Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst...

30
Gathright Dam Case History – Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E., P.G. Geotechnical Engineer – Schnabel Engineering 19 September 2012 Virginia

Transcript of Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst...

Page 1: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Gathright Dam Case History –Constructing a Dam in Karst Geology

H. Marcus Kim, P.E.Geotechnical Engineer - USACE

F. Alex Rutledge, P.E., P.G.

Geotechnical Engineer – Schnabel Engineering

19 September 2012

Virginia

Page 2: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

• Gathright Dam General Information

• Site Geology

• Challenges

• Solutions

PRESENTATION OUTLINE

Page 3: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

General Information - Location

Page 4: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

General Information – Site Map

Gathright Dam

Lake Moomaw

Jackson River

Emergency Spillway

Page 5: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

• Flood Control Act of 1946

• Study Completed in 1964

• Construction 1974 – 1979

• Filling of Reservoir

1979 - 1982

General Information – Project History

Page 6: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

General Information – Typical Dam Cross Section

: clayey silts and silty clays: sand-gravel size material: quarry spall material(2”-6” size)

: up to 16”

UPSTREAM DOWNSTREAM

134

4

2 34

2 Max. Height257-ft

Page 7: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

General Information – Features

Page 8: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

General Information – Features

Dam Crest

Width: 32-ftLength at top: 1,310-ft

Page 9: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

General Information – Features

Page 10: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

General Information – Features

INTAKE TOWER

260-ft TallMulti-level Release Gates

Page 11: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

General Information – Features

LAKE MOOMAW

Length: 12-milesShoreline: 43.5-milesDepth: 80-ft (Avg) & 150-ft (Intake Tower)Surface Area: 2,530-acres

Page 12: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

General Information – Elevations

Flood Control

Spillway El = 1667.5

El = 1554

Top of DamEl = 1684.5

NTS

El = 1582

Conservation Pool

Spillway Design Flood El = 1679.5

El = 1610

Invert Elev at Intake 1430.5

OutletWorks Invert Elev at

Outlet 1424.6

PMF El = 1670.6

Pool of RecordEl. 1598.4Jan 1996

Page 13: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

General Information

• Built and Operated by USACE Norfolk District

• Provides:

• Flood Control – Protection of properties along the Jackson and James Rivers (immediate protection of Covington, VA)

• Water Quality Augmentation – Regulation of the Jackson River minimum flow rate, temperature, and DO levels.

• Recreation – Lake Moomaw and its surrounding areas (camp sites, trails, etc.). Operated and maintained by US Forest Service.

Page 14: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Geology

• Located in the Appalachian Valley and Ridge Province of Virginia

• Nearly parallel synclinal valleys and anticlinal ridges from intensely folded sedimentary rocks

• Dam located on the Jackson River (Eroded anticlinal ridge)

Typical physiography of Valley and Ridge Province

N

Page 15: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Geology – Site Geologic MapLICKING CREEK: LIMESTONE

HEALING SPRING: SANDSTONE

COEYMANS: LIMESTONE

UPPER KEYSER: LIMESTONE

CLIFTON FORGE:LIMESTONE, SANDSTONE & MINOR SILTSTONE

LOWER KEYSER: LIMESTONE, SANDSTONE, & MINOR SILTSTONE

TONOLOWAY: LIMESTONE

Page 16: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Stilling Basin Mitigation(Tonoloway Formation)

• Artesian flow encountered – 1,000+ gpm

• Consolidation Grouting Program

• Depths 20’ to 40’, total of 7,370-linear feet drilled & grouted

• Cavities (avg. 2.5’ vertically) encountered in 98 of the 206 holes.

• Total of 9,803 ft3 of solids (cement & sand) injected

ZONE OF CONSOLIDATION GROUTING BENEATH

CONCRETE SLABS

Page 17: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Solutions – Stilling Basin Construction Pictures

Concrete slab construction

Tunnel lining frame at Outlet

Nearly completed

Page 18: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Geology – Geologic Cross Section

TOP OF DAM ELEV. 1684.5 FT

NORMAL CONSERVATION POOL 1582.0 FT

LEFT ABT RIGHT ABT

Page 19: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,
Page 20: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Foundation & Abutments Mitigation(Upper Keyser & Coeymans Formations)

• Seepage control & foundation improvement measures included:

• Concrete Membrane in left abutment bedrock

• Consolidation grouting on abutments/foundation

• Curtain grouting along foundation alignment

Page 21: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Solutions – Foundation & Abutment Schematic

APPROXIMATE LIMITS OF CONSOLIDATION GROUTING (OUTER LIMIT OF CORE AND

FILTER ZONE1)

APPROX. CENTERLINEL OF CURTAIN GROUT

Spacing for consolidation grouting (top) and grout curtain (bottom)

Grouting and Concrete Membrane

Profile of centerline of grout curtain along portion of river channel and

right abutment

Page 22: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Solutions – Foundation & Abutment Schematic

Left Abutment

Concrete Membrane Wall

Seal Grouting

Consolidation Grouting

Curtain Grouting (Zones 1, 2 and 3)

Conservation Pool Elevation (1582)

Flood Control Pool Elevation (1610)

Top of Embankment (1684.5)

Spillway Design Flood Elevation (1679.5)

Page 23: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Solutions – Foundation & Abutment Schematic

Page 24: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Solutions – Foundation & Abutment Schematic

Right Abutment

Conservation Pool Elevation (1582)

Flood Control Pool Elevation (1610)

Top of Embankment (1684.5)

Consolidation Grouting

Curtain Grouting (Zones 1, 2 and 3)

Spillway Design Flood Elevation (1679.5)

Page 25: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Drilling of foundation grout holes Grout pump

Concrete placement in Membrane Concrete membrane exposed along the slope of the left abutment, note shotcreteing to the left of the membrane

Page 26: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Dam Monitoring Instrumentation

Page 27: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Dam Monitoring Instrumentation

Page 28: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

Dam Monitoring Instrumentation

Page 29: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

SUMMARY

• Geologic Formations Highly Prone to Develop Solution Features Exist at the Project Site.

• Karst Features Identified and Dam was Designed & Constructed Accordingly

• Extensive Instrumentation Monitoring Program

• Seepage Control & Foundation Improvement Features Working

Page 30: Gathright Dam Case History – Constructing a Dam in Karst ...€¦ · Constructing a Dam in Karst Geology H. Marcus Kim, P.E. Geotechnical Engineer - USACE F. Alex Rutledge, P.E.,

SUMMARY

QUESTIONS?