1.0 x 1.0

= 0.0 + 31.71571 + 23.814

= 55.530 T/M²

Qult = 55.53 T/sq.M

3

SBC = 18.51 T/sq.m

0.000

Assuming the Factor of Safety as =

Based on the above 'N' value the following ' Ø ' values are obtained from the fig.1 of the IS: 6403-1981 less soils (C=0). And for cohesive

soils ( Ø =0) the 'c' value is considered from the relation "

Note:- Where ever the test results are not available the same was assumed based on the available values.

Specific gravity of soil at 1.5 m depth (G)

Assuming the depth factor, shape factor and load inclination factors as unity.

Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-5GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

FOUNDATION ENGINEERING.

Corrected 'N'

Page 13: GEO –INVESTIGATION REPORT

= 2.0 m = 200 cm

= 1.5 m = 150 cm

= 1.0 m

SPT 'N' VALUE OBSERVED = 26

= 21

Due to over burden pressure

As per IS 8009 part I 1976.

Settlement, For 1 kg/cm2 Read from IS 8009

( part I) 1976 Figure - 9 , P.P-17

= 0.0140 m d = ( WT - D)

= 14.00 mm (After applying W') d/b

= 14 mm Adopted water table correction (W')

Premissable settlement = 40 mm

Therefore Allowable Bearing pressure

= 40 / 14

= 2.857 kg/cm2

= 28.57 T/m2

CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE

CADD CONSULTING ENGINEERS (P) LTD BORE HOLE: 04

GEO - TECHNICAL INVESTIGATION & Sheet No : 1

FOUNDATION ENGINEERING.

Water table correction(W')

Corrected N value

NAME OF THE WORK: SOIL INVESTIGATION WORKS FOR SANGHUMUDA

ALLOWABLE BEARING PRESSURE FOR 40MM SETTLEMENT

Width of footing (B)

Depth of footing (D)

Page 14: GEO –INVESTIGATION REPORT

= 2.0 m = 200 cm

= 1.5 m = 150 cm

= 1.0 m

SPT 'N' VALUE OBSERVED = 26

= 21

Due to over burden pressure

As per IS 8009 part I 1976.

Settlement, For 1 kg/cm2 Read from IS 8009

( part I) 1976 Figure - 9 , P.P-17

= 0.0140 m d = ( WT - D)

= 14.00 mm (After applying W') d/b

= 14 mm Adopted water table correction (W')

Premissable settlement = 25 mm

Therefore Allowable Bearing pressure

= 25 / 14

= 1.786 kg/cm2

= 17.86 T/m2

Water table correction(W')

Corrected N value

NAME OF THE WORK: SOIL INVESTIGATION WORKS FOR SANGHUMUDA

ALLOWABLE BEARING PRESSURE FOR 25MM SETTLEMENT

Width of footing (B)

Depth of footing (D)

CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE

CADD CONSULTING ENGINEERS (P) LTD BORE HOLE: 04

GEO - TECHNICAL INVESTIGATION & Sheet No : 1

FOUNDATION ENGINEERING.

Page 15: GEO –INVESTIGATION REPORT

SUMMARY OF GEOTECHNICAL PARAMETERS & SAFE BEARING CAPACITY

BH

DEPTH

BGL

TYPE OF BULK

DENSITY,SPT-‘N’

‘N’

CORRECTI

ON

ARRIVED ALLOWABLE

BERING PRESSURE

ALLOWABLE BERING

PRESSURE

NO (M) SAMPLE gm/cc VALUE VALUEC

KG/CM2

Ø

DEGREESBC T/M²

FOR 25mm

SETTELEMENT T/M²

FOR 40mm

SETTELEMENT T/M²

BH NO :- 04 SHEET NO : 1

NAME OF WORK:- SOIL INVESTIGATION WORKS FOR SAGHUMUDA

28.6

CADD CONSULTING ENGINEERS (P) LTD.

4

FOUNDATION ENGINEERING.

17.916.621

GEO - TECHNICAL INVESTIGATION &

SHEAR

PARAMETERFOOTING

IN M

2X2 261.5 -- -SPT

Page 16: GEO –INVESTIGATION REPORT

4.5M TO 5.0 M

qs = qc x Nj

From laboratory test data

qc = 160 = 1600 T / M2

qs = 1600 x 0.1 = 160 T / M2

LOCATION- SANGHUMUDA

From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

kg / cm2

BH NO-04GEO - TECHNICAL INVESTIGATION &

FOUNDATION ENGINEERING.

LOCATION - SANGHUMUDA

DEPTH OF FOUNDATION -

AS PER CI .6 OF IS:12070

SBC is conservatively Restricted to 80 T / M2

for designed purposed.

Where :

qs = Safe Bearing Pressure (gross)

qc = Average UCS of rock cores

Nj = Empirical coefficient

Including FOS 3

Nj = ( 3 + S / Bf ) / (10√(1 + 300 δ / S))

δ = Thickness of discontinues (cm)

S = Spacing of discontinues (cm)

Bf = Footing Width

Page 17: GEO –INVESTIGATION REPORT

5.0 M TO 6.0M

qs = qc x Nj

From laboratory test data

qc = 192 = 1920 T / M2

qs = 1920 x 0.1 = 192 T / M2

GEO - TECHNICAL INVESTIGATION &

FOUNDATION ENGINEERING.

LOCATION - SANGHUMUDA

DEPTH OF FOUNDATION -

BH NO-04

CADD CONSULTING ENGINEERS PVT.LTD.

AS PER CI .6 OF IS:12070

Where :

qs = Safe Bearing Pressure (gross)

qc = Average UCS of rock cores

Nj = Empirical coefficient

Including FOS 3

SBC is conservatively Restricted to 80 T / M2

for designed purposed.

Nj = ( 3 + S / Bf ) / (10√(1 + 300 δ / S))

δ = Thickness of discontinues (cm)

S = Spacing of discontinues (cm)

Bf = Footing Width

From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

kg / cm2

Page 18: GEO –INVESTIGATION REPORT

6.0 M TO 7.0 M

qs = qc x Nj

From laboratory test data

qc = 236 = 2360 T / M2

qs = 2360 x 0.1 = 236 T / M2

GEO - TECHNICAL INVESTIGATION &

FOUNDATION ENGINEERING.

LOCATION - SANGHUMUDA

DEPTH OF FOUNDATION -

CADD CONSULTING ENGINEERS PVT.LTD.

BH NO-04

AS PER CI .6 OF IS:12070

Where :

qs = Safe Bearing Pressure (gross)

qc = Average UCS of rock cores

Nj = Empirical coefficient

Including FOS 3

SBC is conservatively Restricted to 80 T / M2

for designed purposed.

Nj = ( 3 + S / Bf ) / (10√(1 + 300 δ / S))

δ = Thickness of discontinues (cm)

S = Spacing of discontinues (cm)

Bf = Footing Width

From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

kg / cm2

Page 19: GEO –INVESTIGATION REPORT

7.0 M TO 8.0 M

qs = qc x Nj

From laboratory test data

qc = 247 = 2470 T / M2

qs = 2470 x 0.1 = 247 T / M2

SBC is conservatively Restricted to 80 T / M2

for designed purposed.

Nj = ( 3 + S / Bf ) / (10√(1 + 300 δ / S))

δ = Thickness of discontinues (cm)

S = Spacing of discontinues (cm)

Bf = Footing Width

From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

kg / cm2

AS PER CI .6 OF IS:12070

Where :

qs = Safe Bearing Pressure (gross)

qc = Average UCS of rock cores

Nj = Empirical coefficient

Including FOS 3

CADD CONSULTING ENGINEERS PVT.LTD.

GEO - TECHNICAL INVESTIGATION &BH NO-04

FOUNDATION ENGINEERING.

LOCATION - SANGHUMUDA

DEPTH OF FOUNDATION -

Page 20: GEO –INVESTIGATION REPORT

8.0 M TO 9.0 M

qs = qc x Nj

From laboratory test data

qc = 257 = 2570 T / M2

qs = 2570 x 0.1 = 257 T / M2

SBC is conservatively Restricted to 80 T / M2

for designed purposed.

Nj = ( 3 + S / Bf ) / (10√(1 + 300 δ / S))

δ = Thickness of discontinues (cm)

S = Spacing of discontinues (cm)

Bf = Footing Width

From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

kg / cm2

AS PER CI .6 OF IS:12070

Where :

qs = Safe Bearing Pressure (gross)

qc = Average UCS of rock cores

Nj = Empirical coefficient

Including FOS 3

CADD CONSULTING ENGINEERS PVT.LTD.

GEO - TECHNICAL INVESTIGATION &BH NO-04

FOUNDATION ENGINEERING.

LOCATION - SANGHUMUDA

DEPTH OF FOUNDATION -

Page 21: GEO –INVESTIGATION REPORT

9.0 M TO 10.0 M

qs = qc x Nj

From laboratory test data

qc = 262 = 2620 T / M2

qs = 2620 x 0.1 = 262 T / M2

SBC is conservatively Restricted to 80 T / M2

for designed purposed.

Nj = ( 3 + S / Bf ) / (10√(1 + 300 δ / S))

δ = Thickness of discontinues (cm)

S = Spacing of discontinues (cm)

Bf = Footing Width

From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

kg / cm2

AS PER CI .6 OF IS:12070

Where :

qs = Safe Bearing Pressure (gross)

qc = Average UCS of rock cores

Nj = Empirical coefficient

Including FOS 3

CADD CONSULTING ENGINEERS PVT.LTD.

GEO - TECHNICAL INVESTIGATION &BH NO-04

FOUNDATION ENGINEERING.

LOCATION - SANGHUMUDA

DEPTH OF FOUNDATION -

Page 22: GEO –INVESTIGATION REPORT

BORE HOLE NO -04

SO

AK

ED

UN

SO

AK

ED

4.5m to

5.0m34% 26% 0.29% 10.6% 4.7 6.9 166 172 81 2.69 2.66 43.8 1

5.0m to

6.0m48% 33% 0.30% 10.7% 5.6 8.0 192 207 84 2.69 2.66 44.6 2

6.0m to

7.0m 54% 37% 0.31% 11.6% 5.8 9.8 236 244 86 2.69 2.66 45.5 3

7.0m to

8.0m 68% 48% 0.31% 11.8% 5.9 10.3 247 252 88 2.68 2.66 45.4 4

8.0m to

9.0m 75% 55% 0.31% 11.8% 6.3 10.7 257 264 89 2.68 2.66 45.4 5

9.0m to

10.0m 83% 74% 0.31% 11.4% 6.5 10.9 262 264 89 2.68 2.66 45.4 6

NOTE:- Nj = 0.1

qs= S.B.C OF ROCK IN T/M2

qs (qu) X Nj

SBC is conservatively Restricted to 80 T / M2 for designed purposed.

PO

RO

SIT

Y (

MG

/(1+

MG

)X10

0

FOUNDATION ENGINEERING.

SUMMARY OF FOUNDATION DETAILS OF ROCK SAMPLES

LOCATION:-SANGHUMUDA

UN

IT W

EIG

HT

OF

RO

CK

(g

/cc)

HA

RD

NE

SS

(H

,SC

AL

E M

OH

S)

SA

MP

LE

S R

EF

: N

O

BO

RE

HO

LE

DE

PT

H O

F F

OU

ND

AT

ION

BG

L (

m)

UN

CO

NF

INE

D

CO

MP

RE

SS

ION

ST

RE

NG

TH

OF

RO

CK

IN T

/M2

(q

s = q

u *

NJ)

CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

1 4

SP

EC

IFIC

GR

AV

ITY

RQ

D %

CO

RE

RE

CO

VE

RY

%

SL

. NO

SL

AK

E U

DR

AB

ILIT

Y IN

DE

X (

10

mn

ts c

ycle

)

MO

IST

ER

CO

NT

EN

T (

%)

SO

UN

DN

ES

S

PO

INT

LO

AD

ST

RE

NG

TH

IND

EX

Page 23: GEO –INVESTIGATION REPORT

CADD CONSULTING ENGINEERS PVT.LTD GEO-TECHNICAL INVESTIGATION &

FOUNDATION ENGINEERING.

Sheet No:1

BOREHOLE NO- 4

ANALYSIS OF THE SUB SOIL INVESTIGATION TEST RESULT

LOCATION: -SANGHUMUDA

BOREHOLE NO- 4

Borehole no- -4, was sunk up to an average depth of 10.0m the sub soil strata of the Borehole is given in

litho logical form and summarized as follows.

STRATUM

The top layer up to an average depth up to 4.5 m consists of D.I rock ..

The stratum below an average depth from 4.5 m to 10.0 m is consists of hard rock.

The strata are moderately medium to very dense compact and low to medium plasticity.

The SPT value tabulated in bore log data sheet.

The core recovery was observed during investigation and tabulated in bore log data sheet.

The ground water table was encountered at 3.0 m within boring depth.

Page 24: GEO –INVESTIGATION REPORT

FOUNDATION & RECOMMENDATION

Considering the 7 no’s of bore hole and after studying all the engineering

properties it has been decided that depth of foundation can be taken in

suitable depth by digging at least 1.5m inside rock from the original ground

level both for economical point of view and for good structural stability.. But

however the structural designer can adopt higher depth to take advantage of

higher SBC depending upon the load as per decision of designer.

The designer can study the ABP/SBC table for above borehole

and take his own decision as per structural load and position of structure at

the site. The settlement is negligible. Therefore no special care is required for

footing. Single isolated RCC footing can be adopted for framed structure and

for all types of structure.

1. All R.C.C works should be designed as per IS –456-2000

2. Shallow foundation will be designed as per IS: 6403-1981.

3. The groundwater table were encountered and tabulated in Bore log data

in all bore holes.