Neil Davies – UK – Session 1: Network Components – Paper 0980
On-line Condition Monitoring of Distribution Network Assets – Making the
Network Smarter
Neil Davies
Frankfurt (Germany), 6-9 June 2011
Factors affecting network reliability The direct cost of failure Condition Assessment of MV Assets Smart Substation Monitoring Conclusions
Neil Davies – UK – Session 1: Network Components – Paper 0980
Contents
Frankfurt (Germany), 6-9 June 2011
Switchgear partial discharge faults Switchgear mechanical faults Other switchgear faults (e.g. lightning, protection) Cable faults Theft Vandalism
*Ground Mounted Equipment
Neil Davies – UK – Session 1: Network Components – Paper 0980
Factors Affecting Network Reliability – Major Causes*
Frankfurt (Germany), 6-9 June 2011
Factors affecting Network Reliability – Costs*
£-£2£4£6£8
£10£12£14£16£18£20
Cost (Millions)
Cost of factors affecting UK Network reliability
*Ground Mounted Equipment
Neil Davies – UK – Session 1: Network Components – Paper 0980
Frankfurt (Germany), 6-9 June 2011
Planned intervention or unplanned remedial action?
Neil Davies – UK – Session 1: Network Components – Paper 0980
Frankfurt (Germany), 6-9 June 2011
Restoration of unexpected failures is more costly and takes longer
Effective management of assets requires accurate knowledge of condition
Condition links good investment, operation and maintenance of networks
Improving network performance can have significant cost benefits
Neil Davies – UK – Session 1: Network Components – Paper 0980
Condition – the key factor in improving SAIDI and SAIFI
Frankfurt (Germany), 6-9 June 2011
Partial Discharge Monitoring UltraTEV Monitor
Powerful WEB enabled hub PD monitor Locate Transient Earth Voltage signals to resolution of 30cm Locate ultrasonic activity Locate Cable Discharge activity Correlate discharge with environmental and network
conditions
Neil Davies – UK – Session 1: Network Components – Paper 0980
Frankfurt (Germany), 6-9 June 2011
Cable PD Monitoring from Substation UltraTEV Monitor Capture
1750
1800
1850
1900
1950
2000
2050
2100
2150
-5 0 5 10 15 20 25
Time (us)
Am
plitu
de (A
DU
)
Determine magnitude and location of discharge
Correlate with switchgear discharge signals
Map PD signals along length of cable
Neil Davies – UK – Session 1: Network Components – Paper 0980
Frankfurt (Germany), 6-9 June 2011
Substation Monitoring Approach
The UltraTEV Monitor Hub provides a web based gateway into substation
Additional condition and network parameters can be monitored
Limited additional cost Improved business case for capital
expenditure of condition monitoring Single interface per substation
Neil Davies – UK – Session 1: Network Components – Paper 0980
Frankfurt (Germany), 6-9 June 2011
Smart Substation MonitorPartial Discharge - Switchgear
Circuit Breaker Trip Timing
Protection Battery Condition Security cameras and recording
System Voltage and Current
Power Quality Environment
Partial Discharge - Cables
Substation MonitorWeb
Asset / Circuit Algorithms
Fault Level
Neil Davies – UK – Session 1: Network Components – Paper 0980
Frankfurt (Germany), 6-9 June 2011
Smarter Networks Need Condition Monitoring
AssetCondition
Partial Discharge - Switchgear
Circuit Breaker Trip Timing
Protection Battery Condition
Security cameras and recording
Partial Discharge - Cables
Neil Davies – UK – Session 1: Network Components – Paper 0980
Frankfurt (Germany), 6-9 June 2011
Smarter Networks Need Condition Monitoring
AssetCondition
SystemCondition
System Voltage and Current
Power QualityEnvironment
Asset / Circuit Algorithms
Fault Level
Neil Davies – UK – Session 1: Network Components – Paper 0980
Frankfurt (Germany), 6-9 June 2011
Smarter Networks Need Condition Monitoring
The Smart Grid of tomorrow will be built on the assets of yesterday
AssetCondition
AssetCapability
PerformanceRisk
SystemCondition
HeadroomCapability
SystemCapacity
SystemChange
PrematureAgeing
SmartSubstation
Monitor
Neil Davies – UK – Session 1: Network Components – Paper 0980
Frankfurt (Germany), 6-9 June 2011
The Smart Grid of Tomorrow Will Be Built Upon the Assets of Yesterday
Smarter Networks Need Condition Monitoring
Neil Davies – UK – Session 1: Network Components – Paper 0980