First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9...

25
Kriegers Flak CGS Offshore hybrid projects in the North Seas and the Baltic Sea NSEC side event, WindEurope Conference, Bilbao 2019 Rebekka Falk, Energinet First of the kind: Kriegers Flak CGS 1

Transcript of First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9...

Page 1: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Offshore hybrid projects in the North Seas and the Baltic Sea

NSEC side event, WindEurope Conference, Bilbao 2019

Rebekka Falk, Energinet

First of the kind: Kriegers Flak CGS

1

Page 2: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

2. April 2019 NSEC side event: Offshore hybrid projects in the North Seas and the Baltic Sea

2

PROGRAM

• Objectives and motivation

• General introductionto the KF CGS inkl. video

• A sneak peak on the technical system

• Challenges and experiences

• Key take away

• Future perspectives

Page 3: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGSKriegers Flak CGS

2. April 2019NSEC side event: Offshore hybrid projects

in the North Seas and the Baltic Sea3

Objectives – EU policy level

The Combined Grid Solution…

• contributes to the single electricity market

• fosters the energy transition in Denmark and Germany by strengthening the integration of renewable energy in the electricity grid.

• contributes to the objective of the European Council to provide 15 per cent of generating capacities as interconnector capacities.

Offshore platform Baltic 1 / © 50Hertz

Page 4: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGSKriegers Flak CGS

2. April 2019 NSEC side event: Offshore hybrid projects in the North Seas and the Baltic Sea

4

Objectives – DK/project partners

The Combined Grid Solution…

• Increases the security of supply and stabilises the electricity system

• Increases the utilization of infrastructure

• Explores new technical solutions

• Increases cooperation with neighbouring countries

Offshore platform Baltic 1 / © 50Hertz

Page 5: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGSKriegers Flak CGS

2. April 2019 NSEC side event: Offshore hybrid projects

in the North Seas and the Baltic Sea5

Combined Grid Solution - Brief Overview

• KF CGS will link the German Mecklenburg-Western Pomerania and the Danish region of Sjaelland

• Interconnection between the existing German offshore wind farms Baltic 1 & 2 and the new Danish offshore wind farm(s) (OWF) Kriegers Flak (2021)

• Project partners: Energinet.dk and 50Hertz (+ EU )

• In operation Q3 2019

Page 6: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGSKriegers Flak CGS

2. April 2019 NSEC side event: Offshore hybrid projects in the North Seas and the Baltic Sea

6

Introduction video

https://youtu.be/wsuQaf-msaE

Page 7: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

A SPEAK PEAK ON THE TECHNICAL SYSTEM…

7

Page 8: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Kriegers Flak CGS – Electrical System Assets

82. April 2019

KFA

KFB

KFEBAZ BAE

BwW220/150kV 450MVA

380kV/150kV/30kV 400MVA

HVDC

BwC

Possible extension towards Sweden

BJS220

Bjæverskov 400 kV

Ishøj 400 kV

KFA: 200MW

KFB: 400MW

Baltic 2: 288MW

RA4

Baltic 1: 48MW

TA1

TA2

RA1

RA3

RA2

TA3

RKFA

CB

01

Busbar ABusbar B

PST

9 km

80 km

80 km

34 km

25 km 60 km75 km

NSEC side event: Offshore hybrid projects in the North Seas and the

Baltic Sea, Bilbao

Page 9: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Kriegers Flak CGS – Electrical System Assets

92. April 2019

KFA

KFB

KFEBAZ BAE

BwW220/150kV 450MVA

380kV/150kV/30kV 400MVA

HVDC

BwC

Possible extension towards Sweden

BJS220

Bjæverskov 400 kV

Ishøj 400 kV

KFA: 200MW

KFB: 400MW

Baltic 2: 288MW

RA4

Baltic 1: 48MW

TA1

TA2

RA1

RA3

RA2

TA3

RKFA

CB

01

Busbar ABusbar B

PST

9 km

80 km

80 km

34 km

25 km 60 km75 km

Denmark Germany

NSEC side event: Offshore hybrid projects in the North Seas and the

Baltic Sea, Bilbao

Page 10: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Kriegers Flak CGS – Electrical System Assets

102. April 2019

KFA

KFB

KFEBAZ BAE

BwW220/150kV 450MVA

380kV/150kV/30kV 400MVA

HVDC

BwC

Possible extension towards Sweden

BJS220

Bjæverskov 400 kV

Ishøj 400 kV

KFA: 200MW

KFB: 400MW

Baltic 2: 288MW

RA4

Baltic 1: 48MW

TA1

TA2

RA1

RA3

RA2

TA3

RKFA

CB

01

Busbar ABusbar B

PST

9 km

80 km

80 km

34 km

25 km 60 km75 km

HVDC BtB150kV cablesystem

220kV meshed offshore system

NSEC side event: Offshore hybrid projects in the North Seas and the

Baltic Sea, Bilbao

Page 11: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

CHALLENGES AND EXPIRIENCES

11

Page 12: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

122. April 2019

3.1 Challenges (and Opportunities)

CHALLENGES on the way

Challenges (and opportunities) related to the

specific pilot characteristics of the project

Challenges (and opportunities) related to having two national TSOs as equal

partners in execution and operation

Typical challenges coming from the execution of complex infrastructure projects

NSEC side event: Offshore hybrid projects in the North Seas and the

Baltic Sea, Bilbao

DK regulatory

environment

DE regulatory

environment

Page 13: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

13

Challenge dimension 1 = Context…

Two regulatory environments for permitting and approvals:

• National differences adds increasedcomplexity and time management risks

• Coordination of approval timelines needed

Page 14: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Nothing new - no words needed…

142. April 2019

Challenge dimension 2: „Just“ typical challenges comingfrom the execution of complex infrastructure projects

Master plan The real world

NSEC side event: Offshore hybrid projects in the North Seas and the

Baltic Sea, Bilbao

Page 15: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

2. April 2019 15

Challenge dimension 3: Issues related to having twonational TSOs as equal partners

Need for new ways due to ownership of assets

• 50% ownership for each TSO

• Contract setup for main contracts as 3-side contracts with both TSOs as employers

• Different insurance approaches of the TSOs had to be aligned.

• System operation and maintenance strategies need to be harmonized.

Mirrored project team – each key function in the project has its counterpart

• High amount of communication traffic

• Energinet in lead for Offshore / 50Hertz in lead for Back-to-Back

Cultural clash

• TSOs are different in set up and culture (and so are people…)

NSEC side event: Offshore hybrid projects in the North Seas and the

Baltic Sea, Bilbao

Page 16: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Challenge dimension 4: Specific pilot characteristic – part1

162. April 2019

Integration into existing and new OWP infeed infrastructure and onshore

substations

NSEC side event: Offshore hybrid projects in the North Seas and the

Baltic Sea, Bilbao

Sea cable pull in at Ba2 plattformOffshore platform Baltic 2 / ©

50Hertz

Page 17: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

2. April 2019 NSEC side event: Offshore hybrid projects in the North Seas and the Baltic Sea, Bilbao

17

Driven by heritage and context…

• Existing DE OWFs

• DK OWF close to tender

Pragmatic solution:

• Full access (priority) to OWFs

• Excess capacity to the market (interconnector)

0

100

200

300

400

500

600

700

730 1460 2190 2920 3650 4380 5110 5840 6570 7300 8030 8760

MW

Hours

Potential import

"Excess" capacity on radial grid connection

Wind generation

NB fictive numbers

Grid utilization potential (DK side)

Challenge dimension 4: Specific pilot characteristic – part2

Market arrangements and system operation

Page 18: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Energy transport

1802/04/2019

1. Business As Usual.

2. Offshore wind to Land

(High wind scenarios)

NSEC side event: Offshore hybrid projects in the North Seas and the

Baltic Sea, Bilbao

Page 19: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Energy transport

19

1. Interconnector.

2. Offshore wind to Land

(High wind scenarios)

Page 20: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Energy transport

20

1. Interconnector.

2. Offshore wind to Land

(High wind scenarios)

Page 21: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Energy transport

21

1. Land to Offshore.

2. Then Offshore to Land

(Low/No wind scenarios)

Page 22: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Energy transport

22

1. Land to Offshore.

2. Then Offshore to Land

(Low/No wind scenarios)

Page 23: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

23

Lessons Learnt

KF CGS Successful according to the objectives, but has also showcased issues for consideration in future hybrid projects:

1. Cooperation and mutual cultural understanding is key – and takes time..

2. ”First of its kind” requires• Regulatory coordination • Regulatory innovation • Political support and commitment

3. Starting point matters: ”add on” versus initial design impact:

• Technical concept design • Market rules

• From ”first and special case” to more mainstream concept within the EU-regulatory framework?

Page 24: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

[email protected]

Thank you for the attention!

24

[email protected]

Page 25: First of the kind: Kriegers Flak CGS...TA1 TA2 RA1 RA3 RA2 TA3 RKFA C B 0 1 Busbar A Busbar B PST 9 km 80 km 80 km 34 km 25 km 60 km 75 km NSEC side event: Offshore hybrid projects

Kriegers Flak CGS

Future perspectives

- One way of travel..

- Rules of the game are changing

- Need for new toolsinside and outsidethe electricitysystem