This document provides a technical summary of Hol-land Accommodation Rentals’ Standard Accommoda-tion Modules designed for temporary living quarters. The concept serves the option to avoid use of any underlying ship system and to serve as a self-sufficient module, this relieving the vessel from breaking into existing capacities.

The following modules are arranged with layout as per drawing reference: S2016-240-0000 G.A.

• 1 x Accommodation module • 1 x Restaurant module• 1 x Facility module• 1 x Technical / Facilities module• External stairs and HEB400 foundations

GENERAL SPECIFICATION

DESIGN CODES

Design codes/standards as follows:• IMO SOLAS (Safety at Life at Sea)• NMA (Norwegian Maritime Authority) compliance checked by Lloyd’s Register

• MLC-2006 (Maritime Labor Convention)• MODU Safe Area • SPS Code up to 240 persons

Class rules, standards and guidelines:• Lloyds Register of Shipping

Prior project approvals:• Bureau Veritas• American Bureau of Shipping• RMRS• RINA• DNV/GL

2

Page 3: General accomodation HAR v2

EXTERNAL DIMENSIONSLength 14.96m x Width 10.50m x Height 2.98m + Linking supports 0.30 m female / male

AREA CLASSIFICATIONSafe Area

PASSIVE FIRE PROTECTIONA60 insulation around

WEIGHTFacilities module 68 tons per pieceAccommodation module 72 tons per pieceRestaurant module 76 tons per piece Technical / Facility module 84 tons per piece (empty weight)

INTERNAL DIMENSIONSInternal height 2.30m (accommodation only)

STEEL QUALITYGrade A

STACKING 4 levels high on any vessel allowed

LIFTING POINTSPad eyes to each module

SUPPORT FRAME HEB400 beams below each stack on deck level

HOOK-UP RECESS Located on aft side of module containing all piping and E&I services if required to tie-in to vessel/installation services.

STAIRS AND WALKWAYSModular stairs and walkways will be pro-vided outside the modules. These will be open-type.

ACCESS DOORS2 x A60 personnel doors fitted to each side.

PAINT SPECIFICATIONExternal & InternalExterior thickness 300 µm, 3 layerInternal 100 µm, 1 layer

STRUCTURAL

ACCOMMODATION DESCRIPTION

WWW.HOLLANDSHIPYARDSGROUP.COM 3

Page 4: General accomodation HAR v2

WWW.HOLLANDSHIPYARDSGROUP.COM

ELECTRICAL

REQUIRED POWER FEED400V, 50 Hz.

DISTRIBUTION BOARD1 x Distribution board fitted with double & triple pole 1x fire panel, circuit breakers for all cabin elec-trical and HVAC systems.

CABLESStandard flame retardant (IEC332) armored and unarmored cables as required.

CABLE CONTAINMENTCable basket internally outside painted cable.

NORMAL LIGHTING230 V fluorescent lighting

EMERGENCY LIGHTING24V emergency lighting system.

LOW-LEVEL LIGHTINGProvided in corridors.

EARTHINGAll equipment is suitably earthed in accordance with I.E.E guidelines.

HEAT TRACINGAll weather exposed water lines (Grey and Black water) internal to the modules are heat traced.

4

Page 5: General accomodation HAR v2

WWW.HOLLANDSHIPYARDSGROUP.COM

FIRE DETECTION

SMOKE DETECTORSSmoke / heat detectors are provided in areas in accordance to class requirements and are wired back to a fire panel inside the modules, which leads to a junction box in the recess. This box can be linked through to the control room.

GAS DETECTIONExcluded but optional

HVAC

VENTILATION AND DUCTWORKThe modules have a self-contained ventilation system, Air is drawn from the supply duct via a series of ducts to the corridors, general areas and each bedroom. Duct mounted pre heaters ensure air is raised to a pre-set temperature.

VENTILATION FANVentilation fan located in the corridor ceiling void.

FIRE DAMPERSA60 rated fire dampers fitted to all supply and extract duct penetrations. Each damper is manually operated and by a heat switch.

DUCT PRE-HEATER1 x 8kW rated heater fitted in supply duct and pre-treatment unit is fitted behind the air inlet.

TELECOMS

GA / P.A.1 x GA/PA speakers are mounted in each area, in the corridors and outside modules.

DATACAT6 RJ45

TELEPHONETelephone lines available, wired to junction box in corridor.

TELEVISIONTelevision connections (CAT6 RJ45 and COAX) wired to junction box in corridor.

AIR CONDITIONING

GENERALCooling is provided by means of a 0.3 Kw split systemair-conditioning units in each bedroom. The external condenser/compressor section is housed within the external recess and has a capacity of avg. 30 kW. Also general areas are cooled by means of air-conditioning.

CLIMATE The HVAC system is designed for +40 °C and -20 °C and 70% humidity.

5

Page 6: General accomodation HAR v2

WWW.HOLLANDSHIPYARDSGROUP.COM

WATER SERVICES

POTABLE WATERPotable water in copper pipe internally and terminating in the external services duct. Dead ends are avoided to reduce risk of legionella.

HOT WATERCirculating system.

BLACK WASTEGravity feed black waste system connected to w/c’s and terminating in the external recess.

GREY WASTEGravity feed black waste system connected to wet room shower and wash hand basin and terminating in the external recess.

FIRE EXTINGUISHINGIn the outside staircases fire lines are provided on deck 1 and 3. These need to be hooked up to the on-board fire hydrant.

ARCHITECTURAL

FLOOR SCREED30 mm layer of screed to all non-technical areas

FLOOR FINISHESVinyl

INSULATIONA60 insulation all around.

WALLSWalls connected to corridors 2 x 25 mm thick B15 rated. Outside walls 25 mm thick B15 ratedCabin partitioning 2x 25mm thick, C-rated. (Double C-ratingequals B-rating) with 50mm air gap. CEILING1 layer of 50mm thick, C-rated

SERVICE HATCHESService hatches accessible from corridor and housing all wet cell piping connections.

6

Page 7: General accomodation HAR v2

WWW.HOLLANDSHIPYARDSGROUP.COM

SLEEPER MODULE

The accommodation module is accessible by means of two outside doors and is divided as follows:10 x 2 person cabins with en-suite wet cabins and cen-tral linking corridor.

LAYOUT Each module contains 10 x 2 person cabins which are accessible from a central corridor with outside doors at both ends.

EACH BEDROOM HAS• A bunk bed fitted with storage drawers• 2 x Full height storage two-door lockers with internal hangers and shelves and shelf above.

• 1 x Desk with chair• Window blinds.• Doors B15, with kick-in panel, to each bedroom and service cupboard.

• Bookshelf • Telephone / TV connection• WIFI internet connection

EN-SUITE En-suite shower room with shower, WC, wash basin, and general fixtures and fittings

7

Page 8: General accomodation HAR v2

WWW.HOLLANDSHIPYARDSGROUP.COM

RESTAURANT MODULE

The restaurant module is accessible by means of two outside doors and is divided as follows:Galley, mess / day room area and food storage

STORES• Walk in dry store with storage shelving • Walk in cool store with storage shelving• Walk in freezer store with storage shelving

GALLEY• Rinsing sink mounted and waste disposal unit• Rinsing shower, flexible, two hole• Food scraper• Food shredder• Dishwasher (conveyer type)• External detergent dosing pump• Day to day fridge• Potato scraping machine• Open lockers• Bain Marie• Tray rail on restaurant side• Tiltable frying pan• Deep fat fryer• Range 6-plate + electric oven• Combi-steamer• Cooker hood

RESTAURANT• Seating and table capacity is approx. 46 people for a single shift

• WC cubicle with wash hand basin

8

Page 9: General accomodation HAR v2

WWW.HOLLANDSHIPYARDSGROUP.COM

FACILITIES MODULE

The module is accessible by means of two outside doors and internal division is as follows; 3 x offices, hospital, day room and gym.

OFFICES TOTAL• 8 Workstations • 8 Desk chairs • 8 Storage cabinets • Coat hangers • Telephone and data connection (CAD5) for computers

HOSPITAL• Hospital bed• Desk with chair• 2 x lockers• Wet cabin with WC, Wash hand basin and shower

DAY ROOM• Tables with seats• TV and TV cabinet• Lounge sofa in TV corner• Table-height drawer

GYM• 2 x bicycle machines• 1 x treadmill• 2 x multi-trainer machines• Free weights

9

Page 10: General accomodation HAR v2

WWW.HOLLANDSHIPYARDSGROUP.COM

FRESH WATER MAKER• 2 x Petsea Reverse Osmosis Fresh water maker• Capacity 7,5m3 per day per piece, total 15m3/day• Feeding flow 2.5m³/h• Seawater temperature minimum 2 °C – maximum 40 °C• Design water salinity 38000 ppm

LAUNDRY / LINEN ROOM• 2 x Industrial washing machines • 2 x Industrial dryers • Shelves for storage

CHANGING ROOM• 60 x half / full height lockers• 1 x toilet facility• 1 x urinal• 1 x shower• 4 tap rinsing sink

TECHNICAL / FACILITY MODULE

The Technical / Facility module is accessible by means of two outside doors and is divided as follows: Technical room, generator room, tank capacities, control room, change room and laundry.

SEWAGE SYSTEMGertsen & Olufsen Biological plant

REGULATIONSApproved to IMO MEPC 159(55) & IMO MARPOL 73/78 Rules for installation of sewage treatment

OUTLINE SPECIFICATION • Treatment of black and grey water of max 80 person• 1 x Control cabinet 400V/50 Hz • Macerating pump, max flow 9m3/h, max delivery head 23Mwc, EI. Consumption 1,3Kw

• Discharge pump, max. Flow 17m3/h, max. Delivery head 23 Mwc, EI. Consumption 2,6Kw

• Air compressor, EI. Consumption 2,20 kW

DIMENSIONS: • 3200x2000x2300mm• Org. Load 6,00kg BOD5/day• Hydr. Load 14,80m3/day• Weight operational 9990kg (Dry weight 2240kg)

10

Page 11: General accomodation HAR v2

WWW.HOLLANDSHIPYARDSGROUP.COM

CONTACT

HOLLAND ACCOMODATION RENTALSRivierdijk 4363372 BW Hardinxveld-GiessendamThe Netherlands

T: +31 (0) 184 630 516M: [email protected] W: www.hollandshipyardsgroup.com

GENERATOR ROOMJohn Deere Radiator-cooled generators, 3 x 125 KVA with parallel running and provided with PLC. Engine room ventilation with fire flaps.

CONTROL ROOM• Emergency battery pack • Control panels (Generators, Fire alarm, GA/PA)• Connection to underlying ship systems • Workstation

TANKS• Fuel tank (38 m³) • Sludge tank (2 m3) • Treated sewage tank (25 m³) Additional tank provided in barge.

• Drinking water tank (42 m³)

All tanks are provided with ventilation and sounding system as well as a manhole for access.

The technical areas are not provided with an air conditio-ning system. Electrical heaters are provided in the control room, technical room and in the generator room. Other areas in the module are provided with HVAC system.

SPARE PARTSSpare parts will be supplied alongside the modules. A list will be discussed and made available on request.