Oracle Advanced Supply Chain Planning R11i (Release 11.5.10) FORECAST TO PLAN – USING ORACLE DEMAND PLANNING Prepared by Oracle Applications Manufacturing BDE Author: Sanjeev Kale Creation Date: January 18, 2005 Last Updated: March 7, 2005 Copyright © 2002 Oracle Corporation All Rights Reserved Page 1

Transcript of FORECAST TO PLAN – USING ORACLE DEMAND PLANNING

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

FORECAST TO PLAN – USING ORACLE DEMAND PLANNING

Prepared by Oracle Applications Manufacturing BDE

Author: Sanjeev Kale

Creation Date: January 18, 2005

Last Updated: March 7, 2005

Copyright © 2002 Oracle Corporation All Rights Reserved

Page 1

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Introduction............................................................................................................................................................................................. 3 Oracle Demand Planning Data Loader Steps.......................................................................................................................................... 4

Method I – Prior to 11.5.10................................................................................................................................................................. 4 Using Excel Spread Sheet to Import Data into Oracle Demand Planning.......................................................................................... 4 Populating the staging tables using the worksheets (*.csv) via sqlldr.............................................................................................. 14 Method II –11.5.10 Collect Flat File Data – Self Service ................................................................................................................ 16

Oracle Demand Planning – Running Data Pull .................................................................................................................................... 23 Oracle Demand Planning – Define Demand Plan................................................................................................................................. 28 Oracle Demand Planning – Generate Sales Forecast............................................................................................................................ 34 Oracle Demand Planning –Achieve Consensus Forecast ..................................................................................................................... 44 Advanced Supply Chain Plan –Create and Launch Plan ...................................................................................................................... 63 Hierarchies used in the seeded Vision Demand Plans .......................................................................................................................... 68 Glossary ................................................................................................................................................................................................ 89

Page 2

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Introduction The purpose of the document is to walk you through the set up and understanding of Oracle Demand Planning. I have made certain assumptions while writing this. They are as follows

• You are using 11.5.10 version of Oracle Application. • This data has been tested and works on Vision Database.

Page 3

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Demand Planning Data Loader Steps

Method I – Prior to 11.5.10

Using Excel Spread Sheet to Import Data into Oracle Demand Planning The purpose of this paper is to walk through the steps required to update the Excel Spread Sheet to upload custom data. It will walk you through examples of updating data in the order that is easiest to use. By using the spreadsheet the shipping/booking history information as well as the level values will be loaded via the staging tables. This is in lieu of pulling the data from the Order Management transaction system. We are only using the seeded levels and hierarchies. To customize hierarchies, please refer to the Advanced Topics section of the Demand Planning User’s Guide and to the white papers available on the APS website. Please find attached with this document a file named ODP.zip.

The Process

1) Go through the spreadsheet and the ODP Data Loader Steps document, which are provided in the same zip file from where you accessed this document.

2) Model the changes on paper first. 3) Modify the spreadsheet as required for your changes. 4) Populate the modified data (spreadsheet) into the staging tables on the planning server using the loader

program. This replicates what the collection programs would do if it were to be collecting the data from the planning server. The loader program and vision demo data spreadsheet are included for your convenience. Please go through this document and the ODP Data Loader Steps document before starting the process.

5) Build and validate the Demand Plan as the Demand Planning System Administrator. 6) Build the demand plan (Cube) as the Demand Planning Administrator 7) Go through the Demand planning Process as explained in user guide and other documents. 8) You should be prepared to go through a few iterations of this process. It is best to not make sweeping changes

in the spreadsheet unless you are comfortable with the process. It is easiest to restrict the changes to only the level values (such as, the names of the products, customers etc.).

Step 1 – Populate the MSD_ST_LEVEL_VALUES worksheet

Page 4

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Define the Level Values you are going to use. The level value is the item name, customer name, ship to etc that you will be using. This is done on the Level Value worksheet. There are 33 different levels that are system defined and populated. Following Rules must be observed for populating level values.

1) All levels, 1 - 33 must be present with values. 2) All primary keys must be unique within the level. You can have the same primary key in two different levels,

but not within the same level. 3) The level values and the shipment/booking data are going to be loaded via the flat files, the primary keys

for some of the levels need to map back to the source transaction tables. The mapping instructions will be provided in the next few sections.

4) You only need to change the values for the items you want to resemble the prospects data. For example, if you only need to change the item numbers and the customers, then you can leave the rest of the level values as they are.

5) One level value can have only one parent level value in a hierarchy.

Instance_id – can be extracted from MSC_APPS_INSTANCES as follows

select INSTANCE_ID from MSC_APPS_INSTANCES where INSTANCE_CODE='TST'

Level_id - Is a system defined level id. The level ids are listed below Level ID relating to Product Hierarchy

1 Item 2 Product Category 3 Product Family 28 All Products

Page 5

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Level ID Relating to Ship From Hierarchy

7 Organization 8 Operating unit 9 Legal Entity 10 Business group 29 All Organizations Level ID relating to Ship To Relationships 11 Ship to location 12 Region 13 Country 14 Area 15 Customer 16 Customer Class 17 Customer Group 30 All Geography Level ID’s relating to Sales Reps 18 Sales Representative 19 Sales Manager 1 20 Sales Manager 2 21 Sales Manager 3 22 Sales Manager 4 32 All Sales Representatives

Page 6

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Level ID’s Relating to Sales Groups 23 Sales Group 1 24 Sales Group 2 25 Sales Group 3 26 Sales Group 4 32 All Sales Representatives Level ID’s Relating to Sales Channel 27 Sales Channel 33 All Sales Channels The highlighted level ids are significant in that the primary keys (SR_LEVEL_PK) for this need to map to the values in the appropriate source transaction tables.

The following table describes the suggested scripts that will extract these primary key values

LEVEL_ID LEVEL NAME SCRIPT TO EXTRACT SR_LEVEL_PK 1 Item select SR_INVENTORY_ITEM_ID,ITEM_NAME

from MSC_SYSTEM_ITEMS where ITEM_NAME IN(‘AS66311’,’CM66321’,'’CM66326') and ORGANIZATION_ID=207 and PLAN_ID=-1;

2 Product Category select CATEGORY_ID from MTL_CATEGORIES_V where STRUCTURE_NAME = 'Item Categories' and CATEGORY_CONCAT_SEGS =’ COMPUTER.HANDHELD’;

3 Product Family select CATEGORY_ID from MTL_CATEGORIES_V where STRUCTURE_NAME = 'Product Family' and CATEGORY_CONCAT_SEGS = ' Hardware';

7 Organization select ORGANIZATION_ID from MTL_PARAMETERS where ORGANIZATION_CODE='M1';

8 Operating Unit select OPERATING_UNITS_ID

Page 7

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

from HRFG_OPERATING_UNITS where OPERATING_UNIT_NAME=’ Vision Operations’; Note: The operating unit name for your organization can be determined by viewing the Accounting Information for your Organization Setup. This is usually a 3-segment flexfield that contains the set of books, operating unit, and legal entity names. Inventory > Setup > Organizations > Organizations

9 Legal Entity select LEGAL_ENTITY_ID from HRFG_OPERATING_UNITS where LEGAL_ENTITY_NAME=’ Vision Operations’; Note: The legal entity name for your organization can bedetermined by viewing the Accounting Information for your Organization Setup. This is usually a 3-segment flexfield that contains the set of books, operating unit, and legal entity names. Inventory > Setup > Organizations > Organizations

10 Business Group select BUSINESS_GROUP_ID, BUSINESS_GROUP_NAME from HRFG_OPERATING_UNITS where LEGAL_ENTITY_NAME=’ Vision Operations’ and OPERATING_UNIT_NAME=’ Vision Operations’; Note: The legal entity name and the operating unit name for your organization can be determined by viewing the Accounting Information for your Organization Setup. This is usually a 3-segment flexfield that contains the set of books, operating unit, and legal entity names. Inventory > Setup > Organizations > Organizations

11 Ship To Location select RAC.customer_name,RAC.customer_id, ACS.customer_site_id from arfg_customer_sites ACS, ra_addresses_all RAL, ra_customers RAC

Page 8

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

where RAC.customer_name='Computer Service and Rentals' and RAC.customer_id=RAL.customer_id and RAL.address_id=ACS.address_id and ACS.site_usage = 'Ship To'; NOTE: The Ship-to-Location primary key will be the extracted ACS.customer_site_id.

15 Customer select RAC.customer_name,RAC.customer_id, ACS.customer_site_id from arfg_customer_sites ACS, ra_addresses_all RAL, ra_customers RAC where RAC.customer_name='Computer Service and Rentals' and RAC.customer_id=RAL.customer_id and RAL.address_id=ACS.address_id and ACS.site_usage = 'Ship To'; NOTE: The Customer primary key will be the extracted RAC.customer_id.

12 Region If the Region level value is interpreted as the city, county or state, the information can be extracted from RA_ADDRESSES_ALL: select RAC.customer_name,RAC.customer_id, ACS.customer_site_id,RAL.city, RAL.state, RAL.county, RAL.country from arfg_customer_sites ACS, ra_addresses_all RAL, ra_customers RAC where RAC.customer_name='Computer Service and Rentals' and RAC.customer_id=RAL.customer_id and RAL.address_id=ACS.address_id and ACS.site_usage = 'Ship To'; Since the primary key for this level value is not significant, you can assign any primary key.

13 Country The Country level value can be extracted from RA_ADDRESSES_ALL:

Page 9

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

select RAC.customer_name,RAC.customer_id, ACS.customer_site_id, RAL.city, RAL.state, RAL.county, RAL.country from arfg_customer_sites ACS, ra_addresses_all RAL, ra_customers RAC where RAC.customer_name=' Computer Service and Rentals' and RAC.customer_id=RAL.customer_id and RAL.address_id=ACS.address_id and ACS.site_usage = 'Ship To'; Since the primary key for this level value is not significant, you can assign any primary key.

18 Sales Representative select salesrep_id, SUBSTR(name,1,35) from RA_SALESREPS_ALL ORDER BY NAME;

In this paper we will be using following information Item = AS66311,CM66321, CM66326 and the item category = ‘COMPUTER.HANDHELD’ and Product Family = ‘Hardware’, Organization = M1 and will be using the following customer with their corresponding ship to location Computer Service and Rentals - Chattanooga= 1249, Tempe= 1028, Toronto= 1072 AT&T Universal Card - San Mateo = 5684, San Jose = 5911, Jacksonville = 1062 Business World - San Jose = 7718, San Mateo = 3915 Nicole Aron - San Jose = 6352 Hilman and Associates - Tulsa = 1279 Example

Primary level key for level_id =3 (Item) select SR_INVENTORY_ITEM_ID,ITEM_NAME from MSC_SYSTEM_ITEMS where ITEM_NAME IN('AS66311') and ORGANIZATION_ID=207 and PLAN_ID=-1; SR_INVENTORY_ITEM_ID ITEM_NAME -------------------- ---------- 2848 AS66311

Page 10

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Primary level key for level_id =2 (Product Category) select CATEGORY_ID from MTL_CATEGORIES_V where STRUCTURE_NAME = 'Item Categories' and CATEGORY_CONCAT_SEGS ='COMPUTER.HANDHELD' CATEGORY_ID ----------- 1375

Primary level key for level_id =3 (Product Family) select CATEGORY_ID from MTL_CATEGORIES_V where STRUCTURE_NAME = 'Product Family' and CATEGORY_CONCAT_SEGS = 'Hardware'; CATEGORY_ID ----------- 1535

The worksheet entry would be as follows

Instance Level Id

Level Value Sr Level PK

21 1 AS66311

284821 2 COMPUTER.HANDHELD

1375

21 3 Hardware 1575 Step 2 – Populate the MSD_ST_LEVEL_ASSOCIATIONS worksheet

This worksheet is used to relate the level values from one level to another. In essence you are filling the hierarchy that has been defined. The product hierarchy is referenced below

Page 11

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

ItemLevel ID 1 AS66311 PK 2848

Product CategoryLevel ID 2

COMPUTER.HANDHELDPK 1375

Product Family

Level ID 3 Hardware PK 1575

All Products

Level ID 28 PK 1

To interpret the level value association, Level 1 Item (Primary Key = 2848) rolls up to both Level 2, Product Category (Primary key = 1375) and Product Family (Primary key = 1575). Level 2 rolls up to level 28 All Products (Primary key =1) similarly Level 3 rolls up to level 28 All Products (Primary key =1)

The worksheet entry would look as follows

Page 12

Instance

Level Id

Level Value PK

Parent Level ID

Parent Level Value PK

21 1 2848 2 137521 1 2848 3 157521 2 1375 28 121 3 1575 28 1

Step 3 – Populate the MSD_ST_SHIPMENT_DATA and/or MSD_ST_BOOKING_DATA worksheet

The process is the same for both of these worksheets. The difference between the two is the shipment data worksheet has actual ship dates and the booking worksheet does not. This worksheet is used to create shipment data. In it’s present form it has shipping history that starts in Jan 1998 and goes through Feb 2000. You will probably need to change the dates to reflect the data.

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Instance = Instance_id from MSC_APPS_INSTANCES Org = The Ship from Location Org PK = The Org Primary Key Model Number = The Item Number Item PK = The Item Primary Key Customer No = The Customer Name Cust PK = The Customer’s Primary Key Ship To = The Ship to Customer Location Ship To PK = The Ship to Location Primary Key Sales Rep = The Sales Rep Sales Rep PK = The Sales Rep Primary Key Sales Channel = The Name of the Sales Channel Sales Channel PK = The Primary Key of the sales Channel. Book Date = The date the Order was booked Requested Date = The date the order was requested Promise Date = The date the order was promised Shipped Date = The date the order was shipped Quantity = the number of units shipped Amount = the value of the shipment. Step 4 – Populate the MSD_ST_PRICE_LIST to define the prices If you want your forecast to have amounts, vs. just quantities, you need to enter price list data so the forecast has something to base the value or the amount calculation on. If these are 0 you will not get an amount number in the cube. Key for the worksheet • Instance = MSC_APPS_INSTANCES.INSTANCE_ID • Price List Name = Free text – Not validated against price list in OM • ORG LVL Id = What is the Org Level ID – Or what level for the Org Dimension are you going to be

controlling the pricing at. In this example it is 29 (All Organizations)

Page 13

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

• Sr Org Lvl Pk = What is the Level Value for the Org Hierarchy – in our case the Primary Key is 1 or All orgs

• Prod Lvl Id = What is the product level ID - Or what level of the product Dimension are you going to be controlling price at. In this example the Product Level Id = 1 (Item)

• SR_Prod_LVL_PK – What is the level value for the product ID – this is where you would enter the level value for the item number if you were controlling price at the item level. The extraction process for this primary key is described in an earlier section.

• Geolvl ID – What is the Level ID for the Geography Dimension you are going to be controlling pricing at. – in this example it is 30 (All Geography)

• SR GEO LVL PK – What is the geography level value. In this example the primary key =1 or All Geography.

• Sales Channel Lvl Id – What is the Level Id for the Sales Channel Dimension you are going to be controlling pricing at – in this example it is 33

• Sales Channel Lvl PK– What is the Primary Key for the Sales Channel – in this example the Primary Key = 1 or all Sales Channels.

• Sales Rep Lvl Id – What is the Level Id for the Sales Rep Dimension you are going to be controlling pricing at – in this example it is 32 – All Sales Reps

• Sales Rep Lvl PK What is the primary key for the sales reps – in this example the primary key = 1 or all Sales Reps

• Start Date – End Dates – Enter the start and end date for the pricing • Price – Enter the price • Priority – will override any overlapping date ranges or other conflicts, such as two prices are applicable

for a customer at any point in time. The price with a Priority 1 will be applied before the price with a priority two.

At this time we are not going to populate the MSD_ST_PRICE_LIST.

Populating the staging tables using the worksheets (*.csv) via sqlldr 1. ftp the following files from the ODP.zip to the unix

Page 14

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

msd_st_level_associations.csv msd_st_level_associations.ctl msd_st_level_values.csv msd_st_level_values.ctl msd_st_shipment_data.csv msd_st_shipment_data.ctl refresh_stage.sql refresh_fact.sql update_sr_orig_item_pk.sql

2. Rename the following files $ mv msd_st_level_values.csv msd_st_level_values.csv1 $ mv msd_st_level_associations.csv msd_st_level_associations.csv1 $ mv msd_st_shipment_data.csv msd_st_shipment_data.csv1

3. Execute the following commnd on each of the *.csv file. The reason for performing the following is to truncate the additional ‘Carriage Return’ character added by windows in the csv file. Other wise you will get ORA-1722 "invalid number"

$ tr -d '\r' < msd_st_level_values.csv1 > msd_st_level_values.csv $ tr -d '\r' < msd_st_level_associations.csv1 > msd_st_level_associations.csv $ tr -d '\r' < msd_st_shipment_data.csv1 > msd_st_shipment_data.csv $ rm *.csv1

4. Execute the following commands to populate the staging tables.

$ sqlplus apps/apps @refresh_stage.sql $ sqlldr apps/apps control=msd_st_level_values.ctl $ sqlldr apps/apps control=msd_st_level_associations.ctl $ sqlldr apps/apps control=msd_st_shipment_data.ctl $ sqlplus apps/apps @update_sr_orig_item_pk.sql $ sqlplus apps/apps @refresh_fact.sql

Page 15

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Method II –11.5.10 Collect Flat File Data – Self Service

To use this option, you need to create data files by downloading the templates and specifying the data in the templates. Next, you load data files into Oracle Demand Planning by specifying the location of control and data files. To load data files using Self Service user interface: 1. Select the Demand Planning System Administrator responsibility. 2. In the Navigator, select Collections Collect from Legacy Systems Collect Flat File Data Self Service. The Self

Service page appears. 3. Select download link to download the template zip file. 4. Select Browse to select the data file to upload. 5. Submit the concurrent request for DP Purge Program. 6. Select Start Load Now to load the data file in Oracle Demand Planning. To perform flat file loads:

1. Download the OATemplate.exe and extract the contents into a directory. You can download the template by

selecting the Load Setup Data link from the Admin tab in Collaborative Planning, or through the self-service load menu from your APS application. Click the link to Download Templates.

2. Open up Microsoft Excel using the ExcelLoad.xlt file. When prompted, select Enable Macros.You will see the APS menu option appear on the menu bar in Excel.

3. Import the appropriate *.dat file for the entity you want to upload by selecting the Import option from the APS menu.If you are importing the dat file for the first time, then the Excel would prompt you to enter the Date format(in which all the dates in the dat files would be converted) and the Delimiter(this value will be used internally to seperate different columns in the dat file and will correspond to the "MSC: Self Service Loads Delimiter" profile). Once the user enters these values, these would be stored internally (and the user is not required to keyin these again). However, the user can change date format/delimiter by following the path: APS Menu->User Options. This will open a window for modifying the values.The user can perform three actions on this window 'Apply'- that applies all the changes on currently open sheet; 'Apply & Save'- that applies all the changes on currently open sheet and also saves these settings(date format/delimiter) for the user; 'Cancel'- that does nothing.

Page 16

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

NOTE: Currently we are supporting six date formats and two delimiters.While uploading the file, make sure that the demimiter set in the dat file matches with the delimiter value in "MSC: Self Service Loads Delimiter" profile, else the laod will fail.

4. Make changes and export the *.dat file by selecting the Export option from the APS menu. . 5. Return to the Collaborative Planning application and navigate to the Load Setup Data page under the Admin

tasks. 6. Browse for the *.dat file and load it by clicking the "Load Setup Data" link.

NOTE: Alternatively, you can load multiple *.dat files at the same time by placing them in one .zip file. Browse and select the Zip file. Some files such as TradingPartner.dat and TradingPartnerSite.dat must be loaded together in a Zip file. In this case, import the files, make changes, and export the files separately to your computer. Then place the two files together in a single Zip file. Complete steps 5 and 6 above.

Description and format of the upload files: Each file that you upload is stored with the extension .dat. The first row of each *.dat file contains columns that define the attributes for the entity that you want to load. For each *.dat file, the definition of the columns that it contains is provided below. In this particular we will look at just the following three files, since we will be using only these three.

LevelValue.dat Purpose:Use this file to define level members within a level of a demand planning hierarchy.

Field Name Description Source Instance Code Source instance code defined on the planning server. Level Name Name of the level in a demand planning hierarchy. Level Value Value of the level. Level Value Description Description of the level value. Attribute1 Attribute2 Attribute3 Attribute4 Attribute5

Page 17

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

LevelAssociation.dat Purpose: Use this file to define a hierarchy or level associations in demand planning.

Field Name Description Source Instance Code Source instance code defined on the planning server. Level Name Name of a level in a demand planning hierarchy. Sr. Level Value Value of this level. Parent Level Name Name of the parent's level in the demand planning hierarchy.Sr. Parent Level Value Value of the parent level. Attribute1 Attribute2 Attribute3 Attribute4 Attribute5

Page 18

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

ShipmentData.dat Purpose:Use this file to load historical order shipments used in demand planning.

Field Name Description Source Instance Code Source instance code defined on the planning server. Inv Org Organization identifier on the planning server. The Inv Org is the same as the Organization.Item Inventory item name. Customer Customer nameSales Channel Sales channel through which order is fulfilled. Sales Representative Sales representative. Ship To Loc Ship-to location. User Defined Level1 User Defined1 User Defined Level 2 User Defined2 Demand Class Name of the Demand Class.Defaulted, if not provided. Booked Date Date the order is booked. Requested Date Date the order is requested; customer's request date. Promised Date Date the order is promised. Shipped Date Date the order is shipped. Schedule Ship Date Schedule Arrival Date Amount Amount in the demand plan currency. Quantity Shipped Quantity Original Item Parent Item Name The name of the Parent Item

Page 19

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Open up Microsoft Excel using the ExcelLoad.xlt file. When prompted, select Enable Macros.You will see the APS menu option appear on the menu bar in Excel. Import the appropriate LevelValue.dat file by selecting the Import option from the APS menu. Please add the data provided. Make changes and export the *.dat file by selecting the Export option from the APS menu. Repeat this procedure for LevelAssociations.dat, and ShipmentData.dat. Add these three files to a zip file named as (Xxodptst.zip).

Page 20

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 21

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

The following request are launched by this process

REQ_ID CPRG_NAME ========= ================================================ 2721886 User File Upload 2721887 Loader Worker 2721888 Loader Worker 2721889 Loader Worker 2721890 Pre-Process Monitor 2721891 MSC Pre Process Worker 2721892 MSC Pre Process Worker 2721893 MSC Pre Process Worker 2721894 Pull Level Values 2721895 Pull Shipment Data 2721896 Planning ODS Load 2721897 Planning ODS Load Worker 2721898 Planning ODS Load Worker 2721899 Planning ODS Load Worker 2721900 Planning Data Collection - Purge Staging Tables

Page 22

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Demand Planning – Running Data Pull

To understand the Dimension Hierarchies logon to the application as mfg/welcome user and select the ‘Demand Planning System Administrator’ and the navigation is Other Dimension Viewer

Page 23

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

The Data has been populated in the MSD_ST% tables now we have to run the following data pull program in this order, Navigation path Collections Pull Data

• Level Values complete refresh = yes • Shipment Data

Page 24

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

After the Data Pull program completes succesfully, execute the following SQL and verify the data with the worksheet data.

col INSTANCE format A4 col LEVEL_VALUE FORMAT A35 COL SR_LEVEL_PK FORMAT A15 select instance, level_id, level_value, sr_level_pk, level_pk from MSD_LEVEL_VALUES;

select mla.instance, mla.level_id "Level ID", a.level_value "Level Value", mla.parent_level_id "PLevel ID", b.level_value "Parent Level Value" from MSD_LEVEL_ASSOCIATIONS mla, MSD_LEVEL_VALUES a, MSD_LEVEL_VALUES b where mla.instance = a.instance and mla.sr_level_pk = a.sr_level_pk and mla.instance = b.instance and mla.sr_parent_level_pk = b.sr_level_pk order by 2;

select * from MSD_SHIPMENT_DATA;

You can verify the level values and level associations by Login as Demand Planning System Administrator, Navigation path Dimension Values Level Values. Enter Dimension = Product, Level=Item

Page 25

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Dimension Values Level Associations. Enter Dimension = Product, Parent Level Name =Product Category

Page 26

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

After verifying the data matches to the worksheet data. Run the Audit Fact process to validate the fact data. Please make sure the Audit Fact process completes without error, If it completes with warning we can ignore the warning.

Page 27

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Demand Planning – Define Demand Plan

Oracle Process/Procedures

Navigation Path Specific step

Logon to the application as mfg/welcome Responsibility = Demand Planning System Administrator

Demand Plans

Select Organization Code=TST:M1 This will list all the Demand Plans available. Click cancel

Name = XXODPPLAN Gregorian = Day Description = XX Test ODP Plan Manufacturing = Day Base UOM = Ea

Dimension Tab Dimension User Dimension Geography Geograghy Click on DP Hierarchies Hierarchy Name Dimension Name Customer Class Geograghy Geograghy Geograghy

Dimension User Dimension Ship from Location Ship from Location Click on DP Hierarchies Hierarchy Name Dimension Name Organization Ship from Location

Page 28

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Dimension User Dimension Product Product Click on DP Hierarchies Hierarchy Name Dimension Name Product Category Product Product Family Product

Dimension User Dimension Time Time Click on DP Hierarchies Hierarchy Name Dimension Name Gregorian Calendar Manufacturing Calendar Vision01

Input Parameters Tab Type = Shipmet History – Shipped Items Forecast by = Shipped Date Start Date = 01-APR-1998 End Date = 30-JUN-1999 Quantity Used = Quantity Amount Used = Amount

Page 29

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Scenarios Tab Name = XXTESTODP Description = 2005 Forecast Forecast based on = Shipmet History – Shipped Items Forecast Period Type = Shipped Date Output Period Type = Day History Start Date = 01-APR-1998 History End Date = 30-JUN-1999 Horizon Start Date = 01-Jan-2005 Horizon End Date = 31-Dec-2005 Click on Output levels Buttons Output levels Dimension Level Product Item Ship from Location Organization Geography Ship To Location Verify the Lowest Time level for Manufacturing is Day

Click on the Validate Plan, this will launch a concurrent process, After the process completes successfully, requery the XXODPPLAN. The Status should be valid

Page 30

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Demand Plan Administration

This will launch SSA window with XXODPPLAN status = Not built. Click on XXODPPLAN – A message will appear that the Plan needs to be built “This plan does not exist. Do you wish to build it?” Click Yes Following message appears “A data download process has been initiated. Please wait for a workflow notification” Click on Exit

Page 31

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

The Status will now show In-Progress/Built, You can click on the Status link to view the batch log for a plan. When the download is completed succesfully, the batch log would look like as follows

Page 32

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10) Demand Plan - SKODPPLAN 01/20/2005-21:54:10 -> Begin Downloading Data from Planning Server. 01/20/2005-21:54:10 -> Generating Express metadata structures. 01/20/2005-21:54:11 -> Loading specified Demand Plan information. 01/20/2005-21:54:11 -> Loading Dimension information. 01/20/2005-21:54:11 -> Loading Hierarchy and Level information. 01/20/2005-21:54:11 -> Generating DP Dimension metadata. 01/20/2005-21:54:12 -> Generating DP Hierarchy and Level metadata. 01/20/2005-21:54:12 -> Processing Attributes. 01/20/2005-21:54:12 -> Loading Time dimension values. 01/20/2005-21:54:35 -> Loading dimension values. 01/20/2005-21:54:35 -> Verify that all dimensions have values. 01/20/2005-21:54:35 -> Setting backend hierarchy information. 01/20/2005-21:54:36 -> Loading Input Parameters and Scenarios. 01/20/2005-21:54:38 -> Loading Item Unit of Measure information. 01/20/2005-21:54:38 -> Loading events. 01/20/2005-21:54:39 -> Loading data for specified Input Parameters. 01/20/2005-21:54:39 -> Loading data for the following Input Parameter: Shipment History - Shipped Items:Shipped Date. 01/20/2005-21:54:42 -> Loading Unit of Measure conversion information. 01/20/2005-21:54:42 -> Calculating conversion coefficients for Product dimension. 01/20/2005-21:54:42 -> Loading variable Product pricing information. 01/20/2005-21:54:42 -> Converting for Express Objects. 01/20/2005-21:54:43 -> Converting to application metadata. 01/20/2005-21:55:49 -> Synchronizing variable names. 01/20/2005-21:55:49 -> Creating required worksheet objects. 01/20/2005-21:55:49 -> Creating required Workflow objects in the Master database. 01/20/2005-21:55:49 -> Aggregating input parameters needed for allocation. 01/20/2005-21:55:55 -> Allocating input parameters. 01/20/2005-21:55:55 -> Apply intelligent rounding to specified input parameters. 01/20/2005-21:55:55 -> Aggregating other input parameters. 01/20/2005-21:55:55 -> Setting DP system flags. 01/20/2005-21:56:04 -> Completed Downloading Data from Planning Server. With this process completed we have built the Demand Plan.

Page 33

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Demand Planning – Generate Sales Forecast

Oracle Process/Procedures

Navigation Path Specific step

Logon to the application as mfg/welcome Responsibility = Demand Planning System Administrator

Demand Plan Administration

Click on the XXODPPLAN

In the Demand Plan Navigator click on Measures

Highlight the measure “Forecast of Shipment History – Shipped Date”

Click on Edit button. This will pop up the measure Wizard – Data Transformation window.

Select Forecast Tab In the Forecast Levels region, set the levels for the Dimensions as follows Geography Ship to Location Ship from Location Organization Product Item Time Gregorian Month

What time period do you want to base your forecast? (this should default from you Plan definition). Set it to From APR 1998 To JUN 1999

Page 34

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

What time period do you want to forecast? From Current Month To A Year Later

Click Finish This completes the Forecast measure definitions.

Populate Measures This is run to calculate measures in the shared database. The process calculates measures that have been downloaded from the Demand Planning Server.

Highlight the plane name at top of the Demand Plan Navigator

Select ‘Populate Measures’ radio button Click apply

The status of “Populate Measures” should eventually change from Blank to Running to a date and time stamp with the completion date.

The Demand Plan Navigator shoul look this.

Page 35

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 36

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Demand Planner Assignments Distribute data segments among Demand Planners.

Highlight Demand Planner Assignments in the Demand Plan Navigator

In the right Panel click on Settings button Change “All Geography” dropdown to “Customer” Change “All Organization” to “Organization” Change “All Product” dropdown to “Item” Click OK

In the right Panel click on “New” button Highlight “Untitled Assignment 1”, replace text with planner name “ODP Assignment for MFG1”. Use the dropdown to select a username that have the Demand Planner responsibility assigned to them. The LOV will show only those users who has Demand Planner assigned. In this case I will select “MFG1”.

Click on Edit in the right pane, to edit the scope of this Planner’s assignment.

Select Data Window will appear, Select Value for Geography. Select “Computer Service and Rental” and click on the “>” button Select Value for Ship from Location. Select “M1” and click on the “>” button Select Value for Product. Select “AS66311” and click on the “>” button Select Value for Measure. Select “Forecast of Shipment History – Shipped Items:Shipped Date” and click on the “>” button Click on OK button.

Page 37

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

In the right Panel click on “New” button Highlight “Untitled Assignment 2”, replace text with planner name “ODP Assignment for MFG2”. Use the dropdown to select a username that have the Demand Planner responsibility assigned to them. The LOV will show only those users who has Demand Planner assigned. In this case I will select “MFG2”.

Click on Edit in the right pane, to edit the scope of this Planner’s assignment.

Select Data Window will appear, Select Value for Geography. Select “AT&T Universal Card” and click on the “>” button Select Value for Ship from Location. Select “M1” and click on the “>” button Select Value for Product. Select “AS66311”, “CM66321”,”CM66326” and click on the “>” button Select Value for Measure. Select “Forecast of Shipment History – Shipped Items:Shipped Date” and click on the “>” button Click on OK button.

In the right Panel click on “New” button Highlight “Untitled Assignment 3”, replace text with planner name “ODP Assignment for MFGMGR”. Use the dropdown to select a username hat have the Demand Planner responsibility assigned to them. The LOV will show only those users who has Demand Planner assigned. In this case I will select “MFG”.

Page 38

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Click on Edit in the right pane, to edit the scope of this Planner’s assignment.

Select Data Window will appear, Select Value for Geography. Select “AT&T Universal Card” and “Computer Service and Rental” and click on the “>” button Select Value for Ship from Location. Select “M1” and click on the “>” button Select Value for Product. Select “AS66311”, “CM66321”,”CM66326” and click on the “>” button Select Value for Measure. Select “Forecast of Shipment History – Shipped Items:Shipped Date” and click on the “>” button Click on OK button.

Distribute to Planners The process distributes all measures that have been marked for distribution as well as any measures that have been defined by the Demand Plan Manager since the last time that the batch was run. The process also distributes data assignments

Highlight the plane name at top of the Demand Plan Navigator

Select ‘Distribute to Planners’ radio button Click apply The status of “Distribute to Planners” should eventually change from Blank to Running to a date and time stamp with the completion date.

Page 39

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10) The Demand Planner Assignment screnn should look like as follows

Page 40

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 41

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 42

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10) The baseline forecast has been distributed to the individual planners. MFG1 Planner will plan the forecast for the customer “Computer Service and Rentals” where as MFG2 Planner will plan the forecast for the customer “AT&T Universal Card”.

Page 43

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Demand Planning –Achieve Consensus Forecast

Oracle Process/Procedures

Navigation Path Specific step

Logon to the application as MFG/welcome Responsibility = Demand Plan Manager

Click on the XXODPPLAN Demand Planning worrksheet window appears.

Click on the “New” icon (First icon) on the Navigation toolbar), Select new WorkSheet

In the right pane, click on “Choose Values from List” icon on the document toolbar and select “Measure” Clear out default measures by moving them from the right side to the left side (using << icon). On left, highlight those measures you want to be available as worksheets.

- For the baseline forecasts we will work with will be titled “ Forecast of Shipment History-Shipped Items:Shipped Date”. Select that and click on the “>” button

- Product select “AS66311”, “CM66321”,”CM66326” and click on the “>” button - Time Select 2005 and all the Qtr;s and Months for 2005 and click on the “>” button - Geography Select “Computer Services and Rentals”

and “AT&T Universal Card” and click on the “>” button - Ship from Locoation Select “M1” and click on the “>” button

Worksheet should appear with the Baseline Forecast displayed in Quantity. And it should look like this.

Page 44

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 45

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 46

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Save Worksheet Click on “Save as” ” icon on the document toolbar

Save the Document as XXWSMGR

Logout and Log back in as MFG1/welcome Responsibility = Demand Planner Self-Service

Click on the XXODPPLAN Demand Planning worrksheet window appears.

Click on the “New” icon (First icon) on the Navigation toolbar), Select new WorkSheet

In the right pane, click on “Choose Values from List” icon on h the document toolbar and select “Time” Clear out default measures by moving them from the right side to the left side (using << icon). On left, highlight 2005 and all the Qtr;s and Months for 2005 and click on the “>” button

- Geography Select “Computer Services and Rentals” and click on the “>” button

Verify the results matches with previous step.

Save Worksheet Click on “Save as” ” icon on the document toolbar

Save the Document as XXWS001

Page 47

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 48

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Logout and Log back in as MFG2/welcome Responsibility = Demand Planner Self-Service

Click on the XXODPPLAN Demand Planning worrksheet window appears.

Click on the “New” icon (First icon) on the Navigation toolbar), Select new WorkSheet

In the right pane, click on “Choose Values from List” icon on h the document toolbar and select “Time” Clear out default measures by moving them from the right side to the left side (using << icon). On left, highlight 2005 and all the Qtr;s and Months for 2005 and click on the “>” button

- Geography Select “AT&T Universal Card” and click on the “>” button

Verify the results matches with previous step.

Save Worksheet Click on “Save as” ” icon on the document toolbar

Save the Document as XXWS002

Page 49

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 50

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Change forecast values. At this point the Demand Plan has been sent to the Demand Planner’s Personal databases for review/adjustment by the Demand Planners. Demand Planners can update the baseline forecast that has been created based on information the planner has.

Click in the cell Apr-2005 for Item AS66311 and enter the value 3000.and then click on “Modify Selected Data” then click on Fill and then click on the cancel button.

Save Worksheet Click on “Save as” ” icon on the document toolbar

Save the Document as XXWS002

Page 51

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 52

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Logout and Log back in as MFG1/welcome Responsibility = Demand Planner Self-Service

Click on the XXODPPLAN Demand Planning worrksheet window appears.

Double click on the worksheet XXWS001 Change the Forecast quantity for the following Dates from 1786.51 to 2000, Please review the quantity for the month = 50,022.32. 14-FEB-2005 15-FEB-2005 (FEB or the current month) 21-FEB-2005 22-FEB-2005 16-FEB-2005 17-FEB-2005 23-FEB-2005 24-FEB-2005 After the change the Forecast Quantity for the Month of Feb = 51,730.24 = (50,022.32 +(213.49 * 8))

Save Worksheet Click on “Save as” ” icon on the document toolbar

Save the Document as XXWS001

Page 53

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 54

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Logout and Log back in as MFG1/welcome Responsibility = Demand Planner Self-Service

Click on the XXODPPLAN Demand Planning worrksheet window appears. Double click on the worksheet. Click on the Tools icon in the Navigation toolbar then Collaborate Send Measures Select the “Forecasr of Shipment History – Shipped Item: Shipped Date” and click on the “>” Send Option select Send entire assignment scope of measure(s) radio button Click Ok Repeat this procedure of user MFG2.

Logout and Log back in as MFG/welcome Responsibility = Demand Plan Manager

Click on the XXODPPLAN Demand Planning worrksheet window appears. Double click on the worksheet. Click on the Tools icon in the Navigation toolbar then Collaborate Receive Measures Select the “Forecasr of Shipment History – Shipped Item: Shipped Date” and click on the “>” Click Ok

Page 55

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Verify that the following forcast quantities are visible in the cells 1) Geography = Computer and Service Rentals FEB-2005 = 51,730.23 2) ) Geography = AT&T Universal Card APR-2005 = 3000.00 The Manager knows that there is Promotional demand for AS66311 from AT&T Universal Card in the months of MAY and JUNE 2005 for 8000 and 10000 respectively. So he decides to update the forecast quantity. May 2005 = 8000 June 2005 = 10000 Save the worksheet Click on the Tools icon in the Navigation toolbar then Collaborate Send Measures Select the “Forecasr of Shipment History – Shipped Item: Shipped Date” and click on the “>”

Page 56

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 57

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 58

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Logout and Log back in as MFG2/welcome Responsibility = Demand Planner Self-Service

Click on the XXODPPLAN Demand Planning worrksheet window appears. Double click on the worksheet. Click on the Tools icon in the Navigation toolbar then Collaborate Receive Measures Select the “Forecasr of Shipment History – Shipped Item: Shipped Date” and click on the “>” Click Ok

Double click on the worksheet XXWS002 Click on Tools Submit Measures Repeat this procedure of user MFG1.

Page 59

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 60

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 61

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Oracle Process/Procedures

Navigation Path Specific step

Logout and Log back in as mfg/welcome Responsibility = Demand Planning System Administrator

Demand Plan Administration

Click on the XXODPPLAN

Highlight the plane name at top of the Demand Plan Navigator

Select ‘Collect Data from Planners’ radio button Click apply

Upload Measures to Planning server

Highlight the plane name at top of the Demand Plan Navigator

Select ‘Upload Measures to Planning Server’ radio button Click apply

Page 62

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Advanced Supply Chain Plan –Create and Launch Plan

Oracle Process/Procedures

Navigation Path Specific step

Logout and Log back in as mfg/welcome Responsibility = Advanced Supply Chain Planner

Supply Chain Plan Names

Name = XXASCPPLAN Description = XX Test ASCP Plan Plan Options 1) Main Tab Planned Items = Demand Schedule Items only 2) Organization Tab Organization = TST:M! Demand Schedule = SKTESTODP Ship To Consumption Level = Customer

Launch the Plan

Log in the Planners and the review the forecast for the updates periods.

Page 63

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 64

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 65

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 66

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 67

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Hierarchies used in the seeded Vision Demand Plans Thanks to David Dosland for the following flowchart showing to Hierarchies used in the seeded Vision Demand Plan. The document can be found at http://globalxchange.oraclecorp.com/pls/gxchange/docs/PAGE/ROOTCORNER/KNOWLEDGEAREAS1/KNOWLEDGEAREAS/EBUSINESS_SUITE/EBSUITE/510141708879281890835/EBS_ADS_DEMO_SCRIPTS/ADS DEMODOCS_11510/DD_COREPRODUCTS_10/DD_SCP_10/ODP-HIERARCHIES 11510R1.10.

Page 68

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 69

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 70

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 71

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 72

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 73

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 74

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 75

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 76

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 77

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 78

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 79

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 80

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 81

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 82

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 83

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 84

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 85

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 86

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 87

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Page 88

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10)

Glossary Aggregation - In Oracle Demand Planning, the consolidation of data for lower level dimension values into parent values. Data is often collected at the lowest available level of detail and is aggregated into higher level totals for analysis. For example, units sold in various cities might be aggregated into total units sold for all cities in a region. The aggregation rule might be “add,” in which case the values are added, or there might be an alternate aggregation rule such as “average.” Aggregation level In Oracle Demand Planning, the position in a dimension hierarchy at which data can be viewed or manipulated. For example, aggregation levels for a Geography dimension might include City, County, State, Region, and so forth. Consensus forecast - Forecast generation by consultation among or consolidation of individual forecasts issued by different groups within an organization. Dimension - In Oracle Demand Planning, a list of categories for data. A dimension acts as an index for identifying the values of a variable. Examples of dimensions are Product, Geography, and Time. Dimension value - In Oracle Demand Planning, an element in the list that makes up a dimension. For example, dimension values in the Geography dimension might include Boston, Chicago, and New York. Hierarch - In Oracle Demand Planning, a means of organizing and structuring data within a dimension. A hierarchy exists when values within a dimension are arranged in levels, with each level representing the aggregated total of the data from the below. For example, a Geography dimension might have a hierarchy that includes levels for Account, City, State, and Region. Level - In Oracle Demand Planning, a position in a dimension hierarchy. Each level above the base level represents the aggregated total of the data from the level below. For example a Geography dimension might have ascending levels such as Customer, City, State, and Region. Within a dimension hierarchy, a dimension value at one level has a family elationship with the dimension values at the levels above and below that level.

Measure In Oracle Demand Planning, a data variable that is a placeholder for storing or calculating data values for all levels of all dimensions.

r

Page 89

Oracle Advanced Supply Chain Planning R11i (Release 11.5.10) OLAP - Abbreviation for Online Analytical Processing.

atabase - In Oracle Demand Planning, the database to which a demand planner has modification rights. A

l forecast - Historical data are used to generate statistical forecasts in Oracle Demand Planning.The resultant

ion whose values represent time periods. For example, values in the time dimension could include the following:

Personal ddemand planner works in his or her personal database and submits final forecasts to the shared database. Scenario - In Oracle Demand Planning, forecasts can be generated from multiple sources such as sales, management, marketing, budget, constrained, and unconstrained.Forecasts from each source can also differ in scope, certainty, expectation (for example, optimist versus pessimistic), aggregation level, time horizon, attributes, and so forth. Each unique situation or function represents a scenario. Scenarios are set up and associated with a demand plan in the Demand Planning Server. Planners submit a forecast for each scenario in the demand plan. statisticaforecasts include an estimate of the forecast error. Time dimension - In Oracle Demand Planning, a dimens

• Years such as “2003” and “2004” • Quarters such as “Quarter 1 - 2003” and “Quarter 2 - 2003” • Months such as “February 2003” and “March 2003”