FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon...
Transcript of FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon...
![Page 1: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/1.jpg)
TRANSPORTATIONFlorida Department ofFlorida Department of
TRANSPORTATION
FIVE YEAR WORK PROGRAMOVERVIEW
Stacy L. Miller, PEAssistant Secretary for Finance and Administration
May 29, 2019
![Page 2: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/2.jpg)
Florida Department of Transportation
OUTLINE
• Tentative Work Program FYs 19/20 thru 23/24
• Calibrate the Program
• Sources and Activities
• Major Categories and Phases
• Outlook for Consultant Engineering
• Consultant Engineering Trends and Statistics
• Summary of Major Projects
• Production Pipeline
• Construction Contract Letting Information
• Design/Build Projects
• Advanced Production Potential
• Manage What You Measure
![Page 3: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/3.jpg)
Florida Department of Transportation
CALIBRATE THE PROGRAM
• Revenue Estimating Conference
• Safety
• Maintenance and Operation of the System
• Construction and Right of Way Estimates
• Transportation Technology Operations and Innovations
![Page 4: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/4.jpg)
Florida Department of Transportation
State24,629.6
50%
Local and Other Funds1,262.6
2%
Turnpike and Tolls9,446.2
19%
Federal-Aid11,850.0
24%
Right of Way and State Infrastructure Bank
Bonds2,366.4
5%
Other Financing16.20%
Total - $49,571 M
FUNDING BY SOURCE FYs 19/20 THRU 23/24
![Page 5: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/5.jpg)
Florida Department of Transportation
FUNDING BY PROGRAM FYs 19/20 THRU 23/24
5Total - $49,571 M
![Page 6: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/6.jpg)
Florida Department of Transportation
FUNDING BY CATEGORY FYs 19/20 THRU 23/24
6Total - $49,571 M
![Page 7: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/7.jpg)
Florida Department of Transportation
CONSTRUCTION PLAN FYs 19/20 THRU 23/24
7
TOTAL -$22,526 M
![Page 8: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/8.jpg)
Florida Department of Transportation
PRELIMINARY ENGINEERING FYs 19/20 THRU 23/24
8
TOTAL $3,973 M
![Page 9: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/9.jpg)
Florida Department of Transportation
RIGHT OF WAY SUPPORT FYs 19/20 THRU 23/24
9
TOTAL $503 M
![Page 10: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/10.jpg)
Florida Department of Transportation
CONSTRUCTION ENGINEERING & INSPECTION
FYs 19/20 THRU 23/24
10
TOTAL $2,535 M
![Page 11: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/11.jpg)
Florida Department of Transportation
TOTAL BUDGET REQUEST $10,806MLEGISLTATIVE BUDGET REQUEST April 3, 2019- Totals May Not Add Due To Rounding - Excludes Emergency Related Programming
BUDGET REQUEST FY 19/20
11
![Page 12: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/12.jpg)
Florida Department of Transportation
CONSULTANT ENGINEERING STATEWIDE TREND
122014-2018 are Actual Acquisitions.
2019 is Adopted. 2019 is from the 4/3/19 Snapshot.Boxes are not included.
2014 2015 2016 2017 2018 2019 2020
PE/RW $375 $529 $665 $660 $588 $670 $807
CEI $271 $294 $348 $184 $356 $372 $380
TOTAL $646 $823 $1,013 $844 $944 $1,042 $1,186
$-
$200
$400
$600
$800
$1,000
$1,200
$1,400
$ M
ILLI
ON
S
![Page 13: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/13.jpg)
Florida Department of Transportation
CONSULTANT ENGINEERING BY DISTRICT FY 19/20
13
DIST
PRELIMINARY ENGINEERING (PE)ROW (42) CEI (62) *TOTAL
PLANNING (12) PD&E (22) DESIGN (32)
$ M # $ M # $ M # $ M # $ M # $ M #
D1 $5 12 $15.5 10 $54.5 78 $3.8 3 $47.4 43 $126.2 146
D2 $3.9 8 $4.4 7 $60.3 59 $7 2 $52.7 72 $128.2 148
D3 $0 0 $1.5 2 $64.3 58 $0 $0 $43.7 53 $109.4 113
D4 $7.8 23 $9.2 20 $85 136 $12.2 9 $32.7 95 $146.8 283
D5 $2 1 $19.9 8 $54.9 66 $4 1 $35.1 62 $115.9 138
D6 $6.1 17 $8.2 14 $55.4 86 $0 1 $56 56 $94 174
D7 $6.5 13 $3.5 3 $70.9 64 $3.3 3 $88.8 70 $172.9 153
TE $0 0 $14.9 10 $222.1 68 $1.2 6 $55 31 $293.1 115
SW $31.3 74 $77 74 $667.4 615 $31.4 25 $379.6 482 $1,186 1,270
![Page 14: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/14.jpg)
Florida Department of Transportation
FY 19/20 PROJECT AMOUNT RANGES
ESTIMATED
PROJECT VALUE
DOLLAR VOLUME
OF PROJECTS IN
RANGE $M
% OF PROJECT
DOLLARS IN
RANGE
NUMBER
OF PROJECTS
IN RANGE
% OF PROJECT
NUMBERS IN
RANGE
< $1M $312 26% 994 78%
$1M - $5M $450 38% 235 19%
>$5M - $10M $202 17% 29 2%
> $10M $222 19% 12 1%
TOTAL $1,186 100% 1,270 100%
CONSULTANT ENGINEERING STATISTICS
14
![Page 15: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/15.jpg)
Florida Department of Transportation
FY 19/20 PROJECTS > $10M
DIST ITEM-SEG DESCRIPTION PHASE COST $M
2211024-1 D/W LOCATION SURVEYS
PE 16.01
3441038-1 SR 8 (I-10) FROM W OF CR 189 LOG LAKE RD TO E OF SR 85 FERDON BLVD
PE 15.11
4436903-1 SR-9/I-95 FROM S. OF SR-858/HALLANDALE BCH BLVD TO N.OF HOLLYWOOD BLVD
PE 21.59
7422904-2 I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND
CEI 10.54
8190591-3 TPK CONSULTANT FOR TRAFFIC AND REVENUE
PDE 10.48
8415748-1 WIDEN TPK FROM SR710 (MP 106.1) TO MP 117 (4 TO 8 LNS)
PE 14.58
8432417-5 TURNPIKE CONSULTANT FOR PRODUCTION PROJECT MANAGEMENT
PE 13.27
8432417-7 TURNPIKE CONSULTANT FOR PRODUCTION PROJECT MANAGEMENT
PE 11.00
8435787-1 WIDEN TPK- US27 TO CR470 INTCHNG (MP289.3 - 297.3)(4TO8LNS)(LAKE CNTY)
PE 21.50
8437300-4 SUNTRAX CONNECTED/AUTOMATED VEHICLE TEST FACILITY
CEI 22.24
8438547-2 ORLANDO SOUTH ULTIMATE INTERCHANGE AT SR528 (MP 4) AND SR91 (MP 254)
PE 14.66
8440314-2 COLONIAL PARKWAY (SR 504) - WOODBURY ROAD TO SR 520
PE 13.83
CONSULTANT ENGINEERING MAJOR PROJECTS BY
DISTRICT
![Page 16: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/16.jpg)
Florida Department of Transportation
CONSTRUCTION CONTRACT LETTING TREND
16
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
P3 - SR 836/I-395 & I-95 $0.6
P3 - I4 $2.3
Target & Reserves $0.1 $0.2 $0.1 $1.3 $1.2
SCHEDULED $3.1 $3.2 $2.6 $3.6 $2.2 $2.3
ACTUAL $2.3 $2.7 $2.9 $2.3 $3.2 $2.7
$2.3
$2.7 $2.9
$5.2
$2.7
$-
$1.0
$2.0
$3.0
$4.0
$5.0
$6.0
CO
NTR
AC
T LE
TTIN
GS
IN $
BIL
LIO
NS
$3.3
$2.8
$3.7$3.5 $3.5
$3.1
$2.3
$3.8
![Page 17: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/17.jpg)
Florida Department of Transportation
CONSTRUCTION PROJECT STATISTICS
17
FY 19/20 LETTING PROJECT TYPES - STATEWIDE
ROADWAY (02) BRIDGE (03/04) RESURFACE (05) SAFETY (06) TRAFFIC (07) TOTAL
$M # $M # $M # $M # $M # $M #
$1,652.0 260 $985.6 68 $426.0 63 $104.2 38 $41.5 37 $3,209.3 466
These lettings include the Highway and Bridge Programs only, including Resurfacing, Bridges, Roadway, Safety, and Traffic
Operations. Only Contract Classes 1 (Central Office Let), 7 (District Office Let), and 9 (Design-Build) are included.
FY 19/20 SCHEDULED PROJECTS FOR LETTING(RESERVES NOT INCLUDED)
DIST 1 2 3 4 5 6 7 TE CO SW
$M $325.4 $429.8 $309.4 $203.8 $227.4 $79.2 $1,181.1 $448.9 $4.4 $3,209.3
FY 19/20 PROJECTS > $50MDISTRICT ITEM-SEG PROJECT DESCRIPTION ESTIMATE $M
01 201215-3 I-4 AT SR 557 66.8
01 413065-1 I-75 AT SR 884 (COLONIAL BLVD) INTERCHANGE 52.7
02 210024-4 SR20 FROM: ALACHUA C/L TO: SW 56TH AVENUE 55.5
02 439100-1 I-10 FROM: I-295 TO: I-95 128.4
03 220440-1 SR 30 (US 98) FROM BAYSHORE ROAD TO PORTSIDE DRIVE 69.6
07 422904-2 I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND 765.0
07 435142-1 SR 52 REALIGNMENT FROM URADCO PLACE TO W OF FORT KING ROAD 81.9
08 435542-1 WIDEN HEFT- NW 106TH ST TO I-75 (MP34 TO MP39) 6TO10 LANES W/EXP LANES 99.0
08 438018-1 WIDEN POLK PKWY FROM MP 18 TO MP 22, 2 TO 4 LANES 67.2
08 437300-4 SUNTRAX CONNECTED/AUTOMATED VEHICLE TEST FACILITY 119.3
![Page 18: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/18.jpg)
Florida Department of Transportation
DST ITEM-SEG PROJECT DESCRIPTION EST $M COMMENT
01 201215-3 I-4 AT SR 557 66.77 Standalone
01 413065-1 I-75 AT SR 884 (COLONIAL BLVD) INTERCHANGE 52.74 Standalone
02 438608-1 I-10 SUWANNEE COUNTY EAST BOUND REST AREA 11.06 G/W 438609-1
02 438609-1 I-10 COLUMBIA COUNTY WB REST AREA IMPROVEMENTS REPLACEMENT 9.49 G/W 438608-1
02 439100-1 I-10 FROM: I-295 TO: I-95 128.36 Standalone
03 220440-1 SR 30 (US 98) FROM BAYSHORE ROAD TO PORTSIDE DRIVE 69.63 Standalone
04 435245-1 ST. LUCIE COUNTY ATMS 6.86 Standalone
04 440746-1 HAMMONDVILLE ROAD FROM POWERLINE ROAD TO EAST OF SR-9/I-95 5.82 G/W 440746-2/3/4/5 & 441727-1
04 440746-2 NORTHWEST 31ST AVENUE FROM COMMERICAL BOULEVARD TO MCNAB ROAD 4.04 G/W 440746-1/3/4/5 & 441727-1
04 440746-3 SR-845/POWERLINE RD FR SR-816/OAKLAND PK BV TO SR-870/COMMERCIAL BV 0.98 G/W 440746-1/2/4/5 & 441727-1
04 440746-4 LAUDERDALE LAKES GREENWAY FROM NW 29TH AVENUE TO NW 31ST AVENUE 0.26 G/W 440746-1/2/3/5 & 441727-1
04 440746-5 RIVERLAND ROAD FROM SR-7/US-441 TO BROWARD BOULEVARD 4.19 G/W 440746-1/2/3/4 & 441727-1
DESIGN-BUILD PROJECTS FY 19/20
![Page 19: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/19.jpg)
Florida Department of Transportation
FY 2020 DESIGN BUILD PROJECTSDST ITEM-SEG PROJECT DESCRIPTION EST $M COMMENT
04 441727-1 SR-845/POWERLINE RD. FROM NW 29TH ST. TO SR-816/OAKLAND PARK BLVD. 0.30 G/W 440746-1/2/3/4/5
06 442040-1 SR 5/US 1/OVERSEAS HIGHWAY AT ISLAMORADA FOUNDERS PARK 4.26 Standalone
07 422904-2 I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND 764.98 G/W 422904-4/9 and 444184-1
07 422904-4 I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60 46.42 G/W 422904-2/9 and 444184-1
07 422904-9 I-275/SR 93(HOWARD FRKL)#150210 FROM N OF 4TH STREET TO S OF SR 60 0.37 G/W 422904-2/4 and 444184-1
07 444184-1 I-275/SR 93 SB FROM HOWARD FRANKLAND BRIDGE TO REO ST 3.16 G/W 422904-2/4/and 9
07 424213-3 CITY OF TAMPA DOWNTOWN TAMPA ATMS 176 SIGNALS - PHASE 2 13.73 G/W 424213-4, 6
07 424213-4 CITY OF TAMPA ATMS 122 SIGNALS- PHASE 3 13.70 G/W 424213-3, 6
07 424213-6 CITY OF TAMPA USF AREA/BUSCH BLVD ATMS 104 SIGNALS - PHASE 4 12.30 G/W 424213-3, 4
08 438018-1 WIDEN POLK PKWY FROM MP 18 TO MP 22, 2 TO 4 LANES 67.19 G/W 438018-3
08 438018-3 RESURFACING POLK PARKWAY MP 17.20-18.00 & MP 22.00-24.38 10.53 G/W 438018-1
TOTAL 1,297.14
DESIGN-BUILD PROJECTS FY 19/20
![Page 20: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/20.jpg)
Florida Department of Transportation
• Supports efforts to maximized use of transportation funds.
• Reported monthly to the Executive Team.
SUMMARY BY PHASE- TOTAL APP (ADVANCED PRODUCTION PHASES) AS OF APRIL 3, 2019 IN $M
PHASE 2020 2021 2022 2023
PLANNING/PD&E $12 $11 $34 $7
PE $92 $111 $216 $18
R/W $91 $143 $163 $186
CONSTRUCTION $281 $2,530 $4,859 $2,348
TOTALS $476 $2,795 $5,272 $2,559
ADVANCED PRODUCTION POTENTIAL
20
![Page 21: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/21.jpg)
Florida Department of Transportation
# PRIMARY MEASURES OBJECTIVEFY17/18 RESULTS
1 The consultant contract dollars executed as a percentage of the original estimated amount. ≥ 95% 97.9%
2 The number of ROW projects certified compared to the number scheduled for certification. ≥ 90% 100.0%
3 The construction contract dollars executed as a percentage of the original estimated amount. ≥ 95% 98.0%
4 The number of construction contracts actually executed compared against the number planned. ≥ 95% 89.8%
5For all construction contracts completed during the year, the percentage of those contracts that were completed within 20% abovethe original contract time.
≥ 80% 86.8%
6For all construction contracts completed during the year, the percentage of those contracts that were completed at a cost within 10% above the original contract amount.
≥ 90% 93.9%
7 The percentage of bridge structures on the State Highway System having a condition rating of either excellent or good. ≥ 90% 95.2%
8 The percentage of bridge structures on the State Highway System with posted weight restrictions. < 1% 0.03%
9 The percentage of lane miles on the State Highway System having a Pavement Condition Rating of either excellent or good. > 80% 91.3%
10 Achieve a Maintenance Rating of at least 80 on the State Highway System. > 80 85
11 The number of lane miles of capacity improvement projects on the State Highway System let compared against the number planned. > 90% 74.0%
12 The public transit ridership growth rate compared to the population growth rate. > 3.16% -7.93%
13 Of the federal funds subject to forfeiture at the end of the federal fiscal year, the percent that was committed by the Department. > 100% 100%
14 The Department’s dollar amount of administrative costs as a percent of the total program. < 2% 0.51%
15 Adopt a balanced work program and manage cash within the statutory requirements. YES Yes
16 The annual dollar amount of MBE utilization.Annual
Increase102.8%
17The dollar volume of Disadvantaged Business Enterprise participation as a percentage of all executed Federal/State construction and consultant contracts.
9.91% 12.25%
SUMMARY OF PERFORMANCE FY 17/18
21
![Page 22: FIVE YEAR WORK PROGRAM · 441038-1 sr 8 (i-10) from w of cr 189 log lake rd to e of sr 85 ferdon blvd pe 15.11 4 436903-1 sr-9/i-95 from s. of sr-858/hallandale bch blvd to n.of hollywood](https://reader033.fdocuments.in/reader033/viewer/2022041704/5e43a5917756a11d5d4baa9c/html5/thumbnails/22.jpg)
Florida Department of Transportation
CONTACTS - OFFICE OF WORK PROGRAM AND BUDGET
Staff Responsible Area Phone
Lisa Saliba Director (850) 414-4622
Kendra Sheffield Work Program Development (850) 414-4627
Mechelle Marcum Budget Officer (850) 414-4637
Cynthia Lorenzo Federal Aid (850) 414-4448
Jason Shiver FM Support (850) 414-4651
Greg Paterson Financial Management/Strategic Ops (850) 414-4637
Dan Cashin Finance, Program and Resource Allocation (850) 414-4428
Morris Pigott Production Management (850) 414-4449
1st
2nd Future Projects
http://www.fdot.gov/
WORK PROGRAM INFORMATION
22