ARC O5005512ARC 05005521ARC 05005532ARC 05005533ARC 05005515ARC 05005517ARC 04805449ARC 04305278ARC 04305283
CONSTRUCTION WORKSHOP
![Page 2: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/2.jpg)
FINISHING WORKS OF BUILDING CONSTRUCTION
West raja bazar,house -48Road-1
![Page 3: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/3.jpg)
WALL-
A WALL IS A STRUCTURE THAT DEFINES AN AREA, CARRIES A LOAD, OR PROVIDES SHELTER OR SECURITY
WALL FINISHING
![Page 4: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/4.jpg)
WALL FINISHING STEPS OF WALL FINISHING
CURING TIME OF BRICK- BEFORE BONDING-24 HOUR
MORTARS WIDTH BETWEEN TWO
BRICKS OF MASONRY WALL ½” ,
CURING TIME OF MASONRY BRICK MASONRY WALL 7-14 DAYS BEFORE PLASTER AFTER PLASTERING 7-14 DAYS
![Page 5: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/5.jpg)
WALL FINISHING STEPS OF WALL FINISHING
RATIO OF MORTER
RATIO OF MORTER FOR 5” WALL BONDING 1:4 (CEMENT:SAND)
RATIO OF MORTAR FOR 10” WALL BONDING 1:5 (CEMENT:SAND)
REQUIRED TOOLS FOR MASONRY WALL TROWELL,BRICK HAMMER ,SPIRIT LEVEL,PLUMB BOB.METRE RULE,LINE AND PINS
![Page 6: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/6.jpg)
WALL FINISHINGSTEPS OF PLASTERING
CURING THE WALL THREE TIMES OF THE DAY (7 DAYS)BRUSHING AND SCRAPING THE WALL RAKED JOINTS WASHED THE WALL WITH WATER AND KEPT WET BEFORE PLASTERING RATIO OF MORTER FOR PLASTER 1:4PLASTER THICKNESS 1/2” -1”CURING TIME OF WALL AFTER PLASTERING 10 DAYS
![Page 7: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/7.jpg)
WALL FINISHING STEPS OF PAINTING
PREPARATION OF SURFACE:
FIRST RUBBED THE PLASTER BY WALL PLASTER STONE(60 NO. ,80 NO. , 120 NO.)THEN RUBBED THE WALL WITH BRUSHES FOR FREE FROM MORTAR DROPPINGS AND OTHER FOREIGN-MATTER
![Page 8: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/8.jpg)
WALL FINISHING STEPS OF PAINTING
3 STEPS OF PAINT-
PARIMARY COATING (WHITE WASHING)
SECONDARY COATING (COLOUR WASHING)
TERTIARY COATING (DISTEMPER)
TIME DURATION COATING- MINIMUM 1 DAY
![Page 9: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/9.jpg)
WALL FINISHING STEPS OF TILES
FIRST WASHED THE WALL WITH WATER AND KEPT WET BEFORE TILES SETTINGSECOND PASTE THE MORTER OVER THE WALLMORTER RATIO FOR TILES 1:3 OR 1:4THICKNESS OF MORTER FOR TILES ¾” BEFORE SETTING TILES HAVE TO CURING 1- 1.5 HOURRATIO OF TILES FOOTING 1:1 (WHITE CEMENT:WATER)
![Page 10: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/10.jpg)
CERAMIC TILES GLASS TILE
![Page 11: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/11.jpg)
CERAMIC TILES DIGITAL/3D TILE
![Page 12: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/12.jpg)
CERAMIC TILES
Gilded Ceramic Tile
![Page 13: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/13.jpg)
STONE TILES
![Page 14: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/14.jpg)
NATURAL STONE
![Page 15: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/15.jpg)
CLADDING TILES
![Page 16: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/16.jpg)
BATHROOM WALL TILES
![Page 17: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/17.jpg)
KITCHEN WALL TILES
![Page 18: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/18.jpg)
WALL FINISHING
TYPES OF WALL
BRICK WALLWOODEN WALLCONCRETE WALLFERROCEMENT WALLSTONE WALLBAMBOO WALL
![Page 19: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/19.jpg)
BRICK WALL
BRICKWORK IS MASONRY PRODUCED BY A BRICKLAYER, USING BRICKS AND MORTAR IN A VARIETY OF PATTERNS WITH A VARIETY OF MORTAR JOINTS. TYPICALLY, ROWS OF BRICKS – CALLED COURSES – ARE LAID ON TOP OF ONE ANOTHER TO BUILD UP A STRUCTURE SUCH AS A BRICK WALL.
![Page 20: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/20.jpg)
WOODEN WALL
![Page 21: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/21.jpg)
CONCRETE WALL
![Page 22: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/22.jpg)
FERROCEMENT WALL
![Page 23: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/23.jpg)
STONE WALL
![Page 24: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/24.jpg)
BAMBOO WALL
![Page 25: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/25.jpg)
A FLOOR IS THE WALKING SURFACE OF A ROOM OR VEHICLE. FLOORS MAY BE STONE, WOOD, BAMBOO, METAL, OR ANY OTHER MATERIAL THAT CAN SUPPORT THE EXPECTED LOAD.
FLOOR FINISHING
![Page 26: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/26.jpg)
STEPS OF FLOOR FINISHING
CHIPING THE FLOOR BY ROUGHING TOOL (LOCALLY-বা�সু�লা�), CLEAN THE TOTAL FLOOR BY WATER LEVEL THE FLOOR BY LEVELING TOOLS COVER THE FLOOR BY MORTER MIXING (RATIO OF MORTER -1:3THICKNESS OF MORTAR – ½” COVER THE MORTER BY GRAVING CEMENT.MIXING RATIO OF GRAVING CEMENT (1:1) (CEMENT:WATER)6TH SET THE TILES OVER THE MORTAR-CURING THE CERAMICS TILES 1- ½ HOUR BEFORE SETTING ON THE FLOOR.TILES--A TILE IS A MANUFACTURED PIECE OF HARD-WEARING MATERIAL SUCH AS CERAMIC, STONE, METAL, OR EVEN GLASS , walls.
FLOOR FINISHING
![Page 27: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/27.jpg)
FLOOR FINISHING
•WET FLOORING•MUD FLOOR•BRICK FLOOR•CONCRETE FLOOR•TILES FLOOR•MARBLE & GRANITE•NET CEMENT
•DRY FLOORING
•WOODEN FLOOR•BAMBOO FLOOR•GLASS FLOOR•METAL FLOOR•VINYL SHEET•RUBBER FLOORING
TYPES OF FLOORWET FLOORINGDRY FLOORING
![Page 28: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/28.jpg)
WET FLOORING
MUD FLOORING
![Page 29: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/29.jpg)
WET FLOORING
BRICK FLOORING
![Page 30: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/30.jpg)
WET FLOORING
CONCRETE FLOORING
![Page 31: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/31.jpg)
WET FLOORING
TILES FLOORING
![Page 32: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/32.jpg)
WET FLOORING
MARBEL FLOORING
![Page 33: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/33.jpg)
WET FLOORING
TERAZZO FLOORING
![Page 34: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/34.jpg)
DRY FLOORING
WOODEN FLOORING
![Page 35: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/35.jpg)
DRY FLOORING
BAMBOO FLOORING
![Page 36: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/36.jpg)
DRY FLOORING
GLASS FLOORING
GLASS
![Page 37: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/37.jpg)
DRY FLOORING
METAL FLOORING
![Page 38: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/38.jpg)
DRY FLOORING
STONE FLOORING
![Page 39: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/39.jpg)
DRY FLOORING
VENYL SHEET FLOORING
![Page 40: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/40.jpg)
CEILING FINISHING
CEILING ---- A CEILING IS AN OVERHEAD INTERIOR SURFACE THAT COVERS THE UPPER LIMIT OF A ROOM. IT IS NOT GENERALLY CONSIDERED A STRUCTURAL ELEMENT, BUT A FINISHED SURFACE CONCEALING THE UNDERSIDE OF THE FLOOR OR ROOF STRUCTURE ABOVE.
![Page 41: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/41.jpg)
CEILING FINISHING
DROPPED CEILING ---- A DROPPED CEILING IS A SECONDARY CEILING, HUNG BELOW THE MAIN (STRUCTURAL) CEILING. IT MAY ALSO BE REFERRED TO AS A DROP CEILING, T-BAR CEILING, FALSE CEILING, SUSPENDED CEILING, GRID CEILING, DROP IN CEILING, OR DROP OUT CEILING.
![Page 42: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/42.jpg)
CEILING FINISHING
STEPS OF CEILING FINISHING
CHIPING THE CEILING. WASH THE CEILING BY WATER. COVER THE TOTAL CEILING BY GRABING CEMENT.THAN COVER THE GRABING CEMENT BY MORTAR THICKNESS OF CEILING PLASTER ½”
![Page 43: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/43.jpg)
DOOR SETTING
DOOR ---- A DOOR IS A MOVING STRUCTURE USED TO BLOCK OFF, AND ALLOW ACCESS TO, AN ENTRANCE TO OR WITHIN AN ENCLOSED SPACE, SUCH AS A BUILDING OR VEHICLE. SIMILAR EXTERIOR STRUCTURES ARE CALLED GATES. WHEN OPEN, DOORS ADMIT PEOPLE, ANIMALS, VENTILATION, AND LIGHT.
![Page 44: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/44.jpg)
DOOR SETTING
DOOR TYPES :
SWINGING DOORBYPASS SLIDING DOORSURFACE SLIDING DOORPOCKET SLIDING DOORFOLDING DOOR
SWINGING DOOR
![Page 45: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/45.jpg)
DOOR SETTING
DOOR SETTING TIME :
DOOR FRAME- DURING BRICK WORKS AND BEFORE WALL PLASTERINGDOOR PANEL- AFTER WALL AND FLOOR TILES SETTING
![Page 46: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/46.jpg)
DOOR SETTING
DOOR ELEMENTS :
DOOR PANELDOOR FRAMEHINGESDOOR LOCKSETS
DOOR LOCK
DOOR PANEL
HINGES
DOOR FRAME
![Page 47: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/47.jpg)
DOOR MODULE
![Page 48: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/48.jpg)
WINDOW SETTING
•A WINDOW IS AN OPENING IN A WALL THAT ALLOWS THE PASSAGE OF LIGHT AND AIR IF NOT CLOSED OR SEALED.
•MODERN WINDOWS ARE USUALLY GLAZED OR COVERED IN SOME OTHER TRANSPARENT OR TRANSLUCENT MATERIAL.
![Page 49: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/49.jpg)
WINDOW SETTING
WINDOW TYPES: FIXED WINDOWCASEMENT WINDOWAWNING & HOPPER WINDOWSLIDING WINDOWDOUBLE – HUNG WINDOWPIVOTING WINDOWHIGH WINDOW
![Page 50: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/50.jpg)
WINDOW SETTING
WINDOW SETTING TIME: WINDOW GRILL- DURING BRICK WORKS AND BEFORE WALL PLASTERINGWINDOW FRAME- AFTER WALL PLASTERINGWINDOW SLIDING PANEL-AFTER PLASTERING AND TILES SETTING
![Page 51: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/51.jpg)
WINDOW SETTING
WINDOW ELEMENTS: WINDOW FRAMECASING TRIMROUGH OPENING SASH AND GLAZING
FRAME
CASING TRIM
SASH AND GLAZING
ROUGH OPENING
![Page 52: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/52.jpg)
GRILL SETTING TIME:
WINDOW GRILL SETTING
DURING BRICK WORK AND BEFORE WALL PLASTER
![Page 53: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/53.jpg)
RAILING SETTING TIME:
RALING SETTING
DURING BRICK WORK AND BEFORE WALL PLASTER.
![Page 54: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/54.jpg)
STAIR RAILING
STAIR RAILING SETTING TIME- AFTER OPEN SHUTTERING OF STAIR .
![Page 55: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/55.jpg)
PLUMBING
PLUMBING IS THE SYSTEM OF PIPES, DRAINS FITTINGS, VALVES, AND DEVICES INSTALLED IN A BUILDING FOR THE DISTRIBUTION OF WATER FOR DRINKING, HEATING AND WASHING, AND THE REMOVAL OF WATERBORNE WASTES.
PLUMBING AND FIXTURE
![Page 56: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/56.jpg)
PLUMBING COMPONENT SETTINGS TIME: AFTER BRICK WORKS AND BEFORE WALL PLASTER AND TILES SETTING.
PLUMBING AND FIXTURE
![Page 57: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/57.jpg)
PIPE OR TUBINGVALVESELBOWSTEES AND UNIONS
PLUMBING COMPONENTS:
![Page 58: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/58.jpg)
PLUMBING COMPONENTS:
PIPE OR TUBING
![Page 59: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/59.jpg)
PLUMBING COMPONENTS:
VALVES
![Page 60: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/60.jpg)
PLUMBING COMPONENTS:
ELBOWS
![Page 61: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/61.jpg)
PLUMBING COMPONENTS:
TEES
![Page 62: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/62.jpg)
PLUMBING COMPONENTS:
UNIONS
![Page 63: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/63.jpg)
A KITCHEN IS A ROOM OR PART OF A ROOM USED FOR COOKING AND FOOD PREPARATION.
KITCHEN
![Page 64: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/64.jpg)
KITCHEN FIXTURES:SINKRANGEKITCHEN HOOD
KITCHEN FIXTURES SETTINGS TIME: SINK-BEFORE TILES SETTING.RANGE AND KITCHEN HOOD AFTER PLASTERING OR TILES SETTING
KITCHEN
![Page 65: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/65.jpg)
SINK
KITCHEN FIXTURES
![Page 66: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/66.jpg)
KITCHEN RANGE
KITCHEN FIXTURES
![Page 67: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/67.jpg)
KITCHEN HOOD
KITCHEN FIXTURES
![Page 68: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/68.jpg)
KITCHEN CABINETS
KITCHEN FIXTURES
![Page 69: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/69.jpg)
A TOILET IS A SANITATION FIXTURE USED PRIMARILY FOR THE DISPOSAL OF HUMAN URINE AND FECES. THEY ARE OFTEN FOUND IN A SMALL ROOM REFERRED TO AS A TOILET/BATHROOM/LABORATORY
TOILET
![Page 70: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/70.jpg)
BASINSHOWERSURINALSWATER CLOSETS (WC)LOW PAN
TOILET FIXTURES SETTING TIME: W.C , LOW PAN AND BASIN- BEFORE TILES SETTING
TOILET FIXTURES
![Page 71: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/71.jpg)
BASIN
TOILET FIXTURES
![Page 72: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/72.jpg)
SHOWERS
TOILET FIXTURES
C 6’-6”
C 3’-6”
![Page 73: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/73.jpg)
URINALS
TOILET FIXTURES
![Page 74: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/74.jpg)
WATER CLOSET
TOILET FIXTURES
![Page 75: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/75.jpg)
LOW PAN
TOILET FIXTURES
![Page 76: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/76.jpg)
ELECTRICAL SYSTEMS IS THE ELECTRICAL WIRING AND ASSOCIATED DEVICES SUCH AS SWITCHES, METERS AND LIGHT FITTINGS USED IN BUILDINGS OR OTHER STRUCTURES.
ELECTRICAL SYSTEMS
![Page 77: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/77.jpg)
ELECTRICAL SYSTEMS COMPONENT:ELECTRIC POWERELECTRIC SERVICEELECTRIC CIRCUITSELECTRIC WIRINGELECTRICAL OUTLETS
ELECTRICAL SYSTEMS
![Page 78: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/78.jpg)
ELECTRIC POWER
ELECTRICAL SYSTEMS COMPONENT
![Page 79: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/79.jpg)
ELECTRIC SERVICE
ELECTRICAL SYSTEMS COMPONENT
![Page 80: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/80.jpg)
ELECTRICAL SYSTEMS COMPONENT
ELECTRIC CIRCUITS
![Page 81: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/81.jpg)
ELECTRIC WIRING
ELECTRICAL SYSTEMS COMPONENT
![Page 82: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/82.jpg)
ELECTRIC OUTLETS
ELECTRICAL SYSTEMS COMPONENT
![Page 83: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/83.jpg)
ELECTRICAL SYSTEMS SETTING TIME
FIRST ELECTRICAL SERVICES (PIPE) – BEFORE CASTING OF ROOF AND AFTER BRICK WORKSELECTRICAL CIRCUITS-BEFORE WALL PALSTERINGELECTRIC WIRING- AFTER ELECTRICAL CIRCUIT SETTINGELECTRICAL OUTLETS - AFTER WALL PLASTERING AND WALL PAINT OR TILES FITTINGS
ELECTRICAL SYSTEMS
![Page 84: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/84.jpg)
AN ELEVATOR (LIFT IN BRITISH ENGLISH) IS A TYPE OF VERTICAL TRANSPORT EQUIPMENT THAT EFFICIENTLY MOVES PEOPLE OR GOODS BETWEEN FLOORS (LEVELS, DECKS) OF A BUILDING, OR OTHER STRUCTURE.
LIFTT
![Page 85: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/85.jpg)
LIFT
![Page 86: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/86.jpg)
LIFT
![Page 87: Finishing works detail of residence building](https://reader036.fdocuments.in/reader036/viewer/2022081501/55d6dbcdbb61eb58538b456b/html5/thumbnails/87.jpg)
THANK YOU