FOTO
Implementation Scenariosfor 4D CAD in Practice
Marcel Broekmaat (HBG / Royal BAM Group)
Bauke de Vries (TU/e)
bam
consultancy and engineering
2
4D CAD
4D software3D CAD modelcontaining building parts
Schedule
task calendar
Time
4D construction processsimulation
bam
consultancy and engineering
3
Research goalsWork flow
How does 4D CAD fit in the existing working procedures, or is another procedure necessary?
Data management
Is the data needed for 4D CAD available in the right format from the existing CAD systems and planning systems?
User requirements
Can construction managers handle the application and does it support their work?
Organisational requirements
How is 4D CAD related to the other business processes (finances, resource management, document management, risc management, etc.)?
bam
consultancy and engineering
4
Research methodParticipatory research
• Shipping center Rotterdam• World Trade Center Amsterdam
Ivinzn (Stanford University – CIFE)
Questionnaire / Interviews
Hands On Session - Experiment
Process modeling
bam
consultancy and engineering
5
Invizn
Scheduled activities4D CAD
components
Activitytypes
3D CADcomponents
bam
consultancy and engineering
7
Shipping Center RotterdamExperiment:
4D simulation presentation to foremen
Task:
Mention 3 most import construction issues
Result:
Differences between for and after presentation
bam
consultancy and engineering
8
Experiment:
Analysis of construction planning
Results:
Improved insight in construction sequence by
subcontractors
World Trade Center Amsterdam
bam
consultancy and engineering
9
3D/4D modeling processExperiences “captured”
Guideline for future 4D models
bam
consultancy and engineering
11
Work methods
UML current work method
(AS IS)
UML SAP work method(TO BE)
UML desired workmethod
(TO BE)
UML 4D supportedwork method
(AS IS)
work method
softwarefunctonality
work method
• Like current situation, 4D software is used as an extension
• Integrated work method• Fast generation of alternative
models
• Integrated work method, using SAP [and SAP WBS] - NO 3D/4D!
• Paper based• PowerProject software
bam
consultancy and engineering
12
Transition scenarios
UML current work method
(AS IS)
UML SAP work method(TO BE)
UML desired workmethod
(TO BE)
UML 4D supportedwork method
(AS IS)
work method
softwarefunctonality
work method
bam
consultancy and engineering
13
ConclusionsNaming convention
• Databases
• Facilitation of 4D model creation
• Consistency!
ERP software• Most effective basis for cooperative and integrated work method
Organisation structure of projects• Greatly influences opportunities for effectuation of intended work
methods