GROUND IMPROVEMENT PLAN
Job Description
Materials
TradeReplace both taps in the men’s toilets as currently dripping.
2 x cold push button taps
Plumber
In both men’s toilets remove toilet and reinforce floor with ply. New floor covering with either Altro Vinyl or similar brand or Tile.
12 or 18mm ply for the floor.Altro vinyl floor or Tiles
PlumberJoinerCarpet fitter or Tiler
Replace Hot water unit
Hot water unit(which the club has)
Plumber/ Electrician
Refit sink as currently loose.
Possibly silicone to bed the sink down.
Plumber
New carpet or floor covering required in the bar.
Carpet or Altro vinyl floor
Carpet fitter
No Picture Remove hot air extractor unit from bar and patch up wall.
Plaster board and board finnish
Plasterer
Page 2 of 9
Cut out and remove rotten ply.
Ply to the same thickness as to what is removed.Paint finish like wethertex to try and match texture.
JoinerPainter
Install non slip decking on step treads.
Non slip decking Joiner
Relay block paving to football club entrance.
Maybe washed sand,Kiln dried sand
Groundworker/Block paver
Repair broken/ fallen fence to the front of the football club.
Maybe treated timber
Fencer/Joiner
Welcome signage / club branding to the left and right of the door.Maybe showing sponsors one side. Open to ideas
Signs Sign writer.Someone to install.
Removal and replacement of fascia board around old gatehouse as it is rotten.Paint Gatehouse
Fascia board(upvc or timber)Paint
JoinerPainter or volunteers to paint
Page 3 of 9
Painting to gates and gatehouse.Maybe club branding to gatehouse.Finish layer of Tarmac
Paint Painter orVolunteers to paint.Tarmac layer
As above As above As above
Painting of gatehouse.New window so can use as a serving hatch at events.Block paving or slabs to grass area.
Paint.Tilt and Turn window.Block pavers or slabs.
Painter or Volunteers to paint.Joiner/ window fitter.Groundworker/ block paver
General tidy up and rubbish removal.
skip Volunteers
Clad in upvc.Good clean.
Upvc fascia and soffit
Joiner/ fascia and soffit fitter.
Replacement of springs to both barriers.Paint both barriers.
2 x SpringsPaint
Metal worker/Engineer.Painter
Page 4 of 9
Astro turf or Block pave a path to the gate.
Astro turf orBlock pavers
Groundworker/ Block paver
Remove and replace ply around dug outs. Paint.
12mm plyPaint
JoinerPainter
Put a steel roof along fence supports to allow standing under but also shelter for markets at events.
Steel roof sheets,Steel purlins.
Steel fabricator
General tidy and clean up.Moss and weed removal.Clean Tesco shelters
Bucket, sponge, washing up liquid.Shovels, spades and stiff yard brush.
Volunteers
Move hand dryer in men’s outside toilet to the side of the sink.
None. Electrician
Page 5 of 9
Rubbish bin required in men’s outside toilet
Rubbish bin None
Tile verge needs repointing
Sand and cement.
Bricklayer,Builder or roofer
Needs step leading or substitute flashing.Guttering and down pipe
Lead or lead substitute.Guttering and down pipe.
Plumber, roofer,Joiner
Extractor fan cover needs to go on.
Extractor fan cover
Anyone
Unit to be custom built with 8 compartments.This is to store match day training tops and shorts in.
Melamine board or 18mm MDF
Bench joiner
Strengthen over head cabinets to accept match day bags.
4 x 2 timber joiner
Page 6 of 9
Painting of changing room
PaintCleaning productsMould remover
Paintervolunteers
Replacement heater Electric heater electrician
No picture Clad shower ceiling with upvc cladding. Install new toilet and cubicle in showers.
Cladding (club has)CubicleToilet and sink
JoinerPlumber
Replacement tap to referees changing room
Tap Plumber
Replace bi-folding door in referees changing room.Freshen up the changing room with paint.
Door(which club has)Paint
JoinerPainter or volunteers to paint
Floor wants painting in middle room
Floor paint Painter or volunteers to paint
Page 7 of 9
Remove or replace floor ties in away changing rooms
TilesTile adhesiveGroutFloor self-leveller
Tiler
No picture Kitchen roof outside needs replacing due to leeking.
12mm ply or OSBFurring stripsRubber roof or felt
Joinerroofer
No picture Kitchen needs replacing to a higher standard.Also needs painting
New kitchen units and worktops. Ideally stainless steel but domestic will suffice.
Joiner/ kitchen fitter.Painter
No picture All extractor fans in all 3 changing rooms need checking and replacing if faulty. All lights need checking to make sure they’re working.
Extractor fans (club has)Possibly new lights
Electrician
Ladies toilet needs rot cutting out around the pipes and repairing. Freshen up with paint.New toilet seat.
Ply to the thickness of whats removed.Plasterboard and skim or cover with panelling.Paint.New toilet seat.
JoinerMaybe plasterer.Painter.
Studded wall to go up to block corridor and doorway creating to the right of the radiator into the conservatory to make new entrance into ladies toilet. Stud work to create alcove for baby changing facility.
3x 2 timberPlasterboardskimDoor lining and doorBaby changing pull down unit.
JoinerPlastererPainter
Page 8 of 9
New solid door to go on door frame and door into bar to be locked and screwed up. This will allow for the existing corridor to become a much needed storage area for the bar.
Solid door Joiner