Failure Mode and Effective Analysis (FMEA) For
Purified Water Generation, Storage and Distribution System
Page 1 of 16
1.0 RISK ASSESSMENT
Based on the System Level Impact Assessment the Direct / Indirect Impact system is determined. And based on FMEA (Failure Mode Effective Analysis) various failure modes of the system components are determined and the extent of qualification or mitigation activities are derived and documented.
The risk rating is determined based upon component failure Severity (S), frequency of Occurrence (O) and likelihood of Detection (D).
The Severity (S) shall be rated, determined and documented (Low=1, Medium=2, High=3).
DESCRIPTION SEVERITY (S)No Impact on Product Quality, Overall System Performance and/or Functionality, Operator Safety, exception or gap with respect to regulations or standards (GxP, EU, GAMP, ASTM, etc.) 1
Minor Impact on Product Quality, Overall System Performance and/or Functionality and Operator Safety. 2
Major Impact on Product Quality, Overall System Performance and/or Functionality, Operator Safety and Exception or gap with respect to regulations or standards (GxP, EU, GAMP, ASTM, etc.) 3
The frequency of Occurrence (O) shall be rated, determined and documented (Low=1, Medium=2, High=3).DESCRIPTION OCCURRENCE (O)
Occurrence is extremely rare or unlikely 1Occurrence is occasionally 2Occurrence is almost every time the system is used 3
The likelihood of Detection (D) shall be rated, determined and documented (Low=3, Medium=2, High=1).
Page 2 of 16
DESCRIPTION DETECTION(D)100% detection or inspection technique is in place specifically for the failure like an alarm, interlock, and error message or system shutdown. 1
Detected by indirect means or by observation like indirect indication or visual inspection. 2No specific detection method 3
RPN (Risk Priority Number) = Severity of failure (S) X frequency of Occurrence (O). X Detection (D) The Risk level will then be based on the following table.
RATINGS RISKRPN 3 Low (L)9 ≥ RPN > 3 Medium (M)RPN > 12 High (H)
Identify the post mitigation risk level by rating S,O & D and calculate the RPN no for the same
Page 3 of 16
2.0 SYSTEM RISK ASSESSMENT MATRIX
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
A. Purified Water Generation System
1. Raw Water Tank
Increased microbial and particle contamination of the in-feed raw water
There may be leakage in the Tank
The system shall be inefficient to remove the increased microbial and particulate contamination.
Frequent changes of the RO membrane
No impact on product quality, as raw water is not used for process
Vent Filter is provided for venting to avoid any vacuum hazards and to prevent any atmospheric contamination and moisture from entering the tank
The raw water transfer piping is provided with the facility for adding sodium hypochlorite solution on line to raw water.
3 1 1 3 _ _ _ _ _ Commissioning IQ OQ
2. Raw Water
Sampling of the Raw water is not possible
Sampling point may not be considered in the design
The raw water quality shall decide the final purified water quality and the extent of the pretreatment.
No impact on product quality, as raw water is not used for process
Sampling points are provided in raw water feed line before Multi grade filter 3 1 1 3
Routine Sampling of the raw water shall be carried out as per SOP
3 1 1 3
Commissioning IQ OQ SOP for
Sampling
3. NaOCl dosing
NaOCl dosing pump fails.
Mechanical damage of pump
Increase in bioburden in raw water.
Load on downstream purification system.
No impact on product quality as UF and RO
Alarm is provided in case of malfunction of dosing pump.
The pre-treatment system stops in case dosing pump malfunction.
3 2 1 6 Preventive maintenance of pump shall be carried out frequently as per PM SOP.
A standby pump shall be kept as spare.
3 1 1 3 Commissioning OQ SOP for PM
Page 4 of 16
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
membranes are installed at downstream.
Drinking water may go out of microbial specification.
4. Multi Grade Filter
Multi Grade Filter not working properly; filtration of raw water may not take place.
Multiport valve may not function properly.
Initial Filtration of raw water may not take place. Downstream system may not get water for processing.
No impact on product quality, as raw water is not used for process.
Alarm is provided in case of malfunctioning of multiport valve.
Pop up is shown on the HMI, to indicate status of the Multiport valve and MGF mode i.e. service or backwash.
2 2 1 4
Multiport valve operation shall be verified during commissioning.
Routine preventive maintenance of the valve shall be carried out as per SOP.
2 1 1 2
Commissioning OQ Preventive
maintenance SOP for MGF.
5. Multi Grade Filter
Multi Grade Filter not working properly; filtration of raw water may not take place.
Choking of Multi grade Filter
Initial Filtration of raw water may not take place.
Downstream system may not get water for processing.
No impact on product quality, as raw water is not used for process.
Pressure gauges are provided to monitor pressure across MGF and indicate choking.
Backwash provision is provided for cleaning of MGF and prevents choking.
2 3 1 6
Routine monitoring of pressure shall be carried out to check choking of MGF.
Backwash shall be carried out at frequent intervals as per SOP.
Frequency shall be derived based on vendor recommendation and on consumption of water.
Routine calibration of Pressure gauges shall be performed as per calibration plan.
2 1 1 2
Commissioning IQ SOP for MGF
operation & Cleaning
Calibration Master plan SOP
Page 5 of 16
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
6. Softener Unit
Softener Unit not working properly, removal of ions from the water may not takes place
Automatic multiport valve may not function properly.
Initial removal of ions from raw water may not take place it may lead to hardness & scale formation
Downstream system may not get water for further water treatment
No impact on product quality, as water is not used for process.
Alarm is provided in case of malfunctioning of Automatic multiport valve.
Pop up is shown on the HMI, to indicate status of the Multiport valve and softener unit
2 2 1 4
Automatic Multiport valve operation shall be verified during commissioning.
Routine preventive maintenance of the valve shall be carried out as per SOP.
2 1 1 2
Commissioning OQ Preventive
maintenance SOP for Softener.
7. Softener Unit
Softener Unit not working properly, removal of ions from the water may not takes place
Regeneration of the softener not possible
Softener having low OBR
Downstream may not get water for further water treatment
No impact on product quality, as water is not used for process
Brine Tank is provided with level switch to monitor the level of the brine solution
Force regeneration can be activated through HMI & Manual mode as well
2 3 1 6
Routine monitoring of Brine tank shall be carried out as per defined procedures.
Regeneration frequency of the Softener shall be as per SOP.
Frequency shall be derived based on vendor
2 1 1 2
Commissioning OQ Preventive
maintenance SOP for Softener.
8.Ultra filtration system
Colloidal particulate & high molecular weight material may not be filtered from water
Ultra filtration service cycle valve not working properly
Increase the colloidal particulate & high molecular weight material in the water
No impact on product quality, as water is not used for process.
Alarm is provided in case of malfunctioning of Ultra filtration service cycle
Pop up is shown on the HMI, to indicate status of the Ultra filtration service cycle valve
2 2 1 4
UF Service cycle valve operation shall be verified during commissioning.
Routine preventive maintenance of the valve shall be carried out as per SOP.
2 1 1 2
Commissioning OQ Preventive
maintenance SOP for UF.
9. Ultra filtration system
Choking of the Ultra
filtration of
UF Backwash & Fast Flush
may not takes
Ultra filtration may be hampered
Lack of water to
Centrifugal pump with desired flow rate is placed for
2 2 1 4 Operation of the Backwash centrifugal pump
2 1 1 2 Commissioning OQ Preventive
Page 6 of 16
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
the system place
Downstream No impact on
product quality, as water is not used for process.
backwashing & Fast Flushing of UF Module
Pressure gauge is provided at the discharge pump to monitor the pressure
Popup indication in HMI to indicate the Backwash & Fast Flush cycle
shall be verified during commissioning
UF backwash & Fast Flush process shall be verified during commissioning
Routine Preventive maintenance of the Pump shall be as per the SOP
maintenance SOP for UF.
10. UF permeate
Level of the UF
permeate is not
controlled
Level switch of the UF tank is not working
properly
Low level of the UF permeate tank will lead to damage of the connected suction pump
Lack of water to downstream
No impact on product quality, as water is not used for process.
Alarm will appear for high level of the UF permeate tank
Water will re-circulate in case of the high level of the UF permeate tank
Connected suction pumps will stop in case of low level of UF permeate tank
2 2 1 4
Operation of the level switches shall be verified during commissioning
Routine Preventive maintenance of the Pump shall be as per the SOP
2 1 1 2
Commissioning IQ & OQ Preventive
maintenance SOP.
11. Activated Carbon Filter
High chlorine
level & Bad Water Odor
Activated carbon filter not working
properly
The chlorine content in water shall lead to oxidation of the RO membrane
Odor of water may be not good
May not affect the final quality of the water as SMBS dosing is present
Activated Carbon Filter is provided to adsorb the free chlorine present in the influent water & to improve water bad odor
Pressure will be monitored across the vessel by pressure gauge
2 1 1 2 _ _ _ _ _ Commissioning IQ & OQ
12. Ultra Violate Sterilizer
Increase microbial
Ultra violate sterilizer not
Living microorganism
UV sterilizer is provided with 3 1 1 3 _ _ _ _ _ Commissioning
IQ & OQ
Page 7 of 16
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
odor working properly
grows and in a favorable condition for their exponential growth
May increase the microbial level of the final water
intensity & hour meter to check the intensity and working hour of the UV lamp of UV sterilizer
Routine Monitoring of the UV Sterilizer shall be checked regularly
SOP of Operation & PM of the UV Sterilizer
13.Antiscalent Dosing System
Low chemical level in antiscalant dosing tank
Antiscalent Dosing System
not working properly
Low level of chemical will not release antiscalant as per the requirement which leads Precipitation of silica on RO membrane can damage the membrane and reduce efficiency.
No impact on product quality, as water is not used for process.
The Chemical dosing system comprises with level switch which will trip the dosing pump
Alarm provision is provided in case of low chemical
3 2 1 6
Operation of the Chemical dosing system shall be verified during commissioning
Routine checkup of chemical dosing shall be performed regularly
2 1 1 2
Commissioning IQ & OQ Preventive
maintenance SOP.
14.NaOH Dosing System
PH of the PW water not controlled as per the requirement
NaOH Dosing System not
working properly
CO2 Level of the Water may be increase which may affect the final pH of the water
The NaOH dosing system comprises with pH Transmitter which will monitor the pH of the water
Alarm provision is provided to alert the operator
3 2 1 6
Operation of the NaOH dosing system shall be verified during commissioning
Routine checkup of NaOH dosing shall be performed regularly
Calibration of the pH transmitter as per the SOP
2 1 1 2
Commissioning IQ OQ Calibration
Master plan SOP
15. SMBS Dosing System
Low chemical level in SMBS
SMBS Dosing System not
working properly
Low level of chemical will not neutralize chlorine as per the
The Chemical dosing system comprises with level switch which
3 2 1 6 Operation of the Chemical dosing system shall be verified during
2 1 1 2 Commissioning IQ & OQ Preventive
maintenance
Page 8 of 16
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
dosing tank
requirement The chlorine
content in water shall lead to oxidation of the RO/EDI
No impact on product quality, as water is not used for process.
will trip the dosing pump
Alarm provision is provided in case of low chemical
commissioning Routine checkup
of chemical dosing shall be performed regularly
SOP.
16. ORP Sensor
Chorine Level after SMBS dosing may not be detected
ORP sensor is not working
properly
The chlorine content in water shall lead to oxidation of the RO membrane and hence shall affect the final water quality
No impact on product quality, as water is not used for process.
Alarm is provisioned for high ORP.
Auto dump valve is provided in case of free chlorine level high 3 2 1 6
Operation of the ORP Sensor Shall be Verified during commissioning
Calibration of the ORP Sensor as per the SOP
2 1 1 2
Commissioning IQ OQ Calibration
Master plan SOP
17. Heat Exchangers
Optimum temperature of water may not be maintained
Heat Exchangers is not working
Water temperature will not be adequate, which may lead to RO membrane damage
No impact on product quality, as water is not used for process
Heat exchangers are provided with Hot and cold arrangement before RO inlet
Temperature transmitters provided to measure the inlet temperature of the water before entering to RO membrane
3 1 1 3 _ _ _ _ _
Commissioning IQ OQ Preventive
maintenance SOP.
18. Multipurpose Storage tank
Storage of water may not be possible before RO
Storage tank before RO is not working
properly
Supply to RO membrane will hamper
No impact on product quality, as water is not used for process.
Multipurpose storage tank is provided with capacitance level transmitter which will perform the necessary action to
3 1 1 3 _ _ _ _ _ Commissioning IQ OQ Preventive
maintenance SOP.
Page 9 of 16
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
open and close the inlet valve to avoid the dry run of the RO feed pump
All set points of water level of the storage tank shall be controlled by the HMI
Recirculation to UF permeate tank in case of the high level of in feed water is provided
Spray ball & vent filter is provided to ensure clean ability of the tank
19.High Pressure Pump
Water Pressure may not sufficient to feed RO
High Pressure Pump is not functioning
properly
Filtration of the high molecular weight inorganic as well organic molecules may not be possible which will lead to affect the final water quality
High pressure pump with VFD is provided
Pressure Transmitter is provided to monitor the Pressure of water at RO inlet
If the Pump discharge goes above the set point then pump will trip
3 1 1 3 _ _ _ _ _
Commissioning IQ OQ Preventive
maintenance SOP.
20. Heat Sanitary RO system
High conductivity after RO permeate
Heat Sanitary RO system not
functioning properly
Purified water out of specification. Shall affect product quality/ product release
Conductivity transmitter is provided at the downstream of RO to check conductivity along with alarm provision.
High conductivity water after RO shall be dump by
3 1 1 3 Routine calibration of conductivity sensor shall be performed as per calibration plan.
2 1 1 2 Commissioning OQ Calibration
Master Plan SOP
Page 10 of 16
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
dumping valve
21.Heat Sanitary RO system
Choking of RO membrane
May be due to high use of RO membrane
RO membrane will damage & shall affect the product quality
Pressure at the concentration side and permeate side will be monitored and controlled by pressure transmitter
An alarm of high pressure will initiate
High pressure pump will trip in case of the high pressure
3 1 1 3
Routine calibration of pressure transmitter shall be performed as per calibration plan.
2 1 1 2
Commissioning OQ Calibration
Master Plan SOP
22.4
EDI permeate
High conductivity after EDI
EDI is not working properly
Purified water out of specification. Shall affect product quality/ product release,
Conductivity sensor is provided at the downstream of EDI to check conductivity along with alarm provision.
High conductivity water after EDI shall be diverted back to multipurpose storage tank through a flow divertor valve.
3 1 1 3
Routine calibration of conductivity sensor shall be performed as per calibration plan.
2 1 1 2
Commissioning OQ Calibration
Master Plan SOP
23. RO + EDI Sanitization
Bio-burden in RO & EDI
RO + EDI Sanitization not possible
Purified water out of specification. Shall affect product quality/ product release,
RO + EDI will be heat sanitized
Hot water sanitization will be carried out to gather using multipurpose tank & heat exchanger
Hot water sanitization will be carried out to with the help of HMI
During Sanitization all conductivity interlocks will be
3 2 1 6 RO+EDI Sanitization performance will be verified at the time of commissioning
Routine calibration of temperature sensor shall be performed as per calibration plan.
2 1 1 2 Commissioning OQ Calibration
Master Plan SOP
Page 11 of 16
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
bypassed & EDI will be switched off.
An Alarm message in the HMI will appear
B. Purified Water Storage & Distribution System
24. Storing of water
Difficulty in catering to simultaneous demand of multiple user points.
No storage of purified water before use.
The purified water generated cannot be stored.
The purified water may not distributed to the user points through distribution loop shall lead affect product release
The purified water generated is stored in a storage tank.
Storage capacity of the storage tank is sufficient.
The purified water from the storage tank shall be distributed to the user points through distribution loop and returned back to PW storage tank.
3 1 1 3 _ _ _ _ _ Commissioning IQ
25. PW Storage Tank
Contamination of PW possible.
Leakage in PW storage tank/ pipelines
Purified water out of specification. Shall affect product quality/ product release,
PW storage tank is provided with vent filter to avoid atmospheric contamination
Hydrotest is conducted for the tank at the vendor’s site. Vendor will provide the certificate for the same.
For distribution pipelines, Hydrotest/ Pressure leak test is conducted by the vendor on site after installation.
3 2 2 12
SOP for routine preventive maintenance.
Pressure of the storage tank and distribution line should be monitored regularly.
Hydrotest to be conducted at regular intervals as per SOP.
2 1 1 2 Commissioning OQ SOP of PM
26. PW Storage Tank
Cleaning of the tank not possible Contamination of PW possible.
Spray ball may not functioned properly
Purified water out of specification. Shall affect product quality/ product release,
The Tank is designed with torispherical top and bottom dish to maintain full drain ability of the water
3 2 2 12 Spray ball coverage study shall be carried out in commissioning and qualification
2 1 1 2 Commissioning OQ SOP of PM
Page 12 of 16
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
tank Spray ball is
provided inside the tank which will ensure the interior surface of the storage tank are flushed continuously to avoid the formation of the bio film
SOP for routine preventive maintenance.
27. PW Storage Tank
Distribution pumps will run dry which may damage the pump and cause loop contamination due to growth of microbes
Low water level in the storage tank due to low generation or high usage.
The purified water may not distributed to the user points through distribution loop shall lead affect product release
The PW storage tank is provided with level transmitter (with 4 levels) for monitoring of low-low, low, high and high-high water level.
Discharge pump turns off in case of low-low level in tank.
Alarm provisioned in case of low level and low-low level.
The PW inlet valve will automatically open in case water level inside tank goes below high level.
Sight glass has been provisioned in the tank.
3 2 2 12
SOP for Preventive maintenance of PW storage and Distribution system.
Routine calibration of Level transmitter as per SOP.
2 1 1 2 Commissioning OQ SOP of PM
28.PW Distribution line
Presence of particles inside pipelines may contaminate PW. .
Pipelines may not passivated after welding.
Purified water may be contaminated Shall affect product quality/ product release,
Pipeline shall be passivated after welding and before being used.
Passivation test reports to be provided
3 1 1 3 _ _ _ _ _ Commissioning IQ
29. PW Distribution line
Increase in Bio burden in Purified water in distribution loop and pumps.
Water may be stagnant in the distribution loop or is held up in the discharge pump.
Purified water out of specification. Shall affect product quality/ product release,
The water distribution is in a closed loop system, wherein the water will be in continuous flow.
All pipelines shall
3 1 1 3 _ _ _ _ _ Commissioning IQ
Page 13 of 16
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
have drainable slope of > 1:100.
Discharge pump shall be self-draining type.
The dead leg in the loop shall not be more than 1.5d. (d- diameter of the extended part)
30.PW Distribution line
High conductivity of purified water in distribution line.
PW may not used for long duration
High conductivity water in distribution line may contaminate the fresh incoming purified water to storage tank.
Conductivity sensors are provided in the supply and return line along with alarm provision in case of high and high – high conductivity.
Auto-dumping facility is provided in supply line in case of high-high conductivity.
System trips in case of continuous high-high conductivity.
3 1 1 3
Routine calibration of flow meter and conductivity sensor as per SOP.
2 1 1 2
Commissioning OQ Calibration
Master Plan SOP
31.PW Distribution line
High TOC of purified water in distribution loop.
PW may not used for long duration
Purified water out of specification. Shall affect product quality/ product release,
Online TOC analyzer is installed at return line to storage tank along with alarm provision and auto-dumping facility in case of high TOC.
3 1 1 3Routine calibration of TOC analyzer as per SOP.
2 1 1 2
Commissioning OQ Calibration
Master Plan SOP
32. PW Distribution line
Possibility of microbial growth over continuous usage of water.
Frequent sanitization of PW storage and distribution system not possible
Purified water may be contaminated Shall affect product quality/ product release
A suitable sanitization process is provided in the PLC for effective sanitization of the PW storage tank and distribution system.
Tank is jacketed and is provided with plant steam supply for heating of water during sanitization.
Temperature sensor is provided in the PW storage tank and on return line to monitor
3 2 2 12 Sanitization frequency shall be established during qualification and performed routinely.
Routine calibration of temperature sensors as per SOP.
2 1 1 2 Commissioning OQ Calibration
Master Plan SOP
Page 14 of 16
Sr. No
Risk IdentificationCurrent controls (Interlock/Alarm arrangement)
Risk Assessment Proposed
Additional Risk control measure (Mandatory for Risk elements having RPN>3)
Revised Risk Classification
Verification point
Component Failure/Critic
al Process Step Failure
Potential Failure Mode
(Defect)
Potential Risk Cause
Potential Risk/Effect/Impact
on Product Quality/ Product
Release
S O D RPN S O D RPN
temperature during sanitization.
Alarm is provisioned in case of High/ low temperature during sanitization.
33. MOC
Internal surface may react with PW during normal or sanitization mode and lead to purified water contamination
Internal surface/ contact parts is not compatible with the purified water
Purified water may be contaminated Shall affect product quality/ product release
All Metallic critical contact parts (PW storage tank, distribution pipelines, valves, sampling and user valves) as well as contact parts of instruments, level transmitters, valves etc., are made of SS 316L stainless steel.
Distribution system pipelines are electro polished & orbitally welded.
Vendor to provide MOC certificates for the same.
3 1 1 3 _ _ _ _ _ Commissioning IQ
34. Joints
Leaking joints may lead to contamination of PW.
Joints are not air tight. Suitable gaskets are not provided or are not replaceable.
Purified water may be contaminated Shall affect product quality/ product release
Suitable gaskets are provided for air tight triclover connection and are easily replaceable.
Quick release Triclover joints are recommended.
3 2 1 6
Regular maintenance and replacement of gaskets and O-rings as per SOP
2 1 1 2 Commissioning IQ SOP of PM
35. Calibration
Calibration of measuring instrument is not possible
Operation failure may affect the quality of the PW.
Purified water may be contaminated Shall affect product quality/ product release
Calibration of the instrument is done at vendor site
Calibrated instruments are installed
3 2 1 6
Routine calibration of the entire measuring instrument shall be performed as per SOP.
2 1 1 2
Commissioning OQ Calibration
Master Plan SOP
Page 15 of 16
3.0 APPROVALS
Function Name Designation Signature/ DatePrepared by:IPSM – Validation and C&QChecked by: IPSM – Validation and C&QApproved by:J&J – Facility EngineerApproved by:J&J – Quality AssuranceApproved by:J&J – Manufacturing Approved by:J&J – Microbiology Lab RepresentativeApproved by:J&J – EH & S Representative
The words ‘IPS’ or ‘IPSM’ in this document will indicate Integrated Project Services – Mehtalia, Mumbai and J&J will indicate Ethicon (a Johnson & Johnson company).