FPSO Update for NOIA 2012 Fall Meeting · Petrobras America General Meeting - 2nd Quarter 2009 1...
Transcript of FPSO Update for NOIA 2012 Fall Meeting · Petrobras America General Meeting - 2nd Quarter 2009 1...
Petrobras America General Meeting - 2nd Quarter 2009
1
Chinook
Cascade
Gas Export
FPSO Update for NOIA 2012 Fall Meeting
Gregory D. Roland
Regulatory Compliance Area Manager
Petrobras America Inc. October, 2012
Petrobras America General Meeting - 2nd Quarter 2009
2
The presentation may contain forecasts about future events. Such forecasts merely reflect the expectations of the Company's management. Such terms as "anticipate", "believe", "expect", "forecast", "intend", "plan", "project", "seek", "should", along with similar or analogous expressions, are used to identify such forecasts. These predictions evidently involve risks and uncertainties, whether foreseen or not by the Company. Therefore, the future results of operations may differ from current expectations, and readers must not base their expectations exclusively on the information presented herein. The Company is not obliged to update the presentation/such forecasts in light of new information or future developments. All projects forecasted herein are subject to approval by the appropriate stakeholders.
The United States Securities and Exchange Commission permits oil and gas companies, in their filings with the SEC, to disclose only proved reserves that a company has demonstrated by actual production or conclusive formation tests to be economically and legally producible under existing economic and operating conditions. We use certain terms in this presentation, such as oil and gas resources, that the SEC’s guidelines strictly prohibit us from including in filings with the SEC.
CAUTIONARY STATEMENT FOR US INVESTORS
Disclaimer
Petrobras America General Meeting - 2nd Quarter 2009
3
History
Petrobras America General Meeting - 2nd Quarter 2009
4
More History
• 1891 – 1896 Ohio and California • 1900 – Gulf of Mexico, Texas and Louisiana • Drilled on platforms, not too far from shore • 1947 - Approximately 50 years pass – out of sight of land • Need for storage or pipelines.... • Going farther out, the more the technology has to increase • Floating rigs / facilities
Petrobras America General Meeting - 2nd Quarter 2009
5
FPSO
Floating Production Storage and Offloading
Petrobras America General Meeting - 2nd Quarter 2009
6
Long History of Technological and Operational Leadership in Deepwater
Petrobras America General Meeting - 2nd Quarter 2009
7
Year Cascade Chinook
2002 1 Discovery Well
2003 1 Discovery Well
2005 2 Appraisal Wells
2006 Petrobras Operator
2009 2 Wells
2010 1 Well
2012 1 Well Producing 2nd Well by end of year
1 Well Producing 2nd Well drilling
Cascade and Chinook Field History (1996 Lease Sale)
Petrobras America General Meeting - 2nd Quarter 2009
8
Cascade and Chinook Location & Infrastructure
BRETON SOUND
MAIN PASS S.& E. ADDNSMAIN PASS
E. ADDNSOUTH PASS
E. ADDNCHANDELEUR
CHANDELEURCHANDELEUR SOUND
SOUTH PADRE ISLAND
MISSISSIPPI SOUND
SABINE PASS
ADDN.CHANDELEUR SOUND
BRAZOS
MATAGORDA ISLAND
MUSTANG ISLAND
NORTH PADRE ISLAND
HIGH ISLAND
S. ADDNGALVESTON
GALVESTON
S. ADDNBRAZOS
S. EXTE. ADDN
HIGH ISLAND
E. ADDNHIGH ISLAND
S. ADDNHIGH ISLAND
ISLANDSOUTH PADRE
E. ADDNISLAND
NORTH PADRE
E. ADDNMUSTANG ISLAND
PORT ISABEL
CORPUS CHRISTI
SABINE PASS
E. ADDN
KEATHLEY CANYON
GARDEN BANKS
ALAMINOS CANYON
EAST BREAKS
WALKER RIDGE
GREEN CANYON
EWING BANK
SIGSBEE ESCARPMENT
MISSISSIPPI CANYON
VIOSCA KNOLL
MOBILE
AMERY TERRACE
S. ADDNWEST CAMERON
W. ADDNWEST CAMERON
WEST CAMERON
PENSACOLA
LUND SOUTH
LUND
ATWATER VALLEY
S. ADDNVERMILION
VERMILION
S. ADDNEAST CAMERON
EAST CAMERON
HENDERSON
LLOYD RIDGE
DE SOTO CANYON
DESTIN DOME
S. ADDNISLAND
SOUTH MARSH
ISLANDSOUTH MARSH
N. ADDNISLAND
SOUTH MARSH
FLORIDA PLAIN
SHIP SHOAL
S. ADDNEUGENE ISLAND
EUGENE ISLAND
SOUTH TIMBALIER
BAY MARCHAND
SOUTH PELTO
S. ADDNSHIP SHOAL
WEST DELTA
S. ADDNGRAND ISLE
GRAND ISLE
S. ADDNSOUTH TIMBALIER
S. ADDNSOUTH PASS
SOUTH PASS
S. ADDNWEST DELTA
TEXAS
MISSISSIPPILOUISIANA
FLORIDAALABAMA
2,400,0002,200,0002,000,0001,800,0001,600,0001,400,0001,200,0001,000,000 3,400,0003,200,0003,000,0002,800,0002,600,000
1,400,0001,200,0001,000,000800,000600,000400,000200,000 3,000,0002,800,0002,600,0002,400,0002,200,0002,000,0001,800,0001,600,000 3,400,0003,200,000
800,000600,000400,000200,000
9,80
0,00
09,
600,
000
9,40
0,00
011
,200
,000
11,0
00,0
0010
,800
,000
10,6
00,0
0010
,400
,000
10,2
00,0
0010
,000
,000
10,4
00,0
0010
,200
,000
10,0
00,0
009,
800,
000
9,60
0,00
09,
400,
000
11,2
00,0
0011
,000
,000
10,8
00,0
0010
,600
,000
30°0
0'N28
°00'N
26°0
0'N
88°00'W90°00'W92°00'W94°00'W96°00'W
Cascade & Chinook
Petrobras America General Meeting - 2nd Quarter 2009
9
Phase 1 • 2 Wells from Cascade & 1 from Chinook; • Subsea X-Trees, Manifolds, Pumps, Flowlines and Risers; • Gas exported by Pipeline and Oil by Shuttle –Tanker.
Potential Phases 2 & 3 • Up to 6 wells on Cascade & 7 on Chinook; • Subsea Trees and Manifolds; • Replacement of the FPSO; • Oil Export: Shuttle Tanker vs. Pipeline.
Option for Phase 3
Phase 1 Configuration
Cascade and Chinook Phased Development
Petrobras America General Meeting - 2nd Quarter 2009
10
Cascade and Chinook Well Drilling and Completion Rigs
Ocean Endeavor Diamond Offshore Drilling
2008 2008
West Sirius Seadrill Limited
Discover Deep Seas Transocean Ltd.
2009
Petrobras America General Meeting - 2nd Quarter 2009
11
Drilling and Completion of new Wells
VANTAGE - Titanium Explorer Drill Ship
1st Quater 2011 2012
ENSCO – Mendocino Drill Ship
2011
Petrobras America General Meeting - 2nd Quarter 2009
12
SUBSEA INNOVATIONS 1.- First pull-in of umbilicals using subsea winch
operated by ROVs
2.- Deepest pipe-in-pipe flowlines
3.- Deepest gas export pipeline (8,200 ft)
4.- Deepest subsea boosting system (8,800 ft)
Petrobras America General Meeting - 2nd Quarter 2009
13
Wave Buoy on deck
Cascade and Chinook Wave Buoy Installation and Operation
Petrobras America General Meeting - 2nd Quarter 2009
14
Riser Deepest and Highest Pressure Rated Free Standing Hybrid Risers (8200 ft) |
4 Production Risers 1 Gas Export Riser
Petrobras America General Meeting - 2nd Quarter 2009
15
Buoy Disconnection
15
Should a hurricane come her
way, the FPSO can
disconnect from the
subsea structures and go to
safe waters
Petrobras America General Meeting - 2nd Quarter 2009
16
Subsea Installation Vessels
Hereema Balder
Subsea 7 Seven Seas Technip - Deep Blue Technip - Olympic
Challenger
Veolia – Viking Poseidon
Petrobras America General Meeting - 2nd Quarter 2009
17
Shuttle Tanker Construction in Philadelphia
Shuttle Launching
Petrobras America General Meeting - 2nd Quarter 2009
18
Shuttle Tanker Overseas Cascade
Shipping in the Gulf of Mexico Part of BP’s Macondo Operation
First use of purpose-built Jones Act ShuttleTankers in the USA
Petrobras America General Meeting - 2nd Quarter 2009
19
First FPSO in the US Gulf of Mexico Deepest Floating Production System in the World (8200 ft)
FPSO Vessel Name: BW Pioneer
Length - 794 ft Processing Capacity – 80,000 Barrels/day
Storage Capacity – 500,000 BBL Production: February 2012
/ Floating Production, Storage and Offloading
Petrobras America General Meeting - 2nd Quarter 2009
20
e cannot currently be displayed.
CASCADE AND CHINOOK Main Highlights
1. First FPSO in the US Gulf of Mexico.
2. Deepest floating production system (8,200 ft).
3. First use of Purpose-built Jones Act shuttle tankers in the US.
4. First pull-in of umbilicals using subsea winch operated by ROV’s.
5. Deepest and highest pressure rated free standing hybrid risers (8,200 ft at 10,000 psi).
6. Deepest pipe-in-pipe flowline (8,800 ft).
7. Deepest subsea boosting system (8,800ft).
8. Deepest gas export pipeline (8,200 ft).
9. First single trip multi-zone – Frac Pack System application (3 zones) in deep wells (27,000 ft).
Petrobras America General Meeting - 2nd Quarter 2009
21
SAFETY Over 3 million man-
hour without a Lost Time
Incident
F I R S T
Petrobras America General Meeting - 2nd Quarter 2009
22
FPSO BW PIONEER
Petrobras America General Meeting - 2nd Quarter 2009
23
FPSO BW PIONEER
Petrobras America General Meeting - 2nd Quarter 2009
24
Chinook
Cascade
Gas Export
Thank you.
Gregory D. Roland
Regulatory Compliance Area Manager Petrobras America Inc.