FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION …

9
REVISIONS (DO NOT USE THIS BLOCK UNTIL AFTER PERMIT IS ISSUED) HARRIS COUNTY (IFC 2012) FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION 7.0 (MAR 2017) BUILDING PLANNING & DESCRIPTION 1 MEANS OF EGRESS 3 FIRE-RESISTANCE RATE CONSTRUCTION 5 STORAGE: STANDARD & HIGH PILED 9 CHAPTER 10 IBC 2012 CHAPTER 6, 7 AND 10 IBC 2012 CHAPTER 32 IFC 2012 (REFER TO REGULATIONS FOR REQUIREMENT FOR CONSULTANT ENGINEER SECTION 3201.5 HC AMENDMENTS) NEW CONSTRUCTION LEASE SPACE BUILD-OUT (LSBO) SUBSTANTIAL IMPROVEMENT SHELL BUILDING CHANGE OF OCCUPANCY OTHER: __________________________ SINGLE OCCUPANCY SEPARATED USE NON-SEPARATED USE (SECTION 508.3 OR 508.4 IBC 2012) TYPE OF CONSTRUCTION: __________________________ (CHAPTER 6 IBC 2012) HEIGHT LIMITATION: __________________ AREA LIMITATION: ________________ (TABLE 503 IBC 2012) BUILDING VALUATION BUILDING NUMBER: ________ OF ________ CALL CENTERPOINT ENERGY AHEAD OF TIME, AT 713-207-4460, TO OBTAIN AN ADDRESS ADDRESS: ____________________________________________________________________________________ CITY, ST: ___________________________________ ZIP CODE: _________________ SUITE: _______________ ESTIMATED COST OF CONSTRUCTION: $_________________________________________________ T.D.L.R #: ________________________________ (REQUIRED FOR CONSTRUCTION OVER $50,000) TEXAS DEPARTMENT OF LICENSING AND REGULATIONS (http://www.license.state.tx.us/) TELEPHONE: (512) 463-6599 TOLL FREE (IN TEXAS): 800-803-99202 FAX: (512) 475-2871 RELAY TEXAS-TDD: 800-735-2989 HCAD #. OR PROPERTY TAX #: _________________________________ (13 DIGITS) FLOODPLAIN: _______ LIST BELOW THE PURPOSE/USE OF THE BUILDING OR AREA BEING REVIEWED. INCLUDE DETAILS ON THE PRODUCTS/MATERIALS BEING STORED/FABRICATED AND NOTE HOW THEY ARE BEING PACKAGED. SHELL BUILDING PERMIT #: ___________________________ CIVIL PROJECT #: _______________________ GROSS SQUARE FOOTAGE: __________________________ #OF FLOORS: ___________ HEIGHT:__________ OCCUPANCY TYPE AND LOAD 2 CHAPTER 2, 3 & TABLE 1004.1.2 IBC 2012 A-1 A-2 A-3 A-4 A-5 B E F-1 F-2 H-1 H-2 H-3 H-4 H-5 I-1 I-2 I-3 I-4 M R-1 R-2 R-3 R-4 S-1 S-2 U OCCUPANCY CLASSIFICATION TYPES BREAK DOWN AREAS AND OCCUPANT LOADS PER FLOOR OCCUPANCY CLASSIFICATION SPECIFIC USE TOTAL SQUARE FOOTAGE SF PER OCCUPANT DESIGN OCCUPANTS # OF EXITS PROVIDED # OF REQUIRED EXITS MEANS OF EGRESS SHEET # STAIRWAYS (PER FLOOR) EGRESS @ 1ST FL OR LSBO (SECTION 1005.3 IBC 2012) PANIC HARDWARE ON EXIT DOORS? YES NO (SECTION 1008.1.9 IBC 2012) STAIRWAYS (SECTION 1009 IBC 2012) MINIMUM CLEAR WIDTH SHOWN ON: ________________________________ (EACH STAIRWELL) EGRESS WIDTHS ARE SHOWN ON: __________ ACCESSIBLE AREAS OF REFUGE & 2-WAY COMMUNICATIONS SHOWN ON: ________ FRONTAGE INCREASE CALCULATIONS ARE SHOWN ON SHEET: __________________________________ (SECTION 1007.3 TO 1007.6 IBC 2012) EXIT SIGNS/EGRESS ILLUMINATION (SECTION 1006 & 1011 IBC 2012) REQUIRED AND SHOWN ON: ___________________________ (HIGHLIGHT ON PLANS) EXTERIOR EMERGENCY LIGHTING PROVIDED? YES NO EXIT TRAVEL DISTANCE (TABLE 1016.2 IBC 2012) PROVIDE TRAVEL DISTANCE MAX TRAVEL DISTANCE OCCUPANCY TYPE SHEET # ELEVATORS ELEVATOR KEYBOX LOCATED IN LOBBY? (MUST BE WITHIN 20' OF THE CALL BUTTON) NEW EXISTING YES NO FIRE PROTECTION SYSTEMS 4 CHAPTER 9 IBC & IFC 2012 ALL FIRE PROTECTION PLANS SHALL BE SUBMITTED FOR REVIEW AFTER BUILDING PERMIT HAS BEEN ISSUED (I.E. UNDERGROUND FIRE LINE, SPRINKLER SYSTEM, FIRE ALARM SYSTEM, STANDPIPE, FIRE PUMP ROOM, AND FIRE PROTECTION WATER SUPPLY SYSTEMS) AUTOMATIC FIRE SPRINKLER SYSTEM/ALTERNATIVE AUTOMATIC FIRE EXTINGUISHING SYSTEM ALL SPRINKLERS SHALL COMPLY WITH MONITORING (SECTION 903 HC FIRE CODE AMENDMENTS & SECTION 903.4 IFC 2012) PROVIDED AS NOTED ON: __________ NOT REQUIRED PER SECTION 903 SYSTEM PROVIDED: NFPA 13 NFPA 13R NFPA 13D OTHER: __________ STANDARD ELO ESFR QUICK RESPONSE SPRINKLER HEAD PROVIDED: FIRE DEPARTMENT ACCESS TO SPRINKLER CONTROLS: SPRINKLER RISER ROOM OR POST INDICATOR VALVE SHOWN ON: __________ (SECTION 901.4.6.1 HC AMENDMENTS IFC 2012) FDC SHOWN ON: __________ (FDC SHALL COMPLY WITH SECTION 912 IFC 2012) SUPPRESSION SYSTEM PROVIDED (SECTION 904 IFC 2012) REQUIRED AND SHOWN ON: __________ STANDPIPE SYSTEM & HOSE CONNECTIONS (SECTION 905 IFC 2012) (I.E. IN STAIRWAYS, STAGES, MALLS) PROVIDED AS NOTED ON: __________, TYPE OF SYSTEM PROVIDED: _________ (CLASS I, II OR III) NOT REQUIRED PER SECTION 905 PORTABLE FIRE EXTINGUISHERS (SECTION 906 IFC 2012) PROVIDED AS NOTED ON: __________, NUMBER PROVIDED: __________ (HIGHLIGHT ON PLANS) FIRE ALARM & DETECTION SYSTEMS (SECTION 907 & HC AMENDMENTS IFC 2012) FIRE ALARM SYSTEM (DEFERRED SUBMITTAL) EMERGENCY VOICE EVACUATION DEDICATED FUNCTION (SPRINKLER MONITORING, ELEVATOR RECALL, PRE-ACTION, EMERGENCY ALARM, SMOKE CONTROL) OTHER: ________________________ HVAC & AIR DISTRIBUTION SYSTEM CONTROLS (SECTION 907.2.13.1.2 IFC 2012) SMOKE DETECTORS PROVIDED TO SHUT DOWN UNITS OVER 2,000 CFM PROVIDED ON: __________ FIRE/SMOKE DAMPERS IN THE BUILDING SHOWN ON: __________ NO FIRE/SMOKE DAMPERS IN THE BUILDING SMOKE CONTROL SYSTEMS (SECTION 909 IFC 2012)(I.E. FOR HIGH RISE, ATRIUMS OR STAIRWAY PRESSURIZATION) PROVIDED AS NOTED ON: __________ NOT REQUIRED PER SECTION 909 SMOKE & HEAT VENTILATION (SECTION 910 & TABLE 910.3 IFC 2012) CALCULATIONS PROVIDED AS NOTED ON: __________ NOT REQUIRED PER SECTION 910 NOTE: WHERE AREAS OF THE BUILDING ARE EQUIPPED WITH EARLY SUPPRESSION FAST-RESPONSE (ESFR) SPRINKLERS, AUTOMATIC SMOKE AND HEAT VENTS SHALL BE INSTALLED PER MANUFACTURERS SPECIFICATIONS, MEETING LOCAL JURISDICTION REQUIREMENTS. SHOW DETAILS OF FIRE WALLS OR FIRE BARRIERS MEETING HORIZONTAL WALLS AND ROOF DECKS (SEE SECTION 706.5, 706.6 & 707.5 IBC 2012) FIRE-RESISTANCE RATING REQUIREMENTS (TABLES 601, 602 & 602.4 IBC 2012) HOURS PROVIDED HOURS REQUIRED BUILDING ELEMENTS UL OR IBC STANDARD USED & DESIGN DETAIL SHOWN ON STRUCTURAL FRAME EXTERIOR BEARING WALLS EXTERIOR NON-BEARING WALLS INTERIOR BEARING WALLS INTERIOR NON-BEARING WALLS FLOOR CONSTRUCTION ROOF CONSTRUCTION STAIRWELLS (SECTION 1009) CORRIDORS (SECTION 1018) ELEVATOR SHAFTS (SECTION 713) FIRE RATED DOORS (TABLE 716.5) DEMISING/PARTITION WALL (SECTION 708) FIRE BARRIER (SECTION 707) FIRE WALL (SECTION 706) DRAFTSTOPS: YES, SHOWN ON: __________ NO (SPRINKLED ATTIC) N/A (SECTION 718.4) HAVE YOU CHECKED WIDTH OF OPENINGS IN FIRE RATED WALLS? (TABLE 705.8, SECTION 706.8 & 707.6 IBC 2012) YES NO FIRE SEPARATION DISTANCE (FEET) (SECTION 602 IBC 2012) NORTH SOUTH EAST WEST ROOF COVERING CLASSIFICATION PROVIDED: (TABLE 1505.1 IBC 2012) A B C WATER SUPPLY (FOR FIREFIGHTING) 6 CHAPTER 5, APPENDIX B & C IFC 2012 __________ GROSS SIZE OF BUILDING IN SQUARE FEET (INCLUDE ALL OVERHANGS UNDER ROOF) PUBLIC WATER SUPPLY WITH FIRE HYDRANTS (FOR PROPOSED AND EXISTING FIRE HYDRANTS ONLY) NAME OF THE MUNICIPAL UTILITY DISTRICT: ________________________________________________ NUMBER OF HYDRANTS WITHIN 400 FT (NON-SPRINKLED) OR 600 FT (SPRINKLED) OF BUILDING: __________, SHOWN ON: __________ REQUIRED GPM: __________ DURATION: __________ (TABLE B105.1 IFC 2012) 75% REDUCTION? YES NO (MUST MAINTAIN MINIMUM OF 1,500 GPM) WATER SOURCE FOR RURAL AREAS WITHOUT FIRE HYDRANTS (COMPLETE THE FIRE FLOW CALCULATOR) ***DRY HYDRANT ABOVEGROUND STORAGE UNDERGROUND STORAGE OTHER: _________________________ DESIGN SPECIFICATIONS AND LOCATIONS SHOULD MEET MINIMUM REQUIRED WATER SUPPLY FROM THE FIRE FLOW CALCULATOR NFPA 1142 (http://hcpid.org/permits/docs/FC_fire_flow_calculator.pdf). ***SUBMIT DRY HYDRANT DESIGN PLANS & CALCULATIONS TO FIRE PROTECTION FOR REVIEW & APPROVAL (http://hcpid.org/permits/docs/FC_dry_hydrant_worksheet.pdf) FIRE LANE ACCESS 7 CHAPTER 5 & APPENDIX D IFC 2012 FIRE LANE LAYOUT PLAN, WHICH SHALL INCLUDE THE SITE PLAN, THE FIRE LANE & FIRE HYDRANTS, IS SHOWN ON: __________. (HIGHLIGHT THE FIRE HYDRANT LOCATIONS ON THE PLANS) AERIAL ACCESS LAYOUT, FOR BUILDINGS OVER 30 FT, IS SHOWN ON: __________. FIRE LANES WILL BE APPROVED CONCEPTUALLY DURING THE CIVIL REVIEW PROCESS. HOWEVER, THE FIRE CODE PLAN REVIEWER MAY CHANGE THE FIRE LANE LAYOUT BASED ON THE BUILDING SPECIFICATIONS. PROVIDING A DRY STANDPIPE/WALL HYDRANT OR REMOTE FIRE HOSE CONNECTION TO COMPLY WITH FIRE LANE HOSE COVERAGE. SUBMIT PLANS TO FIRE PROTECTION FOR REVIEW (SECTION 915.1 HC AMENDMENTS) FIRE LANE LAYOUT, GENERAL REQUIREMENTS & APPROVED SIGN (http://hcpid.org/permits/docs/FC_firelane_layout_gen_req_and_approved_sign.pdf) INTERIOR FINISH 8 CHAPTER 8 & TABLE 803.9 IBC 2012 ROOMS AND ENCLOSED SPACES EXIT ENCLOSURES AND EXIT PASSAGEWAYS OCCUPANCY GROUP SHEET # CORRIDORS PRODUCTS BEING STORED: ____________________________________________________ YES NO STORAGE PACKAGING (I.E. PALLETS, RACKS, SOLID PILED, DRUMS, CARDBOARD BOXES, WRAPPED IN PLASTIC, ETC.): ____________________________________________________________________________ YES NO MAXIMUM HEIGHT OF COMMODITY: ____________________________________________________ YES NO ***THIS BUILDING IS DESIGNED FOR THE INTENT OF HIGH PILED STORAGE. IF YES, THEN PROVIDE HIGH PILED STORAGE FORM (http://hcpid.org/permits/docs/FC_high_piled_storage_form.pdf). YES NO FIRE DEPARTMENT ACCESS DOORS YES NO HIGH PILED STORAGE RACK LAYOUT/ELEVATIONS, CODE ANALYSIS, ETC. SHOWN ON: __________ NO HAZARDOUS MATERIALS 10 CHAPTER 50 IFC 2012 ***THIS BUILDING IS DESIGNED FOR THE INTENT OF HAZARDOUS MATERIAL STORAGE. IF YES, THEN PROVIDE ALL HMIS SUMMARY AND MSDS REPORTS. YES NO EMERGENCY ALARM SYSTEM REQUIRED PER SECTION 5004.9 IFC 2012 YES NO YES VENTILATION WITH EMERGENCY ALARM STAND BY POWER PER SECTION 5004.3 AND 5004.7 IFC 2012. NO YES SPILL CONTROL AND SECONDARY CONTAINMENT PER SECTION 5004.2 IFC 2012 YES NO SPECIAL CONDITIONS 11 PROPERTIES WITH FENCE AND GATES SHALL PROVIDE A 911 KEY BOX AT ENTRY GATE ATRIUM(S) PER 404 IBC 2012? YES NO PAINT SPRAY BOOTHS, COATINGS, DIPPING OR INDUSTRIAL OVENS USED PER 2404, 2405, 2406 AND CHAPTER 30 IFC 2012? YES NO YES NO HIGH RISE BLDG PER 403 IBC 2012? YES NO ANY FUEL STORAGE TANKS PER 5704 IFC 2012? YES NO SEPTIC SYSTEM? SUBMIT PLANS TO WASTEWATER FOR REVIEW. YES NO YES NO YES NO HEALTH DEPARTMENT APPROVAL? REQUIRED FOR ALL ESTABLISHMENTS THAT SERVE/PREPARE FOOD AND BEVERAGES FOR THE PUBLIC OR HAVE REFRIGERATED FOOD STORAGE. YES NO MEDICAL GAS PER 5306 IFC 2012? YES NO PUBLIC UTILITIES? CERTIFICATION PERMIT OFFICE REVIEWER'S SIGNATURE BLOCK THE PROJECT KNOWN AS (MUST BE THE NAME OF BUSINESS/DBA IF BUILDING IS FOR A SPECIFIC COMPANY) PROJECT NUMBER: IFC 2012 COMMENTS & NOTES A COPY OF THESE APPROVED CONSTRUCTION PLANS MUST BE KEPT AT PROJECT SITE FOR THE FINAL INSPECTION OF THE BUILDING (http://www.hcad.org) (http://www.eng.hctx.net/permits/Fire/Fire-Code/Fire-Code-Review) SHEET NO.(S) DATE DESCRIPTION REVIEWER COUNTY P.E. FIRE CODE REVIEW SHEET NUMBER ________ OF ________ WAS ACCEPTED BY HARRIS COUNTY FOR THE PURPOSES LISTED BELOW: REVIEWER'S STAMP CRITICAL FACILITIES (HARRIS COUNTY REGULATIONS AND AMENDMENTS) FIRE PUMP EMERGENCY STANDBY POWER PER 913.8 HC AMENDMENTS? MIXED OCCUPANCY NO HVAC UNITS OVER 2,000 CFM YES NO OTHER: __________________________ RESIDENTIAL BOARD AND CARE OCCUPANCIES (REFER TO THE HARRIS COUNTY CODEWORD OF THE SAME NAME AND ALSO COMPLETE THE RESIDENTIAL BOARD AND CARE CERTIFICATION FORM RBC-8A RBC-8B RBC-16A RBC-16B NOT REQUIRED PER SECTION 907 NOT REQUIRED

Transcript of FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION …

Page 1: FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION …

REVISIONS (DO NOT USE THIS BLOCK UNTIL AFTER PERMIT IS ISSUED)

HARRIS COUNTY (IFC 2012)FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION 7.0 (MAR 2017)

BUILDING PLANNING & DESCRIPTION1 MEANS OF EGRESS3 FIRE-RESISTANCE RATE CONSTRUCTION5 STORAGE: STANDARD & HIGH PILED9CHAPTER 10 IBC 2012 CHAPTER 6, 7 AND 10 IBC 2012 CHAPTER 32 IFC 2012 (REFER TO REGULATIONS FOR REQUIREMENT FOR CONSULTANT ENGINEER SECTION

3201.5 HC AMENDMENTS)

NEW CONSTRUCTIONLEASE SPACE BUILD-OUT (LSBO)

SUBSTANTIAL IMPROVEMENT

SHELL BUILDING

CHANGE OF OCCUPANCYOTHER: __________________________

SINGLE OCCUPANCY SEPARATED USE NON-SEPARATED USE

(SECTION 508.3 OR 508.4 IBC 2012)TYPE OF CONSTRUCTION: __________________________ (CHAPTER 6 IBC 2012)HEIGHT LIMITATION: __________________ AREA LIMITATION: ________________ (TABLE 503 IBC 2012)

BUILDING VALUATIONBUILDING NUMBER: ________ OF ________

CALL CENTERPOINT ENERGY AHEAD OF TIME, AT 713-207-4460, TO OBTAIN AN ADDRESS

ADDRESS: ____________________________________________________________________________________CITY, ST: ___________________________________ ZIP CODE: _________________ SUITE: _______________

ESTIMATED COST OF CONSTRUCTION: $_________________________________________________T.D.L.R #: ________________________________ (REQUIRED FOR CONSTRUCTION OVER $50,000)TEXAS DEPARTMENT OF LICENSING AND REGULATIONS(http://www.license.state.tx.us/)TELEPHONE: (512) 463-6599 TOLL FREE (IN TEXAS): 800-803-99202FAX: (512) 475-2871 RELAY TEXAS-TDD: 800-735-2989

HCAD #. OR PROPERTY TAX #: _________________________________ (13 DIGITS) FLOODPLAIN: _______

LIST BELOW THE PURPOSE/USE OF THE BUILDING OR AREA BEING REVIEWED. INCLUDEDETAILS ON THE PRODUCTS/MATERIALS BEING STORED/FABRICATED AND NOTE HOW THEYARE BEING PACKAGED.

SHELL BUILDING PERMIT #: ___________________________ CIVIL PROJECT #: _______________________

GROSS SQUARE FOOTAGE: __________________________ #OF FLOORS: ___________ HEIGHT:__________

OCCUPANCY TYPE AND LOAD2CHAPTER 2, 3 & TABLE 1004.1.2 IBC 2012

A-1 A-2 A-3 A-4 A-5 B E

F-1 F-2 H-1 H-2 H-3 H-4 H-5

I-1 I-2 I-3 I-4 M R-1 R-2

R-3 R-4 S-1 S-2 U

OCCUPANCY CLASSIFICATION TYPES

BREAK DOWN AREAS AND OCCUPANT LOADS PER FLOOR

OCCUPANCYCLASSIFICATION SPECIFIC USE

TOTAL

SQUAREFOOTAGE

SF PEROCCUPANT

DESIGNOCCUPANTS

# OF EXITS PROVIDED# OF REQUIRED EXITSMEANS OF EGRESS SHEET #

STAIRWAYS (PER FLOOR)

EGRESS @ 1ST FL OR LSBO

(SECTION 1005.3 IBC 2012)

PANIC HARDWARE ON EXIT DOORS? YES NO (SECTION 1008.1.9 IBC 2012)STAIRWAYS (SECTION 1009 IBC 2012)MINIMUM CLEAR WIDTH SHOWN ON: ________________________________ (EACH STAIRWELL)EGRESS WIDTHS ARE SHOWN ON: __________ACCESSIBLE AREAS OF REFUGE & 2-WAY COMMUNICATIONS SHOWN ON: ________

FRONTAGE INCREASE CALCULATIONS ARE SHOWN ON SHEET: __________________________________(SECTION 1007.3 TO 1007.6 IBC 2012)

EXIT SIGNS/EGRESS ILLUMINATION (SECTION 1006 & 1011 IBC 2012)REQUIRED AND SHOWN ON: ___________________________ (HIGHLIGHT ON PLANS)

EXTERIOR EMERGENCY LIGHTING PROVIDED? YES NOEXIT TRAVEL DISTANCE (TABLE 1016.2 IBC 2012)

PROVIDE TRAVELDISTANCEMAX TRAVEL DISTANCEOCCUPANCY TYPE SHEET #

ELEVATORSELEVATOR KEYBOX LOCATED IN LOBBY?(MUST BE WITHIN 20' OF THE CALL BUTTON)

NEW EXISTING YES NO

FIRE PROTECTION SYSTEMS4CHAPTER 9 IBC & IFC 2012

ALL FIRE PROTECTION PLANS SHALL BE SUBMITTED FOR REVIEW AFTER BUILDING PERMITHAS BEEN ISSUED (I.E. UNDERGROUND FIRE LINE, SPRINKLER SYSTEM, FIRE ALARM SYSTEM,STANDPIPE, FIRE PUMP ROOM, AND FIRE PROTECTION WATER SUPPLY SYSTEMS)

AUTOMATIC FIRE SPRINKLER SYSTEM/ALTERNATIVE AUTOMATIC FIREEXTINGUISHING SYSTEMALL SPRINKLERS SHALL COMPLY WITH MONITORING(SECTION 903 HC FIRE CODE AMENDMENTS & SECTION 903.4 IFC 2012)

PROVIDED AS NOTED ON: __________ NOT REQUIRED PER SECTION 903

SYSTEM PROVIDED:NFPA 13NFPA 13RNFPA 13DOTHER: __________

STANDARDELOESFRQUICK RESPONSE

SPRINKLER HEAD PROVIDED:

FIRE DEPARTMENT ACCESS TO SPRINKLER CONTROLS:SPRINKLER RISER ROOM OR POST INDICATOR VALVE SHOWN ON: __________(SECTION 901.4.6.1 HC AMENDMENTS IFC 2012)

FDC SHOWN ON: __________ (FDC SHALL COMPLY WITH SECTION 912 IFC 2012)

SUPPRESSION SYSTEM PROVIDED (SECTION 904 IFC 2012)REQUIRED AND SHOWN ON: __________

STANDPIPE SYSTEM & HOSE CONNECTIONS (SECTION 905 IFC 2012)(I.E. IN STAIRWAYS, STAGES, MALLS)

PROVIDED AS NOTED ON: __________, TYPE OF SYSTEM PROVIDED: _________ (CLASS I, II OR III)NOT REQUIRED PER SECTION 905

PORTABLE FIRE EXTINGUISHERS (SECTION 906 IFC 2012)PROVIDED AS NOTED ON: __________, NUMBER PROVIDED: __________ (HIGHLIGHT ON PLANS)

FIRE ALARM & DETECTION SYSTEMS (SECTION 907 & HC AMENDMENTS IFC 2012)FIRE ALARM SYSTEM (DEFERRED SUBMITTAL)

EMERGENCY VOICE EVACUATION

DEDICATED FUNCTION (SPRINKLERMONITORING, ELEVATOR RECALL,PRE-ACTION, EMERGENCY ALARM,SMOKE CONTROL)

OTHER: ________________________

HVAC & AIR DISTRIBUTION SYSTEM CONTROLS (SECTION 907.2.13.1.2 IFC 2012)SMOKE DETECTORS PROVIDED TO SHUT DOWN UNITS OVER 2,000 CFM PROVIDED ON: __________

FIRE/SMOKE DAMPERS IN THE BUILDING SHOWN ON: __________NO FIRE/SMOKE DAMPERS IN THE BUILDING

SMOKE CONTROL SYSTEMS (SECTION 909 IFC 2012)(I.E. FOR HIGH RISE, ATRIUMSOR STAIRWAY PRESSURIZATION)

PROVIDED AS NOTED ON: __________

NOT REQUIRED PER SECTION 909

SMOKE & HEAT VENTILATION (SECTION 910 & TABLE 910.3 IFC 2012)CALCULATIONS PROVIDED AS NOTED ON: __________NOT REQUIRED PER SECTION 910

NOTE: WHERE AREAS OF THE BUILDING ARE EQUIPPED WITH EARLY SUPPRESSION FAST-RESPONSE(ESFR) SPRINKLERS, AUTOMATIC SMOKE AND HEAT VENTS SHALL BE INSTALLED PERMANUFACTURERS SPECIFICATIONS, MEETING LOCAL JURISDICTION REQUIREMENTS.

SHOW DETAILS OF FIRE WALLS OR FIRE BARRIERS MEETING HORIZONTAL WALLS AND ROOF DECKS(SEE SECTION 706.5, 706.6 & 707.5 IBC 2012)

FIRE-RESISTANCE RATING REQUIREMENTS (TABLES 601, 602 & 602.4 IBC 2012)

HOURSPROVIDED

HOURSREQUIREDBUILDING ELEMENTS UL OR IBC STANDARD USED &

DESIGN DETAIL SHOWN ONSTRUCTURAL FRAME

EXTERIOR BEARING WALLS

EXTERIOR NON-BEARING WALLS

INTERIOR BEARING WALLS

INTERIOR NON-BEARING WALLS

FLOOR CONSTRUCTION

ROOF CONSTRUCTION

STAIRWELLS (SECTION 1009)

CORRIDORS (SECTION 1018)

ELEVATOR SHAFTS (SECTION 713)

FIRE RATED DOORS (TABLE 716.5)

DEMISING/PARTITION WALL (SECTION 708)

FIRE BARRIER (SECTION 707)

FIRE WALL (SECTION 706)

DRAFTSTOPS: YES, SHOWN ON: __________ NO (SPRINKLED ATTIC) N/A (SECTION 718.4)

HAVE YOU CHECKED WIDTH OF OPENINGS IN FIRE RATED WALLS?(TABLE 705.8, SECTION 706.8 & 707.6 IBC 2012)

YES NO

FIRE SEPARATION DISTANCE (FEET)(SECTION 602 IBC 2012)

NORTH SOUTH EAST WEST

ROOF COVERING CLASSIFICATION PROVIDED:(TABLE 1505.1 IBC 2012)

A B C

WATER SUPPLY (FOR FIREFIGHTING)6CHAPTER 5, APPENDIX B & C IFC 2012

__________ GROSS SIZE OF BUILDING IN SQUARE FEET (INCLUDE ALL OVERHANGS UNDER ROOF)

PUBLIC WATER SUPPLY WITH FIRE HYDRANTS(FOR PROPOSED AND EXISTING FIRE HYDRANTS ONLY)NAME OF THE MUNICIPAL UTILITY DISTRICT: ________________________________________________NUMBER OF HYDRANTS WITHIN 400 FT (NON-SPRINKLED) OR 600 FT (SPRINKLED) OF BUILDING: __________,SHOWN ON: __________REQUIRED GPM: __________ DURATION: __________ (TABLE B105.1 IFC 2012)

75% REDUCTION? YES NO (MUST MAINTAIN MINIMUM OF 1,500 GPM)

WATER SOURCE FOR RURAL AREAS WITHOUT FIRE HYDRANTS(COMPLETE THE FIRE FLOW CALCULATOR)

***DRY HYDRANTABOVEGROUND STORAGE

UNDERGROUND STORAGEOTHER: _________________________

DESIGN SPECIFICATIONS AND LOCATIONS SHOULD MEET MINIMUM REQUIRED WATER SUPPLY FROM THEFIRE FLOW CALCULATOR NFPA 1142 (http://hcpid.org/permits/docs/FC_fire_flow_calculator.pdf).

***SUBMIT DRY HYDRANT DESIGN PLANS & CALCULATIONS TO FIRE PROTECTION FOR REVIEW &APPROVAL (http://hcpid.org/permits/docs/FC_dry_hydrant_worksheet.pdf)

FIRE LANE ACCESS7CHAPTER 5 & APPENDIX D IFC 2012

FIRE LANE LAYOUT PLAN, WHICH SHALL INCLUDE THE SITE PLAN, THE FIRE LANE & FIRE HYDRANTS, ISSHOWN ON: __________. (HIGHLIGHT THE FIRE HYDRANT LOCATIONS ON THE PLANS) AERIAL ACCESSLAYOUT, FOR BUILDINGS OVER 30 FT, IS SHOWN ON: __________.

FIRE LANES WILL BE APPROVED CONCEPTUALLY DURING THE CIVIL REVIEW PROCESS. HOWEVER, THEFIRE CODE PLAN REVIEWER MAY CHANGE THE FIRE LANE LAYOUT BASED ON THE BUILDINGSPECIFICATIONS.

PROVIDING A DRY STANDPIPE/WALL HYDRANT OR REMOTE FIRE HOSE CONNECTION TO COMPLY WITHFIRE LANE HOSE COVERAGE. SUBMIT PLANS TO FIRE PROTECTION FOR REVIEW (SECTION 915.1 HCAMENDMENTS)

FIRE LANE LAYOUT, GENERAL REQUIREMENTS & APPROVED SIGN(http://hcpid.org/permits/docs/FC_firelane_layout_gen_req_and_approved_sign.pdf)

INTERIOR FINISH8CHAPTER 8 & TABLE 803.9 IBC 2012

ROOMS AND ENCLOSEDSPACES

EXIT ENCLOSURES ANDEXIT PASSAGEWAYS

OCCUPANCYGROUP SHEET #CORRIDORS

PRODUCTS BEING STORED: ____________________________________________________YES NOSTORAGE PACKAGING (I.E. PALLETS, RACKS, SOLID PILED, DRUMS, CARDBOARD BOXES, WRAPPEDIN PLASTIC, ETC.): ____________________________________________________________________________

YES NO

MAXIMUM HEIGHT OF COMMODITY: ____________________________________________________YES NO***THIS BUILDING IS DESIGNED FOR THE INTENT OF HIGH PILED STORAGE. IF YES, THENPROVIDE HIGH PILED STORAGE FORM (http://hcpid.org/permits/docs/FC_high_piled_storage_form.pdf).

YES NO

FIRE DEPARTMENT ACCESS DOORSYES NOHIGH PILED STORAGE RACK LAYOUT/ELEVATIONS, CODE ANALYSIS, ETC. SHOWN ON: __________NO

HAZARDOUS MATERIALS10CHAPTER 50 IFC 2012

***THIS BUILDING IS DESIGNED FOR THE INTENT OF HAZARDOUS MATERIAL STORAGE. IF YES,THEN PROVIDE ALL HMIS SUMMARY AND MSDS REPORTS.

YES NO

EMERGENCY ALARM SYSTEM REQUIRED PER SECTION 5004.9 IFC 2012YES NO

YES

VENTILATION WITH EMERGENCY ALARM STAND BY POWER PER SECTION 5004.3 AND 5004.7 IFC 2012.NOYESSPILL CONTROL AND SECONDARY CONTAINMENT PER SECTION 5004.2 IFC 2012YES NO

SPECIAL CONDITIONS11PROPERTIES WITH FENCE AND GATES SHALL PROVIDE A 911 KEY BOX AT ENTRY GATE

ATRIUM(S) PER 404 IBC 2012?YES NO PAINT SPRAY BOOTHS, COATINGS,DIPPING OR INDUSTRIAL OVENS USEDPER 2404, 2405, 2406 AND CHAPTER 30 IFC2012?

YES NOYES NO HIGH RISE BLDG PER 403 IBC 2012?YES NO ANY FUEL STORAGE TANKS PER

5704 IFC 2012?YES NO SEPTIC SYSTEM? SUBMIT PLANS

TO WASTEWATER FOR REVIEW.YES NOYES NO

YES NO HEALTH DEPARTMENT APPROVAL?REQUIRED FOR ALL ESTABLISHMENTSTHAT SERVE/PREPARE FOOD ANDBEVERAGES FOR THE PUBLIC OR HAVEREFRIGERATED FOOD STORAGE.

YES NO MEDICAL GAS PER 5306 IFC 2012?YES NO

PUBLIC UTILITIES?

CERTIFICATION

PERMIT OFFICE

REVIEWER'S SIGNATURE BLOCK

THE PROJECT KNOWN AS(MUST BE THE NAME OF BUSINESS/DBA IF BUILDING IS FOR A SPECIFIC COMPANY)

PROJECT NUMBER: IFC 2012

COMMENTS & NOTES

A COPY OF THESE APPROVED CONSTRUCTION PLANS MUST BE KEPT AT PROJECT SITE FORTHE FINAL INSPECTION OF THE BUILDING

(http://www.hcad.org)

(http://www.eng.hctx.net/permits/Fire/Fire-Code/Fire-Code-Review)

SHEET NO.(S)DATE DESCRIPTION REVIEWER COUNTY P.E. FIRE CODEREVIEW

SHEET NUMBER

________ OF ________

WAS ACCEPTED BY HARRIS COUNTY FOR THE PURPOSES LISTED BELOW:

REVIEWER'S STAMP

CRITICAL FACILITIES (HARRIS COUNTYREGULATIONS AND AMENDMENTS)FIRE PUMP EMERGENCY STANDBYPOWER PER 913.8 HC AMENDMENTS?

MIXED OCCUPANCY

NO HVAC UNITS OVER 2,000 CFM

YES NO OTHER: __________________________

RESIDENTIAL BOARD AND CARE OCCUPANCIES (REFER TO THE HARRIS COUNTY CODEWORD OF THESAME NAME AND ALSO COMPLETE THE RESIDENTIAL BOARD AND CARE CERTIFICATION FORM

RBC-8A RBC-8B RBC-16A RBC-16B

NOT REQUIRED PER SECTION 907

NOT REQUIRED

Stephen.Kotaifani
Text Box
Intend design for S1 classification
Stephen.Kotaifani
Text Box
Although the design, the review and the build are completed for S1 classification, the permit for this project will be issued as U classification "Shell building" and no occupancy will be allowed until each tenant applies for separate permit as per AHJ regulations to ensure compliance with classification.
Stephen.Kotaifani
S. Kotaifani Approved Stamp
Stephen.Kotaifani
Text Box
1908120042
Stephen.Kotaifani
Approved
WWaddell
JonSteiberTHIN
Page 2: FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION …
Page 3: FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION …
Page 4: FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION …

I-45 NORTH

TO HOUSTON

F

.M

. 2

9

2

0

S

P

R

IN

G

S

T

U

E

B

N

E

R

W

E

S

T

G

R

A

N

D

P

A

R

K

W

A

Y

SPRING

STUEBNER EAST

RILEY FUZZELL

SPRING

CYPRESS

ALD

IN

E W

ES

TF

IE

LD

LOUETTA

CYPRESSWOOD

OH

E

OHEOHE

OHEOHE OHE

//

//

//

//

//

OHE OHE OHE OHE OHE OHE

OH

EO

HE

OH

EO

HE

OH

EO

HE

OH

EO

HE

THE UTILITY COMPANIES AND TO VERIFY THE EXISTING

PRIVATE AND PUBLIC UTILITIES FROM DAMAGE.

CONSTRUCTION. THE CONTRACTOR SHALL PROTECT ALL

LOCATION AND DEPTH OF THE UTILITIES PRIOR TO ANY

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY

LOCAL CODES, STANDARD SPECIFICATIONS, AND DRAWING

ALL WORK TO BE COMPLETED IN ACCORDANCE WITH ALL

OR REPLACE THE DAMAGED WORK TO ITS ORIGINAL

CONDITION-AT THE CONTRACTORS EXPENSE.

WHICH IS TO REMAIN - THEN THE CONTRACTOR SHALL REPAIR

THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE

AGENTS SHOULD DAMAGE OR DESTROY ANY EXISTING WORK

DURING THE COURSE OF WORK - IF THE CONTRACTOR OR ITS

KEEP SITE CLEAN AND SECURE AT ALL TIMES.

REMOVE ALL DEBRIS FROM SITE AND DISPOSE CORRECTLY.

PROJECT DATES

REQUIREMENTS.

OWNER PRIOR TO COMMENCING THE WORK.

5.

4.

3.

VICINITY MAP

GENERAL NOTES

2.

1.

BUILDING CODE AND DATA

INDEX OF DRAWINGS:

SITE PLAN

ENGINEER'S LICENSE SEAL, SIGNATURE & DATE.

COVER SHEETCS1

PROJECT SCOPE

12345

A1.10

ARCHITECTURAL

(NOT TO SCALE)

01-01-20 ISSUED FOR PERMIT REVIEW

SYMBOLS AND ABBREVIATIONSCS2

ACCESSIBILITY STANDARDSCS3

FLOOR PLAN & DETAILS

COVER SHEET

CS1

SCALE = AS NOTED 1COVER SHEET

JOB LOCATION

NEW CONSTRUCTION SHELL BUILDING

SHEET TITLE

DRAWN BY: MJM

PROJECT NO: 080717

CHECKED BY : SB

PROJECT TITLE

01-01-20 PERMIT DRAWINGS

SHEET NUMBER

1

MALONEY SERVICES L.L.C. 2020. THIS OFFICE ASSUMES NO

LIABILITY FOR ERRORS OR OMISSIONS ON THESE PLANS. ALL

INFORMATION MUST BE CONFIRMED PRIOR TO

COMMENCEMENT OF CONSTRUCTION. IT IS THE OWNERS AND

BUILDERS RESPONSIBILITY FOR FOLLOWING MATERIAL AND

MANUFACTURERS INSTRUCTIONS, AND USING RECOGNIZED

STANDARDS FOR EACH TRADE, AS WELL AS COMPLIANCE IN

FULL WITH ALL GOVERNING CODE REQUIREMENTS FOR THE

GEOGRAPHIC AREA IN WHICH THIS PROJECT IS TO BE

CONSTRUCTED.

PROJECT DESCRIPTION:

NEW CONSTRUCTION OF METAL BUILDING / OFFICE WAREHOUSE - TENANT

UNSPECIFIED

BUILDING CODES TO BE FOLLOWED

ALL DRAWINGS & CONSTRUCTION SHALL COMPLY

WITH THE INTERNATIONAL BUILDING

CODE 2012 ED.

2012 INTERNATIONAL FIRE CODE

OCCUPANCY USE: SHELL ONLY - 7,200 S.F. TOTAL

OCCUPANCY LOAD: SEE FIRE CODE REVIEW SHEET

CONSTRUCTION TYPE:

TYPE IIB

SPRINKLED:

NO

SQUARE FOOTAGE:

7,200

C-4.0 SITE PLAN

A1.20 BUILDING ELEVATIONS

BLDG "A" BLDG "B" BLDG "C"

BLDG "D"BLDG "E"

BLDG "F"

ALD

IN

E W

ES

TF

IE

LD

Maloney Services
Typewritten text
01-01-2020
Stephen.Kotaifani
S. Kotaifani Approved Stamp
Page 5: FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION …

PROVIDE FIRE BLOCKING WHERE WALLS INTERSECT FURR DOWNS AND

COMBUSTIBLE FRAMING. SPACE NO FARTHER THAN 10'-0" APART AND

AND LOCATE 2X FIRE BLOCKING AT ALL CONCEALED SPACES WITH

PROVIDE AS REQUIRED BY GOVERNING AUTHORITIES HAVING JURISDICTION

CONTRACTOR SHALL PROVIDE PROOF TO OWNER THAT ADEQUATE

CONTRACTOR WILL BE HELD RESPONSIBLE FOR STUDYING DRAWINGS,

TO HAVE VISITED THE SITE, AND TO HAVE SATISFIED HIMSELF

REGARDING ALL EXISTING CONDITIONS UNDER WHICH HE WILL BE

CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING

AND NEW WORK. ANY WORK DAMAGE FOR ANY REASON SHALL BE

SUBSTITUTIONS, REVISIONS OR CHANGES MAY BE ALLOWED ONLY IF

SUCH ITEMS ARE SUBMITTED TO THE OWNER IN A TIMELY MANNER IN

WRITING AND SUBSEQUENTLY APPROVED BY THE ARCHITECT IN DESIGN

AND PERFORMANCE. THE CONTRACTOR IS LIABLE FOR REPLACEMENT,

REPAIR AND DELAYS CAUSED BY ANY UNAUTHORIZED SUBSTITUTION,

AND COMPLETE SPECIFICATIONS AND DRAWINGS AS REQUIRED

COMPARING ITEMS. THE OWNER RESERVES THE RIGHT TO REJECT

UNLESS NOTED OTHERWISE, REFER TD THE EQUIPMENT DRAWINGS AND

SPECIFICATIONS FOR ALL KITCHEN EQUIPMENT WORK. KITCHEN

WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.

CONTRACTOR SHALL INSTALL ROUGH BLOCKING OR WOOD NAILERS

DURING THE ROUGH FRAMING STAGE OF CONSTRUCTION AS REQUIRED

FOR PROPERLY SECURING WALL CABINETS, SHELVING, LIGHTING AND

ELECTRICAL FIXTURES, WALL MOUNTED EQUIPMENT, MILLWORK,

APPLIED DECORATIVE TREATMENTS, AND HANDRAIL BRACKETS.

WHERE DISCREPANCIES EXIST IN DRAWINGS THE CONTRACTOR SHALL

NOTIFY THE OWNER IMMEDIATELY AND IF HE FAILS TO DO SO IT

WILL BE HIS RESPONSIBILITY TO CORRECT THE SITUATION REASONABLY

AS PER THE OWNER DIRECTION ENLARGED SCALE DRAWINGS

/DETAILS SHALL GOVERN OVER SMALLER SCALED DRAWINGS AND

AXX.XX

AXX.XX

CONTRACTOR SHALL SUPERVISE THE WORK AND COORDINATE ALL 7.

ALL MATERIALS AND EQUIPMENT INCORPORATED IN THE WORK SHALL

BE NEW UNLESS OTHERWISE SPECIFIED AND ALL WORK SHALL BE OF

GOOD QUALITY, FREE FROM FAULTS AND IN CONFORMANCE WITH THE

WOOD SHALL BE NEW UNLESS SPECIFIED AS "USED" OR "BARNWOOD.

CONTRACTOR SHALL KEEP THE PREMISES FREE FROM ACCUMULATION

OF WASTE MATERIALS OR RUBBISH CAUSED BY HIS OPERATIONS. AT

THE COMPLETION OF THE WORK HE SHALL PERFORM A FINAL CLEAN-UP

INSIDE, CLEAN ALL GLASS SURFACES AND LEAVE THE WORK ROOM

CONTRACTOR SHALL GUARANTEE FOR (1) ONE YEAR THAT ALL OF THE

WORK UNDER THE CONTRACT IS FREE FROM FAULTY MATERIALS,

WATER-TIGHT, AND LEAK PROOF IN EVERY PARTICULAR AND FREE FROM

AXX.XX

AXX.XX

AXX.XX

USED WOOD SHALL BE SUPPLIED BY OWNER.

IMPROPER WORKMANSHIP.

CLEAN.

11.

PORTIONS THEREOF.

PLANS.

10.

9.

8.

CEILINGS, AND WHERE INDICATED ON THE DRAWINGS

DRAFT STOPS & FIRE BLOCKING:

SPECIFICATIONS SHALL GOVERN ALL.

19A.

19.

17.

18.

UTILITY TAP FEES. G.C. SHALL PAY FOR REMAINING PERMITS & FEES.

ALL WORK PERFORMED SHALL BE IN STRICT ACCORDANCE WITH ALL

BEFORE PERFORMING ANY WORK OR ORDERING ANY MATERIALS, THE

CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF ANY EXISTING OR

NEW WORK AND SHALL BE RESPONSIBLE FOR THEIR ACCURACY, ANY

DIFFERENCES FOUND SHALL BE SUBMITTED TO THE ARCHITECT FOR

OWNER SHALL PAY FOR GENERAL BUILDING PERMIT, IMPACT FEES &

CONTRACTOR SHALL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT,

FIXTURES, AND SERVICE NECESSARY FOR THE PROPER EXECUTION OF

CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACTS AND OMISSIONS

APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING

CONSIDERATION BEFORE PROCEEDING WITH THE WORK. THE

CONTRACTOR SHALL ALSO VERIFY THE LOCATION OF EXISTING

UTILITIES PRIOR TO BEGINNING WORK.

UTILITIES SHALL BE PROVIDED BY CONTRACTOR.

OF ALL HIS EMPLOYEES AND SUBCONTRACTORS.

THE PLANS.

6.

4.

5.

3.

JURISDICTION.

2.

1.

DRAWINGS GOVERN FOR ALL CRITICAL DIMENSIONS.

LIABILITY INSURANCE HAS BEEN OBTAINED.

OBLIGED TO OPERATE.

REPLACED AT NO COST TO THE OWNER.

FOR ANY REASON.

16.

15.

14.

13.

12.

NOT USED

PROVIDE VAPOR RETARDER WITH A MAX. PERF OF ONE

PROVIDE GALVANIZED STRAP MASONRY TIES AT 16" O.C. EACH WAY.

CERTIFIED TEST & BALANCE REPORT IS REQUIRED BY LOCAL AUTHORITY.)

ALL GYPSUM BOARD TO BE 5/8' TYPE 'X' UNLESS NOTED OTHERWISE. IN

DAMP AREAS GREEN GYPSUM SHALL BE USED IN LIEU OF GYP. BOARD.

IN WET AREAS DUR-ROCK OR CONC./MESH BD. SHALL BE USED.

ALL WORK ON THIS PROJECT SHALL BE IN CONFORMANCE WITH THE

1.STATE AND LOCAL BUILDING CODE LATEST EDITION

2.NATIONAL FIRE CODES: BY NFPA

3.NATIONAL ELECTRICAL CODE (LATEST EDITION)

5.NATIONAL SANITATION FOUNDATIONS (N.S.F.)

6.OCCUPATIONAL SAFETY AND HEALTH STANDARDS - 1910, CHAPTER

XVII OF TITLE 20, CODE OF FEDERAL REGULATIONS.

7.REGULATIONS BY UTILITY COMPANIES SUPPLYING UTILITIES TO THE

PROJECT, BOTH TEMPORARILY AND PERMANENTLY.

8.COMPRESSED GAS ASSOCIATION (C.G.A.)

9.FIRE RESISTANCE RATINGS: BY AMERICAN INSURANCE ASSOCIATION.

CONTRACTOR TO BALANCE SYSTEM FOR ADEQUATE AIR DISTRIBUTION

WITHIN ALL CONDITIONED AREAS TO THE OWNER'S SATISFACTION. (UNLESS

CONTRACTOR SHALL SUBMIT ALL WOOD STAIN AND SPECIALTY FINISHES

SAMPLES TO THE ARCHITECT AND OWNER FOR APPROVAL PRIOR TO

FINAL FINISHING. IF FAILURE TO SUBMIT SAMPLES FOR APPROVAL THE

CONTRACTOR WILL BE RESPONSIBLE FOR REFINISHING TO THE

ARCHITECT AND OWNER'S SATISFACTION.

CONTRACTOR SHALL REPAIR WALLS AND EQUIPMENT DAMAGED DURING

CONTRACTOR SHALL COMPLY WITH ALL THE REQUIREMENTS AS STATED

IN THE AIA A201 GENERAL CONDITIONS OF THE CONTRACT FOR

CONSTRUCTION, 1987 EDITION, UNLESS WRITTEN AUTHORIZATION IS

1. ART CONSULTING

CONTRACTOR SHALL COORDINATE ALL DELIVERIES AND ACCESSIBILITY

TO BUILDING FOR ALL ITEMS SUCH AS, BUT NOT LIMITED TO THE

FOLLOWING' FURNITURE, FIXTURES, EQUIPMENT, ACCESSORIES.

PRIOR TO STARTING CONSTRUCTION THE GENERAL CONTRACTOR SHALL

BE RESPONSIBLE TO VERIFY THAT ALL REQUIRED PERMITS AND

APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION

OF ANY ITEM SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED ALL

PLANS AND ANY OTHER APPROVALS FROM GOVERNMENTAL AGENCIES

OR OTHER REGULATORY AUTHORITIES HAVING JURISDICTION OVER THE

PROJECT. FAILURE OF THE CONTRACTOR TO FOLLOW THIS PROCEDURE

SHALL CAUSE THE CONTRACTOR TO ASSUME FULL RESPONSIBILITY FOR

ANY SUBSEQUENT MODIFICATION OF THE WORK MANDATED BY ANY

2. SPECIALTY LIGHTING

3. KITCHEN EQUIPMENT

REGULATORY AUTHORITY.

26.

25.

35.

34.

33.

32.

31.

AT THE WARM SIDE OF INSULATION.

CONSTRUCTION AS REQUIRED.

OBTAINED BY THE ARCHITECT.

SHOP DRAWINGS SHALL BE SUBMITTED TO THE OWNER FOR APPROVAL

PRIOR TO FABRICATION OF ANY ITEM. FAILURE TO ADHERE TO THIS

PROCEDURE SHALL PLACE FULL RESPONSIBILITY FOR ANY ERRORS

UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE TO STUD

THE SUBMISSION OF A BID OR PROPOSAL WILL BE CONSTRUED AS

EVIDENCE THAT THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH

THE PLANS AND EXISTING CONDITIONS OF THE BUILDING SITE. CLAIMS

MADE SUBSEQUENT TO THE PROPOSAL FOR MATERIALS AND LABOR

BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE RECOGNIZED IF

THEY COULD HAVE BEEN FORESEEN HAD PROPER EXAMINATION BEEN

ALL WOOD PLATFORMS ARE TO HAVE FIRE BLOCK SEPARATION

CONTRACTOR TO COORDINATE ALL WORK WITH OWNER'S

CONSULTANTS AND OWNER'S CONTRACTORS OF EACH SPECIALTY AREA.

SUCH SPECIALTY AREAS SHALL INCLUDE BUT NOT LIMITED TO THE

DIRECTLY UPON THE CONTRACTOR.

FRAMING.

WALLS FOR EVERY 100 SQUARE FEET.

FOLLOWING:

24.

23.

MADE.

22.

21.

20.

30.

29.

28.

27.

4.NATIONAL PLUMBING CODE

FOLLOWING

ANY ROOM THAT IS USED FOR AN ASSEMBLY PURPOSE WHERE FIXED 36.

SEATS ARE NOT INSTALLED SHALL HAVE THE CAPACITY OF THE ROOM POSTED

IN A CONSPICUOUS PLACE ON AN APPROVED SIGN NEAR THE MAIN EXIT OR

EXIT-ACCESS DOORWAY FROM THE ROOM. SUCH SIGNS SHALL INDICATE THE

NUMBER OF OCCUPANTS PERMITTED FOR EACH ROOM USE.

SYMBOLS &

ABBREVIATIONS

CS2

SHEET TITLE

DRAWN BY: MJM

PROJECT NO: 080717

CHECKED BY : SB

PROJECT TITLE

01-01-20 PERMIT DRAWINGS

SHEET NUMBER

1

MALONEY SERVICES L.L.C. 2020. THIS OFFICE ASSUMES NO

LIABILITY FOR ERRORS OR OMISSIONS ON THESE PLANS. ALL

INFORMATION MUST BE CONFIRMED PRIOR TO

COMMENCEMENT OF CONSTRUCTION. IT IS THE OWNERS AND

BUILDERS RESPONSIBILITY FOR FOLLOWING MATERIAL AND

MANUFACTURERS INSTRUCTIONS, AND USING RECOGNIZED

STANDARDS FOR EACH TRADE, AS WELL AS COMPLIANCE IN

FULL WITH ALL GOVERNING CODE REQUIREMENTS FOR THE

GEOGRAPHIC AREA IN WHICH THIS PROJECT IS TO BE

CONSTRUCTED.

Page 6: FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION …

ACCESSIBILITY CRITERIA NOT SHOWN HERE.

THE INFORMATION ON THIS SHEET IS NOT "ALL-INCLUSIVE" OF THE ACCESSIBILITY STANDARD

REQUIREMENTS INDICATED. THE CONTRACTOR SHALL REFER TO SAID STANDARDS FOR

ACCESSIBLE STANDARDS:

DOOR CLEARANCES

GENERAL NOTES DRINKING FOUNTAINS

MIN. CLEAR FLOOR SPACESCURB RAMPS AND PARKING -

SITE DRAWINGS

REFER TO

STANDARD CABINET SECTION RAMPS

ACCESSIBLE SYMBOL-

BATHROOM FIXTURES, LAVATORY AND SINK CLEARANCES

ACCESSIBLE PARKING SIGNREACH RANGES

PARKING STALL

ACCESIBILITY

STANDARDS

CS3

SCALE = AS NOTED 1

SHEET TITLE

DRAWN BY: MJM

PROJECT NO: 080717

CHECKED BY : SB

PROJECT TITLE

01-01-20 PERMIT DRAWINGS

SHEET NUMBER

1

MALONEY SERVICES L.L.C. 2020. THIS OFFICE ASSUMES NO

LIABILITY FOR ERRORS OR OMISSIONS ON THESE PLANS. ALL

INFORMATION MUST BE CONFIRMED PRIOR TO

COMMENCEMENT OF CONSTRUCTION. IT IS THE OWNERS AND

BUILDERS RESPONSIBILITY FOR FOLLOWING MATERIAL AND

MANUFACTURERS INSTRUCTIONS, AND USING RECOGNIZED

STANDARDS FOR EACH TRADE, AS WELL AS COMPLIANCE IN

FULL WITH ALL GOVERNING CODE REQUIREMENTS FOR THE

GEOGRAPHIC AREA IN WHICH THIS PROJECT IS TO BE

CONSTRUCTED.

Page 7: FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION …

160'-0"

45

'-0

"

PARKING AREA

12'X12' OVERHEAD

DOOR

12'X12' OVERHEAD

DOOR

12'X12' OVERHEAD

DOOR

12'X12' OVERHEAD

DOOR

EXIT SIGN W/ LIGHTS AND

BATTERY BACK-UP POWER

EMERGENCY EXIT LIGHTS WITH

BATTERY BACK-UP POWER

EXTERIOR RATED

WALL MOUNTED FIRE

EXTINGUISHER

FLOOR PLAN &

DETAILS

A1.10

SCALE: 1/8"=1'-0" 1FLOOR PLANDOOR DETAILS SCALE: NTS 3

LEGEND AND WALL DETAILS

SHEET TITLE

DRAWN BY: MJM

PROJECT NO: 080717

CHECKED BY : SB

PROJECT TITLE

01-01-20 PERMIT DRAWINGS

SHEET NUMBER

1

MALONEY SERVICES L.L.C. 2020. THIS OFFICE ASSUMES NO

LIABILITY FOR ERRORS OR OMISSIONS ON THESE PLANS. ALL

INFORMATION MUST BE CONFIRMED PRIOR TO

COMMENCEMENT OF CONSTRUCTION. IT IS THE OWNERS AND

BUILDERS RESPONSIBILITY FOR FOLLOWING MATERIAL AND

MANUFACTURERS INSTRUCTIONS, AND USING RECOGNIZED

STANDARDS FOR EACH TRADE, AS WELL AS COMPLIANCE IN

FULL WITH ALL GOVERNING CODE REQUIREMENTS FOR THE

GEOGRAPHIC AREA IN WHICH THIS PROJECT IS TO BE

CONSTRUCTED.

SCALE: NTS 2

1 HR. FIRE RATED WALL

1 HR. FIRE RATED WALL

Maloney Services
Typewritten text
01-01-2020
Stephen.Kotaifani
S. Kotaifani Approved Stamp
Page 8: FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION …

160'-0"

16'-0"

21

'-5

"

2/12 COMMON PITCH METAL ROOF TYP.

45'-0"

16

'-0

"

120'-0"

16'-0"

21'-5"

2/12 COMMON PITCH METAL ROOF TYP.

45'-0"

16

'-0

"

BUILDING

ELEVATIONS

A1.20

SCALE: 1/8"=1'-0" 1SOUTH ELEVATION

SHEET TITLE

DRAWN BY: MJM

PROJECT NO: 080717

CHECKED BY : SB

PROJECT TITLE

01-01-20 PERMIT DRAWINGS

SHEET NUMBER

1

MALONEY SERVICES L.L.C. 2020. THIS OFFICE ASSUMES NO

LIABILITY FOR ERRORS OR OMISSIONS ON THESE PLANS. ALL

INFORMATION MUST BE CONFIRMED PRIOR TO

COMMENCEMENT OF CONSTRUCTION. IT IS THE OWNERS AND

BUILDERS RESPONSIBILITY FOR FOLLOWING MATERIAL AND

MANUFACTURERS INSTRUCTIONS, AND USING RECOGNIZED

STANDARDS FOR EACH TRADE, AS WELL AS COMPLIANCE IN

FULL WITH ALL GOVERNING CODE REQUIREMENTS FOR THE

GEOGRAPHIC AREA IN WHICH THIS PROJECT IS TO BE

CONSTRUCTED.

SCALE: 1/8"=1'-0" 2

EAST ELEVATION

SCALE: 1/8"=1'-0" 3

WEST ELEVATION SCALE: 1/8"=1'-0" 4

NORTH ELEVATION

1 HR. FIRE RATED WALL

1 HR. FIRE RATED WALL

Maloney Services
Typewritten text
01-01-2020
Stephen.Kotaifani
S. Kotaifani Approved Stamp
Page 9: FIRE CODE DESIGN AND COMPLIANCE REVIEW SHEET VERSION …

SITE PLAN

SP1.10

SCALE: 1"=25'-0" 1SITE PLAN

SHEET TITLE

DRAWN BY: MJM

PROJECT NO: 080717

CHECKED BY : SB

PROJECT TITLE

01-01-20 PERMIT DRAWINGS

SHEET NUMBER

1

MALONEY SERVICES L.L.C. 2020. THIS OFFICE ASSUMES NO

LIABILITY FOR ERRORS OR OMISSIONS ON THESE PLANS. ALL

INFORMATION MUST BE CONFIRMED PRIOR TO

COMMENCEMENT OF CONSTRUCTION. IT IS THE OWNERS AND

BUILDERS RESPONSIBILITY FOR FOLLOWING MATERIAL AND

MANUFACTURERS INSTRUCTIONS, AND USING RECOGNIZED

STANDARDS FOR EACH TRADE, AS WELL AS COMPLIANCE IN

FULL WITH ALL GOVERNING CODE REQUIREMENTS FOR THE

GEOGRAPHIC AREA IN WHICH THIS PROJECT IS TO BE

CONSTRUCTED.

*

EXISTING FIRE HYDRANT

*

EXISTING FIRE HYDRANT 132' FROM PROPERTY LINE

*

EXISTING FIRE HYDRANT 125' FROM PROPERTY LINE

*

NEW FIRE HYDRANT

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

1 HR FIRE RATED

WALL SYSTEM

Maloney Services
Typewritten text
01-01-2020
Stephen.Kotaifani
S. Kotaifani Approved Stamp