Final Panels

2
THE 10-SECOND EXPERIENCE WESTERN GATEWAY DESIGN PROJECT Princes Freeway. The compelling proposed Gateway is highly eye-catching to those entering the urban precinct of the municipality and to those travelling along the freeway. EOI In the Expression of Interest stage, we as a group had developed 3 major ideas to (voronoi/layering) and ecology (rooting system). CONCEPT A tunnel as an indication of distance travelled (interval of every 50 meters) Tunnel Length: 300 meters; Width: 30 meters; Height: 4-8 meters. DESIGN IDEAS VORONOI & LIGHTING The tunnel is made up of 2 layers of voronoi pattern, forming a structural skin. Using an interval of every 50m, an attractor point is applied while constructing the voronoi pattern. This results in a big contrast between the cell sizes. angles by joining the 2 layers, and these extrusions then become the main support desired areas. Smaller cells are not extruded to provide ventilation and acts as a cut light technique. Cut technique is achieved by direct light penetration through the pattern at sharp angles. The scale of the gaps becomes a major issue in controlling the desired amount of light for penetration. Since smaller cells are located every 50m, the cut light technique also act as an indication of distance travelled by car drivers. now a 10- second experience (100km/hr), rather than a structure. Side Perspective Interior Perspective Aerial View CHENG, YOKE YEE 345573 CHUNG, SZE MAN 538128 KWAN, WEI KUAN 524163

description

Final Panels

Transcript of Final Panels

Page 1: Final Panels

THE 10-SECOND EXPERIENCE

WESTERN GATEWAY DESIGN PROJECT

Princes Freeway. The compelling proposed Gateway is highly eye-catching to those entering the urban precinct of the municipality and to those travelling along the freeway.

EOIIn the Expression of Interest stage, we as a group had developed 3 major ideas to

(voronoi/layering) and ecology (rooting system).

CONCEPTA tunnel as an indication of distance travelled (interval of every 50 meters)Tunnel Length: 300 meters; Width: 30 meters; Height: 4-8 meters.

DESIGN IDEASVORONOI & LIGHTING

The tunnel is made up of 2 layers of voronoi pattern, forming a structural skin. Using an interval of every 50m, an attractor point is applied while constructing the voronoi pattern. This results in a big contrast between the cell sizes.

angles by joining the 2 layers, and these extrusions then become the main support

desired areas.

Smaller cells are not extruded to provide ventilation and acts as a cut light technique. Cut technique is achieved by direct light penetration through the pattern at sharp angles. The scale of the gaps becomes a major issue in controlling the desired amount of light for penetration. Since smaller cells are located every 50m, the cut light technique also act as an indication of distance travelled by car drivers.

now a 10- second experience (100km/hr), rather than a structure. Side Perspective

Interior Perspective

Aerial View

CHENG, YOKE YEE 345573 CHUNG, SZE MAN 538128 KWAN, WEI KUAN 524163

construction technique construction detail - joint

FABRICATIONCONCRETE PAD FOOTINGConcrete pad footings are used because they are suitable for point loads. The two ends of the arch are joined to the concrete pad footing using rubber sealant ball socket to allow slight movement due to expansion and contraction.

CARBON FIBERThe tunnel spans 300m length and has the height of 4m(lowest) to 8m(highest), without any column. The tunnel itself cannot a�ord to be made of heavyweight material. Carbon �ber is a very strong and light �ber-reinforced polymer, which is also corrosion-resistant. It is a common material for automotive and civil engineering. A way of fabricating it is by molding. It is by layering sheets of carbon �ber into a mold in the shape of a temporary steel skeleton. After �lling epoxy into the mold, it is then heated and air-cured. After the carbon �ber has become solid enough, the temporary skeleton is then removed.

VORONOI STRUCTURESThe intercepting elements of the voronoi structures also act as support to the whole tunnel as load is transferred along them. The extrusion between the two layers at the di�used lighting part can act as supports to hold the two layers together. Rainwater can escape from the sides of the semi-transparent glass as they are not completely sealed.

stop motion lighting e�ect of 1:50 model

di�used & cut lighting e�ect of 1:50 model

di�used & cut lighting e�ect of 1:50 model at night

Page 2: Final Panels

construction technique construction detail - joint

FABRICATIONCONCRETE PAD FOOTINGConcrete pad footings are used because they are suitable for point loads. The two ends of the arch are joined to the concrete pad footing using rubber sealant ball socket to allow slight movement due to expansion and contraction.

CARBON FIBERThe tunnel spans 300m length and has the height of 4m(lowest) to 8m(highest), without any column. The tunnel itself cannot a�ord to be made of heavyweight material. Carbon �ber is a very strong and light �ber-reinforced polymer, which is also corrosion-resistant. It is a common material for automotive and civil engineering. A way of fabricating it is by molding. It is by layering sheets of carbon �ber into a mold in the shape of a temporary steel skeleton. After �lling epoxy into the mold, it is then heated and air-cured. After the carbon �ber has become solid enough, the temporary skeleton is then removed.

VORONOI STRUCTURESThe intercepting elements of the voronoi structures also act as support to the whole tunnel as load is transferred along them. The extrusion between the two layers at the di�used lighting part can act as supports to hold the two layers together. Rainwater can escape from the sides of the semi-transparent glass as they are not completely sealed.

stop motion lighting e�ect of 1:50 model

di�used & cut lighting e�ect of 1:50 model

di�used & cut lighting e�ect of 1:50 model at night