Espirito Santo FPSO - Offshore...

26
Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas A&M University March 26, 2010 Chris Wibner Upstream Major Projects Shell International Exploration & Production, Inc.

Transcript of Espirito Santo FPSO - Offshore...

Page 1: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Espirito Santo FPSOTurret & Installation Challenges

SNAME/MTS Joint Meeting Texas A&M University March 26, 2010

Chris Wibner

Upstream Major Projects

Shell International Exploration & Production, Inc.

Page 2: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Contractor owned and operated FPSO (evolution of GFPSO project)

Shell is operator (50%) with partners Petrobras (35%) & ONGC (15%)

FPSO Contractor - BDFT (SBM & MISC JV)

Major subcontractors:

• Keppel Shipyard (hull conversion, turret fabrication, topsides integration)

• Dynamac (topsides fabrication)

• BT Engineering (topsides fabrication)

1780 m water depth at FPSO location

Internal turret with 21 riser/umbilical slots

First turret moored FPSO to accept Steel Lazy Wave Risers

Espirito Santo FPSO

Page 3: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas
Page 4: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

100 kbopd oil processing capacity (low API)

50 mmscfpd gas compression

150 kbpd total liquids processing capacity

130 kbwpd produced water treating capacity

75 kbwpd water injection w/ sulfate reduction for Phase II

150 kbwpd additional water injection deck space

Topsides weight ~ 8,500 tons

Espirito Santo - Topsides Details

Unique challenges: Heavy oil processing (16 API), services for subsea artificial lift systems (i.e.15 MW available AL power, VFDs, Hot oil circulation with gas spike capability)

Page 5: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Vessel As Arrived in Singapore (’06)

Page 6: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

• Lazy Wave Steel Risers & Umbilicals – Vertical load 2,200 tonnes

• Multiple Heavy lifts for integration into vessel

• Large swivel stack – 12 units ~ 150 tonnes

• High Voltage

• Centralized riser/umbilical pull-in winch

• Separate riser & umbilical decks

• Riser spool piece connection inside lower turret

Espirito Santo - Turret Challenges

Page 7: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Turret Cross Section

Page 8: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Umbilical deckCollar deck

SLWR

Typical flexible riser

Max SLMax SL

Lower Turret Layout Difference

Riser deck

Page 9: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Construction Challenges

Built by decks and stacked

Inclined I-tubes, complex alignment and fit up

Umbilical I-tubes required a reverse bend to mitigate clashing

Complex lay-out of I-tubes, generates more engineering studies

Dimensional control

Site integration testing

Page 10: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Integration Photos - Turret

Gantry Manifold

Bogie Support Structure

Lower TurretCollar Structure

Page 11: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

LOWER MOONPOOL INSTALLATION

Page 12: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Upper Moonpool Integration

Page 13: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Upper Moonpool Integrationafter 2nd DD

Page 14: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

BC-10 FPSO TURRET(LOWER TURRET)

Page 15: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Lower Turret Integration

Page 16: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

BC-10 FPSO TURRET(Bogie Support Structure)

Page 17: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

BC-10 FPSO TURRET(UPPER TURRET)

Page 18: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

BC-10 FPSO TURRET(TURRET MANIFOLD)

Page 19: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Riser / Umbilical Interface

Risers clamp castings (12)

Umbilical bellmouths (3)

Umbilical Future (6)

Mooring Connectors (9)

Page 20: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

154 tonnes

24 m Height

Unit 12 – Electro Optical

Unit 11 – Hot Oiling Service Swivel

Unit 10 – Utility LP & HP

Unit 9 – Gas Export / Injection

Units 7 & 8 – HV Electrical

Unit 6 – Water Injection

Unit 5 – Gas Production

Unit 4 – Firewater

Units 1,2,&3 – Oil Production

Swivel Stack

Page 21: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Pull-in Winch

• New concept

• Design developed in house by SBM

• Winch platform provides 3 Motions

2 axis of rotations

1 sliding

Page 22: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

BC-10 FPSO Pull-in Winch

RiserWire

Chain Wire

Page 23: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

SLWR & Umbilical Pull-in

Installation team

ready for another

pull-in within 6 to 8

hours

Page 24: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas
Page 25: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

Conclusions

Steel Risers are feasible from a turret moored FPSO

Interface between the turret & steel risers proved feasible

Winch platform design provided full satisfaction

Comprehensive dimensional control management is a necessity

Site integration testing is extremely important

Installation time comparable to flexible riser

Page 26: Espirito Santo FPSO - Offshore Laboffshorelab.org/documents/Espirito_Santo_turret_installation... · Espirito Santo FPSO Turret & Installation Challenges SNAME/MTS Joint Meeting Texas

QUESTIONS ?