Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring...

14
Fire Safety Management

Transcript of Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring...

Page 1: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Fire Safety Management

Page 2: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

The Main Elements in HSG65

Organising

Planning and Implementing

Measuring Performance

Policy

Reviewing Performance

Auditing

Page 3: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Policy

• Corporate and Local

• Demonstrates commitment of the organisation

• Commitment from board throughout the organisation

Page 4: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Organising• A Responsible Person and Sufficient Assistance• Co-operation and Co-ordination between them• Record arrangements

– If employs five or more– If a licence under and enactment is in force in relation

to premises– If an alterations notice is in force to the premises

• Infrastructure– People– Structure– Processes

• To comply with Policy and Principles and Fire Safety Management Document

Page 5: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Planning and Implementing

• Action Plans Developed as a result of:-– Risk profiling/assessment– Training– Audits– Inspections

• To Include:– Risk, Harm, Controls, risk Rating, Further

Controls, Responsible Person, Timescales, Cost of Non-Compliance

Page 6: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Monitoring and Review• Specialist Group• Report to -• How Often -• Process -• How are the board informed of fire safety risks

and how do they equate them to other risks ?

• Review frequently (not just annually)– Did you achieve targets– If so can we set improvements for coming year– These reviews will feed the process for performance

improvement through policy or organisational change

Page 7: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Measuring Performance

• Performance Indicators (SMART)– Incidents– Unwanted fire signals– Training– Risk assessments– Plans and projects– Fire drills– Maintenance– Inspections– Audits

Page 8: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Auditing

• Audit Managerial Responsibilities– Trained– Emergency plans tested– Policy up to date– Action plans being progressed

• The audit should feed the process for completion

Page 9: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Post Fire ManagementRecording Incidents

• Statutory– RIDDOR– Implied requirement RRFSO Article 11– Evidence in-case of legal proceedings– RP must comply with request of fire service

• Non-Statutory– Report enables investigation– Investigation identifies flaws– Analysis may identify trends

Page 10: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Procedures For Reporting• Internal Recording

– Accident books, Fire Log Book, Occurrence Book

• External Recording RIDDOR– Death and serious injury

• Dangerous Occurrences– Explosion, collapse or bursting of any closed vessel or pipe work– Electrical short circuit or overload causing fire or explosion– Road tanker with dangerous substances overturns and released

or is involved in fire– Fire or explosion causing suspension of work for over 24hrs– Sudden uncontrolled release in a building of 100kg or more of

flammable liquid: 10kg of flammable liquid above boiling point: 10kg or more of flammable gas or of 500kg of these substances of the release is in open air

Page 11: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Fire Investigation

• Purpose• Basic fire related investigation procedures

– Non-fatal fires– Accidental fire investigations– Arson investigations– Preserving the fire scene– Liaison– Identify immediate and underlying cause– Remedial actions

Page 12: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Site and Damaged Area Clean Up Considerations

• Structure

• Environment

• Equipment

• Exposed services

• Substances

• Sensitive information

Page 13: Fire Safety Management. The Main Elements in HSG65 Organising Planning and Implementing Measuring Performance Policy Reviewing Performance Auditing.

Fire ProceduresFire Procedures• Finding a fire

• The fire alarm

• Hearing the fire alarm

• Main escape routes

• Fire exits

• Location of assembly points

• Action at assembly points

• Authorised re-entry into the building