TIr Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852 Attention: Mr. Richard C Wilson Senior Reactor Engineer Subject: a) Quality Assurance Requirements Contained in Nuclear Customer Purchase Orders (b) Bechtel Power Corporation's Purchase Order 8856-F-56718 for Susquehanna Steam Electric Station Dated 15 October 1981 (c) Gibbs & Hill Specification 2323-MS-38H, Revision 1, dated 2 April 1981 Dear Mr. Wilson: During the inspection held at TSI on December 16-20,1991, you requested that ,. forward to you the following information regarding tquality assurance requirements identified in current purchase orders from TSI's nuclear customers: Plant Utility PO No. PO Date QA Requirement Plant Utility PO No. PO Date QA Requirement Plant Utility PO No. PO Date QA Requirement Beaver Valley Duquesne Light Co. 20746-DLC-2057 3/29/91 Certificate of Conformance & MSDS Sheet Braidwood Commonwealth Edison 315219 2-16-88 Certificate of Conformance Browns Ferry Tennessee Valley Authority 92-NJM-81392D 10-28-91 Certificate of Conformance C )P 7)p- t 'T AL;. THERMAL SCIENCE. INC. * 2200 CASSENS DR * ST LOUIS MO 63026 * (314 349 1231 Teli 209901 iAns ebnor TSi UP) * Teleccpipr 1314, 349 1207 'F 20 January 1992

Transcript of Forwards info re QA requirements identified in current ...

Page 1: Forwards info re QA requirements identified in current ...

TIr

Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852

Attention: Mr. Richard C Wilson Senior Reactor Engineer

Subject: a) Quality Assurance Requirements Contained in Nuclear Customer Purchase Orders

(b) Bechtel Power Corporation's Purchase Order 8856-F-56718 for Susquehanna Steam Electric Station Dated 15 October 1981

(c) Gibbs & Hill Specification 2323-MS-38H, Revision 1, dated 2 April 1981

Dear Mr. Wilson:

During the inspection held at TSI on December 16-20,1991, you requested that ,. forward to you the following information regarding tquality assurance requirements identified in current purchase orders from TSI's nuclear customers:

Plant Utility PO No. PO Date QA Requirement

Plant Utility PO No. PO Date QA Requirement

Plant Utility PO No. PO Date QA Requirement

Beaver Valley Duquesne Light Co. 20746-DLC-2057 3/29/91 Certificate of Conformance & MSDS Sheet

Braidwood Commonwealth Edison 315219 2-16-88 Certificate of Conformance

Browns Ferry Tennessee Valley Authority 92-NJM-81392D 10-28-91 Certificate of Conformance

C )P 7)p- t 'T AL;.

THERMAL SCIENCE. INC. * 2200 CASSENS DR * ST LOUIS MO 63026 * (314 349 1231 Teli 209901 iAns ebnor TSi UP) * Teleccpipr 1314, 349 1207

'F

20 January 1992

Page 2: Forwards info re QA requirements identified in current ...

Mr. Richard C. Wilson Nuclear Regulatory Commission

Plant Utility PO No. P ODate QA Requirement

Plant Utility P O Issued By: PO No. PO Date QA Requirement

Plant Utility

Plant Utility

Plant Utility PO No. PO Date QA Requirement

Plant Utility PO No. P 0 Date QA Requiremert

'lant Utility PONo. PO Date QA Requirement

20 January 1992 Page 2

Brunswick Carolina Power & Light Co. 6J1340BP 6-17-91 Certificate of Conformance Documentation of Underwriters Laboratories Listing or Factory Mutual Approval

Byron Commonwealth Edison Pope Co. 001229 9-6-90 Certificate of Conformance

Calloway Union Electric Co. Audited by the NRC - December 16 - December 20,1991

Comanche Peak Texas Utilities Audited by the NRC - December 16 - December 20,1991

Connecticut Yankee Northeast Utilities 941035 3-21-90 'This is a QA Purchase Order"

DC Cook American Electric Power Co. 06198-041-1X 9-13-91 10CFR50, Appendix B & Part 21 Certificate of Conformance "Protected Shipment"

Cooper Nebraska Public Power District 338038 7-29-891 Shelf Life Statement - No other QC Requirements

Page 3: Forwards info re QA requirements identified in current ...

Mr. Richard C. Wilson Nuclear Regulatory Commission

Plant Utility P 0 No. P 0 Date QA Requirement

Plant Utility P0 No. P 0 Date QA Requirement

Plant Utility P 0 No. P0 Date QA Requirement

Plant Utility P 0 No. P 0 Date QA Requirement

Plant Utility PO No. P 0 Date QA Requirement

Plant Utility P0 No. P0 Date QA Requirement

20 January 1992 Page 3

Crystal River Florida Power Corporation F740475X 11-15-91 "Materials must be manufactured in accord with approved Florida Power QA/QC Program" Certificate of Conformance

Davis Besse Toledo Edison Co. S026405D91 6-12-91 Certificate of Conformance Recommended Shelf Life "Must be UL listed or Factory Mutual approved"

Diablo Canyon Pacific Gas & Electric Co. 052516 11-21-91 Certificate of Conformance

Duane Arnold Iowa Electric & Gas Co. S60627 1-14-91 Certificate of Compliance and MSDS Sheet

Enrico Fermi Detroit Edison Co. NM24472 3-14-91 No QC Requirements

Grand Gulf Mississippi Power & Light Co. MP708622 3-31-87 Part 21& MP &L Sec E-270.0 Rev I

Page 4: Forwards info re QA requirements identified in current ...

Mr. Richard C. Wilson Nuclear Regulatory Commission

Plant Utility PONo. P0 Date QA Requirement

Plant Utility P 0 Ordered By PO No. P0 Date QA Requirement

Plant Utility P 0 Ordered By P0 No. P 0 Date QA Requirement

Plant Utility PONo. P0 Date QA Requirement

Plant Utility P0 No. P 0 Date QA Requirement

Plant Utility P0 No. P 0 Date QA Requirement

20 January 1992 Page 4

E I Hatch Georgia Power Co. 7009O21 11-11-91 Certificate of Conformance & MSDS Sheet Protected Shipment & Shelf Life

Indian Point Consolidated Edison Co. ICMS 671A1244 12-21-87 Part 21

LaSalle Commonwealth Edison Transco Co. 7589 7-10-87 No QC requirements

Limerick Philadelphia Electric Co. LS638586 4-5-91 Certificate of Compliance and Certificate of Analysis on Bulk Grade Material

Maine Yankee Maine Yankee Atomic Power 60686 10-24-90 10CFR50, Appendix B

Millstone Northeast Utilities 930735 8-23-89 'This is a QA Purchase Order" No specific QA Requirements

Page 5: Forwards info re QA requirements identified in current ...

Mr. Richard C. Wilson Nuclear Regulatory Commission

Plant Utility P 0 No. P 0 Date QA Requirement

Plant Utility P 0 Ordered By P0 No. P0 Date QA Requirement

Plant Utility P0 No. P0 Date QA Requirement

Plant Utility P 0 No. P0 Date QA Requirement

Plant Utility P 0 Ordered By P0 No. P0 Date QA Requirement

Plant Utility P0 No. P0 Date QA Requirement

20 January 1992 Page 5

McGuire Duke Power A05205-66 1-16-91 Certificate of Conformance Protected Shipment

Nine Mile Point Niagra Mohawk Power Corp. Insulation Consultants & Management Services, Inc. 109A2539 9-5-91 Reg. Guide 1.36 & Certificate of Conformance

North Anna Virginia Electric & Power Co. SNS298528 6-6-90 Certificate of Conformance Protected Shipment

Oyster Creek GPU Nuclear Corp. 0347681 9-12-91 "Commercial Grade - Part 21 does not apply"

Palo Verde Arizona Public Service Co. Thorpe Insulation 45779 12-12-90 Certificate of Conformance Commercial Program Shelf Life

Peachbottom Philiadephia Electric Co. BW647056 9-18-91 Certificate of Conformance Shelf Life

Page 6: Forwards info re QA requirements identified in current ...

Mr. Richard C. Wilson Nuclear Regulatory Commission

Plant Utility PONo.

Plant Utility PO No. PO Date QA Requirement

20 January 1992 Page 6

Perry Cleveland Electric Illuminating Co. Audited by the NRC - December 16 - Decemoer 20, 1991

Praire Island Northern States Power EI3588MQ 6-2-86 Appendix B, IOCFR50 Certificate of Conformance

River Bend Gulf States Utilities Audited by the NRC - December 16 - December 20, 1991

Plant Utility PO No. PO Date QA Requirement

Plant Utility PO No. PO Date QA Requirement

Plant Utility PO No. PO Date QA Requirement

Plant Utility PONo. PO Date QA Requirement

St. Lucie Florida Power & Light C91930 91849 10-8-91 No QA Requirements Shelf Life

San Onofre Southern California Edison Co. 6T1 11003 11-19-91 Reg. Guide 1.36 Certificate of Conformance & MSDS Sheet

Sequoyah Tennessee Valley Authority 92NLM 87119B 11-20-91 Reg. Guide 1.36 Protected Shipment & Shelf Life

Shearon Harris Carolina Power & Light Co. 6F8202BP 1-6-91 Marked "Quality Assurance Material"

Plant Utility PO No.

Page 7: Forwards info re QA requirements identified in current ...

Mr. Richard C. Wilson Nuclear Regulatory Commission

Plant Utility P 0 No. P 0 Ordered By P0 Date QA Requirement

Plant Utility PO No. P 0 Date QA Requirement

Plant Utility P 0 No. P0 Date QA Requirement

Plant Utility PONo.

Plant Utility P0 No. P0 Date QA Requirement

Plant Utility P0 No. P0 Date QA Requirement

20 January 1992 Page 7

Shoreham Long Island Lighting Co. 9201C Robert A Keasbey Co. 6-9-89 No QA Requirements

South Texas Houston Power & Light Co. RS0024245 6-25-91 Certificate of Conformance Manufacturing Date & Shelf Life

Surry Virginia Electric & Power Co. CSY 343814 4-18-91 "Shelf Life Document" Certificate of Analysis & MSDS Sheet

Susquehanna Pennsylvania Power & Light Co. Audited by the NRC - December 16 - December 20, 1991

Three Mile Island GPU Nuclear 0352246 10-24-91 Part 21 Manufactured in accord with TSI QA Program Certificate of Conformance Protected Shipment

Trojan Portland General Electric Co. NQ92612 9-5-91 Certificate of Conformance Protected Shipmert

Page 8: Forwards info re QA requirements identified in current ...

Mr. Richard C. Wilson Nuclear Regulatory Commission

Plant Utility PO No. PO Date QA Requirement

Plant Utility PO No. PO Date QA Requirement

Plant Utility PO No. PO Date QA Requiremen

Plant Utility PO No. PO Date QA Requirement

Utility Plant PO No.

20 January 1992 Page 8

Turkey Point Florida Power & Light C91674-91163 10-31-91 "Comply with OSHA Requirement" Shelf Life Protected Shipment

Vermont Yankee Yankee Atomic Power 44480-1 3-13-91 "Comply with TSI's NQAPM/QCOPM" Certificate of Conformance Shelf Life

Vogtle Georgia Power 6007989 10-11-91 "Comply with GPC Spec X3AR01, Sec E8, Attachment B, Page B-43" Certificate of Conformance Shelf Life

Watts Bar Tennessee Valley Authority NS-42800C 12-20-90 10CFR50, Appendix B Certificate of Conformance, Shelf Life

Washington Public Power Supply System WNP-2 Audited by the NRC - December 16 - December 20, 1991

Page 9: Forwards info re QA requirements identified in current ...

Mr. Richard C. Wilson Nuclear Regulatory Commission

Plant Utility PO No. PO Date QA Requirement

Plant Utility PO No.

Plant Utility PO No. PO Date QA Requirement

20 January 1992 Page 9

Waterford HI Louisiana Power & Light WPO 40451 5-8-91 MSDS Sheet, Spec. Proc. Misc 903, Rev 2

Wolf Creek Kansas Gas & Electric Audited By the NRC - December 16 - December 20,1991

Zion Commonwealth Edison 4F5163 5-31-91 TSI's NQAPM Certificate of Conformance

Bechtel Power Corporation's Purchase Order 8856-F-56718 for Suaquehanna Steam Electric Station Dated 15 October 1981

.t the request of Mr. Randy Moist, we are submitting a copy of the following documents:

1. Telex Purchase Order from Mr C Turnbow Bechtel Power Corporation, Dated 10-15-81

2. Original Bechtel Power Corporation's Purchase Order 8856-F-56718 for Susquehanna Steam Electric Station Dated 15 October 1981 Received by TSI on 13 November 1981 with the following attachments:

a) Equal Opportunity Clause

b) Field Purchase Order Service Agreement

c) Schedule A to Agrrement No. 8856-FTSA-22 Between Bechtel Power Corporation and T.S.I., Inc.

d) Specification 8856-E-61, Rev. 1 - Susequhanna Steam Electric Station

3. Telex Message No. 1125-1 dated 25 November 1981 to Bechtel Power regarding Exceptions to Technical Service Agreement to 8856-FTSA-22

4. A copy of Bechtel Power Corporations Purchase Order 8856-F-56719 for equipment rental dated 15 October 1981

Page 10: Forwards info re QA requirements identified in current ...

Mr. Richard C. Wilson 20 January 1992 Nuclear Regulatory Commission Page 10

5. A copy of the following Invoices

a) No. 11756 dated 29 October 1981 for materials and equipment

b) No. 11756-B dated 30 October 1981 for materials

c) No. FS-104 dated lb November 1981 for Field Service Engineering

d) No. ER-O0 dated 16 November 1981 for equipment rental

e) No. ER-20 dated 21 December 1981 for equipment rental

In his meeting with the NRC representative in Washington, D.C., on October 17, 1991, Mr. Feldman explained TSI's policy to provide installation guides and training to installers of THERMO-LAG, and TSI did not supervise or perform quality control functions or supervise the installation. The enclosed documents relating to Susquehanna Steam Electric Station contain passages that appear inconsistent with TSI's stated policy. However, please understand that TSI did not supervise or perform quality control functions or supervise the installation at Susquehanna. TSI's field service representative was present at Susquehanna for twelve (12) days to provide instruction on setting up the spray equipment and to provide training on the proper method of spraying THERMO-LAG to Stress Skin and nothing more.

Gibbs & Hill Specification 2323-MS-38H. Revision 1. dated 2 April 1981

We hpvr searched our files and have been unable to locate any correspondence r'e,,;r".g exceptions to this specification.

If we can be of any further assistance, do not hesitate to contact us.

Yours truly,

Richard A. Lohman Manager of Quality Assurance

RAL/mm Enclosures