DESOTO COUNTY
ADOPTED FIVE YEAR WORK PROGRAMFISCALFISCAL YEARS YEARS 2017-20212017-2021
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
COUNTYDESOTO
MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.
July 1, 2016 Through June 30, 2021
ADOPTED WORK PROGRAM REPORT
Robin StublenCommunications SpecialistDistrict One Headquarters801 North BroadwayP.O. Box 1249Bartow, FL 33831(863) 519-2362
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 28/18/2016Run Date: SnapShot Date: 7/20/2016
Zachary BurchGovernment Affairs &Communications ManagerSouthwest Area Office10041 Daniels ParkwayFort Myers, Fl. 33913(239) 225‐1950
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
COUNTYDESOTO
July 1, 2016 Through June 30, 2021
CURRENTLY REPORTED ACTIVE FUND CODES
ADOPTED WORK PROGRAM REPORT
ACSL Advance Construction (SL)
ACSN Advance Construction (SN)
BNIR Intrastate R/W and Bridge Bonds
CIGP County Incentive Grant Program
DDR District Dedicated Revenue
DIH State In-house Product Support
DS State Primary Highways and PTO
DU State Primary/Federal Reimbursement
GRSC General Revenue for SCOP
LF Local Funds
SA STP, Any Area
SCOP Small County Outreach Program
SCRA Small County Resurfacing
SN STP, Mandatory, Non-Urban
ACNP Advanced Construction NHPP
NHPP National Highway Preformance Program
SCED
TALL Transportation Alternatives ( Population < 200K)
TALT Transportation Alternatives Any Area
SCWR
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 38/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYDESOTO
HIGHWAYS
FPN: 4136281 Project/Location: ARCADIA TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.855
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 14.168 End Mile Post: 15.023
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $43,933 $46,727 $48,129 $49,573 $51,060
$43,933 $46,727 $48,129 $49,573 $51,060Project Total:
FPN: 4361921 Project/Location: BRIDGE REPLACEMENT ON SR 70 OVER DCI
CANAL IN DESOTO COUNTY
Project Length: 0.005
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 24.691 End Mile Post: 24.696
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DIH $8,167
$8,167Project Total:
FPN: 4318841 Project/Location: CR 661 FROM SR 70 TO HARDEE COUNTY
LINE
Project Length: 7.576
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 7.576
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST GRSC $4,048,269
$4,048,269Project Total:
FPN: 4381031 Project/Location: CR 760A SIDEWALK FROM SW WELLES AVENUE
TO CARLTON AVENUE
Project Length: 0.370
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.450 End Mile Post: 0.820
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SN $91,000
$91,000Project Total:
FPN: 4385651 Project/Location: CR 761 BRIDGE SCOUR
COUNTERMEASURES
Project Length: 0.061
Desc: BRIDGE-REPAIR/REHABILITATION
Comments:
Begin Mile Post: 2.171 End Mile Post: 2.232
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SCED $1,192,201
$1,192,201Project Total:
FPN: 4318921 Project/Location: CR 763 FROM SR 31 TO SR 31
Project Length: 9.800
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 9.800
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST GRSC $122,525
CST SCOP $601,389
CST SCRA $4,687,500
$5,411,414Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 48/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYDESOTO
FPN: 4312971 Project/Location: CR 769 (KINGS HWY) FROM CHARLOTTE CNTY
LINE TO PEACE RIVER STR
Project Length: 2.237
Desc: PD&E/EMO STUDY
Comments:
Begin Mile Post: 0.000 End Mile Post: 2.237
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE ACSL $92,488
$92,488Project Total:
FPN: 4126671 Project/Location: DESOTO COUNTY TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 0.162
Desc: TRAFFIC SIGNALS
Comments:
Begin Mile Post: 14.664 End Mile Post: 14.826
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $7,514 $8,126 $8,370 $8,621 $8,880
$7,514 $8,126 $8,370 $8,621 $8,880Project Total:
FPN: 4382591 Project/Location: EAST MAPLE STREET SIDEWALK FROM NORTH
MILLS AVE TO NORTH LA SOLONA AVE
Project Length: 0.001
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALL $81,000
$81,000Project Total:
FPN: 4366451 Project/Location: HILLSBOROUGH AVENUE FROM FLETCHER
STREET TO ADEL STREET
Project Length: 0.961
Desc: RESURFACING
Comments:
Begin Mile Post: 0.965 End Mile Post: 1.926
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SCRA $1,592,234
$1,592,234Project Total:
FPN: 4366491 Project/Location: NW WINDY PINE AVENUE FROM SR 72 TO END OF
ROAD
Project Length: 1.046
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 1.046
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SCRA $627,724
$627,724Project Total:
FPN: 4385741 Project/Location: REYNOLDS ST BRIDGE OVER HAWTHORNE
CREEK
Project Length: 0.001
Desc: BRIDGE REPLACEMENT
Comments:
Begin Mile Post: 0.001 End Mile Post: 0.002
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST GRSC $413,597
CST SCED $429,421
CST SCOP $477,128
$1,320,146Project Total:
FPN: 4370991 Project/Location: ROBERTS AVENUE EAST GIBSON STREET
NURSING HOME DRIVE
Project Length: 0.310
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.310
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SN $175,000
$175,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 58/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYDESOTO
FPN: 4366471 Project/Location: SE DURRANCE STREET FROM AIRPORT ROAD TO
SR 31
Project Length: 1.086
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 1.086
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SCRA $839,179
$839,179Project Total:
FPN: 4312981 Project/Location: SR 31 EXTENSION FROM SR 70 TO US
17
Project Length: 0.001
Desc: NEW ROAD CONSTRUCTION
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE CIGP $3,000,000
PE SA $569,701
PE SN $3,880,299
$3,000,000 $4,450,000Project Total:
FPN: 4369201 Project/Location: SR 35 (US 17) FROM LIVINGSTON STREET TO
HARDEE COUNTY LINE
Project Length: 6.684
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 6.684
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $557
ENV DDR $100,000
CST DDR $6,481,680
CST DIH $512,500
CST DS $1,054,475
$8,149,212Project Total:
FPN: 4365801 Project/Location: SR 70 FROM ORANGE AVE TO TURNER
AVE
Project Length: 2.393
Desc: RESURFACING
Comments:
Begin Mile Post: 13.229 End Mile Post: 14.664
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $69,204
RRU DDR $300,000
CST DDR $3,790,668
CST DIH $205,400
CST DS $438,049
$69,204 $4,734,117Project Total:
FPN: 4358071 Project/Location: SR72 FROM ROGER AVE TO E OF SW GATOR
TRAIL
Project Length: 0.139
Desc: DRAINAGE IMPROVEMENTS
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.105
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $11,099
CST SN $752,980
$11,099 $752,980Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 68/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYDESOTO
FPN: 4350601 Project/Location: SW FLETCHER ST FROM US 17 TO
HILLSBOROUGH AVE
Project Length: 0.968
Desc: WIDEN/RESURFACE EXIST LANES
Comments:
Begin Mile Post: 0.000 End Mile Post: 0.968
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST GRSC $460,981
CST SCWR $225,046
$686,027Project Total:
FPN: 4385761 Project/Location: SW HULL AVE FROM SW SENATE ST TO US
17
Project Length: 5.500
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 5.500
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SCED $1,253,240
CST SCOP $1,517,838
$2,771,078Project Total:
FPN: 4385751 Project/Location: SW SENATE ST FROM US 17 TO SW GRAPE
AVE
Project Length: 3.470
Desc: RESURFACING
Comments:
Begin Mile Post: 0.000 End Mile Post: 3.470
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SCWR $1,852,048
$1,852,048Project Total:
FPN: 4366481 Project/Location: SW SHORES AVENUE FROM SW BEARD STREET
TO SW CR 760A
Project Length: 1.250
Desc: WIDEN/RESURFACE EXIST LANES
Comments:
Begin Mile Post: 0.000 End Mile Post: 1.250
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SCED $562,349
CST SCOP $81,423
CST SCWR $1,022,945
$1,666,717Project Total:
FPN: 4381051 Project/Location: SW WELLES AVENUE SIDEWALKS FROM CR 760A
TO US HIGHWAY 17/SR 35
Project Length: 0.820
Desc: SIDEWALK
Comments:
Begin Mile Post: 0.450 End Mile Post: 1.270
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE TALL $101,000
$101,000Project Total:
FPN: 4350141 Project/Location: TURNER AVE AT ROAN ST/GIBSON ST
IMPROVEMENTS
Project Length: 0.180
Desc: INTERSECTION IMPROVEMENT
Comments:
Begin Mile Post: 0.929 End Mile Post: 1.109
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SN $151,000
CST SN $906,780
$151,000 $906,780Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 78/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYDESOTO
FPN: 1938982 Project/Location: US 17 FROM CR 760A (NOCATEE) TO HEARD
STREET
Project Length: 4.400
Desc: ADD LANES & REHABILITATE PVMNT
Comments:
Begin Mile Post: 9.513 End Mile Post: 13.913
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
RRU LF $401,461
ROW ACSL $67,460
ROW ACSN $78,131
ROW BNIR $24,999
ROW DIH $5,380
ROW SN $33,120
CST NHPP $22,058
INC ACNP $600,000
$1,232,609Project Total:
HIGHWAYS TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$24,426,653 $6,320,674 $3,475,626 $9,047,655 $3,023,018
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 88/18/2016Run Date: SnapShot Date: 7/20/2016
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1ADOPTED WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYDESOTO
FLP: TRANSIT
FPN: 4101211 Project/Location: DESOTO COUNTY FTA SECTION 5311 OPERATING
ASSISTANCE
Project Length: 0.000
Desc: OPERATING/ADMIN. ASSISTANCE
Comments: SECTION 5311 RURAL AND SMALL AREAS PARATRANSIT OPERATING
Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DU $170,432 $170,432 $170,432 $134,317 $188,817
OPS LF $170,432 $170,432 $170,432 $134,317 $188,817
$340,864 $340,864 $340,864 $268,634 $377,634Project Total:
FLP: TRANSIT TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$340,864 $340,864 $340,864 $268,634 $377,634
COUNTY TOTALSDESOTO
Phase Fund Total2016/17 2017/18 2018/19 2019/20 2020/21
$24,767,517 $6,661,538 $3,816,490 $9,316,289 $3,400,652COUNTY Total: $47,962,486
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC –
Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities PHASE CODES
Page: 98/18/2016Run Date: SnapShot Date: 7/20/2016