GATES COUNTY - NCDOT

9
STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION NO. TOTAL SHEETS N.C. SHEET LOCATION: DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 1 2019CPT.01.14.20212.1, ETC. 2019CPT.01.14.20212.1 2018 STANDARD SPECIFICATIONS PROJECT LENGTH 113 Airport Dr., Edenton NC, 27932 DIVISION OF HIGHWAYS Prepared in the Office of: DIVISION PROPOSALS ENGINEER T F T N E M T R A P E D S T A T E O F O N R H T C A R O L N A I N O I T A T R O P S N A R O CHOWAN COUNTY OF WORK: LENGTH OF ROADWAY PROJECT MAP 2 = 0.36 MI. LENGTH OF ROADWAY PROJECT MAP 3 = 0.15 MI. LENGTH OF ROADWAY PROJECT MAP 1 = 4.37 MI. ASPHALT SURFACE TREATMENT MAPS 1-3 MAP 3 SR 1291 FROM DEAD END TO SR 1290 MAP 2 SR 1290 FROM DEAD END TO SR 1218 DIVISION DESIGN ENGINEER S. P. FENWICK, PLS DIVISION PROJECT TEAM LEAD W. B. HOBBS, P.E. C. E. SLACHTA MAP 1 MAP 1 SR 1319 FROM SR 1316 TO BEGIN 3 LANE MAP 3 MAP 2

Transcript of GATES COUNTY - NCDOT

Page 1: GATES COUNTY - NCDOT

ST

AT

ES

TA

TE

PR

OJE

CT

RE

FE

RE

NC

E N

O.

ST

AT

E P

RO

J. NO

.F

. A. P

RO

J. NO

.D

ES

CR

IPT

ION

NO

.T

OT

AL

SH

EE

TS

N.C

.

SH

EE

T

LO

CA

TIO

N:

DIV

ISIO

N O

F H

IGH

WA

YS

ST

AT

E O

F N

OR

TH

CA

RO

LIN

A

CONTRACT: W BS PROJECT:

12019C

PT

.01.14.20212.1, ET

C.

20

19

CP

T.0

1.1

4.2

02

12

.1

2019CPT.01.14.20212.1, ETC.DA00445

2018 S

TA

ND

AR

D S

PE

CIF

ICA

TIO

NS

PR

OJE

CT

LE

NG

TH

11

3 A

irp

ort D

r., E

den

ton

NC

, 27

93

2

DIV

ISIO

N O

F H

IGH

WA

YS

Prepared in

the O

ffic

e o

f:

DIV

ISIO

N P

RO

PO

SA

LS

EN

GIN

EE

R

TF

TN

EM TR APED

STA

TE

OF

ON

RH

TC

A

RO

LNA I

NOIT

AT

R

OP

SN

AR

O

CH

OW

AN

CO

UN

TY

TY

PE

OF

WO

RK

:

LE

NG

TH

OF

RO

AD

WA

Y P

RO

JE

CT

MA

P 2

= 0

.36 M

I.L

EN

GT

H O

F R

OA

DW

AY

PR

OJE

CT

MA

P 3

= 0

.15

MI.

LE

NG

TH

OF

RO

AD

WA

Y P

RO

JE

CT

MA

P 1

= 4

.37

MI.

AS

PH

AL

T S

UR

FA

CE

TR

EA

TM

EN

T

MA

PS

1-3

MA

P 3

SR

1291 F

RO

M D

EA

D E

ND

TO

SR

1290

MA

P 2

SR

1290 F

RO

M D

EA

D E

ND

TO

SR

1218

DIV

ISIO

N D

ES

IGN

EN

GIN

EE

R

S. P

. FE

NW

ICK

, PL

S

DIV

ISIO

N P

RO

JE

CT

TE

AM

LE

AD

W. B

. HO

BB

S, P

.E.

C. E

. SL

AC

HT

A

NT

S

MA

P 1

MA

P 1

SR

13

19

FR

OM

SR

13

16

TO

BE

GIN

3 L

AN

E

MA

P 3

MA

P 2

Page 2: GATES COUNTY - NCDOT

ST

AT

ES

TA

TE

PR

OJE

CT

RE

FE

RE

NC

E N

O.

ST

AT

E P

RO

J. NO

.F

. A. P

RO

J. NO

.D

ES

CR

IPT

ION

NO

.T

OT

AL

SH

EE

TS

N.C

.

SH

EE

T

LO

CA

TIO

N:

DIV

ISIO

N O

F H

IGH

WA

YS

ST

AT

E O

F N

OR

TH

CA

RO

LIN

A

CONTRACT:

W.B

. HO

BB

S, P

.E.

C.E

. SL

AC

HT

A

W BS PROJECT:

2019CP

T.01.14.20212.1, E

TC

.

2019C

PT

.01.1

4.2

0372.1

2019CPT.01.14.20212.1, ETC.DA00445

2018 S

TA

ND

AR

D S

PE

CIF

ICA

TIO

NS

PR

OJE

CT

LE

NG

TH

11

3 A

irp

ort D

r., E

den

ton

NC

, 27

93

2

DIV

ISIO

N O

F H

IGH

WA

YS

Prepared in

the O

ffic

e o

f:

DIV

ISIO

N P

RO

PO

SA

LS

EN

GIN

EE

R

TF

TN

EM TR APED

STA

TE

OF

ON

RH

TC

A

RO

LNA I

NOIT

AT

R

OP

SN

AR

O

TY

PE

OF

WO

RK

:

MA

P 4

SR

12

04

FR

OM

SR

12

00

TO

SR

12

02

LE

NG

TH

OF

RO

AD

WA

Y P

RO

JE

CT

MA

P 4

= 1

.88

MI.

AS

PH

AL

T S

UR

FA

CE

TR

EA

TM

EN

T

MA

PS

4-1

0

2

LE

NG

TH

OF

RO

AD

WA

Y P

RO

JE

CT

MA

P 1

0 =

1.7

3 M

I.

GA

TE

S C

OU

NT

Y

LE

NG

TH

OF

RO

AD

WA

Y P

RO

JE

CT

MA

P 5

= 0

.51

MI.

MA

P 5

SR

12

05

FR

OM

SR

12

04

TO

DE

AD

EN

D

MA

P 1

0 S

R 1

21

3 F

RO

M S

R 1

21

2 T

O V

A S

TA

TE

LIN

E

NT

S

DIV

ISIO

N D

ES

IGN

EN

GIN

EE

R

S. P

. FE

NW

ICK

, PL

SD

IVIS

ION

PR

OJE

CT

TE

AM

LE

AD

MA

P 6

SR

1226 F

RO

M S

R 1

200 T

O E

ND

PA

VM

T.

LE

NG

TH

OF

RO

AD

WA

Y P

RO

JE

CT

MA

P 6

= 0

.63 M

I.

MA

P 7

SR

1128 F

RO

M N

C 1

37 T

O U

S 1

3

MA

P 1

0

MA

P 7

MA

P 8

SR

11

29

FR

OM

SR

11

28

TO

DE

AD

EN

DM

AP

9 S

R 1

20

0 F

RO

M S

R 1

20

4 T

O V

A S

TA

TE

LIN

E

LE

NG

TH

OF

RO

AD

WA

Y P

RO

JE

CT

MA

P 7

= 1

.90

MI.

LE

NG

TH

OF

RO

AD

WA

Y P

RO

JE

CT

MA

P 8

= 0

.40 M

I.L

EN

GT

H O

F R

OA

DW

AY

PR

OJE

CT

MA

P 9

= 1

.93

MI.

MA

P 5

MA

P 4

MA

P 9

MA

P 6

MA

P 8

Page 3: GATES COUNTY - NCDOT

ST

AT

ES

TA

TE

PR

OJE

CT

RE

FE

RE

NC

E N

O.

ST

AT

E P

RO

J. NO

.F

. A. P

RO

J. NO

.D

ES

CR

IPT

ION

NO

.T

OT

AL

SH

EE

TS

N.C

.

SH

EE

T

LO

CA

TIO

N:

DIV

ISIO

N O

F H

IGH

WA

YS

ST

AT

E O

F N

OR

TH

CA

RO

LIN

A

CONTRACT:

W.B

. HO

BB

S, P

.E.

C.E

. SL

AC

HT

A

W BS PROJECT:

2019CP

T.01.14.20212.1, E

TC

.

2019C

PT

.01.1

4.2

0722.1

2019CPT.01.14.20212.1, ETC.DA00444

2018 S

TA

ND

AR

D S

PE

CIF

ICA

TIO

NS

PR

OJE

CT

LE

NG

TH

11

3 A

irp

ort D

r., E

den

ton

NC

, 27

93

2

DIV

ISIO

N O

F H

IGH

WA

YS

Prepared in

the O

ffic

e o

f:

DIV

ISIO

N P

RO

PO

SA

LS

EN

GIN

EE

R

TF

TN

EM TR APED

STA

TE

OF

ON

RH

TC

A

RO

LNA I

NOIT

AT

R

OP

SN

AR

O

TY

PE

OF

WO

RK

:A

SP

HA

LT

SU

RF

AC

E T

RE

AT

ME

NT

PE

RQ

UIM

AN

S C

OU

NT

Y

LE

NG

TH

OF

RO

AD

WA

Y P

RO

JE

CT

MA

P 1

1 =

6.5

3 M

I.L

EN

GT

H O

F R

OA

DW

AY

PR

OJE

CT

MA

P 1

2 =

3.7

2 M

I.L

EN

GT

H O

F R

OA

DW

AY

PR

OJE

CT

MA

P 1

3 =

4.4

2 M

I.

MA

PS

11-1

3

3

NT

SD

IVIS

ION

DE

SIG

N E

NG

INE

ER

S. P

. FE

NW

ICK

, PL

S

DIV

ISIO

N P

RO

JE

CT

TE

AM

LE

AD

MA

P 1

1

MA

P 1

1 S

R 1

110 F

RO

M C

HO

WA

N C

O. T

O B

EG

IN C

&G

MA

P 1

2

MA

P 1

2 S

R 1

113 F

RO

M S

R 1

110 T

O S

R 1

110

MA

P 1

3 S

R 1

002 F

RO

M G

AT

ES

CO

. LIN

E T

O N

C 3

7

MA

P 1

3

Page 4: GATES COUNTY - NCDOT

VA

RIE

S

03-JAN-2020 14:11S:\Shared\Division One Resurfacing & Retreatment Plans\2020-2021 AST\DA00445_District 1&3\Plans\AST Plans.dgn$$$$USERNAME$$$$

L C

NT

S

UU

TY

PIC

AL

SE

CT

ION

NO

. 1

PR

OJE

CT

RE

FE

RE

NC

E N

O.

SH

EE

T N

O.

FF

42019C

PT

.01.14.20212.1, ET

C.

USE WIT

H M

APS 1 - 13

NO

TE

S:

OR

AS D

IREC

TED B

Y TH

E ENG

INEER

*PAV

EMEN

T MA

RK

ING

S TO B

E PERFO

RM

ED B

Y O

THER

S

*ALL PA

VED

S.R. R

OA

DS TO

BE TR

EATED

TO TH

E END

S OF TH

E RA

DII.,

*ASPH

ALT SU

RFA

CE TR

EATM

ENT, D

OU

BLE SEA

L CO

NSISTS O

F TWO

LAY

ERS O

F TREA

TMEN

T:

0.30 + GA

L/SY A

ND

A LA

YER

OF 78M

AG

GR

EGA

TE AT A

RA

TE OF A

PPRO

X. 18 + LB

S/SY.

BO

TTOM

LAY

ER C

ON

SISTS OF EM

ULISIFIED

ASPH

ALT, G

RA

DE C

RS-2L A

T A R

ATE O

F APPR

OX

--

--

TOP LA

YER

CO

NSISTS O

F EMU

LISIFIED A

SPHA

LT, GR

AD

E CR

S-2L AT A

RA

TE OF A

PPRO

X0.25 + G

AL/SY

AN

D A

LAY

ER O

F:51

6 " LIGH

TWEIG

HT A

GG

REG

ATE A

T A R

ATE O

F APPR

OX

. 9+ LBS/SY

.

**CO

NTR

AC

TOR

SHA

LL BE R

ESPON

SIBLE FO

R LO

AD

ING

, HA

ULIN

G, &

PLAC

ING

ALL A

GG

REG

ATE M

ATER

IAL.

THE R

ESIDEN

T ENG

INEER

'S OFFIC

E MU

ST BE C

ON

TAC

TED PR

IOR

TO STO

CK

PILING

STON

E. A

LL AG

GREG

ATE M

ATERIA

L MA

Y BE STO

CKPILED

AT N

CDO

T MA

INTEN

AN

CE FACILITIES A

S APPRO

VED

BY TH

E DEPA

RTMEN

T.

P A

V E

M E

N T

S C

H E

D U

L E

EX

IS

TIN

G P

AV

EM

EN

T.

U

PR

OP

. AS

PH

AL

T S

UR

FA

CE

TR

EA

TM

EN

T, D

OU

BL

E S

EA

L, A

T A

N A

PP

LIC

AT

IO

N

PR

OJE

CT

SP

EC

IA

L P

RO

VIS

IO

NS

(S

EE

NO

TE

S)

RA

TE

TO

BE

DE

TE

RM

IN

ED

BY

FIE

LD

CO

ND

IT

IO

NS

IN

AC

CO

RD

AN

CE

WIT

HF

Page 5: GATES COUNTY - NCDOT

PROJECT REFERENCE NO. SHEET NO.

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

2019CPT.01.14.20212.1, ETC. 5

*

MAINTENANCE

CHOWAN

NC DOT CHOWAN MAINTENANCE FACILITY - CHOWAN COUNTY

134 Sandy Ridge Rd

Tyner, NC 27980

Page 6: GATES COUNTY - NCDOT

PROJECT REFERENCE NO. SHEET NO.

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

2019CPT.01.14.20212.1, ETC. 6

*

NC DOT GATESVILLE MAINTENANCE FACILITY - GATES COUNTY

304 US Highway 158 West

Gatesville, NC 27938

MAINTENANCE

GATESVILLE

Page 7: GATES COUNTY - NCDOT

PROJECT REFERENCE NO. SHEET NO.

$$$$$$

SY

STIM

E$$$$$

$$$$$$$$$$$$$$$$

DG

N$$$$$$$$$$$$$$$$

$$$$

US

ER

NA

ME$$$$

2019CPT.01.14.20212.1, ETC. 7

*

Hertford, NC 27944

NC DOT HERTFORD MAINTENANCE FACILITY - PERQUIMANS COUNTY

427 Ocean Highway North

MAINTENANCE

HERTFORD

Page 8: GATES COUNTY - NCDOT

SHEET NO.8

LENGTH WIDTH MOBILIZATION ASPHALT SURFACE

TREATMENT, DOUBLE SEAL

EMULSION FOR

ASPHALT SURFACE

TREATMENT

WORK ZONE ADV/GEN WARNING SIGNING

TEMPORARY TRAFFIC

CONTROL

MI FT LS SY GAL SF LS2019CPT.01.14.20212.1 Chowan 1 SR 1319 PARADISE RD FROM SR 1316 TO BEGIN 3 LANE 1 2 2WU NO NO 4.37 20 1 52,974 31,785 134 12019CPT.01.14.20212.1 Chowan 2 SR 1290 OLD FERRY RD FROM DEAD END TO SR 1218 1 2 2WU NO NO 0.36 20 * 5,924 3,554 40 *2019CPT.01.14.20212.1 Chowan 3 SR 1291 HIDDEN COVE RD FROM DEAD END TO SR 1290 1 2 2WU NO NO 0.15 20 * 2,610 1,566 40 *

4.88 61,508 36,905 214

2019CPT.01.14.20372.1 Gates 4 SR 1204 BYRUM RD FROM 1200 TO SR 1202 1 2 2WU NO NO 1.88 20 * 24,609 14,765 40 *2019CPT.01.14.20372.1 Gates 5 SR 1205 PARKER LANE FROM SR 1204 TO DEAD END 1 2 2WU NO NO 0.51 20 * 6,834 4,100 40 *2019CPT.01.14.20372.1 Gates 6 SR 1226 JERNIGAN LANE FROM SR 1200 TO END PAVEMENT 1 2 2WU NO NO 0.63 20 * 9,092 5,455 40 *2019CPT.01.14.20372.1 Gates 7 SR 1128 BARFIELD RD FROM NC 137 TO US 13 1 2 2WU NO NO 1.90 20 * 25,693 15,415 40 *2019CPT.01.14.20372.1 Gates 8 SR 1129 HORTON LANE FROM SR 1128 TO DEAD END 1 2 2WU NO NO 0.40 20 * 4,694 2,817 40 *2019CPT.01.14.20372.1 Gates 9 SR 1200 SAND BANKS ROAD FROM SR 1204 TO VA STATE LINE 1 2 2WU NO NO 1.93 20 * 22,646 13,588 40 *2019CPT.01.14.20372.1 Gates 10 SR 1213 LEES MILL RD FROM SR 1212 TO VA STATE LINE 1 2 2WU NO NO 1.73 20 * 21,999 13,199 40 *

8.98 115,567 69,339 280

2019CPT.01.14.20722.1 Perquimans 11 SR 1110 CENTER HILL RD FROM CHOWAN CO TO BEGIN CURB 1 2 2WU NO NO 6.53 20 * 85,119 51,071 262 *2019CPT.01.14.20722.1 Perquimans 12 SR 1113 GREAT HOPE CH RD FROM SR 1110 TO SR 1110 1 2 2WU NO NO 3.72 16-20 * 40,106 24,064 208 *2019CPT.01.14.20722.1 Perquimans 13 SR 1002 COUNTY LINE RD FROM GATES CO TO NC 37 1 2 2WU NO NO 4.42 18 * 50,075 30,045 166 *

14.67 175,300 105,180 636

28.53 1 352,375 211,424 1,130 1GRAND TOTAL

TOTAL FOR PROJ NO. 2019CPT.01.14.20722.1

TOTAL FOR PROJ NO. 2019CPT.01.14.20372.1

TOTAL FOR PROJ NO. 2019CPT.01.14.20212.1

LANES

PROJECT NO.2019CPT.01.14.20212.1, ETC.

PROJECT NO COUNTY MAP NO

S U M M A R Y O F Q U A N T I T I E SROUTE DESCRIPTION TYP

NOLANE TYPE

FINAL SURFACE TESTING

REQUIRED

WARM MIX ASPHALT

REQUIRED

Page 9: GATES COUNTY - NCDOT

DIRECTION OF TRAFFIC FLOW

STATIONARY SIGN

LEGEND

DE

PA

RT

EN

OF ANSP

O

RT

ATI

ON

TA

E

OF

NORTH

R

OL

NA

WO

RK

ZO

NE

TRAFFIC

C

ON

TR

OL

DIV

ISIO

NOF HIG

HW

AY

ST

S

CA

I

M

T

TR

LIMITS

CONSTRUCTION

Y1

48'' X 48''AHEAD

ROAD

W20-1

WORK1

2

48'' X 48''

48'' X 48''W20-7 A

48'' X 48''

AHEAD

ROAD

W20-1

WORK

W7-3aP24'' X 18''XX MILES

NEXT

3

UNMARKED

48'' X 48''W8-7

LOOSE

GRAVEL

LIMITS

CONSTRUCTION

48'' X 24''

END

ROAD WORK

G20-2 A

ROAD

48'' X 48''

UNDER

CONST

Y2

LIMITS

CONSTRUCTION

dhstallin

gs

AT

D1C

AD293575

S:\

Gro

ups-

Div

1CC\

Share

d\

Divisio

n

One

Resurfacin

g

&

Retreat

me

nt

Pla

ns\2019-2020

AS

T

Maps\

DA00445_

District 1&

3\

Pla

ns\

AS

T

Pla

ns.d

gn

07-

MA

R-2019 07:4

3

SHEET NO.PROJ. REFERENCE NO.

3) DEAD END ROADS

2) SUBDIVISION ROADS

1) LESS THAN 1000' OF RESURFACING ALONG -Y- LINE

PL

AC

EM

EN

T

PE

R

DI

RE

CTI

ON

SI

GNI

NG

NO

TE

S

AN

D

MAINLINE (-L-) SIGNING -Y- LINE SIGNING

(SEE NOTE BELOW)

1

2

3

5

4

SIGNING FOR ASPHALT SURFACE TREATMENT

PAVEMENT

SP

4

TEE INTERSECTION

5

SP 13106

4

5

WHEN WORK ENDS AT A 3-WAY TEE INTERSECTION.

PLACE 500' FOLLOWING THE END OF CONSTRUCTION LIMITS OR AS SHOWN

AND SPACE 1 MILE APART THEREAFTER.

- AT TEE INTERSECTIONS INSTALL INITIALLY 0.5 MILE FROM INTERSECTION

THEREAFTER.

- PLACE INITIALLY AT THE CONSTRUCTION LIMITS AND SPACED 1 MILE APART

- STARTING WITH "LOOSE GRAVEL" (W8-7) FOLLOWED BY "UNMARKED PAVEMENT".

- ALTERNATE THE FOLLOWING TWO SIGNS:

THE FOLLOWING -Y- LINE CONDITIONS:

STATIONARY SIGNING NOT REQUIRED FOR

PORTABLE SIGN

(SEE NOTE BELOW)

1 MILE SPACING

1000' OR MORE

1000' OR MORE

3 3 4

1

5

4

5

1

33

(SEE NOTE BELOW)

2

1

5

4 3

BELOW)

(SEE NOTE

Y3

THAN 2 MILES

MAPS LESS

LINES IF RESURFACING LIMITS EXTEND 1000' ALONG -Y- LINE.

- PLACE 1000' PRIOR TO BEGINNING OF CONSTRUCTION LIMITS. ONLY USED ON -Y-

NUMBERS.

ROUND UP TO THE NEAREST WHOLE NUMBER. DO NOT USE FRACTIONAL OR DECIMAL

- SIGN #2 ONLY USED WHEN RESURFACING LIMITS ARE 2 OR MORE MILES IN LENGTH.

WITHIN 0.5 MILES FROM "END ROAD WORK" SIGN.

- A MAXIMUM OF 2 SIGN SETS PER MILE. DO NOT INSTALL WHEN -Y- LINES ARE

AS A SINGLE UNIT AND INSTALL WITHIN 500' OF EACH APPROACH.

- FOR MULTIPLE -Y- LINES THAT ARE SEPARATED BY 0.25 MILES OR LESS, TREAT

- INSTALL 500' +/- FROM EACH -Y- LINE APPROACH AS SHOWN ABOVE.

SUBDIVISION ROADS ARE NOT "THROUGH" ROADWAYS.

- THESE ARE FOR -Y- LINES THAT ARE "THROUGH" ROADWAYS. DEAD END AND

MIDWAY THROUGH AND AN "END ROAD WORK" SIGN AT THE END CONSTRUCTION LIMIT.

"LOOSE GRAVEL" SIGN AT THE BEGINNING CONSTRUCTION LIMIT FOLLOWED BY AN "UNMARKED PAVEMENT" SIGN

FOR AST RESURFACING MAPS WITH CONSTRUCTION LIMITS LESS THAN 2 MILES IN LENGTH, USE A STATIONARY

START OF CONTRACT WORK.

ADDITIONAL SIGNS REQUESTED BY NCDOT DIVISIONS SHALL BE INSTALLED WITHIN 7 BUSINESS DAYS OF THE

THE ABOVE SIGNS ARE ALL THAT ARE REQUIRED FOR A CONTRACTOR TO BEGIN A RESURFACING CONTRACT. ANY

ASPHALT SURFACE TREATMENT

2-LANE ROADWAY

FOR

ADVANCE WARNING SIGNS

REMOVE UPON COMPLETION OF WORK.

SHALLE BE USED ALONG THE -Y- LINE AS SHOWN BELOW.

AN UNSIGNED -Y- LINE, PORTABLE ADVANCE WARNING SIGNS

WHEN PAVING/CONSTRUCTION ACTIVITIES PROCEED ACROSS

OF FLAGGER.

PLACED 500' IN ADVANCE

OF FLAGGER.

PLACED 250' IN ADVANCE

92019CPT.01.14.20212.1