Gate terminal

Gas Access To Europe

Page 2: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

2

Analyst Conference Call

18 December 2007 @ 13.30 hour (CET)

Jack de KreijCFO and Member of the Executive Board

Gate terminal builds first Dutch LNG terminal

Page 3: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

3

Agenda

�Press release summary

�Market demand for Dutch LNG terminal

�Gate terminal

�Launching customers

�Financial matters of attention

�Future developments

Page 4: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

4

Press release summary

Page 5: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

5

Press release 18 December 2007

• Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with an annual throughput capacity of 9 bcm

• Estimated all inclusive project cost of around EUR 800 million

• First phase capacity of 9 bcm gas throughput, 1 jetty, 3 storage tanks of 180.000 cbm and gasification units.

• Launching customers are DONG Energy, EconGas and Essent

• DONG Energy, Essent and OMV GAS INTERNATIONAL acquire a minority equity stake of 5% each

• Other developments:

– Vopak will take part in feasibility study LNG terminal Eemshaven

– Heads of Agreement signed by Essent, Gasunie and Vopak

– Vopak acquires 25% stake in Eemshaven project

Page 6: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

6

Market demand for Dutch LNG terminal

Page 7: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

7

LNG demand worldwide

Source: CWC LNG Summit Presentation, Rome Dec. 2007

Page 8: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

8

European gas market

0

100

200

300

400

500

600

700

800

900

1000

1995 2000 2005 2010 2015 2020 2025

bill

ion

m3

24012050

European production

Existing import contracts

New pipelines

LNG under construction

Demand

Source: Gasunie

Page 9: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

9

New imports from more distant fields

• Pipelines from Russia, Iran and/or Norway

• Liquid natural gas from: Algeria, Egypt, Nigeria, Qatar, Australia and Iran

• Diversification of sources is the best way to guarantee the security of supplies

European gas market

Page 10: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

10

European LNG receiving terminals

1980 – 1998: 8 operational terminals in Europe;

1999 – 2006: 5 new terminals commissioned, 7 in construction and

expansion existing terminals; growth rate > 6% per annum

Operational LNG terminal LNG terminal under developmentStatus 2005:

Source: AIChE LNG Challenge Presentation 13 Febr. 2007

Page 11: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

11

The Netherlands – Excellent entry point

Page 12: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

12

Gate terminal

Page 13: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

13

Gate terminal ready for operations in 2011

Rationale:

Strengthen position the Netherlands for natural gas

The almostcontinuousdelivery of naturalgas to the nationalgas transmissionnetwork for the Dutch and northwestEuropean markets

The regasification

of LNG into natural

gas

The storage of

LNG as a buffer

between the

receipt and

continuous

delivery of

natural gas

The receipt of

LNG from special

LNG carriers in the

port

Secure additional long term natural gas supplies

Facilitate modern European gas markets by multi-user and open access

Terminal’s four functions

Page 14: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

14

The LNG/Natural Gas chain

The LNG / natural gas chain requires large investments and isbuilt on long-term supply, transport, and terminal contracts

Typical component capital investment cost (for 9 BCM):

1 x € 4.0B 4 x € 0.2B 1 x € 0.8B+ +

Page 15: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

15

The LNG receiving terminal

Natural Gas (NG)

Hig

h pr

ess

ure

pum

ps

Reinforced Concrete Roof

Roof Nozzles OnlySustended Ceiling with Thermal Insulation

9% Ni Inner Tank

Annular SpaceWith Perlite

Thermal Insulation

Pre - StressedConcrete Wall

Reinforced ConcreteBase Slab

Foam-GlassBottom Insulation

Pump Columns

LN

G c

arr

iers

LNG

jetty

Unlo

adin

gand v

apour

retu

rn s

yste

m

LNG

sto

rage

tank

s

with

low

pres

sure

pum

ps Low

press

ure

exp

ort s

yste

m

Reg

asi

fiers

Nat

ura

l gas

anays

is

and

mete

rs

Nat

ura

l gas

trans-

mis

sion

pipe

line

Vent or torch

Re-condensor

Main functions of the terminal:

Receipt and unloadingLNG Carriers

LNG storage Export under pressure and regasified

Liquefied Natural Gas (LNG)

Warm waterCold water drainage

Page 16: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

16

Gate terminal: the location

Page 17: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

17

Launching customers

Page 18: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

18

The launching customers

DONG Energy, Denmark3 bcm 5% equity stake

EconGas, Austria3 bcm

OMV Gas International5 % equity stake

Essent3 bcm 5% equity stake

Page 19: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

19

• Long term contracts: 20 - 25 years

• 100% fixed tariff: take or pay

• Tariffs are indexed (CBS)

• First customers are minority shareholders

Customer contract structure

Page 20: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

20

Partnership: Vopak/Gasunie/Clients/GATE

Majority ShareholdersCustomer Shareholders

Gate

terminal

42.5%

OMV GAS INTERNATIONAL

Essent DONG Energy GasunieVopak

42.5%5% 5% 5%

Limited

Partnership

Page 21: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

21

Financial matters of attention

Page 22: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

22

• Project financing to be obtained by Gate terminal in 2008

• Initial project costs around EUR 800 million

• Initial Vopak share in equity EUR 50-80 million

• Equity return aligned with market for new greenfieldinfrastructure projects in Europe

Gate terminal project financing

Page 23: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

23

Balance sheet

Gate’s impact on Vopak Financial Statement

Joint ventures

and associates

Profit & LossResult of jv basedon equity method

Cash Flow

Off Balance Sheet guarantees

Project Phase

2007-2011

Operations

beyond 2011

Joint venturesand associates

Joint venturesand associates

Only pre-OPEX

Equitycontribution

Dividendreceived

Page 24: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

24

Future developments

Page 25: Gate terminal Gas Access To Europe - Vopak.com · 5 Press release 18 December 2007 • Vopak and Gasunie have taken final investment decision to build first Dutch LNG terminal with

25

Future developments

• 2008+ Increase number of customers in GATE terminal Rotterdam and expand the throughput capacity from 9 to 16 bcm

• Feasibility study second location in the Netherlands: Eemshaven

– Partners Gasunie and Essent

• Ongoing feasibility study for regional terminal in Rostock, Germany with partners Gasunie and VNG