Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

19
Gary M. Morris Gary M. Morris Manager - IT Manager - IT Steel Dynamics, Inc. Steel Dynamics, Inc. Structural & Rail Mill Structural & Rail Mill November, 2006 November, 2006 Steel Dynamics, Inc. Steel Dynamics, Inc. Overview Overview

description

Steel Dynamics, Inc. Overview. Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006. SDI FOUNDERS. ‘Dick’ Teets Vice President General Manager – Structural & Rail Div. Keith Busse President & CEO. - PowerPoint PPT Presentation

Transcript of Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Page 1: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Gary M. MorrisGary M. MorrisManager - ITManager - IT

Steel Dynamics, Inc.Steel Dynamics, Inc.Structural & Rail MillStructural & Rail Mill

November, 2006November, 2006

Steel Dynamics, Inc.Steel Dynamics, Inc.

OverviewOverview

Page 2: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

“Always producing a high-grade, high quality product at the lowest possible cost.”

- K Busse

‘Dick’ TeetsVice PresidentGeneral Manager – Structural & Rail Div

SDI FOUNDERS

Mark MillettVice PresidentGeneral Manager – Flat Roll Division

Keith BussePresident & CEO

Page 3: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Steel Dynamics – Flat Roll DivisionButler, IN.

Page 4: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

450 Acres

Steel Dynamics – Structural and Rail DivisionColumbia City, IN.

2601 S 700 EColumbia City, IN. 46725(866) 740-8700 Toll Free

On US 30 between Columbia City and Fort Wayne Indiana

Strategically located in the “Rust Belt”

Page 5: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

APRIL 2000pre-construction

FEB. 2002~ 7/8 complete

Green-field Site

$ 350 Million$ 350 Million total costtotal cost

~ $ 1 Million investment / ~ $ 1 Million investment / employment positionemployment position

(at full staffing)

Steel Dynamics – Structural and Rail DivisionColumbia City, IN.

Page 6: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Mill Process

ScrapEAF

LMF

VTD

Continuous Caster

Semi - Finished Products

Reheat Furnace

Hot Rolling

Str

uctu

ral

Rail Premium

Sta

ndar

d

Cooling Bed

Straightening

Structural

Rai

l

Inline Inspection

Cut, Pile, & Bundle

Drill, Cut,

End Straighten

Ship to Customer

Page 7: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Electric Arc FurnaceElectric Arc Furnace(s)(s)

Page 8: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Designed CapacityDesigned Capacity1.2M tons / eaf / annum1.2M tons / eaf / annum

142.5 ton/hr 50min tap-tap142.5 ton/hr 50min tap-tap

Current environmental permitting allows Current environmental permitting allows operation of only one furnace at a time.operation of only one furnace at a time.

Spring 2003 36 – 45 avg min tap-tapSpring 2003 36 – 45 avg min tap-tap

Electric Arc FurnaceElectric Arc Furnace(s)(s)

Page 9: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Continuous CasterContinuous Caster

Exit of spray chamberExit of spray chamber

Casting beam blanksCasting beam blanksWithdrawal RollsWithdrawal Rolls

Casting beam blanksCasting beam blanks

Page 10: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Production TrackingProduction Tracking

Page 11: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

• Recuperative - Natural gas

• 3 Zones: Charge, Heat, Soak

• 80’x50’ 19’ - 47’ 6 bloom lengths

• Walking Beam

• Deep Charge

Reheat FurnanceReheat Furnance

• Heating Rate:356 Million Btu / hr300 ton/hr – hot charge200 ton/hr – cold charge

A C Leadbetter

Discharging BB2 @ 2250°F

Page 12: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

UREDGER

UF

7500 hp5000 hp

7500 hp

Tandem / Combination MillTandem / Combination Mill SMS - SchloemannSMS - Schloemann

Page 13: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

TCS’s job is Roll Gap Adjustment

• Roll gap calibration after roll change

• Determination of passline after roll change

• Determination of roll spring

• Calculation of the position of the rolls=> with the static Automatic Gage Control (AGC) before the rolling

• Roll gap control (loop control)=> with the dynamic Automatic Gage Control (AGC) during the rolling( 1 sec cycle rate )

• Position control of the hydraulic cylinders (very fast loop control) in both mode, to keep the setted cylinder position of the rolls

Technology Control System

Precision: ± .05mm / .002”

Precision: ± .02mm / .0008”

Page 14: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Steel Dynamics, Inc.Steel Dynamics, Inc.

Question and AnswerQuestion and Answer

Page 15: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Required SkillsRequired Skills

Problem SolvingProblem Solving CommunicationCommunication Highly AnalyticalHighly Analytical Enjoys challengesEnjoys challenges Time ManagementTime Management In-depth business In-depth business

knowledgeknowledge Team orientedTeam oriented

Programming Programming - .NET, - .NET, PowerBuilder, C#, PowerBuilder, C#, C++, PLSQL, TSQLC++, PLSQL, TSQL

Strong GUI designStrong GUI design Database designDatabase design Wireless/RFID Wireless/RFID

architecturearchitecture Project Project

ManagementManagement

Page 16: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Rolling Mill - Required SkillsRolling Mill - Required Skills

Problem SolvingProblem Solving CommunicationCommunication Highly AnalyticalHighly Analytical MathMath Time ManagementTime Management In-depth business In-depth business

knowledgeknowledge Team orientedTeam oriented

Skilled trades: pipe Skilled trades: pipe fitters, hydraulics, fitters, hydraulics, welding, welding, electricians, electricians, mechanical mechanical

MS Office SuiteMS Office Suite Project Project

ManagementManagement CNC machiningCNC machining LeadershipLeadership

Page 17: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Melt Shop Mill - Required Melt Shop Mill - Required SkillsSkills

Problem SolvingProblem Solving CommunicationCommunication Highly AnalyticalHighly Analytical MathMath Time ManagementTime Management In-depth business In-depth business

knowledgeknowledge Team orientedTeam oriented

Skilled trades: pipe Skilled trades: pipe fitters, hydraulics, fitters, hydraulics, welding, welding, electricians, electricians, mechanical mechanical

MS Office SuiteMS Office Suite Project Project

ManagementManagement CNC machiningCNC machining LeadershipLeadership

Page 18: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Staff - Staff - SalariesSalaries

Page 19: Gary M. Morris Manager - IT Steel Dynamics, Inc. Structural & Rail Mill November, 2006

Salary - Salary - ManagemeManageme

ntnt