  • SULTANATE OF OMAN

    MINISTRY OF TRANSPORT AND COMMUNICATIONS DIRECTORATE GENERAL OF ROADS & LAND TRANSPORT

    MUSCAT

    UPGRADING OF FALAJ AL QABAIL ROUNDABOUT TENDER NO. 51/2012

    MONTHLY PROGRESS REPORT NO. 7

    JULY 2014

    CONSULTANT:

    RENARDET S.A. & PARTNERS CONSULTING ENGINEERS LLC. P.O. Box 579, Muscat, P.C. 100, Sultanate of Oman

    CONTRACTOR:

    CONSOLIDATED CONTRACTORS CO. LLC P.O. Box 614, Muscat, P.C. 100, Sultanate of Oman

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 1

    Table of Contents

    S. No. Description Page No.

    1. Project Particulars 2

    2. Scope of Work 3

    3. Typical Cross Sections 4

    4. Site visits/ Meetings 6

    5 Engineers Site Staff 7

    6. Progress Review 8

    7. Financial Status 22

    8. Contractors Resources 23

    9. QA/ QC Reports 27

    10. Engineers Comments 31

    11. Project Correspondence 32

    12. Progress Photographs 36

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 2

    Project Particulars

    Client: Ministry of Transport &

    Communications

    P.O. Box 684, Muscat, Postal Code 113

    Directorate General of Roads

    Sultanate of Oman.

    Consultant: Renardet S.A & Partners L.L.C. P.O. Box 579, Muscat, Postal Code 100

    Sultanate of Oman.

    Contractor: Consolidated Contractors Company

    L.L.C.

    P.O. Box 614, Muscat, Postal Code 100

    Sultanate of Oman.

    Project Commencement Date: 30.10.2013

    Mobilization Period: 60 Days

    Construction Period: 548 Days

    Completion date: 29.06.2015

    Original Contract Value:

    (Including Contingencies) R.O. 17,884,403.000

    Amount of Contingencies: R.O. 1,402,155.613

    Original Contract Value:

    (Excluding Contingencies) R.O. 16,482,247.387

    Planned physical progress

    cumulative up to end of July 2014

    42.37%

    Achieved physical progress

    cumulative up to end of July 2014 22.55%

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 3

    Scope of Work

    This project is located in Batinah Region on existing Batinah Highway in the Wilayat Sohar and

    consists of construction of an interchange in place of existing roundabout along with allied works.

    Total length of the project along Batinah highway is about 4.0 km which shall be converted from four

    lanes to six lanes with tapering back to 4lanes, all as shown on plans. Also included in the scope of

    work is the construction of service roads, pedestrian underpasses.

    The work also includes expropriation of properties, relocation/protection of services (sewerage,

    telephone, electricity, water, irrigation) road lighting works and traffic signals.

    Major items within the scope of work consist of but not limited to the following:

    Removal of existing asphalt surface, extension of existing embankment and earthwork to achieve

    the designed profile and gradient.

    Removal of existing drainage structures and construction of new ones including protection works

    as shown on construction drawings and as directed.

    Expropriation of open/built up properties and removal of existing structures thereupon.

    Construction of interchange ramps, Box Girder Bridge, roundabout, pedestrian underpasses and

    service roads.

    Provision of new street lighting system/traffic signals and removal/disposal of existing street light

    poles including conductors/cables, transformers, feeder pillars, foundations etc., all for the

    proper completion of the job.

    Construction of earthen embankment/sub grade, sub-base, aggregate base course, bituminous base

    course and bituminous wearing course as per details on the construction drawings.

    Installation of road side furniture (traffic signs, road marking etc.) and protection works on

    embankment slopes.

    Relocation/Protection of existing LT, 11KV and 33KV transmission lines and allied items

    (transformers etc.) as per the requirements of concerned authority.

    Relocation/Protection of existing utilities (sewerage, telephone, electricity, water lines and

    irrigation) as per the requirements of concerned authorities.

    Provision of ducts for future utilities as per the requirements of utility operator.

    Construction of concrete safety barriers, fixing of guard rails and paving tiles.

    Provision of traffic diversion in coordination with concerned authorities.

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 4

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 5

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 6

    Site visits/ Meetings

    S. No. Details of Site Visit Date Final Outcome/ Decisions

    1 Meeting with Director of

    Maintenance, Sohar Municipality for

    the approval of MAS for Street

    Lighting Luminaires.

    01.07.2014 Director informed that the

    Luminaires from M/s Majelite

    Industries shall be approved.

    2 Meeting with Director of

    Maintenance, Sohar Municipality for

    the approval of MAS for Street

    Lighting Luminaires.

    08.07.2014 Director informed that the

    Luminaires from M/s Majelite

    Industries shall be approved.

    3 Meeting with DGRs QS at Muscat

    office.

    17.07.2014 Invoice No. 5 was reviewed.

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 7

    Engineers Site Staff S.

    No. Name Designation

    Date of

    Joining

    1. Roberto Benigni Head Supervision Projects

    2. Muneer Abdul Resident Engineer 19.03.2014

    3. Hussein Shah Material Engineer 04.01.2014

    4. Ernesto B. Paredes Bridge Engineer 16.04.2014

    5. Sande H Tangaras Civil Engineer 08.06.2014

    6. Danilo Quantity Surveyor 19.06.2014

    6. Mohamed Safie Land Surveyor 04.01.2014

    7. Aseef Iqbal Site Inspector 10.02.2014

    8. Alaa Aldin Abdelfatah Site Inspector 30.03.2014

    9. Walid Samy Abdoh Mostafa Material Inspector 01.04.2014

    10. Haneefa Mohmmed Al Zadjali Secretary 13.04.2014

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 8

    2013

    De

    cJan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    No

    vD

    ec

    Jan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    0.0

    1

    0.2

    5

    1.4

    2

    4.2

    3

    7.2

    5

    10.0

    6

    9.4

    2

    9.7

    3

    10.2

    1

    9.7

    9

    8.4

    9

    5.7

    2

    4.5

    5

    3.5

    6

    2.7

    9

    3.8

    3

    3.5

    5

    3.4

    7

    1.6

    7

    -

    -

    -

    -

    -

    0.2

    8

    0.1

    8

    1.0

    1

    2.8

    9

    5.6

    5

    5.1

    8

    7.3

    6

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    0.0

    10.2

    61.6

    75.9

    113.1

    523.2

    132.6

    442.3

    752.5

    862.3

    770.8

    676.5

    981.1

    384.6

    987.4

    891.3

    194.8

    698.3

    3100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    -

    0.2

    8

    0.4

    5

    1.4

    6

    4.3

    6

    10.0

    1

    15.1

    9

    22.5

    5

    CU

    MU

    LA

    TIV

    E P

    RO

    GR

    ES

    SC

    L14 O

    rg P

    lan

    Cu

    mu

    lati

    ve

    %

    Actu

    al C

    um

    ula

    tive

    2014

    2015

    MO

    NT

    HL

    Y P

    RO

    GR

    ES

    SC

    L14 O

    rg P

    lan

    pe

    r M

    on

    th %

    Actu

    al p

    er

    Mo

    nth

    0.0

    0

    20

    .00

    40

    .00

    60

    .00

    80

    .00

    10

    0.0

    0

    12

    0.0

    0

    - 2 4 6 8

    10

    12

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    Nov

    Dec

    Jan

    Feb

    Mar

    Apr

    May

    Jun

    Jul

    Aug

    Sep

    Oct

    20

    13

    20

    14

    20

    15

    % Cumulative

    % MONTHLY

    MO

    NT

    HS

    UP

    GR

    AD

    ING

    OF

    FA

    LA

    J A

    L Q

    AB

    AIL

    RO

    UN

    DA

    BO

    UT

    PR

    OJ

    EC

    T -

    OM

    AN

    MO

    NT

    HLY

    CL

    14

    PL

    AN

    NE

    D V

    S. A

    CT

    UA

    L M

    AN

    HO

    UR

    S

    CL

    14

    Org

    Pla

    n p

    er

    Mo

    nth

    %A

    ctu

    al p

    er

    Mo

    nth

    CL

    14

    Org

    Pla

    n C

    um

    ula

    tive %

    Actu

    al C

    um

    ula

    tiv

    e

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 9

    REV

    .:0

    PER

    IOD

    EN

    DIN

    G:

    Ju

    l-14

    2013

    De

    cJan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    No

    vD

    ec

    Jan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    CL

    14 P

    lan

    %0.3

    08.6

    719.2

    326.8

    931.7

    736.6

    441.5

    146.3

    951.2

    656.1

    361.0

    165.8

    870.7

    675.6

    380.5

    085.3

    890.2

    595.1

    3100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    -

    6.6

    2

    13.0

    3

    22.3

    6

    37.3

    1

    43.0

    0

    44.1

    1

    51.2

    1

    CL

    14 P

    lan

    %0.0

    00.0

    00.3

    820.3

    747.7

    048.3

    348.3

    348.3

    348.3

    348.3

    348.3

    348.3

    348.3

    359.9

    177.8

    490.2

    794.9

    3100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    -

    10.0

    9

    10.0

    9

    17.5

    9

    19.5

    2

    77.4

    2

    69.9

    6

    70.1

    8

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.7

    86.5

    816.7

    629.3

    841.3

    758.6

    466.6

    074.1

    882.8

    584.7

    584.7

    585.2

    492.3

    492.3

    498.3

    6100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    -

    -

    -

    -

    4.3

    5

    4.8

    9

    -

    5.2

    7

    CL

    14 P

    lan

    %0.0

    00.0

    01.0

    19.2

    129.3

    045.9

    156.9

    062.2

    464.5

    967.9

    469.0

    869.0

    875.0

    582.8

    593.4

    898.6

    4100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    -

    -

    -

    5.0

    0

    5.0

    0

    53.2

    3

    62.1

    6

    74.9

    1

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    011.0

    726.2

    741.9

    859.9

    878.7

    379.9

    079.9

    085.2

    089.4

    592.6

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    87.7

    719.3

    231.2

    244.9

    451.9

    852.1

    490.1

    490.1

    4100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    CL

    14 P

    lan

    %0.0

    00.0

    00.2

    31.4

    32.9

    710.1

    723.6

    536.5

    151.4

    763.0

    674.2

    675.9

    777.3

    780.0

    582.4

    088.9

    792.1

    398.5

    5100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    -

    -

    -

    0.4

    8

    1.2

    6

    5.5

    9

    14.9

    3

    27.7

    2

    CL

    14 P

    lan

    %0.0

    00.0

    04.0

    215.2

    134.6

    257.8

    969.2

    681.4

    083.3

    883.4

    684.5

    092.8

    999.9

    6100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    -

    -

    -

    0.0

    1

    6.0

    5

    14.7

    3

    18.1

    4

    22.3

    3

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.0

    00.0

    00.3

    81.2

    12.6

    33.4

    24.2

    35.5

    06.0

    86.0

    834.3

    599.3

    899.7

    699.7

    6100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    -

    -

    -

    2.5

    0

    16.1

    9

    14.3

    9

    13.2

    4

    16.1

    9

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.0

    00.0

    00.0

    00.0

    02.8

    017.8

    743.8

    561.5

    972.9

    881.1

    583.9

    484.4

    285.3

    592.8

    696.3

    9100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    -

    -

    -

    -

    -

    2.6

    1

    4.9

    8

    6.4

    2

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    04.4

    317.2

    333.3

    649.1

    365.0

    780.7

    993.8

    2100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    -

    -

    -

    6.1

    6

    9.8

    7

    17.6

    3

    25.6

    9

    35.9

    0

    CL

    14 P

    lan

    %0.0

    00.0

    00.0

    00.0

    00.0

    00.1

    70.7

    91.4

    35.6

    513.4

    121.8

    430.5

    632.9

    470.9

    475.0

    494.0

    296.4

    3100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0100.0

    0

    Actu

    al

    -

    -

    -

    0.1

    3

    5.5

    2

    9.2

    6

    13.3

    8

    16.8

    7

    Re

    vis

    ed

    Pla

    n0.1

    1

    0.2

    5

    0.4

    8

    0.7

    6

    2.4

    7

    5.6

    4

    12.4

    8

    21.6

    4

    30.7

    8

    39.8

    7

    48.3

    5

    56.2

    6

    64.3

    4

    71.0

    5

    77.3

    1

    81.9

    9

    85.5

    9

    88.9

    3

    93.3

    5

    96.6

    4

    98.2

    7

    99.3

    8

    100.0

    0

    Actu

    al C

    um

    -

    0.2

    8

    0.4

    5

    1.4

    6

    4.3

    6

    10.0

    1

    15.1

    9

    22.5

    5

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    -

    2013

    De

    cJan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    No

    vD

    ec

    Jan

    Fe

    bM

    ar

    Ap

    rM

    ay

    Ju

    nJu

    lA

    ug

    Se

    pO

    ct

    0.0

    1

    0.2

    5

    1.4

    2

    4.2

    3

    7.2

    5

    10.0

    6

    9.4

    2

    9.7

    3

    10.2

    1

    9.7

    9

    8.4

    9

    5.7

    2

    4.5

    5

    3.5

    6

    2.7

    9

    3.8

    3

    3.5

    5

    3.4

    7

    1.6

    7

    -

    -

    -

    -

    -

    0.2

    8

    0.1

    8

    1.0

    1

    2.8

    9

    5.6

    5

    5.1

    8

    7.3

    6

    0.0

    1

    0.2

    6

    1.6

    7

    5.9

    1

    13.1

    5

    23.2

    1

    32.6

    4

    42.3

    7

    52.5

    8

    62.3

    7

    70.8

    6

    76.5

    9

    81.1

    3

    84.6

    9

    87.4

    8

    91.3

    1

    94.8

    6

    98.3

    3

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    100.0

    0

    -

    0.2

    8

    0.4

    5

    1.4

    6

    4.3

    6

    10.0

    1

    15.1

    9

    22.5

    5

    UP

    GR

    AD

    ING

    OF

    FA

    LA

    J A

    L Q

    AB

    AIL

    RO

    UN

    DA

    BO

    UT

    - O

    MA

    N

    MA

    NH

    OU

    RS

    OV

    ER

    AL

    L P

    RO

    JE

    CT

    S-C

    UR

    VE

    Ite

    mD

    es

    cri

    pti

    on

    Wtd

    .

    %

    Pla

    n/

    Actu

    al

    2014

    C

    Cle

    ari

    ng

    &

    Re

    mo

    va

    l o

    f

    Ob

    str

    uc

    tio

    ns

    0.9

    5

    2015

    BR

    oa

    d D

    ive

    rsio

    ns

    2.7

    3

    Bu

    dg

    ete

    d

    Man

    -Hrs

    56,4

    23

    1

    9,5

    58

    ES

    tru

    ctu

    ral

    Ex

    ca

    va

    tio

    n0.7

    2

    DE

    mb

    an

    km

    en

    t3.5

    974,0

    43

    1

    4,8

    21

    GB

    itu

    min

    ou

    s

    Pa

    ve

    me

    nt

    3.5

    7

    FS

    ub

    ba

    se

    &

    Ag

    gre

    ga

    te B

    as

    e2.4

    250,0

    04

    7

    3,7

    24

    IC

    on

    cre

    te f

    or

    Bri

    dg

    e22.1

    2

    H

    Co

    nc

    rete

    fo

    r

    Bo

    x C

    ulv

    ert

    /Un

    de

    rpa

    s

    38.1

    9788,1

    38

    4

    56,5

    22

    LM

    SE

    wa

    lls

    6.8

    4

    JD

    rain

    ag

    e W

    ork

    s1.5

    0

    KIn

    cid

    en

    tal

    Co

    ns

    tru

    cti

    on

    13.3

    3

    30,9

    20

    275,0

    37

    1

    41,1

    90

    2014

    2015

    MO

    NT

    HL

    Y P

    RO

    GR

    ES

    SC

    L14 O

    rg P

    lan

    pe

    r M

    on

    th %

    Actu

    al p

    er

    Mo

    nth

    CU

    MU

    LA

    TIV

    E P

    RO

    GR

    ES

    SC

    L14 O

    rg P

    lan

    Cu

    mu

    lati

    ve

    %

    Actu

    al C

    um

    ula

    tive

    MM

    EP

    Wo

    rks

    &

    Du

    cts

    4.0

    3

    TO

    TA

    L100.0

    00

    83,2

    64

    2,0

    63

    ,64

    4

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 10

    Progress of Permanent Works

    Sl. No.

    Description Unit BOQ Qty. Actual Qty.

    % This Month

    % Last Month

    1 Clearing & Grubbing M2 161,752 137,490 85.00% 85.00%

    2 Removal of Trees No. 956 656 68.62% 68.62%

    3 Removal of Existing Pavement

    M3 24,000 13,500 56.25% 56.25%

    4 Removal of Reinforced Concrete

    M3 1,000 493.5 49.35% 0.32%

    5 Removal of Signboards Nr. 60 15 25.00% 25.00%

    6 Removal of Floodway Marker posts

    Nr. 400 Revised

    200 50.00% 50.00%

    7 Removal of Drainage Protection Works

    M3 6,000 1,902 31.70% 31.70%

    8 Expandable Piles No. 4 4 100.0% 100.0%

    9 Working Piles No. 110 Revised

    95 86.36% 83.63%

    10 MSE Panels - Precast M2 13,030

    Revised

    4,742 36.39% 23.72%

    11 RCC Drainage Pipes LM 3,680 Revised

    832 22.61% 22.61%

    12 Steel Fixing Tons 4,600 Revised

    938.4 20.40% 12.22%

    13 Concrete Class 30 Box Culverts

    M3 17,200 4,139 24.06% 10.76%

    14 Concrete Class 15 M3 2,600 2,512 96.61% 81.3%

    15 Precast NJB M 6,400 2,209 34.51% 21.1%

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 11

    PILE MONTHLY SCHEDULE (CASTING) as of 31 JULY 2014

    LOCATION PILE NO. CASTING SETTING OUT BORING,

    REBARS, & CONCRETE

    INTEGRITY TEST

    LOAD TEST (Expendable Piles)

    - EP 01 3 26/3/2014 26/3/2014 - 7-8/5/2014

    - EP 02 2 25/3/2014 25/3/2014 - 16-17/4/2014

    - EP 03 1 25/3/2014 25/3/2014 - 5-6/4/2014

    - EP 04 4 26/3/2014 26/3/2014 - 13-14/5/2014

    - - - - - - LOAD TEST (Working

    Piles)

    P3R 85 1 7/4/2014 8/4/2014 23/4/2014 -

    P3R 87 2 7/4/2014 8/4/2014 23/4/2014 -

    P3R 83 3 8/4/2014 9/4/2014 23/4/2014 -

    P3R 81 4 8/4/2014 9/4/2014 23/4/2014 -

    P3R 79 5 8/4/2014 9/4/2014 23/4/2014 -

    P1R 63 6 9/4/2014 10/4/2014 28/4/2014 -

    P1R 65 7 9/4/2014 10/4/2014 28/4/2014 -

    P3R 86 8 10/4/2014 12/4/2014 23/4/2014 -

    P3R 84 9 10/4/2014 12/4/2014 23/4/2014 -

    P3R 82 10 10/4/2014 12/4/2014 23/4/2014 -

    P1R 68 11 12/4/2014 13/4/2014 28/4/2014 -

    P1R 66 12 12/4/2014 13/4/2014 28/4/2014 -

    P1R 61 13 9/4/2014 13/4/2014 28/4/2014 -

    P3R 80 14 13/4/2014 14/4/2014 23/4/2014 -

    P3L 28 15 13/4/2014 14/4/2014 28/4/2014 -

    P1R 62 16 12/4/2014 15/4/2014 28/4/2014 -

    P1R 67 17 14/4/2014 15/4/2014 28/4/2014 -

    P1R 69 18 14/4/2014 15/4/2014 28/4/2014 -

    P3L 26 19 15/4/2014 16/4/2014 28/4/2014 -

    P3L 30 20 15/4/2014 16/4/2014 28/4/2014 -

    P3L 32 21 15/4/2014 16/4/2014 28/4/2014 -

    P1R 64 22 16/4/2014 17/4/2014 28/4/2014 -

    P1L 6 WP 23 16/4/2014 17/4/2014 11/5/2014 30/4/2014 to 1/5/2014

    P1L 14 24 16/4/2014 17/4/2014 11/5/2014 -

    P3L 25 25 17/4/2014 20/4/2014 28/4/2014 -

    P3L 27 26 17/4/2014 20/4/2014 28/4/2014 -

    P3L 29 27 20/4/2014 28/4/2014 -

    P2R 78 28 19/4/2014 21/4/2014 11/5/2014 -

    P2R 76 29 19/4/2014 21/4/2014 11/5/2014 -

    P2R 74 30 19/4/2014 21/4/2014 11/5/2014 -

    P2L 23 WP 31 21/4/2014 22/4/2014 14/6/2014 1 - 2/6/2014

    P3L 24 32 21/4/2014 22/4/2014 28/4/2014 -

    P3L 31 33 20/4/2014 22/4/2014 28/4/2014 -

    P1L 8 34 22/4/2014 23/4/2014 11/5/2014 -

    P1L 10 35 22/4/2014 23/4/2014 11/5/2014 -

    P1L 12 36 22/4/2014 23/4/2014 11/5/2014 -

    P2L 17 37 23/4/2014 24/4/2014 14/6/2014 -

    P2L 18 38 23/4/2014 24/4/2014 14/6/2014 -

    P2L 22 39 23/4/2014 24/4/2014 14/6/2014 -

    P1L 7 40 24/4/2014 26/4/2014 11/5/2014 -

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 12

    LOCATION PILE NO. CASTING SETTING

    OUT

    BORING, REBARS, & CONCRETE

    INTEGRITY TEST

    LOAD TEST (Working Piles)

    P1L 9 41 24/4/2014 26/4/2014 11/5/2014 -

    P1L 13 42 24/4/2014 26/4/2014 11/5/2014 -

    P1L 11 43 26/4/2014 27/4/2014 11/5/2014 -

    P2L 16 44 26/4/2014 27/4/2014 14/6/2014 -

    P2L 21 45 26/4/2014 27/4/2014 14/6/2014 -

    P2L 19 46 27/4/2014 28/4/2014 14/6/2014 -

    P2R 72 47 27/4/2014 28/4/2014 11/5/2014 -

    P2R 77 48 27/4/2014 28/4/2014 11/5/2014 -

    P2L 15 49 28/4/2014 29/4/2014 14/6/2014 -

    P2L 20 50 27/4/2014 29/4/2014 14/6/2014 -

    P2R 70 51 28/4/2014 29/4/2014 11/5/2014 -

    P2R 71 52 29/4/2014 30/4/2014 11/5/2014 -

    P2R 73 53 29/4/2014 30/4/2014 11/5/2014 -

    P2R 75 54 29/4/2014 30/4/2014 11/5/2014 -

    P5R 105 55 4/5/2014 5/5/2014 18/5/2014 -

    P5R 104 56 4/5/2014 5/5/2014 18/5/2014 -

    P5R 103 57 4/5/2014 5/5/2014 18/5/2014 -

    P5R 102 58 5/5/2014 6/5/2014 18/5/2014 -

    P5R 101 59 5/5/2014 6/5/2014 18/5/2014 -

    P5R 100 60 5/5/2014 6/5/2014 18/5/2014 -

    P5R 97 61 6/5/2014 7/5/2014 18/5/2014 -

    P5R 98 62 6/5/2014 7/5/2014 18/5/2014 -

    P5R 99 63 6/5/2014 7/5/2014 18/5/2014 -

    P5L 48 WP 64 7/5/2014 8/5/2014 3/6/2014 24/5/2014 to 25/5/2014

    P5L 49 65 7/5/2014 8/5/2014 3/6/2014 -

    P5L 50 66 7/5/2014 8/5/2014 3/6/2014 -

    P5L 42 67 10/5/2014 11/5/2014 3/6/2014 -

    P5L 44 68 10/5/2014 11/5/2014 3/6/2014 -

    P5L 46 69 10/5/2014 11/5/2014 3/6/2014 -

    P5L 43 70 10/5/2014 12/5/2014 3/6/2014 -

    P5L 45 71 10/5/2014 12/5/2014 3/6/2014 -

    P5L 47 72 10/5/2014 12/5/2014 3/6/2014 -

    AB1 R 56 73 12/5/2014 13/5/2014 21/5/2014 -

    AB1 R 58 74 12/5/2014 13/5/2014 21/5/2014 -

    AB1 R 60 75 12/5/2014 13/5/2014 21/5/2014 -

    AB1 L 1 76 14/5/2014 15/5/2014 21/5/2014 -

    AB1 L 3 77 14/5/2014 15/5/2014 21/5/2014 -

    AB1 L 5 78 14/5/2014 15/5/2014 21/5/2014 -

    AB1 R 57 79 13/6/2014 14/6/2014 21/5/2014 -

    AB1 R 59 80 13/6/2014 14/6/2014 21/5/2014 -

    AB1 L 2 81 15/5/2014 17/5/2014 21/5/2014 -

    AB1 L 4 82 15/5/2014 17/5/2014 21/5/2014 -

    AB2 L 51 83 19/5/2014 20/5/2014 3/6/2014 -

    AB2 L 53 84 19/5/2014 20/5/2014 3/6/2014 -

    AB2 L 55 85 19/5/2014 20/5/2014 3/6/2014 -

    AB2 R 106 86 19/5/2014 20/5/2014 3/6/2014 -

    AB2 L 54 87 20/5/2014 21/5/2014 3/6/2014 -

    AB2 R 108 88 20/5/2014 21/5/2014 3/6/2014 -

    AB2 R 110 89 20/5/2014 21/5/2014 3/6/2014 -

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 13

    LOCATION PILE NO. CASTING SETTING OUT BORING,

    REBARS, & CONCRETE

    INTEGRITY TEST

    LOAD TEST (Working Piles)

    AB2 L 52 90 21/5/2014 22/5/2014 3/6/2014 -

    AB2 R 107 91 21/5/2014 22/5/2014 3/6/2014 -

    AB2 R 109 92 21/5/2014 22/5/2014 3/6/2014 -

    P4L 33 93 30/7/2014 31/7/2014 - -

    P4L 37 94 30/7/2014 31/7/2014 - -

    P4L 39 95 30/7/2014 31/7/2014 - -

    BRIDGE SUB-STRUCTURE PROGRESS SCHEDULE

    As of 31 JULY 2014

    SUB-STRUCTURE WORK PROGRESS (LHS)

    ACTIVITY AB1 L P1L P2L P3L P4L P5L AB2

    L

    PEDESTAL - - - - - - -

    PIER N/A - - - - - N/A

    2nd Lift - on-going - 24-Jul-14 - - -

    Height (m) - 6.920 6.920 6.920 6.920 6.920 -

    1st Lift - 23-Jul-14 on-going 29-Jun-14 - on-going -

    Height (m) - 1.153 1.210 1.440 1.248 1.225 -

    BIT. PAINTING - 28-May-

    14 26-Jun-14 17-May-14 - 23-Jun-14 -

    PILE CAP - 17-May-

    14 18-Jun-14 8-May-14 - 11-Jun-14 -

    F/P & BLINDING

    N/A 11-May-

    14 11-Jun-14 1-May-14 - 3-Jun-14 N/A

    SUB-STRUCTURE WORK PROGRESS (RHS)

    ACTIVITY AB1 R P1R P2R P3R P4R P5R AB2

    R

    PEDESTAL - - - - - - -

    PIER N/A - - - - - N/A

    2nd Lift - 9-Jun-14 28-Jun-14 22-Jun-14 - 10-Jul-14 -

    Height (m) - 6.920 6.920 6.920 6.920 6.920 -

    1st Lift - 20-May-

    14 11-Jun-14 26-May-14 - 22-Jun-14 -

    Height (m) - 0.366 0.423 0.649 0.461 0.438 -

    BIT. PAINTING - 12-May-

    14 25-May-

    14 8-May-14 -

    31-May-14

    -

    PILE CAP - 4-May-14 13-May-

    14 4/30/2014 -

    20-May-14

    -

    F/P & BLINDING

    N/A 27-Apr-14 7-May-14 22-Apr-14 - 14-May-

    14 N/A

    PREVIOUS

    PREVIOUS MONTH

    THIS MONTH

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 14

    Re

    bar

    sC

    on

    cre

    teR

    eb

    ars

    Co

    ncr

    ete

    Re

    bar

    sC

    on

    cre

    te

    10+

    003

    - 0+

    022

    19.0

    01.

    0 x

    2.0

    13-J

    ul-

    1414-Jul-14

    14-J

    ul-

    1415

    -Ju

    l-14

    15-J

    ul-

    1417

    -Ju

    l-14

    17-J

    ul-

    1422

    -Ju

    l-14

    20+

    022

    - 0+

    040

    18.0

    01.

    0 x

    2.0

    28-M

    ay-1

    44-Jun-14

    4-Ju

    n-1

    412

    -Ju

    n-1

    412

    -Ju

    n-1

    416

    -Ju

    n-1

    416

    -Ju

    n-1

    429

    -Ju

    n-1

    43

    0+04

    0 -

    0+05

    212

    .00

    1.0

    x 2.

    015

    -Ap

    r-14

    16-A

    pr-

    1416

    -Ap

    r-14

    19-A

    pr-

    1419

    -Ap

    r-14

    21-A

    pr-

    1421

    -Ap

    r-14

    29-A

    pr-

    14M

    H0+

    043

    --

    --

    --

    --

    --

    40+

    052

    - 0+

    070

    18.0

    01.

    0 x

    2.0

    5-M

    ar-1

    424

    -Mar

    -14

    24-M

    ar-1

    48-

    Ap

    r-14

    8-A

    pr-

    1412

    -Ap

    r-14

    12-A

    pr-

    1419

    -Ap

    r-14

    50+

    070

    - 0+

    100

    30.0

    01.

    0 x

    2.0

    2-M

    ar-1

    45-

    Mar

    -14

    5-M

    ar-1

    46-

    Mar

    -14

    6-M

    ar-1

    411

    -Mar

    -14

    11-M

    ar-1

    419

    -Mar

    -14

    60+

    100

    - 0+

    104

    4.00

    1.0

    x 2.

    010

    -May

    -14

    8-Ju

    n-1

    48-

    Jun

    -14

    14-J

    un

    -14

    14-J

    un

    -14

    17-J

    un

    -14

    17-J

    un

    -14

    24-J

    un

    -14

    MH

    0+10

    4-

    --

    --

    16-J

    ul-

    1416

    -Ju

    l-14

    --

    -7

    0+10

    4 -

    0+12

    218

    .00

    1.0

    x 2.

    010

    -May

    -14

    17-M

    ay-1

    417

    -May

    -14

    20-M

    ay-1

    420

    -May

    -14

    24-M

    ay-1

    424

    -May

    -14

    29-M

    ay-1

    48

    0+12

    2 -

    0+13

    917

    .00

    1.0

    x 2.

    010

    -May

    -14

    14-M

    ay-1

    414

    -May

    -14

    17-M

    ay-1

    417

    -May

    -14

    19-M

    ay-1

    419

    -May

    -14

    29-M

    ay-1

    49

    0+13

    9 -

    0+15

    011

    .00

    1.0

    x 2.

    05-

    Mar

    -14

    1-A

    pr-

    141-

    Ap

    r-14

    5-A

    pr-

    145-

    Ap

    r-14

    8-A

    pr-

    148-

    Ap

    r-14

    12-A

    pr-

    1410

    0+15

    0 -

    0+17

    020

    .00

    1.0

    x 2.

    02-

    Mar

    -14

    6-M

    ar-1

    46-

    Mar

    -14

    5-A

    pr-

    145-

    Ap

    r-14

    12-A

    pr-

    1412

    -Ap

    r-14

    10-A

    pr-

    14M

    H0+

    165

    --

    --

    -2-

    Jun

    -14

    2-Ju

    n-1

    4-

    --

    110+

    170

    - 0+

    182

    12.0

    01.

    0 x

    2.0

    19-M

    ay-1

    422

    -May

    -14

    22-M

    ay-1

    42-

    Jun

    -14

    2-Ju

    n-1

    45-

    Jun

    -14

    5-Ju

    n-1

    416

    -Ju

    n-1

    412

    0+18

    2 -

    0+20

    018

    .00

    1.0

    x 2.

    019

    -May

    -14

    21-M

    ay-1

    421

    -May

    -14

    25-M

    ay-1

    425

    -May

    -14

    2-Ju

    n-1

    42-

    Jun

    -14

    16-J

    un

    -14

    130+

    200

    - 0+

    213.

    513

    .50

    1.0

    x 2.

    024

    -Fe

    b-1

    427

    -Fe

    b-1

    427

    -Fe

    b-1

    41-

    Mar

    -14

    1-M

    ar-1

    44-

    Mar

    -14

    4-M

    ar-1

    410

    -Mar

    -14

    140+

    213.

    5 -

    0+22

    511

    .50

    1.0

    x 2.

    028

    -May

    -14

    3-Ju

    n-1

    43-

    Jun

    -14

    8-Ju

    n-1

    48-

    Jun

    -14

    17-J

    un

    -14

    17-J

    un

    -14

    28-J

    un

    -14

    MH

    0+22

    5-

    --

    --

    5-Ju

    l-14

    5-Ju

    l-14

    --

    -15

    0+22

    5 -

    0+23

    27.

    001.

    0 x

    1.5

    28-M

    ay-1

    43-

    Jun

    -14

    3-Ju

    n-1

    48-

    Jun

    -14

    8-Ju

    n-1

    417

    -Ju

    n-1

    417

    -Ju

    n-1

    428

    -Ju

    n-1

    416

    0+23

    2 -

    0+25

    018

    .00

    1.0

    x 1.

    510

    -Ap

    r-14

    13-A

    pr-

    1413

    -Ap

    r-14

    15-A

    pr-

    1415

    -Ap

    r-14

    19-A

    pr-

    1419

    -Ap

    r-14

    13-M

    ay-1

    417

    0+25

    0 -

    0+25

    88.

    001.

    0 x

    1.5

    23-A

    pr-

    1426

    -Ap

    r-14

    26-A

    pr-

    1427

    -Ap

    r-14

    27-A

    pr-

    141-

    May

    -14

    1-M

    ay-1

    413

    -May

    -14

    180+

    258

    - 0+

    268

    10.0

    01.

    0 x

    1.5

    13-J

    ul-

    1414-Jul-14

    14-J

    ul-

    1415

    -Ju

    l-14

    15-J

    ul-

    1417

    -Ju

    l-14

    17-J

    ul-

    1422

    -Ju

    l-14

    MH

    0+26

    8-

    --

    --

    --

    --

    -26

    5.00

    0.00

    PR

    EVIO

    US

    PR

    EV

    IOU

    S

    MO

    NT

    HTH

    IS M

    ON

    TH

    F/P

    &

    BLI

    ND

    ING

    (Cha

    inag

    e 23

    +411

    .400

    )

    BA

    SE S

    LAB

    WA

    LLTO

    P S

    LAB

    BA

    LAN

    CE

    (m)

    =TO

    TAL

    LEN

    GTH

    (m

    ) =

    Bit

    um

    ino

    us

    Pai

    nt

    (2 C

    oat

    s)

    FALA

    J R

    CBC

    PR

    OG

    RES

    S SC

    HED

    ULE

    As

    of

    31 J

    ULY

    201

    4

    NO

    .ST

    ATI

    ON

    TYP

    E (1

    Ce

    ll) &

    DIM

    ENSI

    ON

    (m

    )

    LEN

    GTH

    (m)

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 15

    Re

    bar

    sC

    on

    cre

    teR

    eb

    ars

    Co

    ncr

    ete

    Re

    bar

    sC

    on

    cre

    te

    121

    +260

    3 ce

    lls

    - 2.

    0 x

    1.5

    43.0

    390

    --

    --

    --

    --

    LHS

    Blo

    ck 1

    3 ce

    lls

    - 2.

    0 x

    1.5

    19.5

    260

    --

    --

    --

    --

    RH

    SB

    lock

    23

    cell

    s -

    2.0

    x 1.

    523

    .493

    0-

    --

    --

    --

    -2

    21+4

    851

    cell

    - 2

    .0 x

    1.5

    49.7

    500

    --

    --

    --

    --

    Blo

    ck 1

    a1

    cell

    - 2

    .0 x

    1.5

    3.00

    00

    --

    --

    --

    --

    Blo

    ck 1

    b1

    cell

    - 2

    .0 x

    1.5

    17.2

    900

    1-Ju

    l-14

    Blo

    ck 2

    a1

    cell

    - 2

    .0 x

    1.5

    7.71

    00

    1-Ju

    l-14

    --

    --

    --

    -B

    lock

    2b

    1 ce

    ll -

    2.0

    x 1

    .521

    .730

    0-

    --

    --

    --

    -3

    21+8

    382

    x 4

    cell

    s -

    2.0

    x 1.

    557

    .210

    0-

    --

    --

    --

    -B

    lock

    1a

    1 x

    4 ce

    lls

    - 2.

    0 x

    1.5

    5.00

    00

    21-J

    ul-

    14-

    --

    --

    --

    Blo

    ck 1

    b1

    x 4

    cell

    s -

    2.0

    x 1.

    522

    .590

    03-

    Jul-

    14-

    --

    --

    --

    Blo

    ck 2

    1 x

    4 ce

    lls

    - 2.

    0 x

    1.5

    22.5

    800

    3-Ju

    l-14

    --

    --

    --

    -B

    lock

    31

    x 4

    cell

    s -

    2.0

    x 1.

    57.

    000

    0-

    --

    --

    --

    -B

    lock

    4a

    1 x

    4 ce

    lls

    - 2.

    0 x

    1.5

    5.00

    00

    21-J

    ul-

    14-

    --

    --

    --

    Blo

    ck 4

    b1

    x 4

    cell

    s -

    2.0

    x 1.

    522

    .590

    03-

    Jul-

    14B

    lock

    51

    x 4

    cell

    s -

    2.0

    x 1.

    522

    .580

    03-

    Jul-

    14-

    --

    --

    --

    Blo

    ck 6

    1 x

    4 ce

    lls

    - 2.

    0 x

    1.5

    7.00

    00

    --

    --

    --

    --

    421

    +972

    .411

    x 4

    ce

    lls

    - 3.

    0 x

    2.0

    57.6

    290

    --

    --

    --

    --

    Blo

    ck 1

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    28.0

    380

    24-M

    ay-1

    45-

    Jun

    -14

    5-Ju

    n-1

    424

    -Ju

    n-1

    424

    -Ju

    n-1

    415

    -Ju

    l-14

    16-J

    ul-

    14-

    Blo

    ck 2

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    28.0

    310

    24-M

    ay-1

    49-

    Jul-

    1410

    -Ju

    l-14

    --

    --

    -B

    lock

    31

    x 4

    cell

    s -

    3.0

    x 2.

    028

    .026

    017

    -May

    -14

    25-M

    ay-1

    425

    -May

    -14

    3-Ju

    n-1

    43-

    Jun

    -14

    23-J

    un

    -14

    23-J

    un

    -14

    -B

    lock

    41

    x 4

    cell

    s -

    3.0

    x 2.

    028

    .022

    018

    -May

    -14

    12-J

    ul-

    1413

    -Ju

    l-14

    --

    --

    -B

    lock

    51

    x 4

    cell

    s -

    3.0

    x 2.

    028

    .019

    018

    -May

    -14

    29-M

    ay-1

    429

    -May

    -14

    8-Ju

    n-1

    48-

    Jun

    -14

    2-Ju

    l-14

    2-Ju

    l-14

    -B

    lock

    61

    x 4

    cell

    s -

    3.0

    x 2.

    028

    .018

    018

    -May

    -14

    31-J

    ul-

    1431

    -Ju

    l-14

    --

    --

    -B

    lock

    71

    x 4

    cell

    s -

    3.0

    x 2.

    028

    .019

    018

    -May

    -14

    10-J

    un

    -14

    10-J

    un

    -14

    1-Ju

    l-14

    1-Ju

    l-14

    23-J

    ul-

    1424

    -Ju

    l-14

    -B

    lock

    81

    x 4

    cell

    s -

    3.0

    x 2.

    028

    .022

    026

    -May

    -14

    --

    --

    --

    -B

    lock

    91

    x 4

    cell

    s -

    3.0

    x 2.

    028

    .026

    026

    -May

    -14

    15-J

    un

    -14

    15-J

    un

    -14

    7-Ju

    l-14

    8-Ju

    l-14

    --

    -B

    lock

    10

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    28.0

    310

    28-M

    ay-1

    4-

    --

    --

    --

    Blo

    ck 1

    11

    x 4

    cell

    s -

    3.0

    x 2.

    028

    .038

    028

    -May

    -14

    19-J

    un

    -14

    19-J

    un

    -14

    20-J

    ul-

    1420

    -Ju

    l-14

    --

    -B

    lock

    12

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    21.0

    150

    --

    --

    --

    --

    Blo

    ck 1

    31

    x 4

    cell

    s -

    3.0

    x 2.

    021

    .010

    027

    -Ju

    l-14

    --

    --

    --

    -B

    lock

    14

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    21.0

    060

    27-J

    ul-

    14-

    --

    --

    --

    Blo

    ck 1

    51

    x 4

    cell

    s -

    3.0

    x 2.

    021

    .003

    024

    -Ju

    l-14

    --

    --

    --

    -B

    lock

    16

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    21.0

    010

    16-J

    un

    -14

    27-J

    ul-

    1427

    -Ju

    l-14

    --

    --

    -B

    lock

    17

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    21.0

    000

    16-J

    un

    -14

    --

    --

    --

    -B

    lock

    18

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    21.0

    010

    12-J

    un

    -14

    --

    --

    --

    -B

    lock

    19

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    21.0

    030

    12-J

    un

    -14

    --

    --

    --

    -B

    lock

    20

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    21.0

    060

    8-Ju

    n-1

    4-

    --

    --

    --

    Blo

    ck 2

    11

    x 4

    cell

    s -

    3.0

    x 2.

    021

    .010

    08-

    Jun

    -14

    --

    --

    --

    -B

    lock

    22

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    21.0

    150

    8-Ju

    n-1

    425

    -Ju

    n-1

    425

    -Ju

    n-1

    430

    -Ju

    l-14

    30-J

    ul-

    14-

    --

    NO

    .TO

    P S

    LAB

    Bit

    um

    ino

    us

    Pai

    nt

    (2 C

    oat

    s)LE

    NG

    TH (

    m)

    SKEW

    (

    )F/

    P &

    BLI

    ND

    ING

    LHS

    LHS

    LHS

    RH

    S

    TYP

    E &

    DIM

    ENSI

    ON

    STA

    TIO

    N

    RCB

    C P

    RO

    GR

    ESS

    SCH

    EDU

    LE (

    BA

    RR

    EL)

    As

    of

    31 J

    ULY

    201

    4

    BA

    SE S

    LAB

    WA

    LL

    RH

    S

    LHS

    RH

    S

    RH

    S

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 16

    Re

    bar

    sC

    on

    cre

    teR

    eb

    ars

    Co

    ncr

    ete

    Re

    bar

    sC

    on

    cre

    te

    421

    +972

    .411

    x 4

    ce

    lls

    - 3.

    0 x

    2.0

    57.6

    290

    --

    --

    --

    --

    Blo

    ck 2

    31

    x 4

    cell

    s -

    3.0

    x 2.

    06.

    635

    0-

    --

    --

    --

    -B

    lock

    24

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    6.78

    20

    --

    --

    --

    --

    Blo

    ck 2

    51

    x 4

    cell

    s -

    3.0

    x 2.

    06.

    819

    0-

    --

    --

    --

    -B

    lock

    26

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    7.21

    70

    --

    --

    --

    --

    Blo

    ck 2

    71

    x 4

    cell

    s -

    3.0

    x 2.

    07.

    975

    0-

    --

    --

    --

    -B

    lock

    28

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    8.57

    10

    --

    --

    --

    --

    Blo

    ck 2

    91

    x 4

    cell

    s -

    3.0

    x 2.

    09.

    267

    0-

    --

    --

    --

    -B

    lock

    30

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    9.94

    90

    --

    --

    --

    --

    Blo

    ck 3

    11

    x 4

    cell

    s -

    3.0

    x 2.

    010

    .260

    0-

    --

    --

    --

    -B

    lock

    32

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    10.2

    620

    --

    --

    --

    --

    Blo

    ck 3

    31

    x 4

    cell

    s -

    3.0

    x 2.

    010

    .265

    0-

    --

    --

    --

    -5

    22+6

    552

    x 4

    cell

    s -

    2.0

    x 2.

    095

    .482

    45

    R-

    --

    --

    --

    -1

    cell

    - 2

    .0 x

    2.0

    --

    --

    --

    --

    Blo

    ck 1

    1 x

    4 ce

    lls

    - 2.

    0 x

    2.0

    9.67

    545

    R

    --

    --

    --

    --

    Blo

    ck 2

    1 x

    4 ce

    lls

    - 2.

    0 x

    2.0

    32.7

    1145

    R

    30-J

    un

    -14

    --

    --

    --

    -B

    lock

    31

    x 4

    cell

    s -

    2.0

    x 2.

    032

    .711

    45

    R24

    -Ju

    n-1

    421

    -Ju

    l-14

    21-J

    ul-

    14-

    --

    --

    Blo

    ck 4

    1 x

    4 ce

    lls

    - 2.

    0 x

    2.0

    20.3

    1545

    R

    --

    --

    --

    --

    Blo

    ck 5

    1 x

    4 ce

    lls

    - 2.

    0 x

    2.0

    19.0

    3545

    R

    --

    --

    --

    --

    Blo

    ck 6

    1 x

    4 ce

    lls

    - 2.

    0 x

    2.0

    32.7

    1145

    R

    29-J

    un

    -14

    27-J

    ul-

    1427

    -Ju

    l-14

    --

    --

    -B

    lock

    71

    x 4

    cell

    s -

    2.0

    x 2.

    032

    .711

    45

    R24

    -Ju

    n-1

    4-

    --

    --

    --

    Blo

    ck 8

    1 x

    4 ce

    lls

    - 2.

    0 x

    2.0

    10.9

    545

    R

    --

    --

    --

    --

    Blo

    ck 9

    1 ce

    ll -

    2.0

    x 2

    .025

    .03

    45

    R-

    --

    --

    --

    -B

    lock

    10

    1 ce

    ll -

    2.0

    x 2

    .032

    .711

    45

    R28

    -Ju

    n-1

    4-

    --

    --

    --

    Blo

    ck 1

    11

    cell

    - 2

    .0 x

    2.0

    32.7

    1145

    R

    29-J

    un

    -14

    --

    --

    --

    -B

    lock

    12

    1 ce

    ll -

    2.0

    x 2

    .03.

    130

    45

    R-

    --

    --

    --

    -6

    23+4

    921

    x 4

    cell

    s -

    3.0

    x 2.

    079

    .065

    15

    R-

    --

    --

    --

    -1

    cell

    - 3

    .0 x

    2.0

    --

    --

    --

    --

    Blo

    ck 1

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    6.45

    715

    R

    --

    --

    --

    --

    Blo

    ck 2

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    31.5

    4615

    R

    24-J

    un

    -14

    9-Ju

    l-14

    9-Ju

    l-14

    30-J

    ul-

    1430

    -Ju

    l-14

    --

    -B

    lock

    31

    x 4

    cell

    s -

    3.0

    x 2.

    031

    .546

    15

    R24

    -Ju

    n-1

    414

    -Ju

    l-14

    14-J

    ul-

    14-

    --

    --

    Blo

    ck 4

    1 x

    4 ce

    lls

    - 3.

    0 x

    2.0

    7.98

    215

    R

    --

    --

    --

    --

    Blo

    ck 5

    1 ce

    ll -

    3.0

    x 2

    .07.

    039

    15

    R-

    --

    --

    --

    -B

    lock

    61

    cell

    - 3

    .0 x

    2.0

    31.5

    4615

    R

    24-J

    un

    -14

    --

    --

    --

    -B

    lock

    71

    cell

    - 3

    .0 x

    2.0

    31.5

    4615

    R

    24-J

    un

    -14

    --

    --

    --

    -B

    lock

    81

    cell

    - 3

    .0 x

    2.0

    5.52

    515

    R

    --

    --

    --

    --

    LHS

    RH

    S

    Bit

    um

    ino

    us

    Pai

    nt

    (2 C

    oat

    s)

    LHS

    RH

    S

    LHS

    RH

    S

    RH

    S

    LHS

    RCB

    C P

    RO

    GR

    ESS

    SCH

    EDU

    LE (

    BA

    RR

    EL)

    As

    of

    31 J

    ULY

    201

    4

    NO

    .ST

    ATI

    ON

    TYP

    E &

    DIM

    ENSI

    ON

    LEN

    GTH

    (m

    )SK

    EW (

    )

    TOP

    SLA

    BF/

    P &

    BLI

    ND

    ING

    BA

    SE S

    LAB

    WA

    LL

    RH

    S

    LHS

    RH

    S

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 17

    Re

    bar

    sC

    on

    cre

    teR

    eb

    ars

    Co

    ncr

    ete

    Re

    bar

    sC

    on

    cre

    te

    723

    +756

    .51

    cell

    - 2

    .0 x

    1.5

    67.5

    500

    --

    --

    --

    --

    Blo

    ck 1

    1 ce

    ll -

    2.0

    x 1

    .512

    .090

    0-

    --

    --

    --

    -B

    lock

    21

    cell

    - 2

    .0 x

    1.5

    20.1

    800

    12-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1424

    -Ju

    l-14

    Blo

    ck 3

    a1

    cell

    - 2

    .0 x

    1.5

    14.4

    300

    12-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1424

    -Ju

    l-14

    Blo

    ck 3

    b1

    cell

    - 2

    .0 x

    1.5

    8.70

    00

    --

    --

    --

    --

    Blo

    ck 4

    1 ce

    ll -

    2.0

    x 1

    .512

    .090

    0-

    --

    --

    --

    -8

    23+9

    971

    cell

    - 2

    .0 x

    1.5

    70.2

    680

    --

    --

    --

    --

    Blo

    ck 1

    1 ce

    ll -

    2.0

    x 1

    .516

    .128

    0-

    --

    --

    --

    -B

    lock

    2a

    1 ce

    ll -

    2.0

    x 1

    .54.

    933

    0-

    --

    --

    --

    -B

    lock

    2b

    1 ce

    ll -

    2.0

    x 1

    .513

    .860

    08-

    Jul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1424

    -Ju

    l-14

    Blo

    ck 3

    a1

    cell

    - 2

    .0 x

    1.5

    16.3

    000

    8-Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    24-J

    ul-

    14B

    lock

    3b

    1 ce

    ll -

    2.0

    x 1

    .54.

    942

    0B

    lock

    4a

    1 ce

    ll -

    2.0

    x 1

    .57.

    848

    0B

    lock

    4b

    1 ce

    ll -

    2.0

    x 1

    .56.

    197

    09

    24+2

    351

    cell

    - 2

    .0 x

    1.5

    59.1

    060

    --

    --

    --

    --

    Blo

    ck 1

    a1

    cell

    - 2

    .0 x

    1.5

    15.5

    660

    --

    --

    --

    --

    Blo

    ck 1

    b1

    cell

    - 2

    .0 x

    1.5

    15.0

    000

    12-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1424

    -Ju

    l-14

    Blo

    ck 2

    a1

    cell

    - 2

    .0 x

    1.5

    8.90

    00

    12-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1423

    -Ju

    l-14

    23-J

    ul-

    1424

    -Ju

    l-14

    Blo

    ck 2

    b1

    cell

    - 2

    .0 x

    1.5

    15.6

    000

    --

    --

    --

    --

    Blo

    ck 2

    c1

    cell

    - 2

    .0 x

    1.5

    4.02

    00

    --

    --

    --

    --

    1024

    +570

    1 ce

    ll -

    2.0

    x 1

    .551

    .953

    0-

    --

    --

    --

    -LH

    SB

    lock

    11

    cell

    - 2

    .0 x

    1.5

    25.8

    460

    --

    --

    --

    --

    Blo

    ck 2

    a1

    cell

    - 2

    .0 x

    1.5

    13.5

    000

    --

    --

    --

    --

    Blo

    ck 2

    b1

    cell

    - 2

    .0 x

    1.5

    12.5

    870

    --

    --

    --

    --

    Not

    e: P

    reca

    st R

    CBC

    wer

    e us

    ed f

    or a

    ll 1

    cell

    - 2.

    0m x

    1.5

    m lo

    cati

    ons.

    PR

    EVIO

    US

    PR

    EV

    IOU

    S

    MO

    NT

    HTH

    IS M

    ON

    TH

    Bit

    um

    ino

    us

    Pai

    nt

    (2 C

    oat

    s)

    BA

    SE S

    LAB

    WA

    LL

    LHS

    RH

    S

    TYP

    E &

    DIM

    ENSI

    ON

    LEN

    GTH

    (m

    )SK

    EW (

    )

    F/P

    &

    BLI

    ND

    ING

    LHS

    RH

    S

    RCB

    C P

    RO

    GR

    ESS

    SCH

    EDU

    LE (

    BA

    RR

    EL)

    As

    of

    31 J

    ULY

    201

    4

    NO

    .ST

    ATI

    ON

    TOP

    SLA

    B

    LHS

    RH

    S

    RH

    S

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 18

    Re

    bar

    sC

    on

    cre

    teB

    it. P

    ain

    tR

    eb

    ars

    Co

    ncr

    ete

    Bit

    . Pai

    nt

    121

    +260

    3 ce

    lls

    - 2.

    0 x

    1.5

    --

    --

    --

    -2

    21+4

    851

    cell

    - 2

    .0 x

    1.5

    --

    --

    --

    -3

    21+8

    382

    x 4

    cell

    s -

    2.0

    x 1.

    5-

    --

    --

    --

    421

    +972

    .411

    x 4

    ce

    lls

    - 3.

    0 x

    2.0

    --

    --

    --

    -22

    +655

    2 x

    4 ce

    lls

    - 2.

    0 x

    2.0

    --

    --

    --

    -

    1 ce

    ll -

    2.0

    x 2

    .0-

    --

    --

    --

    23+4

    921

    x 4

    cell

    s -

    3.0

    x 2.

    0-

    --

    --

    --

    1 ce

    ll -

    3.0

    x 2

    .0-

    --

    --

    --

    723

    +756

    .51

    cell

    - 2

    .0 x

    1.5

    --

    --

    --

    -

    823

    +997

    1 ce

    ll -

    2.0

    x 1

    .5-

    --

    --

    --

    924

    +235

    1 ce

    ll -

    2.0

    x 1

    .5-

    --

    --

    --

    1024

    +570

    1 ce

    ll -

    2.0

    x 1

    .5-

    --

    --

    --

    PR

    EVIO

    US

    PR

    EV

    IOU

    S

    MO

    NT

    HTH

    IS M

    ON

    TH

    STA

    TIO

    NTY

    PE

    5 6

    INLE

    T

    RCB

    C P

    RO

    GR

    ESS

    SCH

    EDU

    LE (

    INLE

    T &

    OU

    TLET

    )

    As

    of

    31 J

    ULY

    201

    4

    F/P

    &

    BLI

    ND

    ING

    OU

    TLET

    NO

    .

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 19

    DIA TYPESetting out/

    Exc/InstallConcrete Backfill

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE 5/15/2014 5/15/2014 5/18/2014 6/12/2014 UTL-LAY- 81 UTL-CON- 65 UTL-BF- 01

    MIDDLE STAGE 6/11/2014 6/11/2014 6/12/2014 7/10/2014 UTL-LAY- 104 UTL-CON- 83 UTL-BF- 20

    RIGHT STAGE

    LEFT STAGE 5/19/2014 5/19/2014 5/20/2014 6/4/2014 UTL-LAY- 87 UTL-CON- 66 UTL-BF- 03

    MIDDLE STAGE 6/14/2014 14/06/014 6/14/2014 6/21/2014 UTL-LAY- 108 UTL-CON- 84 UTL-BF- 21

    RIGHT STAGE

    LEFT STAGE 5/19/2014 5/19/2014 5/20/2014 5/31/2014 UTL-LAY- 85 UTL-CON- 63 UTL-BF- 02

    MIDDLE STAGE 6/15/2014 6/15/2014 6/15/2014 UTL-LAY- 107 UTL-CON- 85 UTL-BF-

    RIGHT STAGE

    LEFT STAGE 5/20/2014 5/20/2014 5/25/2014 6/4/2014 UTL-LAY- 86 UTL-CON- 64 UTL-BF- 05

    MIDDLE STAGE 6/15/2014 6/15/2014 6/15/2014 7/8/2014 UTL-LAY- 109 UTL-CON- 87 UTL-BF- 23

    RIGHT STAGE

    LEFT STAGE 5/25/2014 5/25/2014 5/25/2014 6/4/2014 UTL-LAY- 90 UTL-CON-68 UTL-BF- 07

    MIDDLE STAGE 6/16/2014 6/16/2014 6/17/2014 7/10/2014 UTL-LAY- 111 UTL-CON- 88 UTL-BF- 28

    RIGHT STAGE

    LEFT STAGE 6/17/2014 6/17/2014 6/18/2014 7/9/2014 UTL-LAY- 112 UTL-CON- 89 UTL-BF- 33

    MIDDLE STAGE 7/20/2014 7/20/2014 7/21/2014 7/27/2014 UTL-LAY- 131UTL-CON-

    106UTL-BF-44

    RIGHT STAGE

    LEFT STAGE 6/19/2014 6/19/2014 6/19/2014 7/6/2014 UTL-LAY- 114 UTL-CON- 92 UTL-BF- 31

    MIDDLE STAGE 7/20/2014 7/20/2014 7/21/2014 7/17/2014 UTL-LAY- 132UTL-CON-

    107UTL-BF-46

    RIGHT STAGE

    LEFT STAGE 6/19/2014 6/19/2014 6/19/2014 7/5/2014 UTL-LAY- 113 UTL-CON- 91 UTL-BF- 30

    MIDDLE STAGE 7/20/2014 7/20/2014 7/21/2014 7/17/2014 UTL-LAY- 133UTL-CON-

    108UTL-BF-45

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE 5/26/2014 5/26/2014 5/26/2014 6/8/2014 UTL-LAY- 88 UTL-CON- 69 UTL-BF- 08

    MIDDLE STAGE 6/11/2014 6/11/2014 6/11/2014 7/22/2014 UTL-LAY-106 UTL-CON- 81 UTL-BF-26

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    Future Road Crossing Utilities Ducts (As of 31 July 2014)

    DRAWING NO.NO. OF

    PIPES

    300 uPVC

    3CCC/FQR/IR/10 SOL-

    30+300 200 uPVC

    4

    BACKFILLIN

    G

    RFI REF.

    S. NO. CHAINAGE

    PIPE SETOUT/EX

    C/BED

    PREP

    INSTALLATI

    ONCONCRETE

    1CCC/FQI/IR/06

    SERVICE ROAD-30+030 200 uPVC

    2CCC/FQR/IR/11 SOL-

    20+150

    CCC/FQR/WA/05 SR-

    10+600 300 uPVC

    5 CCC/FQI/EL/01 21+360 150 uPVC

    6 CCC/FQI/IR/01 21+460 300 uPVC

    7 CCC/FQI/EL/02 21+660

    10

    150 uPVC

    8 CCC/FQI/IR/02 21+780 300

    150

    150

    12 CCC/FQI/IR/03 22+520

    13CCC/FQI/IR/04

    JUNCTION CROSSING22+520 LHS

    9 CCC/FQI/EL/03 21+880

    CCC/FQI/EL/04 22+260

    11 CCC/FQI/EL/05 22+510

    14CCC/FQI/IR/05

    JUNCTION CROSSING22+587 LHS

    CCC/FQI/WA/02

    JUNCTION16 23+008 LHS

    15 CCC/FQI/EL/06 22+760

    150

    200

    200

    200

    150

    300

    uPVC

    uPVC

    uPVC

    uPVC

    uPVC

    uPVC

    uPVC

    uPVC

    uPVC

    3

    3

    3

    2

    2

    2

    3

    1

    Location

    2

    2

    2

    2

    3

    2

    3

    2

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 20

    DIA TYPESetting out/

    Exc/InstallConcrete Backfill

    LEFT STAGE 6/16/2014 6/16/2014 6/16/2014 7/20/2014 UTL-LAY- 102 UTL-CON- UTL-BF-19

    MIDDLE STAGE 7/8/2014 7/8/2014 7/9/2014 7/27/2014 UTL-LAY- 125 UTL-CON-99 UTL-BF-42

    RIGHT STAGE

    LEFT STAGE 5/25/2014 5/25/2014 5/26/2014 6/14/2014 UTL-LAY- 91 UTL-CON- 71 UTL-BF- 06

    MIDDLE STAGE 11/06/201 6/11/2014 6/11/2014 6/23/2014 UTL-LAY- 105 UTL-CON- 82 UTL-BF- 25

    RIGHT STAGE

    LEFT STAGE 5/27/2014 5/27/2014 5/27/2014 6/17/2014 UTL-LAY- 92 UTL-CON- 72 UTL-BF- 09

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE 5/28/2014 5/28/2014 5/28/2014 6/17/2014 UTL-LAY- 93 UTL-CON- 70 UTL-BF- 10

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE 5/29/2014 5/29/2014 5/29/2014 6/17/2014 UTL-LAY- 94 UTL-CON- 73 UTL-BF- 11

    MIDDLE STAGE 7/30/2014

    RIGHT STAGE

    LEFT STAGE 5/29/2014 6/2/2014 6/2/2014 6/17/2014 UTL-LAY- 95 UTL-CON- 75 UTL-BF- 15

    MIDDLE STAGE 7/14/2014 7/14/2014 7/14/2014 UTL-LAY- 124UTL-CON-

    102

    RIGHT STAGE

    LEFT STAGE 5/29/2014 6/2/2014 6/2/2014 6/17/2014 UTL-LAY-97 UTL-CON- 76 UTL-BF- 13

    MIDDLE STAGE 7/14/2014 7/14/2014 7/15/2014 UTL-LAY- 127UTL-CON-

    101

    RIGHT STAGE

    LEFT STAGE 5/29/2014 6/2/2014 6/3/2014 6/19/2014 UTL-LAY- 98 UTL-CON- 77 UTL-BF- 14

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE 6/3/2014 6/4/2014 6/4/2014 6/23/2014 UTL-LAY- 99 UTL-CON- 78 UTL-BF- 16

    MIDDLE STAGEUTL-LAY-140

    R1

    UTL-CON-

    114

    RIGHT STAGE

    LEFT STAGE 6/4/2014 6/5/2014 6/10/2014 23/06/201 UTL-LAY- 100 UTL-CON- 79 UTL-BF- 17

    MIDDLE STAGE 7/23/2014 7/24/2014 UTL-LAY-139

    RIGHT STAGE

    LEFT STAGE 6/9/2014 6/9/2014 6/10/2014 6/23/2014 UTL-LAY- 101 UTL-CON- 80 UTL-BF- 18

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE 7/5/2014 7/5/2014 7/5/2014 UTL-LAY- 123 UTL-CON- 94

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE 7/16/2014 7/16/2014 7/17/2014 7/27/2014 UTL-LAY- 130UTL-CON-

    105UTL-BF- 43

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    S. NO. DRAWING NO. Location CHAINAGE

    PIPENO. OF

    PIPES

    SETOUT/EX

    C/BED

    PREP

    INSTALLATI

    ONCONCRETE

    BACKFILLIN

    G

    RFI REF.

    CCC/FQI/WA/01

    CCC/FQI/EL/1022

    CCC/FQI/WA/0323

    24 CCC/FQI/EL/11

    19 CCC/FQI/EL/13

    CCC/FQI/EL/0820

    CCC/FQI/EL/0921

    24+220

    24+340

    24+520

    24+820

    24+960

    23+820

    23+900

    23+980

    24+000

    24+020

    24+120

    23+060

    23+210

    23+240

    23+560

    17

    18 CCC/FQI/EL/07

    23+020

    CCC/FQI/EL/1227

    28

    29

    30

    31

    32

    CCC/FQI/WA/0425

    CCC/FQI/IR/0726

    CCC/FQI/EL/14

    CCC/FQI/IR/08

    CCC/FQI/EL/15

    CCC/FQI/EL/16

    CCC/FQI/IR/09

    900

    150

    300

    150

    150

    150

    150

    150

    600

    150

    600

    300

    RC

    uPVC

    uPVC

    uPVC

    uPVC

    uPVC

    RC

    uPVC

    RC

    uPVC

    uPVC

    uPVC

    150

    uPVC

    uPVC

    uPVC

    150

    150

    300

    1

    3

    4

    3

    4

    3

    1

    3

    1

    2

    3

    3

    2

    3

    3

    2

    uPVC

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 21

    DIA TYPESetting out/

    Exc/InstallConcrete Backfill

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE 5/21/2014 5/21/2014 5/21/2014 6/4/2014 UTL-LAY- 89 UTL-CON- 67 UTL-BF- 04

    MIDDLE STAGE 6/16/2014 6/16/2014 6/18/2014 7/10/2014 UTL-LAY- 110 UTL-CON- 90 UTL-BF- 29

    RIGHT STAGE

    LEFT STAGE 5/29/2014 5/31/2014 5/31/2014 6/17/2014 UTL-LAY- 96 UTL-CON- 74 UTL-BF- 12

    MIDDLE STAGE 7/10/2014 7/10/2014UTL-LAY- 120

    R1

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE 7/9/2014 7/9/2014 UTL-LAY- 116

    MIDDLE STAGE

    RIGHT STAGE

    LEFT STAGE

    MIDDLE STAGE 7/10/2014 7/10/2014 7/14/2014 UTL-LAY-126UTL-CON-

    103

    RIGHT STAGE 7/22/2014 7/22/2014 7/23/2014 UTL-LAY-136UTL-CON-

    110

    SETOUT/EX

    C/BED

    PREP

    INSTALLATI

    ONCONCRETE

    BACKFILLIN

    G

    RFI REF.

    4

    40 CCC/FQI/SL/04 22+990 150 uPVC 4

    39 CCC/FQI/SL/03 22+820 150 uPVC

    S. NO. DRAWING NO. Location

    CCC/FQI/OMANTEL.2 100 uPVC38 0+140 SOL-3 4

    25+160

    CHAINAGE

    33

    34

    35

    36

    CCC/FQI/EL/17

    CCC/FQI/NAW.2

    CCC/FQI/NAW.3

    CCC/FQI/NAW.4

    37 CCC/FQI/OMANTEL.1

    uPVC

    uPVC

    uPVC

    uPVC

    22+810 100 uPVC

    100

    21+870

    23+580

    24+720

    150

    100

    100

    PIPE

    4

    NO. OF

    PIPES

    2

    3

    2

    2

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 22

    Sl. N

    o.

    DES

    CR

    IPTI

    ON

    PA

    YMEN

    T FO

    R

    THE

    MO

    NTH

    OF

    GR

    OSS

    AM

    OU

    NT

    (R.O

    .)

    GR

    OSS

    AM

    OU

    NT

    CLA

    IMED

    (R

    .O.)

    NET

    AM

    OU

    NT

    CLA

    IMED

    (R.O

    .)

    DA

    TE

    SUB

    MIT

    TED

    AM

    OU

    NT

    CER

    TIFI

    ED (

    R.O

    .)D

    ATE

    CER

    TIFI

    ED

    AM

    OU

    NT

    REC

    EIV

    ED

    (R.O

    .)

    DA

    TE

    PA

    YMEN

    T D

    UE

    DA

    TE

    PA

    YMEN

    T

    REC

    EIV

    ED

    1PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    (AD

    VA

    NC

    E PA

    YMEN

    T)D

    ec-1

    3

    1,6

    48,2

    25

    1,6

    48,2

    25

    1,64

    8,22

    5 23

    -Nov

    -13

    1,6

    48,2

    25

    29-J

    an-1

    41,

    648,

    225

    6-Fe

    b-1

    4

    2PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 2

    Jan-

    14

    2,2

    91,2

    77

    643,

    052

    514,

    442

    12

    -Feb

    -14

    514,

    442

    02-A

    pr-1

    451

    3,60

    8

    10-A

    pr-1

    4

    3PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 3

    Feb

    &M

    ar-1

    4

    2,8

    08,6

    44

    517,

    367

    504,

    147

    06

    -Apr

    -14

    434,

    917

    03-M

    ay-1

    402

    -Jul

    -14

    4PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 4

    Apr

    -14

    3

    ,315

    ,692

    50

    7,04

    8

    41

    7,90

    0

    08-M

    ay-1

    440

    7,53

    8

    05

    -Jun

    -14

    04-A

    ug-1

    4

    5PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 5

    May

    -14

    4

    ,109

    ,460

    79

    3,76

    8

    65

    0,80

    2

    05-J

    un-1

    444

    5,70

    8

    04

    -Jul

    -14

    02-S

    ep-1

    4

    6PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 6

    Jun-

    14

    4,2

    93,7

    64

    184,

    304

    382,

    116

    15

    -Jul

    -14

    382,

    116

    16-J

    ul-1

    414

    -Sep

    -14

    7PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 7

    Jul-

    14

    8PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 8

    Aug

    -14

    9PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 9

    Sep

    -14

    10PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    0O

    ct-1

    4

    11PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    1N

    ov-1

    4

    12PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    2D

    ec-1

    4

    13PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    3Ja

    n-15

    14PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    4Fe

    b-1

    5

    15PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    5M

    ar-1

    5

    16PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    6A

    pr-1

    5

    17PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    7M

    ay-1

    5

    18PA

    YMEN

    T A

    PPLI

    CA

    TIO

    N N

    o. 1

    8Ju

    n-15

    4,29

    3,76

    4

    4,

    293,

    764

    4,11

    7,63

    2

    3,

    832,

    946

    2,

    161,

    833

    ST

    AT

    US

    OF

    PA

    YM

    EN

    T A

    PP

    LIC

    AT

    ION

    TOTA

    L A

    MO

    UN

    T (R

    .O.)

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 23

    LIST OF AVAILABLE EQUIPMENTS AT SITE

    Sl.

    No.CCC HIRED

    TOTAL

    AVAILABLE

    AT SITE

    1 COMPRESSOR

    2 AIR COMPRESSOR 1 1 2

    3 MILLER WELDING MECHINE 2 2

    4 GENERATOR 2 2

    5 CRANES -

    6 CRANES 30 TON / 25 TON / 70 TON 2 1 3

    7 VEHICLES H.D. -

    8 DIESEL TANKER -

    9 FLAT TRAILER 1 1

    10 HIAB TRUCK 2 2

    11 P/MOVER + TIPPING TRAILER 3 3

    12 TIPPER TRUCKS 11 11

    13 WATER TANKER 5000 GAL 2 2 4

    14 EARTH MOVING PLANT

    15 BOBCAT 2 2

    16 EXCAVATOR 2 2

    17 JCB 4CX / 3CX 1 4 5

    18 SHOVEL / WHEEL LOADER 3 3

    19 DOZER D9N/D8R 1 1

    20 TELEHANDLER -

    21 CIVIL ENGINEERING EQUIPMENT

    22 CONCRETE MIXER -

    23 DYNAPAC S/ROLLER -

    24 E/WORK ROLLER 1 1

    25 MOTOR GRADER 1 1 2

    26 TITAN PAVER MACHINE -

    27 TYRE / PTR ROLLER -

    28 PAVER MACHINE -

    29 L. D. VEHICLES & TRUCKS

    30 DYNA TRUCK 1 2 3

    31 MAINTENANCE TRUCKS 1 1

    32 ASHOK LEYLAND BUS 55 SEAT 5 5

    33 TOYOTA COASTER BUS 24 S 1 1

    34 TOYOTA COROLLA/CIVIC/YARIS 11 11

    35 TOYOTA PICKUP/ISUZU 5 7 12

    36 NISSAN PATHFINDER/X-TRAIL 5 5

    37 TOYOTA LAND CRUISER/FORTUNER 4 4

    38 Total 44 44 88

    DESCRIPTION

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 24

    Ja

    n-1

    4Fe

    b-1

    4M

    ar-

    14

    Ap

    r-1

    4M

    ay

    -14

    Ju

    n-1

    4Ju

    l-1

    4A

    ug

    -14

    Se

    p-1

    4O

    ct-

    14

    No

    v-1

    4D

    ec-1

    4Ja

    n-1

    5Fe

    b-1

    5M

    ar-

    15

    Ap

    r-1

    5M

    ay

    -15

    Ju

    n-1

    5Ju

    l-1

    5A

    ug

    -15

    Se

    p-1

    5O

    ct-

    15

    To

    tal

    PLA

    NN

    ED

    TO

    TA

    L P

    ER

    MO

    NTH

    47

    68

    87

    95

    93

    10

    71

    10

    10

    81

    02

    10

    09

    88

    78

    27

    97

    76

    65

    34

    11

    50

    0

    REV

    ISED

    PLA

    NN

    ED

    TO

    TA

    L P

    ER

    MO

    NTH

    68

    87

    95

    93

    10

    71

    10

    10

    81

    02

    10

    09

    88

    78

    27

    97

    76

    65

    34

    1

    PLA

    NN

    ED

    CU

    MU

    LA

    TIV

    E4

    71

    15

    20

    22

    97

    39

    04

    97

    60

    77

    15

    81

    79

    17

    1,0

    15

    1,1

    02

    1,1

    84

    1,2

    63

    1,3

    40

    1,4

    06

    1,4

    59

    1,5

    00

    1,5

    00

    1,5

    00

    1,5

    00

    1,5

    00

    AC

    TU

    AL T

    OTA

    L P

    ER

    MO

    NTH

    33

    55

    66

    68

    77

    86

    88

    47

    3

    AC

    TU

    AL C

    UM

    ULA

    TIV

    E3

    38

    81

    54

    22

    22

    99

    38

    54

    73

    EQ

    UIP

    ME

    NT

    HIS

    TO

    GR

    AM

    20

    14

    20

    15

    47

    68

    87

    95

    93

    107

    110

    108

    102

    100

    98

    87

    82

    79

    77

    66

    53

    41

    33

    55

    66

    68

    77

    86

    88

    68

    87

    95

    93

    10

    711

    01

    08

    10

    21

    00

    98

    87

    82

    79

    77

    66

    53

    41

    0

    20

    40

    60

    80

    10

    0

    12

    0

    Jan-14

    Feb-14

    Mar-14

    Apr-14

    May-14

    Jun-14

    Jul-14

    Aug-14

    Sep-14

    Oct-14

    Nov-14

    Dec-14

    Jan-15

    Feb-15

    Mar-15

    Apr-15

    May-15

    Jun-15

    Jul-15

    Aug-15

    Sep-15

    Oct-15

    No. of EQUIPMENT

    PR

    OJ

    EC

    T M

    ON

    TH

    S

    PL

    AN

    NE

    D T

    OT

    AL

    PE

    R M

    ON

    TH

    AC

    TU

    AL

    TO

    TA

    L P

    ER

    MO

    NT

    H

    RE

    VIS

    ED

    PL

    AN

    NE

    D T

    OT

    AL

    PE

    R M

    ON

    TH

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 25

    CONTRACTORS MANPOWER AVAILABLE AT SITE

    BUDGET ACTUAL BUDGET ACTUAL BUDGET ACTUAL

    A - MANAGEMENT *** 3 3

    B - COMMERCIAL STAFF * 9 1 10

    C - ENGINEERS 5 5

    D - FOREMAN & C/H 21 1 22

    E - ENGINEERING TECHNICIANS ** 22 7 29

    F - DAILY RATED EMPLOYEES :

    1 - SKILLED CRAFTSMEN 132 71 203

    2 - SEMI-SKILLED/UNSKILLED 494 59 553

    TOTAL AS OF END OF THE MONTH 0 686 0 139 0 825

    G - SUBCONTRACTORS

    Number of Personnel employed by Subcontractor on Company Work : 16

    STAFF & LABOUR

    EXPATRIATES NATIONALS TOTAL

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 26

    20

    13

    De

    c-1

    3Jan

    -14

    Fe

    b-1

    4M

    ar-

    14

    Ap

    r-14

    May-1

    4Ju

    n-1

    4Ju

    l-14

    Au

    g-1

    4S

    ep

    -14

    Oct-

    14

    No

    v-1

    4D

    ec-1

    4Jan

    -15

    Fe

    b-1

    5M

    ar-

    15

    Ap

    r-15

    May-1

    5Ju

    n-1

    5Ju

    l-15

    Au

    g-1

    5S

    ep

    -15

    Oct-

    15

    To

    tal

    PL

    AN

    NE

    D T

    OT

    AL

    PE

    R M

    ON

    TH

    - (

    DIR

    EC

    T )

    634

    186

    375

    586

    791

    792

    799

    794

    793

    701

    480

    381

    269

    246

    307

    307

    305

    149

    8301

    565

    756

    754

    750

    700

    652

    667

    554

    516

    387

    297

    276

    365

    271

    135

    92

    51

    7788

    PL

    AN

    NE

    D T

    OT

    AL

    PE

    R M

    ON

    TH

    - (

    IN

    DIR

    EC

    T )

    523

    36

    50

    52

    57

    59

    59

    60

    61

    63

    61

    61

    57

    51

    47

    44

    35

    30

    914

    RE

    VIS

    ED

    - P

    LA

    NN

    ED

    TO

    TA

    L P

    ER

    MO

    NT

    H-(

    IND

    IRE

    CT

    )63

    84

    84

    83

    78

    72

    74

    61

    57

    43

    33

    31

    40

    30

    15

    10

    6862

    PL

    AN

    NE

    D T

    OT

    AL

    PE

    R M

    ON

    TH

    - (

    DIR

    EC

    T +

    IN

    DIR

    EC

    T )

    11

    57

    222

    425

    638

    848

    851

    858

    854

    854

    764

    541

    442

    326

    297

    354

    351

    340

    179

    9215

    RE

    VIS

    ED

    - P

    LA

    NN

    ED

    -

    ( D

    IRE

    CT

    + IN

    DIR

    EC

    T )

    627

    840

    838

    833

    778

    725

    741

    616

    573

    429

    330

    306

    406

    301

    150

    102

    57

    8651

    PL

    AN

    NE

    D C

    UM

    UL

    AT

    IVE

    11

    68

    291

    715

    1,3

    53

    2,2

    02

    3,0

    52

    3,9

    10

    4,7

    64

    5,6

    18

    6,3

    83

    6,9

    23

    7,3

    65

    7,6

    91

    7,9

    88

    8,3

    42

    8,6

    93

    9,0

    33

    9,2

    12

    9,2

    12

    AC

    TU

    AL

    TO

    TA

    L P

    ER

    MO

    NT

    H -

    ( D

    IRE

    CT

    )322

    365

    550

    581

    603

    691

    709

    756

    4577

    AC

    TU

    AL

    TO

    TA

    L P

    ER

    MO

    NT

    H -

    ( IN

    DIR

    EC

    T )

    18

    26

    46

    49

    54

    57

    64

    69

    383

    AC

    TU

    AL

    TO

    TA

    L P

    ER

    MO

    NT

    H -

    ( D

    IRE

    CT

    + IN

    DIR

    EC

    T )

    340

    391

    596

    630

    657

    748

    773

    825

    00

    00

    00

    00

    00

    04960

    AC

    TU

    AL

    CU

    MU

    LA

    TIV

    E340

    731

    1,3

    27

    1,9

    57

    2,6

    14

    3,3

    62

    4,1

    35

    4,9

    60

    RE

    VIS

    ED

    - P

    LA

    NN

    ED

    TO

    TA

    L P

    ER

    MO

    NT

    H -

    ( D

    IRE

    CT

    )

    MA

    NP

    OW

    ER

    HIS

    TO

    GR

    AM

    (D

    IRE

    CT

    & IN

    DIR

    EC

    T)

    20

    14

    20

    15

    11

    57

    222

    425

    638

    848

    851

    858

    854

    854

    764

    541

    442

    326

    297

    354

    351

    340

    179

    340

    391

    596

    630

    657

    748

    773

    825

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    0

    10

    0

    20

    0

    30

    0

    40

    0

    50

    0

    60

    0

    70

    0

    80

    0

    90

    0

    Dec-13

    Jan-14

    Feb-14

    Mar-14

    Apr-14

    May-14

    Jun-14

    Jul-14

    Aug-14

    Sep-14

    Oct-14

    Nov-14

    Dec-14

    Jan-15

    Feb-15

    Mar-15

    Apr-15

    May-15

    Jun-15

    Jul-15

    Aug-15

    Sep-15

    Oct-15

    No. of Men

    PR

    OJ

    EC

    T M

    ON

    TH

    S

    PL

    AN

    NE

    D T

    OT

    AL P

    ER

    MO

    NTH

    - ( D

    IRE

    CT

    + IN

    DIR

    EC

    T )

    AC

    TU

    AL

    TO

    TA

    L P

    ER

    MO

    NT

    H -

    ( D

    IRE

    CT

    + IN

    DIR

    EC

    T )

    RE

    VIS

    ED

    - P

    LA

    NN

    ED

    -

    ( D

    IRE

    CT

    + IN

    DIR

    EC

    T )

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 27

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 28

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 29

  • Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report July 2014

    RENARDET S.A. & PARTNERS Page 30

    Date

    Su

    bm

    itte

    d

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /001

    MA

    S/C

    CC

    /FQ

    I/B

    BC

    /001

    Bit

    um

    ino

    us B

    ase C

    ou

    rse

    Tarm

    ac Z

    aw

    aw

    i L

    LC

    Om

    an

    22/1

    2/2

    013

    Ren

    ard

    et

    AP

    PR

    OV

    ED

    01/0

    4/2

    014

    SO

    /FQ

    I/C

    CC

    /087

    07/0

    4/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /002

    MA

    S/C

    CC

    /FQ

    I/G

    TI/

    002

    Geo

    tech

    nic

    al In

    vesti

    gati

    on

    Sw

    issb

    ori

    ng

    & C

    om

    pan

    y L

    LC

    26/1

    2/2

    013

    Ren

    ard

    et

    AP

    PR

    OV

    ED

    02/0

    2/2

    014

    SO

    /FQ

    I/C

    CC

    /015

    12/0

    2/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /003

    MA

    S/C

    CC

    /FQ

    I/M

    SE

    /003

    MS

    E W

    all S

    yste

    mF

    rey

    ssin

    et

    Ara

    bia

    n S

    ea L

    LC

    26/1

    2/2

    013

    Ren

    ard

    et

    AP

    PR

    OV

    ED

    02/0

    2/2

    014

    SO

    /FQ

    I/C

    CC

    /014

    12/0

    2/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /004

    MA

    S/C

    CC

    /FQ

    I/P

    VC

    /004

    UP

    VC

    Pip

    es

    Am

    ian

    tit

    Om

    an

    26/1

    2/2

    013

    Ren

    ard

    et

    AP

    PR

    OV

    ED

    09/0

    2/2

    014

    SO

    /FQ

    I/C

    CC

    /019

    18/0

    2/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /005

    MA

    S/C

    CC

    /FQ

    I/H

    DP

    E/0

    05

    HD

    PE

    Pip

    es &

    Fit

    tin

    gs

    Am

    ian

    tit

    Om

    an

    26/1

    2/2

    013

    Ren

    ard

    et

    AP

    PR

    OV

    ED

    09/0

    2/2

    014

    SO

    /FQ

    I/C

    CC

    /020

    18/0

    2/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /006

    MA

    S/C

    CC

    /FQ

    I/P

    W/0

    06

    Pilin

    g W

    ork

    sA

    PC

    C L

    LC

    26/0

    1/2

    014

    Ren

    ard

    et

    AP

    PR

    OV

    ED

    19/0

    2/2

    014

    SO

    /FQ

    I/C

    CC

    /026

    25/0

    2/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /007

    MA

    S/C

    CC

    /FQ

    I/M

    C/0

    07

    Bit

    nu

    min

    ou

    s P

    rim

    e C

    oat

    (MC

    -70)

    Em

    irate

    s L

    ub

    e O

    il C

    o. (M

    uscat)

    30/0

    1/2

    014

    Ren

    ard

    et

    AP

    PR

    OV

    ED

    09/0

    3/2

    014

    SO

    /FQ

    I/C

    CC

    /069

    27/0

    3/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /008

    MA

    S/C

    CC

    /FQ

    I/R

    S/0

    08

    Rein

    forc

    ing

    Ste

    el

    Mu

    scat

    Ste

    el In

    du

    str

    ies

    02/0

    2/2

    014

    Ren

    ard

    et

    AP

    PR

    OV

    ED

    20/0

    3/2

    014

    SO

    /FQ

    I/C

    CC

    /063

    24/0

    3/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /009-1

    MA

    S/C

    CC

    /FQ

    I/P

    T/0

    09-1

    Po

    st

    Ten

    sio

    nin

    g W

    ork

    - A

    nch

    ora

    ge

    Fre

    yssin

    et

    Ara

    bia

    n S

    ea L

    LC

    22/0

    2/2

    014

    Ren

    ard

    et

    AP

    PR

    OV

    ED

    27/0

    3/2

    014

    SO

    /FQ

    I/C

    CC

    /089

    14/0

    4/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /009-2

    MA

    S/C

    CC

    /FQ

    I/P

    T/0

    09-2

    Po

    st

    Ten

    sio

    nin

    g W

    ork

    - D

    uct

    Fre

    yssin

    et

    Ara

    bia

    n S

    ea L

    LC

    22/0

    2/2

    014

    Ren

    ard

    et

    AP

    PR

    OV

    ED

    27/0

    3/2

    014

    SO

    /FQ

    I/C

    CC

    /090

    14/0

    4/2

    014

    CC

    C/F

    QI/

    RE

    N/M

    AS

    /009-3

    MA

    S/C

    CC

    /FQ

    I/P

    T/0

    09-3

    Po

    st

    Ten

    sio

    nin

    g W

    ork

    - S

    tran

    dF

    rey

    ssin

    et

    Ara

    bia

    n