FORCE DRAFT HEAT EXCHANGER AIR COOLER INSTALLATION

46
1

Transcript of FORCE DRAFT HEAT EXCHANGER AIR COOLER INSTALLATION

Page 1: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

1

Page 2: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

2

Page 3: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

3

Page 4: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

4

Page 5: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

5

Page 6: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

6

Page 7: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

7

Page 8: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

8

Page 9: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

9

Page 10: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

10

Page 11: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

11

Page 12: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

12

Page 13: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

13

Page 14: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

Plenum Chamber assembly prior to structure Erection completion.

14

Page 15: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

15

Page 16: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

16

Page 17: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

17

Page 18: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

18

Page 19: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

19

Page 20: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

20

Page 21: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

21

Page 22: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

22

Page 23: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

23

Page 24: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

24

Page 25: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

25

Page 26: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

Tube bundle Erection

All structure bolts torque inspection to be done.

Structure top surface fire proofing inspection to be done .

Structure bottom base plate grouting, curing and anchor bolt torque inspection to be completed.

Tube bundle internal connecting beam bolt torque inspection to be completed.

26

Page 27: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

27

Page 28: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

Structure bottom base plate grouting, curing and anchor bolt torque inspection to be completed.

28

Page 29: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

Tube bundle internal connecting beam bolt torque inspection to be completed.

29

Page 30: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

30

Page 31: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

31

Page 32: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

32

Page 33: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

33

Page 34: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

34

Page 35: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

35

Page 36: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

36

Page 37: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

37

Page 38: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

38

Page 39: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

39

Page 40: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

40

Page 41: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

41

Page 42: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

42

Page 43: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

43

Page 44: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

44

Page 45: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

45

Page 46: FORCE DRAFT HEAT EXCHANGER AIR COOLER  INSTALLATION

46

Prepared by; M.Balasubramanian Assist Superintendent Mechanical, Tank farm P-6 SATORP.