An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in
Karst Geologic Settings
Robert C. Bachus, Ph.D., P.E., Geosyntec ConsultantsRichard B. Tedder, P.E., Florida Department of Environmental Protection
Session 3: Geohazards and InfrastructureGeohazards Impacting Transportation in Appalachia
Chattanooga, TN3 August 2011
![Page 2: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/2.jpg)
Innovative….
• Presentation Topic– An Innovative Approach to Characterizing, Permitting, and
Constructing Landfills in Karst Geologic Settings – Innovation relates to a rather unique collaboration between
an environmental regulator and the regulated community• Innovative Presentation
– Infrastructure du jour is the municipal solid waste landfill– I want to set the stage using a rather long introduction and
then ask you for your opinion, insight, and recommendations– Innovation relates to the fact that I have never done this type
of thing before
![Page 3: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/3.jpg)
Problem Statement and Objectives
• Federal regulations exist to govern the siting and design for modern landfills
• Landfills have to be constructed on “stable” ground• Karst (and other geohazards) present significant
challenges:– Engineering design (stability)– Hydrogeology (monitorability)– Construction (soil/rock condition, voids, variability)
3
![Page 4: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/4.jpg)
Problem Statement and Objectives
• All parties need objective criteria to address siting, design, monitorability, operations
• Florida Department of Environmental Protection (FDEP) needs to address issues when considering permitting in karst across the State
• Convened a Technical Advisory Group (TAG) and solicited public participation to help develop objective guidelines.
4
![Page 5: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/5.jpg)
Why TAG?
• Recent Class I Landfill permitting projects in karst areas in Florida raised questions about potential risks to ground water if sinkholes formed and damaged the liner systems.
• While the actual risks to ground water are unclear, the potential risks have created great difficulty for the Department and for applicants when trying to process permit applications for solid waste disposal facilities in Florida
• Need objective expertise to assist the Agency
![Page 6: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/6.jpg)
Florida Geological Survey (FGS) Subsidence Incidence Reports
• Distribution in DEP’s Six Districts:– SWD: 1,403 (60%)– CD: 586 (25%)– NED: 246 (10.5%)– NWD: 99 (4.2%)– SD: 9 (0.4%)– SED: 4 (0.2%)
• Total = 2,347 (as of 03-16-09)Sinkholes “reported” to FGSbut not necessarily “verified.”
![Page 7: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/7.jpg)
Goals of the TAG• Guidance is needed to:
– Help the Department decide how to evaluate and issue these solid waste disposal permits; and,
– Help applicants know what information should be submitted when seeking them.
• When developing the guidance, we need to:– Balance proposed “costs” with the “risks of failure;” – Use both “good science” and “reasonable judgment” when
making recommendations; and,– Set aside personal interests, if any, and focus on what is really
“good” for Florida.
![Page 8: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/8.jpg)
Why Geohazards Conference
• The FDEP approach focuses on technical issues regarding the investigation, characterization, design, and construction of engineered facilities in karst geologic settings. – Technical issues impact all engineered facilities, not just those
constructed for environmental applications. – Approach developed by FDEP may benefit other agencies, owners, and
consultants.• The conference participants at this conference may have specific
experiences and recommendations that will ultimately be beneficial to the FDEP.– Actively engage the participants– Solicit input based of their experience and expertise.
• 8
![Page 9: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/9.jpg)
Geohazards…plus
• Since you are all here today, we share a common bond of…. geohazards
• What are your backgrounds?– karst …or other geohazard?– landfill expertise and/or regulatory knowledge?
• permitee or permiter?– engineer, geologist, hydrogeologist, scientist?– exhibitor/vendor (tools of the trade expertise)
![Page 10: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/10.jpg)
10
What is the End-Product ?
Plan layout of landfill cell
![Page 11: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/11.jpg)
11
What is the End-Product?
Cross-section through landfillcell
![Page 12: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/12.jpg)
12
What is the End-Product?
Excavate to design grades
![Page 13: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/13.jpg)
13
What is the End-Product?
Cut existing soil, remove undesirable materials, and/orfill to achieve design grades
![Page 14: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/14.jpg)
14
Cutter-Pinnacle Conditions
Soil between pinnacles subjected to differential compression due to subsequent loading
![Page 15: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/15.jpg)
15
What is the End-Product
Cell Grading to Facilitate Leachate Collection
![Page 16: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/16.jpg)
16
What is the End-Product
Overburden Thickness vs. Strain on Geomembrane
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
8 9 10 11 12 13 14 15 16 17 18 19 20
Overburden Thickness (ft)
Stra
in o
n G
eom
embr
ane
(per
cent
)
Allow able Starin = 5%
Minimum calculated overburden thickness = 15 ft
In karst, again use analysis to calculate minimum thickness of soil over “design” karst feature
![Page 17: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/17.jpg)
How Big Is This Problem(Slide from First TAG Meeting on 5 May 2010)
• Hard to say. Fortunately, to date, in Florida there are no known sinkholes that have formed under solid waste disposal facilities.
• However, the “perception” of a potential problem has made processing permit applications very difficult. Winter Park, Florida sinkhole in 1981
(~320 ft. wide, ~90 ft. deep)
![Page 18: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/18.jpg)
Southeast Landfill
•Initial Collapse•14 Dec 2010
•First TAG •5 May 2010
•129 ft wide•60 ft deep•Vertical sides
![Page 19: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/19.jpg)
Southeast LandfillHillsborough County, FL
•162 acres
•Constructed over phosphate clay slimes at 15 -18 ft thick
•50 ft of waste
•Built over Hawthorne Formation over Floridan Aquifer
![Page 20: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/20.jpg)
Rules from Chapter 62-701, F.A.C.
• Rule 62-701.300(2)(a), F.A.C. (prohibition for all solid waste disposal facilities)(2) Siting. Unless authorized by a Department permit or site
certification in effect on May 27, 2001, or unless specifically authorized by another Department rule or a Department license or site certification based upon site-specific geological, design, or operational features, no person shall store or dispose of solid waste:
(a) In an area where geological formations or other subsurface features will not provide support for the solid waste;
![Page 21: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/21.jpg)
Rules from Chapter 62-701, F.A.C.
• Rule 62-701.340(3)(a), F.A.C. (location requirement for landfills)(3) Location requirements.(a) The site shall provide structural support for the facility including
total wastes to be disposed of and structures to be built on the site.
• Rule 62-701.400(3)(a)2, F.A.C. (design requirement for landfills)(a) Liners shall be: 2. Installed upon a base and in a geologic setting capable of
providing structural support to prevent overstressing of the liner due to settlements and applied stresses;
![Page 22: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/22.jpg)
Rules from Chapter 62-701, F.A.C.
• Rule 62-701.410(2)(b), F.A.C. (geotechnical requirements for landfills and C&D debris disposal facilities)– (2) Geotechnical site investigation…Prior to any construction
on the landfill site, the engineer shall define the engineering properties of the site that are necessary for the design, construction, and support of the landfill and all installations of the facility and shall:
– (b) Explore and address the presence of muck, previously filled areas, soft ground, lineaments, and sinkholes;
![Page 23: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/23.jpg)
The Permitting Test:Reasonable Assurance
• In order to issue a DEP permit the applicant must provide “reasonable assurance” that the proposed project and the applicant will comply with the Department’s rules.
• Rule 62-701.200(94), F.A.C."Reasonable assurance" means the existence of a substantial
likelihood, although not an absolute guarantee, that the proposed activity and applicant will comply with agency rules, laws, orders and permit conditions. It does not mean proof that a facility will not fail.
• NOTE: The permitting test is “reasonable assurance” not “absolute assurance.”
![Page 24: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/24.jpg)
Purpose and Scope of Work for the TAG
• Develop objective guidance for:1. Using physical and geophysical techniques for
characterizing sinkhole potential of a site;2. Determining if potential sinkhole risks for a site are low,
moderate or high;3. Deciding when a site cannot be used or can be used if
properly stabilized;4. Selecting appropriate site stabilization procedures (and
confirming that they achieved function)5. Monitoring a disposal facility for sinkhole formation.
![Page 25: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/25.jpg)
Purpose and Scope of Work for the TAG
Three primary tasks:1. Site Characterization – What is the right way to
determine the sinkhole potential of a site?2. Site Stabilization – If a site has problems but can be
“fixed” what is the right way to do it and how do you know you succeeded?
3. Disposal Facility Monitoring – Should we add special techniques for sinkhole monitoring?
Landfill Sinkhole TAG website address:http://www.dep.state.fl.us/waste/categories/solid_waste/pages/TAG.htm
![Page 26: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/26.jpg)
Geohazard Participation
1. Are you aware of other forums similar to the TAG where results are in public domain?
2. Are there specific certain (gray) conditions that are non-starters?
3. Are certain investigation techniques de facto required4. Do we define criterion for criticality by “holes per acre”5. Can one develop objective exceptions?6. Should we avoid the “E “ word or embrace it?
26
![Page 27: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/27.jpg)
27
VENUS MARS
Pitfalls of this ForumEngineers are from Mars…. Hydrogeologists are from Venus
(after Bachus, 2005)
![Page 28: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/28.jpg)
28Summer, 2003
![Page 29: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/29.jpg)
29
Engineer(Mars)
Hydrogeologist(Venus)
Summer, 2003)
![Page 30: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/30.jpg)
1. Other Public Domain Forum/Guidance
30
•TDEC DraftGuidance Document(July 1993)
•Needs objective criterion and even more guidance
![Page 31: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/31.jpg)
1. Other Public Domain Forum/Guidance• Identification – Use incremental approach of office reconnaissance, visual
assessment, proof rolling and confirmatory drilling to assess conditions at site– How many holes?– Objective guidance needed
• Assessment of Site Conditions – Use numerical analysis to conform stability– In TN, GA, and AR, this often means specific void size and confirmatory soil
thickness– Objective guidance needed
• Remedial Actions - Evaluate range of potential rehabilitation measures to include over-excavation, grouting, reinforcement, and reverse filter
– If you originally knew it was there, would you permit– Guidance needed apriori
31
(after House, 2011)
![Page 32: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/32.jpg)
2. Conditions that are Non-starters?
•Southeast Landfill
•“If I knew then what I know now’ is really not an appropriate model
![Page 33: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/33.jpg)
33
2. Conditions that are Non-starters?
Proposed Site
•USGS Topo
![Page 34: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/34.jpg)
2. Conditions that are Non-starters?
34
Proposed Site
•Satellite Imagery
![Page 35: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/35.jpg)
35
3. Define Minimum Exploration Guidelines
•Drilling
•CPTu
•Geophysics
![Page 36: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/36.jpg)
36
4. Define *** per Acre Criterion
•Holes
•Voids
•RQD/RMR
![Page 37: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/37.jpg)
37
5. Objective Exceptions
SOIL REGOLITH
BEDROCK
FRACTURED ROCK
Importance of Conceptual Site Characterization Model
In author’s opinion, this is likely the most difficult and contentious issue facing the decision process
??
![Page 38: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/38.jpg)
38
6a. Avoid the “E” Word
TOP OF SUBGRADE
GEOMEMBRANE
DEPTH TOTOP OF VOID
DIAMETERD
gmb
clayCLAY LINER
Liner Displacement Above a Void(2.5 ft diameter, 5 ft deep)
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
-30 -20 -10 0 10 20 30
X (ft)
Z (ft
)
2-D Undrained Soil Collapse Model
3-D Undrained Soil Collapse Model
3-D View of Ground Displacement Field for the Undrained Soil Collapse Model
3-D View of Ground Displacement Field for the Undrained Soil Collapse Model
2222
3/132/322222222
2
2222
1 hzhzyx
hzrhzhzyxhzhzyxSS zztotal
(after Geosyntec using Sagaseta, 1987)
![Page 39: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/39.jpg)
39
6a. Avoid the “E” Word
Analysis results usedto assess stable and unstable conditions
(after Drumm and Yang, 2005)
![Page 40: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/40.jpg)
40
6b. Embrace the “E” Word
Assessment of “Worst-Case”• Worst-case condition sounds good, in that it considers an
extreme event• If safe in “extreme event”, then there will likely be “no surprises”
during operation and will be safe for the life of project • Desirable from several perspectives
– public safety– professional liability– client relationship
• What should we consider as “design” and/or “worst-case” condition
• Balance risk and cost/benefit
![Page 41: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/41.jpg)
41
6b. Embrace the “E” Word(Extreme Event Engineering)
Hurricane Katrina (Category 4) Immediately Preceded Hurricane Rita (Category 4) in September, 2005
Levees in New Orleans Were Designed for aCategory 3 Hurricane
![Page 42: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/42.jpg)
Geohazard Participation
1. Are you aware of other forums similar to the TAG where results are in public domain?
2. Are there specific certain (gray) conditions that are non-starters?
3. Are certain investigation techniques de facto required4. Do we define criterion for criticality by “holes per acre”5. Can one develop objective exceptions?6. Should we avoid the “E “ word or embrace it?
42
![Page 43: An Innovative Approach to Characterizing, Permitting, and ...€¦ · An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings Robert](https://reader030.fdocuments.in/reader030/viewer/2022040407/5eac75e31a01eb12d55ed151/html5/thumbnails/43.jpg)
43
An Innovative Approach to Characterizing, Permitting, and Constructing Landfills in Karst Geologic Settings
THANK YOUfor the invitation and your participation