Franklin Public Works Upcoming Projects Robert Cantoreggi, DirectorMike Maglio, Assistant Town Engineer
2013 through 2015
2013 Water System Improvements• Replace Waterline & Improve Stormwater• Lincoln Street (Brook to Elm)• Daniels Street (Lincoln to Lenox)
• Replace Waterline:• Kathleen Drive (DPW Crews)• Fannie Way (DPW Crews)• Harborwood Drive• Betten Court• Corrine Road
2013 Water System Improvements
• Clean Interior of Tank & Add Agitator• FIP & Forge Hill Tanks
• Water System• Master Plan
2013 Highway Improvements• Reconstruct Roadway & Sidewalks:• Crescent Street & Garfield Street• East Street & West Street
• Reconstruct Roadway & Improve Stormwater• Pyne Road• Island Road
• Overlay Road• Grove Street (near railroad tracks)• Ledge Street (between Hill and Uncas)• Beaver Street Recycling Center
2013 Highway Improvements• Finish Stormwater Improvements• Miller Street, Green Street, Wylie Road
• Prospect Street• Culvert Repair (near Overlook Drive)
• Construct Sidewalk • Panther Way
• Improve Pedestrian Crossing• Parmenter School
• Crack, Chip & Seal • Various roadways
2013 Sewer System Improvements• Install New Grinder Pumps• Jefferson Road• Milliken Road
• I and I Program• Metering of Beaver Street Interceptor• Explore areas for improvement
• CRPCD• Monitor and Assist Proposed Reconstruction of Sewer Treatment Plant
“RAGS’Milliken Pump Station.
2013 Administration and Engineering• Downtown Reconstruction• HPP Project (140 / Main Street)
• Finish Reconstruction• Delcarte Dams (Pleasant Street)
• Lincoln Street Bridge Phase One• Bridge Repairs
• Construct New Hayward Street DPW Entrance
2013 Administration and Engineering
• Evaluate Sign Inventory and Establish Plan• Town wide
• Improve / Create Turning Lane• Panther Way/East Central Street
• Construct New Building for Storage• 247 Fisher Street
2013 DPW Wide
• Finish Construction:• Panther Way Park (off Panther Way)• Recycling Center (off Beaver Street)
• Design and Construct New Playground/Parking/Walkway• Delcarte Playground (Pleasant Street)
• Public Works “Touch-A-Truck” and Library Book Sale(s)• Open House (257 Fisher Street)
• Public Outreach• Earth Day / Arbor Day (Beaver Street Park)
2014 • Replace Waterline & Improve Stormwater• Anthony Road, Conlyn Avenue & Carmine Drive• Summer Street (Rt. 140 to King St)• Lewis Street
• Reconstruct Roadway, One Sidewalk & Improve Stormwater• Lincoln Street (Brook to Elm)
• Reconstruct Roadway & Improve Stormwater• Kathleen Drive (DPW Crews)• Fannie Way (DPW Crews)• Harborwood Drive• Bettoen Court• Corrine Road
• Demolition• Old DPW Garage; 257 Fisher Street
2015 • Reconstruct Roadway & Improve Stormwater• Anthony Road, Conlyn Avenue & Carmine Drive• Oak Street (near High School)
• Reconstruct Roadway, One Sidewalk & Improve Stormwater• Summer Street (Rt. 140 to King Street)• Lewis Street