GEA Compressor HAX2 CO 2 T Assembly instructions

32
engineering for a better world GEA Compressor HAX2 CO 2 T Assembly instructions HAX2/70-4 CO 2 T HAX2/90-4 CO 2 T HAX2/110-4 CO 2 T HAX2/130-4 CO 2 T

Transcript of GEA Compressor HAX2 CO 2 T Assembly instructions

Page 1: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

1

9603

1-03

.201

6-DG

bF

engineering for a better world

GEA Compressor HAX2 CO2 T

Assembly instructions

HAX2/70-4 CO2 THAX2/90-4 CO2 THAX2/110-4 CO2 THAX2/130-4 CO2 T

GEA Bock GmbH

72636 Frickenhausen, Germany

Page 2: GEA Compressor HAX2 CO 2 T Assembly instructions

2

D

GB

F

E

9603

1-03

.201

6-DG

bF

About these instructions

Read these instructions before assembly and before using the compressor. This will avoid misunder-standings and prevent damage. Improper assembly and use of the compressor can result in serious or fatal injury. Observe the safety instructions contained in these instructions.These instructions must be passed onto the end customer along with the unit in which the compres-sor is installed.

GEA Bock GmbH

72636 Frickenhausen

GEA Bock GmbH

Benzstraße 7

72636 Frickenhausen

Germany

Telephone +49 7022 9454-0

Fax +49 7022 9454-137

[email protected]

www.gea.com

Manufacturer

Contact

Page 3: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

3

9603

1-03

.201

6-DG

bF

Contents Page

1 Safety 4 1.1 Identificationofsafetyinstructions 1.2 Qualificationsrequiredofpersonnel 1.3 Safety instructions 1.4 Intended use 2 Product description 6 2.1 Short description 2.2 Name plate 2.3 Type key 3 Areas of application 8 3.1 Refrigerants 3.2 Oil charge 3.3 Limits of application 4 Compressor assembly 10 4.1 Storage and transportation 4.2 Setting up 4.3 Connecting the pipelines - solder system 4.4 Connecting the pipelines - cutting ring system 4.5 Pipes 4.6 Flange shut-off valves (HP/LP) 4.7 Option: cutting ring screw joint (HP/LP) 4.8 Laying suction and pressure lines 4.9 Operating the shut-off valves 4.10 Operating mode of the lockable service connections 5 Electrical connection 15 5.1 Information for contactor and motor contactor selection 5.2 Standard motor, designed for direct or part winding start 5.3 Basic circuit diagram for part winding start 5.4 Electronic trigger unit MP10 5.5 Connection of the electronic trigger unit MP10 5.6 Functional test of the electronic trigger unit MP10 5.7 Oil sump heater 5.8 Fan motor 6 Commissioning 22 6.1 Preparations for start-up 6.2 Pressure strength test 6.3 Leak test 6.4 Evacuation 6.5 Refrigerant charge 6.6 Start-up 6.7 Pressure switch 6.8 Decompression valves 6.9 Avoiding slugging 6.10 Filter dryer 7 Maintenance 26 7.1 Preparation 7.2 Work to be carried out 7.3 Accessories 7.4 Spare parts recommendation 7.5 Lubricants 7.6 Decommissioning 8 Technical data 28 9 Dimensions and connections 29 10 Declaration of installation 30 11 Service 31

Page 4: GEA Compressor HAX2 CO 2 T Assembly instructions

4

D

GB

F

E

9603

1-03

.201

6-DG

bF

1| Safety

1.1 Identificationofsafetyinstructions:

1.2 Qualificationsrequiredofpersonnel

WARNING Inadequatelyqualifiedpersonnelposestheriskofaccidents, theconsequencebeingseriousor fatal injury.Workoncompressorsmust therefore only be performed by personnel with the qualificationslistedbelow:• For example, a refrigeration technician, refrigeration mechatronics

engineer. As well as professions with comparable training, which enable personnel to assemble, install, maintain and repair refrigeration and air-conditioning systems. Personnel must be capable of assessing the work to be carried out and recognising any potential dangers.

DANGER Indicatesadangeroussituationwhich,ifnotavoided,willcauseimmediatefatalorseriousinjury

WARNING Indicatesadangeroussituationwhich,ifnotavoided,maycausefatalorseriousinjury

CAUTION Indicatesadangeroussituationwhich,ifnotavoided,mayimmediatelycausefairlysevereorminorinjury.

ATTENTION Indicatesasituationwhich,ifnotavoided,maycauseproperty damage

INFO Importantinformationortipsonsimplifyingwork

Page 5: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

5

9603

1-03

.201

6-DG

bF

1| Safety

These assembly instructions describe the standard version of the compressors named in the title manufactured by GEA. GEA refrigerating compressors are intended for installing in a machine (within the EU according to the EU Directives 2006/42/EC Machinery Directive, 97/23/EC PressureEquipmentDirectiveand2006/95/EC–LowVoltageDirective).Commissioning is only permissible if the compressors have been installed in accordance with these assembly instructions and the entire system into which they are integrated has been inspected and approved in accordance with legal regulations.

The compressors are intended for use with CO2 in transcritical and/or subcritical systems in compliance with the limits of application.

Onlytherefrigerantspecifiedintheseinstructionsmaybeused.

Any other use of the compressor is prohibited!

1.4 Intended use

WARNING The compressor may not be used in potentially explosive environments!

1.3 Safety instructions

WARNING Riskofaccident.Refrigerating compressors are pressurised machines and therefore requireparticularcautionandcareinhandling.

The maximum permissible overpressure must not be exceeded,even for testing purposes.

Riskofburns!-Dependingontheoperatingconditions,surfacetemperaturesof over 60 °C on the pressure side or below 0 °C on the suction side can be reached.- Avoid the contact with refrigerant under any circumstances. Thecontactwithrefrigerantcan leadtosevereburnsandskin irritations.

Danger of suffocation.CO2 is a nonflammable, acidic, colorless and odorless gas and heavier than air.NeverreleasesignificantvolumesofCO2 or the entire contents of the system into closed rooms!

Safety installationsaredesignedoradjusted inaccordancewithEN 378-2 or appropriate safety standards.

• Transcritical CO2 applications are still in the development phase.•Theyrequireacompletelynewkindofsystemandcontrol.• They are not a general solution for the substitution of F-gases.•Therefore, we expressly point out that all information in this assembly instruction has been provided according to our current levelofknowledgeandmaychangeduetofurtherdevelopment. Legal claims based on the correctness of the information cannot be made at any time and are hereby expressly excluded.

Page 6: GEA Compressor HAX2 CO 2 T Assembly instructions

6

D

GB

F

E

9603

1-03

.201

6-DG

bF

Fig. 1

Fig. 2

2 | Product description

• Semi-hermetic two-cylinder reciprocating compressor with suction gas-cooled drive motor.• Air flow is directed over motor by means of a fan and an air guide hood, which also serves to

reduce the surface temperature at the compressor housing.• Oil pump independent of direction of rotation for reliable and safe oil supply.• One decompression valve each on the low and high pressure side, which vent into the

atmosphere when these inadmissibly high printing pressures are reached.

2.1 Short description

Discharge shut-off valve

Dimension and connection values can be found in Chapter 9

Cylinder cover

Transport eyelet

Valveplate

Oil pump

Terminal box

Suctionshut-off valve

Drive section

Name plate

Oil sight glass

Airdeflectionhood

GEA Bock GmbH

72636 Frickenhausen, Germany

HAX2/110-4 CO2 T

AS30046A002

26,7 A

Y: 110 A Y: 141 A100/150 bar 65

CO2,C 85 E440-480V Y/YY

380-420V Y/YY 9,66

1750

11,66

Page 7: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

7

9603

1-03

.201

6-DG

bF

2 | Product description

2.2 Name plate (example)

2.3 Typekey (example)

¹) HA - Hermetic Air-Cooled (air-cooled) ²) X - Ester oil charge

Fig. 3

/

Transcritical

CO2 version

Number of poles

Swept volume

Size

Oil charge ²)

Series¹)

HA 2 110- 4 CO2X T

1 Type designation2 Machine number3 maximum operating current4 Starting current (rotor blocked) Y: Part winding 1 YY: Part winding 1 and 25 ND (LP): max. permissible operating pressure (g) Low pressure side HD (HP): max. permissible operating pressure (g) High pressure side Observe the limits of

application diagrams!

50 Hz

60 Hz

6 Voltage,circuit,frequency7 Nominal rotation speed8 Displacement9 Voltage,circuit,frequency10 Nominal rotation speed11 Displacement12 Oiltypefilledatthefactory13 Terminal box protection type Electrical accessories can change the IP protection class!

}

}

123

45 100/150 bar

HAX2/110-4 CO2 TAS30046A00226,7 A

380-420V Y/YY9,66

440-480V Y/YY1750 11,66

651312

7

11

6

10

89

CO2,C 85 E

Y: 110 A Y: 141 A

GEA Bock GmbH72636 Frickenhausen, Germany

Page 8: GEA Compressor HAX2 CO 2 T Assembly instructions

8

D

GB

F

E

9603

1-03

.201

6-DG

bF

3 | Areas of application

Thecompressorsarefilledatthefactorywiththefollowingoiltype: GEA C 85 E (only this oil may be used).

3.1 Refrigerants• CO2: R744(RecommendationCO2quality4.5(<5ppmH2O))

3.2 Oil charge

ATTENTION Property damage possible.

The oil level must be in the visible part of the sight glass; damage to the compressor is possible if overfilled or underfilled!

Fig. 4

max.

min.

2,0 Ltr. oil level ~~

ATTENTION Compressor operation is possible within the operating limits shown in the diagrams. Please note the significance of the shaded areas. Thresholds should not be selected as design or continuous operation points.

- Max. permissible ambient temperature 45°C. - Max. permissible discharge end temperature 160°C.- Min. oil temperature ≥ 30°C.- Min. pressure gas temperature ≥ 50°C.-Max.permissibleswitchingfrequency12x/h.- A minimum running time of 3 min. steady-state condition (continuous operation) must be achieved.

Foroperationwithfrequencyconverter:-Frequencyrange30-60Hz.- The maximum current and power consumption must not be exceeded.Inthecaseofoperationabovethemainsfrequency, the application limit can therefore be limited.

3.3 Limits of application

Page 9: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

9

9603

1-03

.201

6-DG

bF

Max. permissible operating pressure (LP/HP)1):100/150bar

1 HAX2/130-4 CO2 TApplications limit

1) LP = Low pressure HP = High pressure

Fig. 5

Unlimited application range

3 | Areas of application

to Evaporation temperature (°C)∆toh Suction gas superheat (K)po Suction pressure (bar)pv2 Discharge end pressure (bar)

1

Page 10: GEA Compressor HAX2 CO 2 T Assembly instructions

10

D

GB

F

E

9603

1-03

.201

6-DG

bF

4 | Compressor assembly

INFO Newcompressorsarefactory-filledwithinertgas(3barnitrogen). Leave this service charge in the compressor for as long as possible and prevent the ingress of air. Immediately after coolingtechnical connection of the compressor ofshutoffdevicesinsuction-,discharge-,oilreturnlineetc.closeand compressors evacuate.Check the compressor for transport damagebefore starting any work.

4.2 Setting up

Setuponanevensurfaceorframewithsufficientload-bearingcapacity.

Single compressor preferably on vibration damper. Compound connection basically rigid.

Provideadequateclearanceformaintenancework. Ensureadequatecompressorventilation.

Do not use in a corrosive, dusty, damp atmosphere or a com-bustible environment.

Fig. 8

Fig. 9

Fig. 10

F

E

D

C

B

A

1234

F

E

D

C

4 3 2 1

A

BTol.-Ang. DIN ISO 2768-mK

Ra Rz

Maß Passung Freigabe

Alternativbezug:Baumustergeprüft

Teil inaktiv

Lieferantenzeichnung

--

K.-Auftrag:PL:

Zeichnung ungültig

Entwicklungsstand

Teil keine Serie

120400

±0.5

über 0.5bis 6

Benzstraße 7 - 72636 Frickenhausen - Germany - www.bock.de

-

-Unbemaßte Radien:

-

Diese Zeichnung ist unser Eigentum!Sie darf ohne unsere Genehmigung weder nach-gebildet, vervielfältigt, oder Dritten Personen zu-gänglich gemacht werden. Der Nachbau nachdieser Zeichnung, oder an Hand der nach dieserZeichnung hergestellten Gegenstände durch denAbnehmer oder Dritte ist nicht gestattet.Wir behalten uns alle Rechte, gemäß DIN ISO 16016an dieser Zeichnung vor.

Bearb.DatumÄnderungs-Nr.

Werkstoff:

Ausgangsteil, bzw. Rohteil:-

-

Gepr.

NameDatum19.04.

WerkstückkantenDIN ISO 13715

Ersatz für:

Ersetzt durch:

Erstellt2010

Geprüft

-

Kurz

Zone

1/x

Oberflächenbehandlung / Härte:-

Blatt:Änderungsbeschreibung

400Benennung:

±0.8

1000 30 6

-

±0.3

12030

±0.2

Zeichn.-Nr. Teile-Nr.

Oberflächenangaben ISO 1302

x.xxxx-xxxxx.x

Zust.Gußtoleranzen:

Gewicht: (kg)

±0.1

Maßstab:

1:1

Wasserwaagefür Indesign

Der Lieferant muß sicherstellen, dass die Ware ineinwandfreiem Zustand angeliefert wird (Korrosions-schutz, Verpackung für sicheren Transport).

Rz 25Rz 160

s

25

zyxwut

0,05 Rz 1,60,30,71,62 Rz 166,3 Rz 63 Rz 6,3Rz 12,5

F:\u

ser\k

urz\

3D S

ache

n\3D

Tei

le\Z

eich

nung

en\W

asse

rwaa

ge

?4.1 Storage and transportation

Use transport eyelet. Do not lift manually! Use lifting gear!

Storage at (-30°C) - (+70°C), maximum permissible relative humidity 10% -95 %, no condensation. Do not store in a corrosive, dusty, vaporous atmosphere or in a com-

bustible environment.

Fig. 7

Fig. 6

ATTENTION Attachments(e.g.pipeholders,additionalunits,fasteningparts,etc.) directly to the compressor are not permissible!

Page 11: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

11

9603

1-03

.201

6-DG

bF

4| Compressor assembly

Materialsoldering/weldingconnection:S235(JRG2C) The pipe connections have graduated inside diameters so that pipes with standart millimetre and inch dimensions can be used. The connection diameters of the shut-off valves are rated for maximum compressor output. Theactualrequiredpipecrosssectionmustbematched to the output. The same applies for non-return valves.Fig. 11: graduated

internal diameter

4.3 Connecting the pipelines - solder system

ATTENTION Damage possible.

Superheating can damage the valve.Remove the pipe supports therefore from the valve for soldering and accordingly cool the valve body during and after soldering.Only solder using inert gas to inhibit oxidation products (scale).

• On its high-pressure side, the compressor has a shut-off valve with multi-sided cutting ring for safe installation of the discharge line.

Cutting ring function before tightening the union nut

4.4 Connecting the pipelines - cutting ring system

Tubepreparation:

The tube has to be sawn in a right angle. An angular tolerance of ±1° is permissible. Slightly trim the pipe ends inside and outside. For thin walled steel pipes or soft pipes made of nonferrous metal, reinforcing sleeves have to be used.

Pipeassembly:

Push Union Nut (5) and Cut Ring (3) onto Pipe (2). Insert pipe into Socket (6) as far as it will go and firmly press against pipe stop, otherwise incorrect assembly. Hand tighten union nut until socket, cutting ring and union nut are locked. Tighten union nut 1 ½ turns using a spanner wrench. The cutting ring is noticeably locked to the socket face (for assembly inside pipe connection, hold up valve with a spanner wrench). This should cause the cutting ring with its cutting edges to cut into the pipe resulting in a visible collar. In order to stick to the turns we recommend using marking lines on union nut and pipe. After assembly, it is necessary to check the collar. The gasket must not be damaged. At least 80% of the cutting face has to be covered. After check-up, screw on and tighten again as described above.

Fig. 12Figure similar

. . . . .

Collar

Page 12: GEA Compressor HAX2 CO 2 T Assembly instructions

12

D

GB

F

E

9603

1-03

.201

6-DG

bF

4| Compressor assembly

4.5 Pipes

4.6 Flange shut-off valves (HP/LP)

CAUTION Riskofinjury.

The compressor must be depressurised through connections A andBbeforecommencinganyworkandpriortoconnectingtotherefrigerant system.

Pipes and system components must be clean and dry inside and free of scale, swarf and layers of rust and phosphate. Only use hermetically sealed parts.

Lay pipes correctly. Suitable vibration compensators must be provided to prevent pipes being cracked and broken by severe vibrations.

Ensure a proper oil return. Keep pressure losses to an absolute minimum.

Fig. 13 Fig. 14

4.7 Option:cuttingringscrewjoint(HP/LP)

Remove Schraderconnection HP

RemoveSchraderconnection LP

Abb. 15 Abb. 16

ATTENTION Property damage possible.

The compressor as delivered is equippedwith Schrader valves on the high and low pressure connections. These are used exclusively for changing with inert gas in the factory, and under no circum-stances may they be connected to the refrigeration circuit (the Schrader valves are approved for overpressure up to 28 bar only)!

A B

Page 13: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

13

9603

1-03

.201

6-DG

bF

4 | Compressor assembly

Valve spindle seal

release

tighten

4.9 Operating the shut-off valves

Before opening or closing the shut-off valve, release the valve spindle seal by approx. ¼ of a turn counter-clockwise.

After activating the shut-off valve, re-tighten the adjustable valve spindle seal clockwise.

Fig. 18 Fig. 19

4.8 Laying suction and pressure lines

Aruleofthumb:Alwayslaythefirstpipesectionstartingfromtheshut-offvalvedownwards and parallel to the drive shaft.

ATTENTION Property damage possible.

Improperlyinstalledpipescancausecracksandtearswhichcanresult in a loss of refrigerant.

INFO Proper layout of the suction and pressure lines directly after the compressor is integral to the smooth running and vibration behaviour of the system.

As short as possible

Rigid fixed point

Fig. 17

Page 14: GEA Compressor HAX2 CO 2 T Assembly instructions

14

D

GB

F

E

9603

1-03

.201

6-DG

bF

4 | Compressor assembly

4.10Operatingmodeofthelockableserviceconnections

Pipe connection

Openingtheshut-offvalve:Spindle: turn to the left (counter-clockwise) as far as it will go. —> Shut-off valve completely opened / service connection closed.The connection which cannot be shut off is intended for safety devices.

Opening the service connectionSpindle: Turn ½ - 1 turn to the right clockwise. —> Service connection opened / shut-off valve opened.The connection which cannot be shut off is intended for safety devices.

Spindle

Connection cannot be shut offConnection

blocked

Service connec-tion closed

Pipe connection

Spindle

Connection cannot be shut offConnection

offen

Service connec-tion opened

Fig. 20

Fig. 21

Afteractivatingthespindle,generallyfitthespindleprotectioncapagainandtightenwith40-50Nm.This serves as a second sealing feature during operation.

Page 15: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

15

9603

1-03

.201

6-DG

bF

5| Electrical connection

5 Electrical connection

INFO Connect the compressor motor in accordance with the circuit diagram (see inside of terminal box). Use suitable cable entry point of the correct protection type (see

name plate) for routing cables into the terminal box. Insert the strain reliefs and prevent chafe marks on the cables.Comparethevoltageandfrequencyvalueswiththedataforthe

mains power supply. Only connect the motor if these values are the same.

DANGER Riskofelectricshock!Highvoltage! Onlycarryoutworkwhentheelectricalsystemisdisconnectedfrom the power supply!

5.1 Information for contactor and motor contactor selection

All protection equipment, switching and monitoring devices must comply with the local safetyregulationsandestablishedspecifications(e.g.VDE)aswellasthemanufacturer’sspecifications. Motorprotectionswitchesarerequired! Motor contactors, feed lines, fuses and motor protection switches must be rated according to the maximum operating current (see name plate). For motor protection, use a current-independent, time-delayed overload protection device for monitoring all three phases. Adjust the overload protection device so that it must be actuated within 2 hours at 1.2 times the maximum working current.

ATTENTION Whenattachingaccessorieswithanelectricalcable,aminimumbending radius of 3 x the cable diameter must be maintained for laying the cable.

Page 16: GEA Compressor HAX2 CO 2 T Assembly instructions

16

D

GB

F

E

9603

1-03

.201

6-DG

bF

5 | Electrical connection

5.2 Standardmotor,designedfordirectorpartwindingstart

Designation on the name plate Sticker on the terminal box

Y/YY

Compressors marked in this way are suitable for direct or part winding start. The motor winding is divided into two parts: part winding 1 = 70% and part winding 2 = 30%. This winding devision redu-ces the start-up current during a part winding start to approx. 65% of the value for a direct start.

INFO Mechanicalstartunloaderwithbypasssolenoidisnotrequired.

Page 17: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

17

9603

1-03

.201

6-DG

bF

In the factory, the motor is switched for direct starting (YY). For part winding start (Y/YY), remove the bridges and connect the motor feed cable according to the circuit diagram:

400 V

Direct start YY Part winding start Y/YY

L1

L2

L3

L1

L2

L3

L1 L3L2

PTC

PW II

PW I

PTC

ATTENTION Property damage possible.

Failure to comply results in reversed fields of rotation and cancause motor damage. After the motor has started up with part win-ding1,partwinding2mustbeswitchedonaftermax.1seconddelay. Failure to comply can be detrimental to the service life of the motor.Ensure that power is supplied via K1 to winding 1 (70%) (1U1 / 1V1 / 1W1) and via K2 to winding 2 (30%) (2U1 / 2V1 / 2W1). The motor contactors (K1/K2) are each to be rated for approx. 70% of the max. operating current.

5| Electrical connection

Page 18: GEA Compressor HAX2 CO 2 T Assembly instructions

18

D

GB

F

E

9603

1-03

.201

6-DG

bF

�nderung

0

Datum Name

Datum

Bearb.

Gepr.

Norm

1

02.Feb.2009

Kelich

10.Feb.2010

Urspr.

2

Ers.f.

3

Ers.d.

4

PWMP10

5 6 7

BOCKCOMPRESSORS

8

=

+

9

Bl.

1 Bl.

1

XSS

Q1

L1 L2 L3 N PE

AnschluákastenVerdichter

I=66%

F1.1

K11

2

1

3

4

2

5

6

3

1U1

1V1

1W1

MY/YY

M1

R1

2U1

2V1

2W1

I=33%

F1.2

K21

2

4

3

4

5

5

6

6 PE

X1L1L1 N N 434311 12 14L S M

X2 1 2 3 4 5 6

R2

F1.1

F1.2

4A

F2

S1

7

MP10

8

M

~1

M1.1

K1

9

X3 1

10

2

C1

3

F5

4

T2 N

P™l

L

P>

F3

M S

11 12 13

K1

P

F4

14

K1

K1T

K2

15 16

K1T

P<

B1

17 18

K1

19

E1

20

L1.1L2.1L3.1L1.2

NPE

70% 30%

�nderung

0

Datum Name

Datum

Bearb.

Gepr.

Norm

1

02.Feb.2009

Kelich

10.Feb.2010

Urspr.

2

Ers.f.

3

Ers.d.

4

PWMP10

5 6 7

BOCKCOMPRESSORS

8

=

+

9

Bl.

1 Bl.

1

XSS

Q1

L1 L2 L3 N PE

AnschluákastenVerdichter

I=66%

F1.1

K11

2

1

3

4

2

5

6

3

1U1

1V1

1W1

MY/YY

M1

R1

2U1

2V1

2W1

I=33%

F1.2

K21

2

4

3

4

5

5

6

6 PE

X1L1L1 N N 434311 12 14L S M

X2 1 2 3 4 5 6

R2

F1.1

F1.2

4A

F2

S1

7

MP10

8

M

~1

M1.1

K1

9

X3 1

10

2

C1

3

F5

4

T2 N

P™l

L

P>

F3

M S

11 12 13

K1

P

F4

14

K1

K1T

K2

15 16

K1T

P<

B1

17 18

K1

19

E1

20

L1.1L2.1L3.1L1.2

NPE

5.3 Basic circuit diagram for part winding start

Compressor terminal box

R1 Cold conductor (PTC sensor) motor windingR2 Thermal protection thermostat (PTC sensor)F1.1 / 1.2 2 motor protection switches (70% / 30% of I A total)F2 Control power circuit fuseF3 High pressure safety monitorF4 Safety chain (high/low pressure monitoring)F5 Oil differential pressure monitorC1 Operating capacitor fanB1 Release switch (thermostat)

Fig. 22

Page 19: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

19

9603

1-03

.201

6-DG

bF

�nderung

0

Datum Name

Datum

Bearb.

Gepr.

Norm

1

02.Feb.2009

Kelich

10.Feb.2010

Urspr.

2

Ers.f.

3

Ers.d.

4

PWMP10

5 6 7

BOCKCOMPRESSORS

8

=

+

9

Bl.

1 Bl.

1

XSS

Q1

L1 L2 L3 N PE

AnschluákastenVerdichter

I=66%

F1.1

K11

2

1

3

4

2

5

6

3

1U1

1V1

1W1

MY/YY

M1

R1

2U1

2V1

2W1

I=33%

F1.2

K21

2

4

3

4

5

5

6

6 PE

X1L1L1 N N 434311 12 14L S M

X2 1 2 3 4 5 6

R2

F1.1

F1.2

4A

F2

S1

7

MP10

8

M

~1

M1.1

K1

9

X3 1

10

2

C1

3

F5

4

T2 N

P™l

L

P>

F3

M S

11 12 13

K1

P

F4

14

K1

K1T

K2

15 16

K1T

P<

B1

17 18

K1

19

E1

20

L1.1L2.1L3.1L1.2

NPE

�nderung

0

Datum Name

Datum

Bearb.

Gepr.

Norm

1

02.Feb.2009

Kelich

10.Feb.2010

Urspr.

2

Ers.f.

3

Ers.d.

4

PWMP10

5 6 7

BOCKCOMPRESSORS

8

=

+

9

Bl.

1 Bl.

1

XSS

Q1

L1 L2 L3 N PE

AnschluákastenVerdichter

I=66%

F1.1

K11

2

1

3

4

2

5

6

3

1U1

1V1

1W1

MY/YY

M1

R1

2U1

2V1

2W1

I=33%

F1.2

K21

2

4

3

4

5

5

6

6 PE

X1L1L1 N N 434311 12 14L S M

X2 1 2 3 4 5 6

R2

F1.1

F1.2

4A

F2

S1

7

MP10

8

M

~1

M1.1

K1

9

X3 1

10

2

C1

3

F5

4

T2 N

P™l

L

P>

F3

M S

11 12 13

K1

P

F4

14

K1

K1T

K2

15 16

K1T

P<

B1

17 18

K1

19

E1

20

L1.1L2.1L3.1L1.2

NPE

Q1 Main switchM1 Compressor motorM1.1 Fan motorK1 Mains contactor (part winding 1)K2 Mains contactor (part winding 2)K1T Delay relay max. 1sS1 Control voltage switchE1 Oil sump heaterXSS Terminal strip in the external switch cabinet

Page 20: GEA Compressor HAX2 CO 2 T Assembly instructions

20

D

GB

F

E

9603

1-03

.201

6-DG

bF

5 | Electrical connection

Fig. 23

Temperature monitoring connections: Motor winding: Terminals 1 - 2 Thermal protection thermostat: Terminals 3 - 4 Restart prevention: Terminals 5 - 6

ATTENTIONTerminals 1 - 6 on the trigger unit MP10 and terminals PTC 1 and PTC 2 on the compressor terminal board must not come into contact with mains voltage. This would destroy the trigger unit and PTC sensors.The supply voltage at L1-N (+/- for DC 24 V version) must be identical to the voltage at terminals11,12,14and43.

5.6 Electronic trigger unit MP10

Thecompressormotorisfittedwithcoldconductortemperaturesensors(PTC)connectedtotheelec-tronic trigger unit MP10 in the terminal box. Readiness to operate is signalled by the H3 LED (green) after the power supply is applied. In the case of excess temperature in the motor winding, the unit switches off the compressor and the H1 LED lights red.

The hot gas side of the compressor can also be protected against overtemperature using a thermal protection thermostat. The H2 LED (red) is provided for the protection function.

The unit trips when an overload or inadmissible operating conditions occur. Find and remedy the cause.

5.7 Connection of the trigger unit MP10

INFO Theunithasarestartpreventiondevice.Afteryouhaverectifiedthefault,interruptthemainsvoltage.Thisunlockstherestartpreventiondevice and the LEDs H1 and H2 go out.

INFO Connect the trigger unit MP10 in accordance with the circuit dia-gram. Protect the trigger unit with a delayed-action fuse (F) of max.4A.Inordertoguaranteetheprotectionfunction,installthetriggerunitasthefirstelementinthecontrolpowercircuit.

Terminal box

Page 21: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

21

9603

1-03

.201

6-DG

bF

5 | Electrical connection

5.8 Function test of the trigger unit MP10

The compressor and the trigger unit MP10 are operational when the H3 LED (green) lights.

Pos ProcedureLED H1 LED H2 LED H3

red red green1 • Interrupt power supply (L1 or S1) OFF OFF OFF

• Release the motor temperature sensor connection (1 or 2)• Release the hot gas temperature sensor (if installed) (3 or 4)

2 • Restore the power supply (L1 or S1) ON• Function check of motor temperature sensor: operational ON• Function check of hot gas temperature sensor: operational ON

3 • Interrupt power supply again (L1 or S1) OFF OFF OFF• Reconnect terminals 1 or 2 and/or 3 or 4

4 •Restorethepowersupply(L1orS1): OFF OFF ON• MP10 is operational again

Before start-up, troubleshooting or making changes to the control power circuit, check the functionality of the trigger unit:

Operation: The oil sump heater operates when the compressor is at a standstill. When the compressor starts up, the oil sump heating switches off.

Connexion:The oil sump heater must be connected via an auxiliary contact (or parallel wired auxiliary contact) of the compressor contactor to a seperate electric circuit.

Electricaldata:230V-1-50/60Hz,160W.

ATTENTION The oil sump heater must generally be connected and operated!

5.7 Oil sump heater

Inordertoavoiddamagetothecompressor,thecompressorisequippedwithanoilsumpheaterasa standart feature.

5.8 Ventilator motor

The ventilator motor for cooling the compressor is already wired in the terminal box. Please consult the main-line wiring diagram in the terminal box for the power supply and triggering via the compressor contactor. The ventilator motor is protected by a pressure controller.

Electricaldata:230V-1-50/60Hz140W/0,71A.

Page 22: GEA Compressor HAX2 CO 2 T Assembly instructions

22

D

GB

F

E

9603

1-03

.201

6-DG

bF

6| Commissioning

6.1 Preparations for start-up

The compressor has undergone trials in the factory and all functions have been tested. There are therefore no special running-in instructions.

Checkthecompressorfortransportdamage!

INFO In order to protect the compressor against inadmissible opera-tingconditions,high-pressureandlow-pressurepressostatscontrols are mandatory on the installation side.

WARNING When the compressor is not running, depending on ambient temperature and amount of refrigerant charge, it is possiblethat the pressure may rise and exceed permitted levels for the compressor.Adequateprecautionsmustbetakentopreventthishappening(e.g.usingacoldstoragemedium,areceivertank,asecondaryrefrigerantsystem,orpressurereliefdevices).

6.3 Leaktest

Carry out the leak test on the refrigerating plant in accordance with EN 378-2 or a corresponding safety standard, while always observing the maximum permissible overpressure for the compressor.

DANGER Riskofbursting!The compressor must only be pressurised using nitrogen (N2). Never pressurise with oxygen or other gases!The maximum permissible overpressure of the compressor must not be exceeded at any time during the testing process (see name plate data)! Do not mix any refrigerant with the nitrogen as this could cause the ignition limit to shift into the critical range.

6.2 Pressure strength test

The compressor has been tested in the factory for pressure integrity. If however the entire system is to be subjected to a pressure integrity test, this should be carried out in accordance with EN 378-2 or a corresponding safety standard without the inclusion of the compressor.

Page 23: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

23

9603

1-03

.201

6-DG

bF

6.4 Evacuation

First evacuate the system and then include the compressor in the evacuation process. Relieve the compressor pressure. Open the suction and pressure line shut-off valves. Turn on the oil sump heater. Evacuate the suction and discharge pressure sides using the vacuum pump. The vacuum has to be broken with nitrogen several times between the evacuation. At the end of the evacuation process, the vacuum should be < 1.5 mbar when the pump is switched off. Repeatthisprocessasoftenasisrequired.

6| Commissioning

Make sure that the suction and pressure line shut-off valves are open.

6.5 Refrigerant charge

Fillingtheliquidrefrigerant:Itisrecommendedthatthesystemfirstbefilledat standstill with gas on the high-pressure side up to a system pressure of at least5.2bar(ifitisfilledbelow5.2barwithliquid,thereisariskofdryiceformation).Furtherfillingaccordingtosystem.

To eliminate the possibility of dry ice formation when the system is operating (duringandafter thefillingprocess), theshut-offpointof the low-pressureswitch should be set to a value of at least 5.2 bar.

Arefrigerantsupplement,whichmaybecomenecessaryafterstart-up,canbe topped up in vapour form on the suction side.

ATTENTION Do not start the compressor if it is under vacuum. Do not apply any voltage - even for test purposes (must only be operated with refrigerant).Under vacuum, the spark-over and creepage current distances of the terminal board connection bolts shorten; this can result in winding and terminal board damage.

ATTENTION Avoidoverfillingthemachinewithrefrigerant! Do not charge liquid refrigerant into the suction-side on the

compressor. Do not mix additives with the oil and refrigerant.

CAUTION Wear personal protective clothing such as goggles and protective gloves!

WARNING Never exceed the max. permissible pressures while charging. Precautionsmustbetakenintime.

INFO Depending upon design of the CO2 refrigerant filling bottle(with/without tubing) CO2 can be filled in liquid after weight or gaseously.Use only high-dried CO2quality(see chapter 3.1)!

Page 24: GEA Compressor HAX2 CO 2 T Assembly instructions

24

D

GB

F

E

9603

1-03

.201

6-DG

bF

6 | Commissioning

6.7 Pressure switch

Check that the safety and protection devices (pressure switch, motor protection, electrical contact protection measures, etc.) are functioning properly.

Switch on the compressor and let it run for at least 10 minutes. Themachineshouldreachastateofequilibrium. Check the oil level: The oil level must be visible in the sight glass. After a compressor is replaced, the oil level must be checked again. If the level is too high, oil mustbedrainedoff(dangerofoilliquidshocks;reducedcapacityoftherefrigeratingsystem).

Suitably adjusted pressure switches that switch off the compressor before reaching the maximum permissible operating pressure must be installed in the system. The pressure reduction for the pressure switches can occur either at the suction and pressure lines between the shut-off valve and compressor or at the non-lockable connections for the shut-off valves (connections A and B, see Chapter 9).

WARNING Ensure that both shut-off valves are open before starting the compressor!

ATTENTION Iflargerquantitiesofoilhavetobetoppedup,thereisariskofoilimpacteffects.Ifthisisthecase,checktheoilreturn!

6.6 Start-up

Page 25: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

25

9603

1-03

.201

6-DG

bF

6 | Commissioning

CO2 streaming out

Fig. 24

6.8 Decompression valves

ATTENTION Thecompressorisfittedwithtwodecompressionvalves.Onevalveeach on the suction and discharge side. If excessive pressures are reached,thevalvesopenandpreventfurtherpressureincrease.Thereby CO2 is blown off to the ambient!Intheeventthatapressurereliefvalveactivatesrepeatedly,checkvalve and replace if necessary as during blow-off extreme condi-tionscanoccure,whichmayresult inapermanent leak.Alwayschecksystemforrefrigerantlossafteractivationofpressurereliefvalve!

The decompression valves do not replace any pressure switches and the additional safety valves in the system. Pressure switches mustalwaysbeinstalledinthesystemanddesignedoradjustedinaccordance with EN 378-2 or appropriate safety standards.FailuretoobservecanresultinriskofinjuryfromCO2 streaming out of the two decompression valves!

Page 26: GEA Compressor HAX2 CO 2 T Assembly instructions

26

D

GB

F

E

9603

1-03

.201

6-DG

bF

7 | Maintenance

6.9 Avoid slugging

7.1 Preparation

7| Maintenance

Topreventslugging: The complete refrigeration plant must be properly designed. All components must be compatibly rated with each other with regard to output (particularly the

evaporator and expansion valves). Suction gas superheating at the compressor input should be > 10 K (check the setting of the

expansion valve). Regard oil temperature and pressure gas temperature. (The pressure gas temperature has to be

high enough min. 50°C, so the oil temperature is > 30°C). Thesystemmustreachastateofequilibrium. Particularlyincriticalsystems(e.g.severalevaporatorpoints),measuressuchastheuseofliquidtraps,solenoidvalveintheliquidline,etc.arerecommended.

There should be no movement of refrigerant in the compressor while the system is at a standstill.

ATTENTION Slugging can result in damage to the compressor and cause refrigeranttoleak.

WARNING Beforestartinganyworkonthecompressor: Switch off the compressor and secure it to prevent a restart. Relieve compressor of system pressure.Preventairfrominfiltratingthesystem!Aftermaintenancehasbeenperformed: Connect safety switch. Evacuate compressor.Releaseswitch-onlock.

WARNING The decompression has to be carried out in a way that no dry ice respectively solid CO2 is producedwhich blocks the outlet andcould hinder the streaming out of CO2. Otherwise, there is the danger that pressure can be built up again.

6.10 Filter dryerGaseous CO2hasasignificantlylowersolubilityinwaterthanotherrefrigerants.Atlowtemperaturesitcanthereforecauseblockingofvalvesandfiltersduetoiceorhydrate.Forthisreasonwerecom-mendtheuseofanadequatelysizedfilterdrierandasightglasswithamoistureindicator.

Page 27: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

27

9603

1-03

.201

6-DG

bF

7 | Maintenance

Available accessories can be found on the Internet at www.gea.com.

7.4 Accessories

7.6 DecommissioningClose the shut-off valves on the compressor. CO2 does not need to be recycled and can therefore be blown off into the environment. It is essential to ensure good ventilation or conduct the CO2 into the outdoors to avoid danger of suffocation. When releasing CO2, avoid a fast drop in pressure to prevent oil from exiting with it. If the compressor is unpressurized, remove the piping on the pressure- and suction-side (e.g. dismantling of the shut-off valve, etc.) and remove the compressor using an appropriate hoist. Dispose of the oil inside in accordance with the applicable national regulations.When decommissioning the compressor (eg. for service or replacement of the compressor) larger amounts of CO2intheoilcanbesetfree.Ifthedecompressionofthecompressorisnotsufficientenough, closed shut-off valves may lead to intolerable excessive pressure. For this reason the suction side (LP) and the high pressure side (HP) of the compressor have to be secured by decompression valves.

7.5 LubricantsFor operation with CO2 the GEA oil C 85 E is necessary!

7.2 Worktobecarriedout

In order to guarantee optimum operational reliability and service life of the compressor, we recommend carrying out servicing and inspection work at regular intervals: Oilchange:

- not mandatory for factory-produced series systems. - forfieldinstallationsorwhenoperatingneartheapplicationlimit:forthefirsttimeafter100

to 200 operating hours, then approx. every 3 years or 10,000 - 12,000 operating hours. Dispose of used oil according to the regulations; observe national regulations.

Annual checks: Oil level, leak tightness, running noises, pressures, temperatures, function of auxiliary devices such as oil sump heater, pressure switch.

HAX2/ ... CO2 T 70-4 90-4 110-4 130-4

Designation Item No. Item No. Item No. Item No.

Set of gaskets 80538

Set of valve plate kit 80532 80533

Set of piston/connecting rod 80508 80528 80529

Set of connecting rod 80520

Only use genuine GEA spare parts!

7.3 Spare part recommendation

Page 28: GEA Compressor HAX2 CO 2 T Assembly instructions

28

D

GB

F

E

9603

1-03

.201

6-DG

bF

8 | Technical dataTy

pe

No. of cylinders

Disp

lace

men

t50

/60

Hz

(145

0 / 1

740

rp

m)

Elec

tric

al d

ata

Weight

C

onne

ctio

ns

Oil chargeVo

ltage

Max

.Op

erat

ing

curr

ent

PW

1+

2

Max

. pow

er

cons

ump-

tion

Star

ting

curr

ent

(rotorlock

ed)

PW 1

/ PW

1+

2

Disc

harg

elin

e DV

Suct

ion

line

SV

m3 /

hA

kWA

kgm

m (i

nch)

mm

(inc

h)Lt

r.

HAX

2/70

-4 C

O2

T

2

6,20

/ 7,

4015

,19,

357

/ 75

149

1822

2,5

HAX

2/90

-4 C

O2

T7,

70 /

9,30

20,5

12,0

82 /

107

160

HAX

2/11

0-4

CO2

T9,

70 /

11,6

026

,715

,711

0 / 1

4116

3

HAX

2/13

0-4

CO2

T11

,50

/ 13,

8031

,818

,512

7 / 1

6116

0

12

3

2

4

380-420VY/YY-3-50HzPW440-480VY/YY-3-60HzPWPW=Part WindingWinding ratio: 70%/30%

Tole

ranc

e (±

10%

) rel

ativ

e to

the

mea

n va

lue

of th

e vo

ltage

rang

e.Othe

rvoltage

san

dtype

sofcurrentonrequ

est.

-Th

especifica

tionsfo

rmax

.pow

ercon

sumptionap

plyfor5

0Hzop

eration.

Fo

r60H

zop

eration,th

especifica

tionshavetobemultip

liedbyth

efactor

1.2.

The

max

. wor

king

cur

rent

rem

ains

unc

hang

ed.

-

Take

acc

ount

of t

he m

ax. o

pera

ting

curr

ent /

max

. pow

er c

onsu

mpt

ion

for

de

sign

of f

uses

, sup

ply

lines

and

saf

ety

devi

ces.

Fus

e: C

onsu

mpt

ion

cate

gory

AC3

1 2

Allspe

cific

ationsarebased

ontheaverag

eofth

evolta

gera

nge

Com

pres

sion

join

t for

ste

el p

ipes

3 4

Page 29: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

29

9603

1-03

.201

6-DG

bF

210

4x 1137052

ca.235

ca.1

80 F,M

HEK

L1B

DV

O

50320

300ca.

262

260

22

ca.4

15

175

SchwingungsdämpferVibration absorbersAmortisseurs de vibration

30

50

10M25

J

A

SV

ca.560

Subject to change without noticeÄnderungen vorbehalten Maße in mm

1.0850-10751.0 cHGX2/90-4 CO2 T

Cotes en mm

HGX2/70-4 CO2 TTyp

10750

Massenschwerpunkt

Halbhermetischer Verdichter HG / Semi-hermetic compressor HG / Compresseur semi-hermétique HG

Centre de gravité

10786

Sous réserve de toutes modifications

Centre of gravity

Teile Nr.

Dimensions in mm

HGX2/130-4 CO2 T 10751 10752

HGX2/110-4 CO2 T

Anschlüsse Connections RaccordsSV Sauganschluss, Rohr mit Schneidring Suction connection, pipe with cutting ring Raccord aspiration, tube avec bague coupante mm 20DV Druckanschluss, Rohr mit Schneidring Discharge connection, pipe with cutting ring Raccord refoulement, tube avec bague coupante mm 10 A Anschluss Saugseite, nicht absperrbar Connection suction side, not lockable Raccord côté aspiration, non obturable Zoll 1/8“ NPTF B Anschluss Druckseite, nicht absperrbar Connection discharge side, not lockable Raccord côté refoulement, non obturable Zoll 1/8“ NPTF E Anschluss Öldruckmanometer Connection oil pressure gauge Raccord du manomètre de pression d'huile Zoll 7/16“ UNF F Ölablass Oil drain Vidange d'huile mm M22x1,5 H Stopfen Ölfüllung Oil charge plug Bouchon de remplissage d'huile Zoll 1/8" NPTF

J Ölsumpfheizung Oil sump heater Chauffage du carter d'huile mm 15 K Schauglas Sight glass Voyant Zoll G 1“ L1 Wärmeschutzthermostat Thermal protection thermostat Thermostat de protection thermique Zoll 1/8“ NPTF M Ölsieb Oil filter Filtre à l’huile mm M22x1,5 O Anschluss Ölspiegelregulator Connection oil level regulator Raccord régulateur de niveau d’huile Zoll G 1"

2 Rz 25 Rz 166,3 Rz 63 Rz 6,3

Maßstab:

%

F

E

D

C

B

A

F

E

D

C

CA

D-Z

eich

nung

- D

arf n

ur m

asch

inel

l geä

nder

t wer

den.

4 3 2 1

A

B

5678

1

1,6

345678

Zeichn.-Nr. / Drawing no. /Numéro de plan:

Tol.-Ang. DIN ISO 2768-mK

1R

evis

ions

durc

hlau

f:

Pos. 465 entf.; Anh. Schraderventil; Neues Klemmbr.; Motordeckel 24 Schr.

Rz 160

Ra Rz

s

25

Kurbelwelle & Pleuel; Werte für Einzeldruckprüfung; Pos.115 mit Loctite 566Maß Passung Freigabe

Alternativbezug:Baumustergeprüft

Teil inaktiv

Lieferantenzeichnung

--

K.-Auftrag:PL:

Zeichnung ungültig

Entwicklungsstand

Teil keine Serie

120400

±0.5

über 0.5bis 6

Benzstraße 7 - 72636 Frickenhausen - Germany - www.bock.de

SchaichSchaichSchaich

BüttnerDiegelDiegel

07.04.0917.03.0815.11.07

7341, 74877211,7253,7254

7148,7167

---

Neue Baugrößen und Scheiben hinzu, Blende entfällt, Schwerpunkt in MaßblattVerschlussbutzen 1/8"; Isolationsfolie; hoher Zylinderdeckel

cba

-

SchaichDiegel15.11.077166,7150-a

-Unbemaßte Radien:

2

Rz 12,50,7 0,3

±0.1

Gewicht: (kg)

Gußtoleranzen:

Zust.

-

zyxwut

an dieser Zeichnung vor.

Bearb.DatumÄnderungs-Nr.

Werkstoff:

Ausgangsteil, bzw. Rohteil:-

-

Gepr.

NameDatum19.06.

18.06.07

0,05 Rz 1,6

WerkstückkantenDIN ISO 13715

Ersatz für:

Ersetzt durch:

Erstellt2006

Geprüft

5.0000-V2777.0 b

LayhDiegel

Zone

1/4

Oberflächenbehandlung / Härte:-

Blatt:

Änderungsbeschreibung

400Benennung:

±0.8

1000 30 6

ca.160

±0.3

12030

±0.2

Zeichn.-Nr. Teile-Nr.

Oberflächenangabennach DIN ISO 1302

1.0850-10751.0

Diese Zeichnung ist unser Eigentum!Sie darf ohne unsere Genehmigung weder nach-gebildet, vervielfältigt, oder Dritten Personen zu-gänglich gemacht werden. Der Nachbau nachdieser Zeichnung, oder an Hand der nach dieserZeichnung hergestellten Gegenstände durch denAbnehmer oder Dritte ist nicht gestattet.Wir behalten uns alle Rechte, gemäß DIN ISO 16016

HGX2/110-4 CO2 T

ca.345

Maße Zubehör / Dimensions Accessories / Dimension Accessories

ca.610

ca.7

15

Vibrationsdamper

ca.675370

ca.24557

ca.1

85

J1

A2

260

22

ca.4

15

ca.340

320

175

2104x 11

F,M

H

KE

LB2

O

X1X2

50

30 M1025

SchwingungsdämpferVibration absorbers

262

134 134 2

62

B1DV

B

A1

ASV

1.0850-10745.0 0m

Halbhermetischer Verdichter HA / Semi-hermetic compressor HA

MassenschwerpunktCentre of gravity

Änderungen vorbehaltenSubject to change without notice

Maße in mmDimensions in mm

Maße und Anschlüsse mit Absperrventile /measures and connections with shut-off valves

Typ / type Teile-Nr. / part-no.HAX2/70-4 CO2 T 10785HAX2/90-4 CO2 T 10744HAX2/110-4 CO2 T 10745HAX2/130-4 CO2 T 10746

Anschlüsse /Connections

SVSaugabsperrventil, Rohr (L/SW, SR)* mm - Zoll

22 - 7/8"Suction line valve, tube (L/SW, SR)* mm - inch

DVDruckabsperrventil, Rohr (L/SW, SR)* mm

18Discharge line valve, tube (L/SW, SR)* mm

AAnschluss Saugseite, nicht absperrbar Zoll

7/16“ UNFConnection suction side, not lockable inch

A1Anschluss Saugseite, absperrbar Zoll

7/16“ UNFConnection suction side, lockable inch

A2Anschluss Saugseite, nicht absperrbar Zoll

1/8“ NPTFConnection suction side, not lockable inch

BAnschluss Druckseite, nicht absperrbar Zoll

7/16“ UNFConnection discharge side, not lockable inch

B1Anschluss Druckseite, absperrbar Zoll

7/16“ UNFConnection discharge side, lockable inch

B2Anschluss Druckseite, nicht absperrbar Zoll

1/8“ NPTFConnection discharge side, not lockable inch

EAnschluss Öldruckmanometer Zoll

1/8“ NPTFConnection oil pressure gauge inch

FÖlablass

mm M22x1,5Oil drain

HStopfen Ölfüllung Zoll

1/8“ NPTFOil charge plug inch

J1Ölsumpfheizung

mm 15oil sump heater

KSchauglas Zoll

G 1"Sight glass inch

LAnschluss Wärmeschutzthermostat Zoll

1/8“ NPTFConnection thermal protection thermostat inch

M Ölsieb

mm M22x1,5 Oil filter

OAnschluss Ölspiegelregulator Zoll

G 1"Connection oil level regulator inch

X1Schraderanschluss, Saugseite Zoll

7/16“ UNFConnection for schrader valve, suction side inch

X2Schraderanschluss, Druckseite Zoll

7/16“ UNFConnection for schrader valve, discharge side inch

(L/SW, SR)* = Löt-/Schweissanschluss, Schneidring(L/SW, SR)* = sold./weld. connection, cutting ring

F

E

D

C

A

F

E

D

C

4 1

A

B

5678

12345678

Zeichn.-Nr. / Drawing no. :

B

3 2

1071

40D

ok-ID

:

Der Lieferant muss sicherstellen, dass die Ware in einwandfreiem Zustand angeliefert wird (Korrosionsschutz, Verpackung für sicheren Transport). The supplier has to ensure the delivery of parts in proper conditions (corrosion prevention, packaging for safe transportation).Weitergabe sowie Vervielfältigung dieses Dokuments, Verwertung und Mitteilung seines Inhalts sind ver-boten, soweit nicht ausdrücklich gestattet. Zuwider-handlungen verpflichten zu Schadenersatz. Alle Rechte für den Fall der Patent-, Gebrauchsmuster- oder Geschmacksmustereintragung vorbehalten. The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization is prohibited. Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.

-Ersatz für / replacement for:

Allgemeintoleranzen / General tolerancesDIN ISO 2768-mK

Ra Rz

Maß / Dimension Passung / Clearance

Baumustergeprüft / Type examination:

--

K.-Auftrag / C.-Task:Projektleiter / Project leader:

120400±0.5

0.56

GEA Bock GmbH - Benzstraße 7 - 72636 Frickenhausen - Germany - www.bock.de

-

-

-Unbemaßte Radien / Undimensioned radii:

-

Bearb. / EditedDatum / DateÄnd.-Nr. / Mod-No.

Werkstoff (Zeile 2+3 alternativ) /Material (Line 2+3 alternative):

Ausgangsteil, Rohteil / Base part, Raw part:

-

-

Geprüft / Appr.

NameDatum / Date01.12.0618.06.07

Werkstückkanten /Workpiece edgesDIN ISO 13715

Erstellt / DrawnGeprüft / Verified Layh

Diegel

1/4

Oberflächenbehandlung, Härte / Treatment of surface, Hardness:-

Blatt /Page:

400Benennung / Description:

±0.81000

30 6

-

±0.312030

±0.2

Zeichnungs-Nr. /Drawing-No.

Oberflächenangaben / Indication of surface texture DIN EN ISO 1302

Zust. / Rev.

Gußtoleranzen / General casting tolerances:

Gewicht / Weight: (kg)

±0.1

Maßstab /Scale:

%

MC- HAX2/110-4 CO2 T

Rz 25Rz 16025 0,05 Rz 1,60,30,71,62 Rz 166,3 Rz 63 Rz 6,3Rz 12,5Status:

-

-

frei (CAD)

Nein / No 10745 .0

19.12.11

20.01.12

19.12.13

28.01.14

28.04.14

Buettner

Egli

Zuder

Gneiting

Zuder

0i | Betriifft Blatt 2

0j | Anschluss E von 7/16" UNF auf 1/8" NPTF geändert

0k | betrifft Blatt 2+3

0l | Ölsumpfheizung 07008 durch 50935 und Verschlussstopfen 50045 durch 50960 ersetzt

0m | Wärmeschutzthermostat und Flanschabsperrventile als Zubehör

8146

8174

8553,8776

8882

8556

Keuerleber

Layh

Keuerleber

Layh

Keuerleber

MK- HAX2/110-4 CO2 T

-08501.

Kunde / Customer:-

s t u w x y z

Alt.bezug / Alt.supply:

-

-Extranet:

Freigabe / Approved

über / abovebis / up to

Teile-Nr. /Part-No.

9 | Dimensions and connections

SVDV

Suction lineDischarge line see technical data, Chapter 8

A Connection suction side, not lockable 7/16“ UNF

A1 Connection suction side, lockable 7/16“ UNF

A2 Connection suction side, not lockable 1/8“ NPTF

B Connection discharge side, not lockable 7/16“ UNF

B1 Connection discharge side, lockable 7/16“ UNF

B2 Connection discharge side, not lockable 1/8“ NPTF

E Connection oil pressure gauge 7/16“ UNF

F Oil drain M22 x 1,5

H Oil charge plug 1/8“ NPTF

J1 Oil sump heater Ø 15 mm

K Sight glass G 1"

L Connection thermal protection thermostat 1/8“ NPTF

M Oilfilter M22 x 1,5

O Connection oil level regulator G 1"

Dimensions in mmFig. 25

Centre of gravity

Page 30: GEA Compressor HAX2 CO 2 T Assembly instructions

30

D

GB

F

E

9603

1-03

.201

6-DG

bF

10| Declaration of installation

DECLARATION OF INSTALLATION

for using the compressors within the European Union(in accordance with Machinery Directive 2006/42/EC)

The manufacturer: GEA Bock GmbH, Benzstraße 7 72636 Frickenhausen, Tel.: 07022/9454-0

hereby declares that the refrigerating compressor HAX2 CO2 Tcomplieswiththebasicrequire-ments of Appendix II 1B of the Machinery Directive 2006/42/EC. Applied harmonised standard:

EN 12693:2008 and the corresponding standards referenced

A partly completed machine may only be put into operation when it has been established that the machine, into which the partly completed machine is to be installed, conforms to the regulations of the Machinery Directive (2006/42/EC).

Themanufacturerundertakestotransmitelectronicallythespecialdocumentationrequiredbyindividualstatesforpartlycompletedmachineryonrequest.

ThespecialtechnicaldocumentationrequiredforpartlycompletedmachineryhasbeencreatedinaccordancewithAppendixVIIPartB.

Person responsible for documentation is: Wolfgang Sandkötter, Benzstraße 7, 72636 Frickenhausen.

Frickenhausen, 01.11.2011 ppa. Wolfgang Sandkötter, ChiefDevelopmentOfficer

Page 31: GEA Compressor HAX2 CO 2 T Assembly instructions

D

GB

F

E

31

9603

1-03

.201

6-DG

bF

Dear customer,

GEAcompressorsaretop-quality,reliableandservice-friendlyqualityproducts. Ifyouhaveanyquestionsaboutinstallation,operationandaccessories,pleasecontactourtechnicalservice or specialist wholesaler and/or our representative. The GEA service team can be contacted by phone with a toll-free hotline 00 800 / 800 000 88 or via e-mail:[email protected]

Yours faithfully

GEABockGmbH

Benzstraße7

72636Frickenhausen

Germany

11| Service

Page 32: GEA Compressor HAX2 CO 2 T Assembly instructions

32

D

GB

F

E

9603

1-03

.201

6-DG

bF96

031-

03.2

016-

DG

bF ©

GEA

Gro

up A

G. A

ll rig

hts

rese

rved

.

GEA Bock GmbH

Benzstraße 7, 72636 Frickenhausen, GermanyTelephone: +49 7022 9454-0, Fax: +49 7022 [email protected], www.gea.com

We live our values.Excellence • Passion • Integrity • Responsibility • GEA-versity

GEA Group is a global engineering company with multi-billion euro sales and operations in more than 50 countries. Founded in 1881, the company is one of the largest providers of innovative equipment and process technology. GEA Group is listed in the STOXX® Europe 600 index.