News Production
Coverage Plan
Punjab Assembly Session
Monday January 28, 2013
Coverage Plan
Punjab Assembly Session
Monday January 28, 2013
Coverage Plan
Expected time of the session is 9am to 5:00 pm Duration of our coverage will be between 30 min. to 1.30 min
We are covering the part of the session, live and we have the
opportunity to edit and trim the footage of the session into as
small as 30 sec. to 3.30 hrs.
Coverage team
Team A
Reporter: Manzoor Shaikh with a cameramen and
assistant along with DSNG van and staff
Team B
Reporter: Ahmed Ali with a cameramen and
assistant
Reach the Assembly building 1 hr before session starting time.
They must position at the main lobby out side the hall near stair case / or in one of the corridor (kindly check the light direction) traditionally in the corner there is a desk for members to take documents/ agenda/or material. This is
the position where we can get most of the members in our frame.
Get SOT -----------The have to take initial comments from the members who are coming to attend the session writes down their name with constituency and party, use general audio to record their name etc)
Get precise answers form as many members as possible on the following
New province in Punjab bill discussed in the session or not?
Expected names for caretaker govt. in Punjab?
When election is expected are we seeing them again?
We need live feed before session started and clips from the in-house coverage of the proceedings
As the session began Team A leave the assembly to cover seminar in PC by planning commission.
DSNG team will join Team B
Team A
Positioned at outside of the building as several organizations are planning to demonstrate against the power failure, junior doctors protesting against their dismissal, WASA employees on their demand.
Get few SOTs, make sure do not lose any shot if there is any clash with police.
Team B remain till the session end sends recorded edited feed to office in short intervals
During session team B must be available for any event at the lobby outside the hall in case of any boycott from any member(s).
They will get first response and comments, which is very important for coverage.
Team B
Shots required for our coverage and edited
time of the shots
Requirement
Establishing shot of the Assembly Building.
Establishing shot of the assembly hall.
Members comments while entering the
assembly hall.
Speaker opens the session and address
Point of order and question raised
by members.
Oath taking of the newly elected members.
Speakers from the benches
Interesting shots as available
Closing remarks by speaker
PTC
1 min.
30 Sec.
6 min.
1 min. to as actual
1 min. to as actual
1 min.
1 man
As actual
1 min.
30 Sec.
Note
Get permission,
Take tapes and light and
Visit the site before session at least one time.
Test satellite feed and equipment before
leaving the office.
Signature 27 January 2013
Producer Assignment Editor