Generator Services
WGGS Capabilities Presentation
Generator Services
LOCATION: New Mexico, USALOCATION: Four Corners, New Mexico
LOCATION: Farmington, New Mexico
LOCATION: Wood Group Generator Services, Inc.
Our Location
Generator Services
Turbo Generator Stators and Rotors
Turbo Power Hydro Power Petroleum Steel Paper
Our Focus
Generator Services
Turbo Power Hydro Power Petroleum Steel Paper
Hydro Generator Stators and Rotors
Our Focus
Generator Services
Turbo Power Hydro Power Petroleum Steel Paper
AC Electric Motor Stators and Rotors
Our Focus
Generator Services
Coil Manufacturing
Roebel BarsMulti Turn Coils
Generator/Motor Shop Services
Stator/ Rotor Rewinds & Core RestacksIn stock Retaining Rings, Full Machining
capabilitiesHigh Speed Balance and Testing
Field Services
Inspection & DiagnosticsOn Site Stator Rewinds
Preventative Maintenance
Rotor Clean Roomsfor Rotor
rewinds & repairs
High Speed Bunker
Electrical Testing at speed
Fully integrated coil facility
design, manufacture,
testing
VPI coils,B-Stage
Up to 15 KV
Short Lead Times
Site Inspection and tests
On-Site Repairs (rewedge, end
winding stability system, core
restack/rewind)
Generator Monitoring and
On-line Diagnostics
Rotor coil manufacture
Cylindrical and salient pole
windings
Fully Integrated Capabilities / Project Management
Generator Services
WGGS Project Management PhilosophyWGGS Project Management Philosophy
WGGS Generator and Electric Motor Wear Factor TourWGGS Generator and Electric Motor Wear Factor Tour
WGGS Turbine Generator Rotor TourWGGS Turbine Generator Rotor Tour
WGGS Turbine Generator Stator TourWGGS Turbine Generator Stator Tour
WGGS Hydroelectric Generator TourWGGS Hydroelectric Generator Tour
WGGS Electric Motor Rewind TourWGGS Electric Motor Rewind Tour
WGGS Generator Assessment Program TourWGGS Generator Assessment Program Tour
Technical Presentation Presentation Chapters
Generator Services
WGGS WGGS Generator Generator Assessment Assessment Program Program TourTour
Generator Services
Wood Group Generator Services, Inc.
Generator Assessment Program (GAP)
Technical Presentation Generator Assessment Program Tour
Generator Services
Generator Assessment Program, Option #112 hour Assessment (to fit “engine borescope”)
Unit condition - Generator assembled but inspection access covers removed
Inspections/tests performed:●
Borescope inspection of armature winding, rotor winding and blocking (as accessible), stator core step laminations and fingerplates
●
Perform tests on rtd’s, armature winding, and rotor winding
●
Armature Winding Test –
IR, PI and Res.
●
TGR Test –
IR, PI, Res., and Impedance
●
Exciter inspection
- Visual inspection, insulation resistance tests
Technical Presentation Generator Assessment Program Tour
Generator Services
Generator Assessment Program, Option #23-4 Day Assessment (to fit “valve inspection” or “auxiliary inspection”)
Unit condition - Rotor installed but top half of end brackets removed
Inspections/tests performed:●
Visual and Borescope inspection of rotor winding and blocking, stator core laminations and fingerplates (as accessible).
●
Insulation tests on rtd’s, armature winding, and rotor winding.
●
Winding tests –
IR, PI, and Resistance -
(armature winding and rotor winding).
●
Core tightness checks (visual indications of looseness).
●
Doble -
Power Factor and Tip up.
●
Corona tests, as assessable, to determine areas and severity of
any corona activity.
●
Step voltage tests (d.c. step voltage / dielectric absorption or
high potential) to determine insulation integrity of armature windings.
●
End winding stability test (end winding basket frequency check).
Exciter inspection: ●
Visual inspection.
●
Insulation resistance tests.
Technical Presentation Generator Assessment Program Tour
Generator Services
Generator Assessment Program, Option #37 – 10 Day Assessment (to fit “cylinder inspection” or “major inspection”)
Unit condition - Rotor removed
Inspections/tests performed:●
Visual inspection stator and rotor
●
Borescope inspection of rotor winding and blocking (as accessible)
●
Perform tests on rtd’s, armature winding, and rotor winding.
●
Winding resistance checks (armature winding and rotor winding).
●
Core tightness checks
●
Corona tests to determine areas and severity of any corona activity
●
Step voltage tests (d.c. step voltage / dielectric absorption or
high potential) to determine insulation integrity of armature windings
●
End winding stability test (end winding basket frequency check)
●
Core El Cid test
●
Wedge Tightness Detection
●
Doble Power Factor and Tip up
●
Rotor impedance and pole balance tests
●
Generator rotor retaining ring NDE inspection (based on OEM requirements)
Exciter inspection:●
Visual inspection
●
Insulation resistance tests
Technical Presentation Generator Assessment Program Tour
Generator Services
Generator Assessment Program, Option #43-4 Day Assessment (to fit “valve inspection” or “auxiliary inspection”)
Unit condition - Rotor installed but top half of end brackets removed
Inspections/tests performed:●
Visual and Borescope inspection of rotor winding and blocking, stator core laminations and fingerplates (as accessible).
●
Insulation tests on rtd’s, armature winding, and rotor winding.
●
Winding tests –
IR, PI, and Resistance -
(armature winding and rotor winding).
●
Core tightness checks (visual indications of looseness).
●
Doble -
Power Factor and Tip up.
●
Corona tests, as assessable, to determine areas and severity of
any corona activity.
●
Step voltage tests (d.c. step voltage / dielectric absorption or
high potential) to determine insulation integrity of armature windings.
●
End winding stability test (end winding basket frequency check).
●
Robotic El CID core test (as accessible).
●
Robotic wedge tightness mapping (as accessible).
Exciter inspection: ●
Visual inspection.
●
Insulation resistance tests.
Technical Presentation Generator Assessment Program Tour
Generator Services
Generator Assessment Program, Option #57-10 Day Assessment (to fit “cylinder inspection” or “major inspection”)
Generator Assessment Program Tour
Unit condition - Rotor installed but one top half of end bracket removed
Inspections/tests performed:●
Visual and Borescope inspection of rotor winding and blocking, stator core laminations and fingerplates (as accessible).
●
Insulation tests on rtd’s, armature winding, and rotor winding.
●
Winding tests –
IR, PI, and Resistance -
(armature winding and rotor winding).
●
Core tightness checks (visual indications of looseness).
●
Doble -
Power Factor and Tip up.
●
Corona tests, as assessable, to determine areas and severity of
any corona activity.
●
Step voltage tests (d.c. step voltage / dielectric absorption or
high potential) to determine insulation integrity of armature windings.
●
End winding stability test (end winding basket frequency check).
●
Robotic El CID core test (as accessible).
●
Robotic wedge tightness mapping (as accessible).
Exciter inspection: ●
Visual inspection.
●
Insulation resistance tests.
Generator Services
Insulation Resistance Test
An insulation resistance test is a low voltage test (typically 500 to 2,500 VDC) utilized to determine only the most general condition
of a winding. It can indicate only the most severe or significant degree of insulation damage and is typically used as a prelude to most searching tests.
Off-Line Inspection, Tests & Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
Off-Line Inspection, Tests & ExaminationsPolarization Index Test
A polarization index test is another relatively low voltage examination. Once again, this test is utilized to determine only the most general condition of a winding. A P.I. test is generally performed in order to determine whether or not more stringent testing can be performed.
Tests, Inspections, and Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
Off-Line Inspection, Tests & ExaminationsDC Ramp or Step Voltage Test
The data concerning winding condition offered by a DC high potential test can be significantly improved by observing the difference in current as the test voltage is increased. If a flaw exists in the ground wall insulation system, a failure is often preceded by an abrupt rise
in current. This allows the operator to terminate the test at the first sign of warning.
Tests, Inspections, and Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
Off-Line Inspection, Tests & ExaminationsPower Factor Tip-Up Test (Doble)
Power Factor Tip-up testing examines the windings at various voltage levels. This test is significant in the degree of detail it can provide with regard to the serviceability of a winding. Factors such as contamination, corona suppression system degradation, partial discharge activity, insulation delamination, and voids all impact the results of this testing.
Tests, Inspections, and Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
Off-Line Inspection, Tests & ExaminationsCorona Camera Examination
A corona camera is a specially designed video instrument, utilized to record the presence of partial discharge activity other wise invisible to the naked eye under normal turbine deck lighting conditions. With this instrument one can see what a particular winding look like under normal operating conditions.
Tests, Inspections, and Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
Off-Line Inspection, Tests & ExaminationsWedge Tightness MappingComputerized wedge tightness testing is a method of precisely measuring the stator slot wedge system for its degree of tightness within the core iron wedge grooves. An automatic hammer, attached to an accelerometer, is used to tap each and every individual wedge. The computer measures, and compares all reading against predefined calibration parameters.
Tests, Inspections, and Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
Off-Line Inspection, Tests & ExaminationsEnd Winding Stability ExaminationPremature winding failure may occur due to excessive end winding
vibration. Large turbine generators and hydro generators are most susceptible. Routine measurement of vibration amplitude and frequency is important in detecting looseness, which can lead to fatigue and failure of copper conductors and insulation systems.
Tests, Inspections, and Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
Off-Line Inspection, Tests & ExaminationsWinding Resistance Measurements
Performed with a Digital Low Resistance Ohm (DLRO) meter, this test measures the resistance across individual phases, phase groups, or coils. Measurement of winding resistance can determine incorrect connections, cold or broken braze joints, severe mismatches, and/or opens.
Tests, Inspections, and Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
Off-Line Inspection, Tests & ExaminationsElectro-Magnetic Core Imperfection Detection (El CID) TestElectromagnetic Core Imperfection Detection (EL CID) core testing is a means by which the integrity of stator core intra-laminar insulation can be measured, utilizing minimal electrical input to excite the iron. EL CID is excellent in its ability to pin point and accurately measure even the smallest defect.
Tests, Inspections, and Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
Off-Line Inspection, Tests & ExaminationsAC Impedance TestAn AC impedance test is performed by inducing into the rotor windings incrementally increasing voltages. The voltage and amperage are
measured and recorded. The ohm values are calculated and graphed against the applicable voltage levels. This is another method of testing for turn-to-turn shorts. An AC impedance test may be performed either with the rotor at rest, or at any desired speed.
Tests, Inspections, and Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
Off-Line Inspection, Tests & ExaminationsAC or DC Pole Drop TestA pole drop test is performed by inducing a voltage into a rotor
winding, measuring the voltage drop across each individual pole,
and then comparing the two against one another. If the reading are off more than 5-percent, turn-to-turn shorts are suspected in the pole generating the lower reading.
Tests, Inspections, and Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
Off-Line Inspection, Tests & ExaminationsStatic Turn Insulation Integrity Test (STIIT) A static turn insulation integrity test (STIIT™) is utilized to measure and compare readings for each and every individual coil within a 2-pole rotor. Readings for like coils of opposing poles are compared to one another as well as industrial standards. Difference in readings are applicable to the degree of turn-to-turn shorts within any particular coils.
Tests, Inspections, and Examinations
Technical Presentation Generator Assessment Program Tour
Generator Services
If any of the afore-mentioned tests produce negative results, a thorough visual inspection is imperative. In other instances, a visual inspect will produce results, which indicate further testing. A visual inspection is quite inexpensive, while being extremely telling about the condition of your generator.
WGGS archives all photographic record of each and every visual inspection performed.
Off-Line Inspection, Tests & ExaminationsVisual Inspection
Tests, Inspections, and Examinations
BackBack
Technical Presentation Generator Assessment Program Tour
Generator Services
WGGS WGGS Electric Electric Motor Motor Rewind Rewind TourTour
Generator Services
Wood Group Generator Service, Inc. (WGGS) reconditions, repairs, rebuilds, and rewinds electric motors of all shapes and sizes. This particular unit failed to ground when a balance weight came loose and struck the stator core iron.
Typical Project Status Report
Electric Motor Rewind Tour
Generator Services
A view of the failed stator coil, melted in half by the event.
The iron damage was severe and deep.
The existing stator windings are carefully removed.
The existing stator housing was grit-blasted clean.
The existing stator core iron was removed and disposed of.
The customer elected to replace the entire stator core.
Electric Motor Rewind Tour
Generator Services
All new stator laminations were procured.
All new end compression rings were manufactured.
All new compression thru- bolts were manufactured.
The new core iron was full flux core tested and El CID tested.
The new core iron was installed and compressed.
The new compression thru- bolts were installed.
Electric Motor Rewind Tour
Generator Services
Wood Group Generator Service, Inc. (WGGS) offers our OMEGA-PacTM and OMEGA-VacTM insulation systems for generator and electric motor stator windings.
Electric Motor Rewind Tour
Generator Services
The lap windings are lifted as the last coils are installed.
The installation of the new windings approaches the lap.
The throw of new stator windings is installed.
A view of the completed windings.
The stator end connections are formed, brazed, and taped.
A new stator wedge system ins installed.
Electric Motor Rewind Tour
Generator Services
Typical Project Final Report
The completed product being loaded out for delivery.
The rewound motor was assembled and prepared for
delivery.
The motor rotor was at-speed balanced at 1,800 RPM.
BackBack
Electric Motor Rewind Tour
Generator Services
WGGS WGGS Turbine Turbine Generator Generator Rotor Rotor TourTour
Generator Services
Wood Group Generator Service, Inc. (WGGS) utilizes a very select group of Heavy Haulers, highly experienced with the handling of Turbine Generator Rotors (TGRs). Seismic recording of the transport is available upon request.
Typical Seismic Recording Report
Turbine Generator Rotor Rewind Tour
Generator Services
A complete and comprehensive incoming mechanical, electrical, and visual inspection is performed on every TGR as received and prior to disassembly.
Typical Incoming Inspection Report
Turbine Generator Rotor Rewind Tour
Generator Services
All TGR retaining rings are removed by highly experienced WGGS Generator Techs, utilizing induction heating equipment. No open flame will ever touch your rings.
Typical Project Status Report
Turbine Generator Rotor Rewind Tour
Generator Services
Block migration and partial end winding collapse.
Pole face block breaking and migration.
Tooth top cracking.
Aluminum saddles fitted over soft copper.
Severe end winding contamination.
Significant end winding turn elongation and deformation.
Turbine Generator Rotor Rewind Tour
Generator Services
Existing windings are carefully removed, cleaned, straightened, annealed as required, further cleaned, and inspected in preparation for re-installation.
All existing winding copper is subjected
to a metallurgical analysis prior to
reuse.
Turbine Generator Rotor Rewind Tour
Generator Services
Again, all new CC107 Silver-bearing copper
is used.
Spools of new copper are setup on a tension
dereeling devise
Continuous-wound coils are generated on the “Merry-go-Round”.
All end windings are annealed in order to
facilitate forming.
All new CC107 Silver- bearing copper is
used.
CNC mills accurately profile the corner
connections.
Corner connections are silver-brazed by
qualified WGGS Techs.
Each and every new coil is carefully
scrutinized prior to installation
Picture-Frame Style Coils:
Continuous-Wound Style Coils:
Turbine Generator Rotor Rewind Tour
Generator Services
All TGR components are thoroughly cleaned, inspected, and rehabilitated as part of the rewind process.
The rotor body forging is grit-blasted, utilizing
a soft media.
Following cleaning, the rotor body forging is thoroughly NDE’d
All rotor body wedges are cleaned and NDE’d
for cracks.
All wedges are hand-fit to their respective slot
locations
The existing retaining rings are cleaned and
NDE’d.
The radial and bore copper assemblies are
reconditioned.
The fan assemblies, coupling, etc, are
cleaned and NDE’d.
The existing end winding blocking is inspected for re-use.
Turbine Generator Rotor Rewind Tour
Generator Services
WGGS has the in-house capability to manufacture each and every component found on a Turbine Generator Rotor.
Special retaining rings insulation.
18Mn18Cr retaining rings from our stock
inventory.
All new fan blades and blower hubs.
All new end winding blocking.
Al new oil defectors, seals, and baffles.
All new diffuser blades.
All new rotor body wedges, including specialized plating.
Completely new diode wheel assemblies.
Turbine Generator Rotor Rewind Tour
Generator Services
The WGGS rewind methodology produces a highly accurate and concentric winding, assuring a smooth-running TGR.
All new ground wall insulation is utilized
on every rewind.
All TGR’s are rewound in an environmentally- controlled clean room.
Temporary blocking is inserted into the end
winding.
Specially-manufactured compression fixtures are
installed.
The compressed windings are induction
baked.
The winding heads and temporary
blocking is removed.
The permanent blocking system is
installed.
The windings are compressed and
induction baked again.
Turbine Generator Rotor Rewind Tour
Generator Services
As part of the final assembly process, all new retaining ring insulation is installed. Induction heating equipment is utilized to install the retaining rings.
Typical TGR In-process Report
Turbine Generator Rotor Rewind Tour
Generator Services
The fully assembled TGR is loaded into the WGGS bunker and subjected to high speed balance, over speed confirmation, and running electrical testing.
Typical High Speed Balance Report, Including Flux Probe.
Turbine Generator Rotor Rewind Tour
Generator Services
The final acceptance process consists of a myriad of highly detailed operations in order to assure that you receive a quality end product.
Our large lathe is utilized to grind and
polish journals.
All final acceptance electrical testing is
performed.
A borescopic inspection is performed under the
retaining rings.
Components such as fan blades are
mounted and secured.
The entire TGR is hand-cleaned and visually inspected.
The TGR is rotated while final run outs measured
and recorded.
The finished product is loaded out and vacuum-sealed.
Protected and secured, the TGR is ready for delivery.
BackBack
Turbine Generator Rotor Rewind Tour
Generator Services
WGGS WGGS Turbine Turbine Generator Generator Stator Stator TourTour
Generator Services
A WGGS Generator Assessment Program (GAP) may indicate a terminal condition, such as extreme Partial Discharge Activity (PDA).
Typical Project Status Report
Turbine Generator Stator Rewind Tour
Generator Services
WGGS Generator Specialists carefully remove the existing coils or bars and prepare the stator core iron to accept all new and modern windings.
Typical Engineering Design & Drawings
Turbine Generator Stator Rewind Tour
Generator Services
All new WGGS OMEGA-PacTM Roebel half-coils can be designed and manufactured. As an alternative, an all new WGGS OMEGA-PacTM insulation system can be installed over top of the existing copper. Application of IEEE 1043 endurance testing is a standard operating procedure.
Turbine Generator Stator Rewind Tour
Generator Services
WGGS Generator Technician install the OMEGA-PacTM new windings, following highly detailed written procedures and processes.
Bottom bars are laid-in over new or rebuilt
surge ring assemblies.
Bars are carefully spaced and lashed to
the surge rings.
Six rows of blocks and ties, where the OEM
winding had only three.
Top bars installed and tightly side-packed
into position.
An all new stator slot wedge system is
installed.
In process high potential testing is performed prior to connection.
No less than three (3) El CID tests are
performed.
The second El CID test is performed after wedge installation.
Turbine Generator Stator Rewind Tour
Generator Services
With the new winding installed, the WGGS Generator Technicians focus on processing the end connections and final processes.
End winding connections are
induction brazed.
Bar-to-circuit ring connections are
brazed and insulated.
Additional filler blocking is installed
behind the clips.
Epoxy/Glass boots are filled with a special
epoxy.
The end connection boots are carefully
installed.
The completed windings are enclosed and oven-
cured.
The completed and fully-cured windings are allowed to cool.
The completed windings are coated
with epoxy-buff paint.
Turbine Generator Stator Rewind Tour
Generator Services
The final acceptance process consists of a myriad of highly detailed tests in order to assure that you a quality end product. Assemble then ensues.
Typical Project Final Report
BackBack
Turbine Generator Stator Rewind Tour