Final Majarrah rev 0

39
Activity ID Activity Name Original Duration Start Finish Consultant Contractor Total Float Majarrah Business Complex 164 15-Jun-15 31-Dec-15 0 Stage I 164 15-Jun-15 31-Dec-15 0 M10000000 Project Data Date 0 15-Jun-15 0 M90000000 Stage 1 Ready for Operation 0 01-Dec-15 0 M90000010 Stage I Soft Opening 0 31-Dec-15 0 Plaza Level 138 15-Jun-15 30-Nov-15 1 General 16 25-Jun-15 14-Jul-15 83 M10000100 Sign a Contract with Fountains and Water Fall Contractor 0 25-Jun-15 C/SCG N/A 33 M10000200 Sign a Contract with Hardscape Contractor for Plaza 0 25-Jun-15 C/TB N/A 13 M10000300 Sign a Contract with Public Address Supplier for Plaza 0 25-Jun-15 C/SCG N/A 33 M10000400 Sign a Contract with CCTV Supplier for Plaza 0 25-Jun-15 C/SCG N/A 16 M10000410 Si gn a Contract with External Plaza Li ghting Fixture Suppl 0 02-Jul-15 C/SCG N/A 39 M10000440 Sign a Contract with Gas Company for Gas Facility 0 14-Jul-15 Client Gas 83 Design Design 22 15-Jun-15 09-Jul-15 33 Architectural Design 10 15-Jun-15 25-Jun-15 1 M11000100 Final Architectural Design for Plaza level 10 15-Jun-15 25-Jun-15 T.B 1 Structural Design 12 27-Jun-15 09-Jul-15 3 M11000200 Structural Design for Demolishing works 12 27-Jun-15 09-Jul-15 HW 3 MEP Design 6 27-Jun-15 02-Jul-15 39 Electrical Systems 6 27-Jun-15 02-Jul-15 39 Power System 6 27-Jun-15 02-Jul-15 37 M11000300 Power System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 37 Lighting System 6 27-Jun-15 02-Jul-15 39 M11000400 Lighting System for External Lighting By LCD 6 27-Jun-15 02-Jul-15 LCD 39 Public Address System 6 27-Jun-15 02-Jul-15 39 M11000500 Public Address System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 39 CCTV System 6 27-Jun-15 02-Jul-15 30 M11000600 CCTV System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 30 Data System 6 27-Jun-15 02-Jul-15 37 M11000700 Data System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 37 Mechanical Systems 6 27-Jun-15 02-Jul-15 35 Fire Fighting System 6 27-Jun-15 02-Jul-15 35 M11000800 Fire Fighting System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 35 Plumbing System 6 27-Jun-15 02-Jul-15 26 Drainage System 6 27-Jun-15 02-Jul-15 1 M11000900 Drainage System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 1 Irrigation System 6 27-Jun-15 02-Jul-15 24 Jun Jul Aug Sep Oct Nov Dec Jan eb 2015 2016 31-Dec- 31-Dec- 30-Nov-15, Pl a 14-Jul-15, General 09-Jul-15, Desi gn 25-Jun-15, Architectural Desi gn 09-Jul-15, Structural Desi gn 02-Jul-15, MEP Desi gn 02-Jul-15, Electrical Systems 02-Jul-15, Power System 02-Jul-15, Li ghting System 02-Jul-15, Public Address System 02-Jul-15, CCTV System 02-Jul-15, Data System 02-Jul-15, Mechanical Systems 02-Jul-15, Fire Fi ghting System 02-Jul-15, Plumbing System 02-Jul-15, Drainage System 02-Jul-15, Irri gation System Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36 Actual Work Remaining Work Critical Remaining Work Milestone Summary Page 1 of 39 TASK filter: All Activities © Primavera Systems, Inc.

Transcript of Final Majarrah rev 0

Page 1: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

Majarrah BusinessMajarrah Business Complex 164 15-Jun-15 31-Dec-15 0

Stage IStage I 164 15-Jun-15 31-Dec-15 0

M10000000 Project Data Date 0 15-Jun-15 0M90000000 Stage 1 Ready for Operation 0 01-Dec-15 0M90000010 Stage I Soft Opening 0 31-Dec-15 0

Plaza LevelPlaza Level 138 15-Jun-15 30-Nov-15 1

GeneralGeneral 16 25-Jun-15 14-Jul-15 83

M10000100 Sign a Contract with Fountains and Water Fall Contractor 0 25-Jun-15 C/SCG N/A 33M10000200 Sign a Contract with Hardscape Contractor for Plaza 0 25-Jun-15 C/TB N/A 13M10000300 Sign a Contract with Public Address Supplier for Plaza 0 25-Jun-15 C/SCG N/A 33M10000400 Sign a Contract with CCTV Supplier for Plaza 0 25-Jun-15 C/SCG N/A 16M10000410 Sign a Contract with External Plaza Lighting Fixture Suppl 0 02-Jul-15 C/SCG N/A 39M10000440 Sign a Contract with Gas Company for Gas Facility 0 14-Jul-15 Client Gas 83

DesignDesign 22 15-Jun-15 09-Jul-15 33

Architectural DesArchitectural Design 10 15-Jun-15 25-Jun-15 1

M11000100 Final Architectural Design for Plaza level 10 15-Jun-15 25-Jun-15 T.B 1Structural DesignStructural Design 12 27-Jun-15 09-Jul-15 3

M11000200 Structural Design for Demolishing works 12 27-Jun-15 09-Jul-15 HW 3MEP DesignMEP Design 6 27-Jun-15 02-Jul-15 39

Electrical SystemsElectrical Systems 6 27-Jun-15 02-Jul-15 39Power SystemPower System 6 27-Jun-15 02-Jul-15 37

M11000300 Power System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 37Lighting SystemLighting System 6 27-Jun-15 02-Jul-15 39

M11000400 Lighting System for External Lighting By LCD 6 27-Jun-15 02-Jul-15 LCD 39Public Address SysPublic Address System 6 27-Jun-15 02-Jul-15 39

M11000500 Public Address System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 39CCTV SystemCCTV System 6 27-Jun-15 02-Jul-15 30

M11000600 CCTV System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 30Data SystemData System 6 27-Jun-15 02-Jul-15 37

M11000700 Data System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 37Mechanical SystemsMechanical Systems 6 27-Jun-15 02-Jul-15 35

Fire Fighting SysteFire Fighting System 6 27-Jun-15 02-Jul-15 35M11000800 Fire Fighting System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 35

Plumbing SystemPlumbing System 6 27-Jun-15 02-Jul-15 26Drainage SystemDrainage System 6 27-Jun-15 02-Jul-15 1

M11000900 Drainage System Update for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 1Irrigation SystemIrrigation System 6 27-Jun-15 02-Jul-15 24

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

31-Dec-

31-Dec-

30-Nov-15, Pla

14-Jul-15, General

09-Jul-15, Design

25-Jun-15, Architectural Design

09-Jul-15, Structural Design

02-Jul-15, MEP Design

02-Jul-15, Electrical Systems02-Jul-15, Power System

02-Jul-15, Lighting System

02-Jul-15, Public Address System

02-Jul-15, CCTV System

02-Jul-15, Data System

02-Jul-15, Mechanical Systems02-Jul-15, Fire Fighting System

02-Jul-15, Plumbing System02-Jul-15, Drainage System

02-Jul-15, Irrigation System

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 1 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 2: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M110001000 Irrigation System Layout for Plaza Level 6 27-Jun-15 02-Jul-15 SCG 24Fountains and WateFountains and Water Fall 6 27-Jun-15 02-Jul-15 26

M110001004 Water Fall Design 6 27-Jun-15 02-Jul-15 SCG 26M110001002 Fountains Design 6 27-Jun-15 02-Jul-15 SCG 26

Shop DrawingsShop Drawings 28 27-Jun-15 30-Jul-15 29

Architectural ShoArchitectural Shop Drawing 12 27-Jun-15 09-Jul-15 13

M110001006 Plaza Architecture Layout Shop Drawing Submittal 6 27-Jun-15 02-Jul-15 N/A 13M110001008 Plaza Architecture Layout Shop Drawing Approval 6 04-Jul-15 09-Jul-15 T.B 13

Structural Shop DStructural Shop Drawing 16 11-Jul-15 30-Jul-15 3

M110001010 Plaza Structural Modifications Layout Submittal 10 11-Jul-15 22-Jul-15 ECIP 3M110001012 Plaza Structural Modifications Layout Approval 6 25-Jul-15 30-Jul-15 HW 3

Electrical SystemsElectrical Systems 18 04-Jul-15 26-Jul-15 33

Power SystemPower System 12 04-Jul-15 16-Jul-15 37M110001014 Power System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 37M110001016 Power System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 37

Lighting SystemLighting System 12 04-Jul-15 16-Jul-15 39M110001018 Lighting System for External Lighting Submittal 6 04-Jul-15 09-Jul-15 Ofoq 39M110001020 Lighting System for External Lighting Approval 6 11-Jul-15 16-Jul-15 SCG 39

Public Address SysPublic Address System 12 11-Jul-15 26-Jul-15 33M110001022 Public Address System for External Lighting Submittal 6 11-Jul-15 16-Jul-15 Ofoq 33M110001024 Public Address System for External Lighting Approval 6 19-Jul-15 26-Jul-15 SCG 33

CCTV SystemCCTV System 12 04-Jul-15 16-Jul-15 30M1PS1360 CCTV System for External Lighting Submittal 6 04-Jul-15 09-Jul-15 Ofoq 30M1PS1370 CCTV System for External Lighting Approval 6 11-Jul-15 16-Jul-15 SCG 30

Data SystemData System 12 04-Jul-15 16-Jul-15 37M110001026 Data System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 37M110001028 Data System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 37

Mechanical SysteMechanical Systems 21 04-Jul-15 29-Jul-15 29

Fire Fighting SystemFire Fighting System 12 04-Jul-15 16-Jul-15 35M110001030 Fire Fighting System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 35M110001032 Fire Fighting System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 35

Plumbing SystemPlumbing System 21 04-Jul-15 29-Jul-15 29Drainage SystemDrainage System 21 04-Jul-15 29-Jul-15 24

M110001034 Drainage System for Plaza Level Submittal 6 04-Jul-15 09-Jul-15 Ofoq 1M110001036 Drainage System for Plaza Level Approval 6 11-Jul-15 16-Jul-15 SCG 1M110001038 Builder Work and Core drill openings for Floor drains

Submittal3 19-Jul-15 21-Jul-15 Ofoq 24

M110001040 Builder Work and Core drill openings for Floor drains Appr 6 22-Jul-15 29-Jul-15 HW 24

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

02-Jul-15, Fountains and Water Fall

30-Jul-15, Shop Drawings

09-Jul-15, Architectural Shop Drawing

30-Jul-15, Structural Shop Drawing

26-Jul-15, Electrical Systems

16-Jul-15, Power System

16-Jul-15, Lighting System

26-Jul-15, Public Address System

16-Jul-15, CCTV System

16-Jul-15, Data System

29-Jul-15, Mechanical Systems

16-Jul-15, Fire Fighting System

29-Jul-15, Plumbing System29-Jul-15, Drainage System

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 2 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 3: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

Irrigation SystemIrrigation System 21 04-Jul-15 29-Jul-15 24M110001042 Irrigation System Layout for Plaza Level Submittal 15 04-Jul-15 21-Jul-15 Ofoq 24M110001044 Irrigation System Layout for Plaza Level Approval 6 22-Jul-15 29-Jul-15 SCG 24

Fountains and WateFountains and Water Fall 18 04-Jul-15 26-Jul-15 32M110001048 Water Fall Shop drawing Submittal 12 04-Jul-15 16-Jul-15 Ofoq 27M110001046 Fountains Shop drawing Submittal 12 04-Jul-15 16-Jul-15 Ofoq 32M110001052 Water Fall Shop drawing Approval 6 19-Jul-15 26-Jul-15 SCG 27M110001050 Fountains Shop drawing Approval 6 19-Jul-15 26-Jul-15 SCG 32

MaterialsMaterials 103 15-Jun-15 20-Oct-15 34

Structural MateriaStructural Materials 36 15-Jun-15 28-Jul-15 12

Structural Material SStructural Material Submittal 6 15-Jun-15 21-Jun-15 12M110001166 Expansion Joints Submittal 6 15-Jun-15 21-Jun-15 ECIP 12

Structural Material AStructural Material Approval 6 22-Jun-15 28-Jun-15 12M110001176 Expansion Joints Approval 6 22-Jun-15 28-Jun-15 ECIP 12

Structural Material PStructural Material P.O 6 29-Jun-15 05-Jul-15 12M110001186 Expansion Joints PO 6 29-Jun-15 05-Jul-15 ECIP 12

Structural Material DStructural Material Delivery 18 06-Jul-15 28-Jul-15 12M110001196 Expansion Joints Delivery to Site 18 06-Jul-15 28-Jul-15 ECIP 12

Finishing MateriaFinishing Materials 76 11-Jul-15 13-Oct-15 37

Finishing Material SFinishing Material Submittal 26 11-Jul-15 11-Aug-15 52M110001054 Plaza Flooring Filling (M-01&M-02&M-03) Material Submi 6 11-Jul-15 16-Jul-15 N/A 13M110001056 Plaza Walkway Filling (M-04) Material Submittal 6 11-Jul-15 16-Jul-15 N/A 61M110001058 Plaza Driveway Filling (M-05 & M-06) Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64M110001060 Fountain Area M-07 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 54M110001062 Plaza Borders B-01 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64M110001064 Building Borders B-02 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64M110001068 Drive Borders B-03 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64M110001070 Planters Copping (C-01 & C-02 & C-03) Material Submittal 6 11-Jul-15 16-Jul-15 N/A 64M110001072 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material Subm 6 11-Jul-15 16-Jul-15 N/A 70M110001074 Loose Gravel GR-01 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 72M110001078 Pre-Cast Concrete Curb CB-01 Material Submittal 6 11-Jul-15 16-Jul-15 N/A 65M110001080 Soft Scape Material Submittal 26 11-Jul-15 11-Aug-15 MIAC 35

Finishing Material AFinishing Material Approval 26 19-Jul-15 18-Aug-15 52M110001082 Plaza Flooring Filling (M-01&M-02&M-03) Material Appro 6 19-Jul-15 26-Jul-15 T.B 13M110001084 Plaza Walkway Filling (M-04) Material Approval 6 19-Jul-15 26-Jul-15 T.B 61M110001086 Plaza Driveway Filling (M-05 & M-06) Material Approval 6 19-Jul-15 26-Jul-15 T.B 64M110001088 Fountain Area M-07 Material Approval 6 19-Jul-15 26-Jul-15 T.B 54M110001090 Plaza Borders B-01 Material Approval 6 19-Jul-15 26-Jul-15 T.B 64

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

29-Jul-15, Irrigation System

26-Jul-15, Fountains and Water Fall

20-Oct-15, Materials

28-Jul-15, Structural Materials

21-Jun-15, Structural Material Submittal

28-Jun-15, Structural Material Approval

05-Jul-15, Structural Material P.O

28-Jul-15, Structural Material Delivery

13-Oct-15, Finishing Mat

11-Aug-15, Finishing Material Submitta

18-Aug-15, Finishing Material Appro

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 3 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 4: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M110001092 Building Borders B-02 Material Approval 6 19-Jul-15 26-Jul-15 T.B 64M110001094 Drive Borders B-03 Material Approval 6 19-Jul-15 26-Jul-15 T.B 64M110001096 Planters Copping (C-01 & C-02 & C-03) Material Approval 6 19-Jul-15 26-Jul-15 T.B 64M110001098 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material Appr 6 19-Jul-15 26-Jul-15 T.B 70M1100010100 Loose Gravel GR-01 Material Approval 6 19-Jul-15 26-Jul-15 T.B 72M1100010102 Pre-Cast Concrete Curb CB-01 Material Approval 6 19-Jul-15 26-Jul-15 T.B 65M1100010104 Soft Scape Material Approval 6 12-Aug-15 18-Aug-15 T.B 35

Finishing Material PFinishing Material P.O 46 27-Jul-15 17-Sep-15 35M1100010106 Plaza Flooring Filling (M-01&M-02&M-03) Material P.O 3 27-Jul-15 29-Jul-15 N/A 13M1100010108 Plaza Walkaway Filling (M-04) Material P.O 3 27-Jul-15 29-Jul-15 N/A 61M11000101010 Plaza Driveway Filling (M-05 & M-06) Material P.O 3 27-Jul-15 29-Jul-15 N/A 64M11000101012 Fountain Area M-07 Material P.O 3 27-Jul-15 29-Jul-15 N/A 54M11000101014 Plaza Borders B-01 Material P.O 3 27-Jul-15 29-Jul-15 N/A 64M11000101016 Building Borders B-02 Material P.O 3 27-Jul-15 29-Jul-15 N/A 64M11000101018 Drive Borders B-03 Material P.O 3 27-Jul-15 29-Jul-15 N/A 64M11000101020 Planters Copping (C-01 & C-02 & C-03) Material P.O 3 27-Jul-15 29-Jul-15 N/A 64M11000101022 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material P.O 3 27-Jul-15 29-Jul-15 N/A 70M11000101024 Loose Gravel GR-01 Material P.O 3 27-Jul-15 29-Jul-15 N/A 72M11000101026 Pre-Cast Concrete Curb CB-01 Material P.O 3 27-Jul-15 29-Jul-15 N/A 65M11000101028 Soft Scape Material P.O 26 19-Aug-15 17-Sep-15 MIAC 35

Finishing Material DFinishing Material Delivery 61 30-Jul-15 13-Oct-15 37M11000101030 Plaza Walkaway Filling (M-04) Material Delivery 26 30-Jul-15 29-Aug-15 N/A 61M11000101032 Plaza Driveway Filling (M-05 & M-06) Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64M11000101034 Fountain Area M-07 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 54M11000101036 Plaza Borders B-01 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64M11000101038 Building Borders B-02 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64M11000101040 Drive Borders B-03 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64M11000101042 Planters Copping (C-01 & C-02 & C-03) Material Delivery 26 30-Jul-15 29-Aug-15 N/A 64M11000101044 Stairs (ST-01 &ST-02&ST-03&ST-04&ST-05) Material Deliv 26 30-Jul-15 29-Aug-15 N/A 70M11000101046 Loose Gravel GR-01 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 72M11000101048 Pre-Cast Concrete Curb CB-01 Material Delivery 26 30-Jul-15 29-Aug-15 N/A 65M11000101050 Plaza Flooring Filling (M-01&M-02&M-03) Material Deliver 52 30-Jul-15 01-Oct-15 N/A 13M11000101052 Soft Scape Material Delivery 18 19-Sep-15 13-Oct-15 MIAC 35

MEP MaterialsMEP Materials 103 15-Jun-15 20-Oct-15 34

Material SubmittalMaterial Submittal 52 15-Jun-15 16-Aug-15 55Electrical Material SElectrical Material Submittal 52 15-Jun-15 16-Aug-15 55

M11000101054 PVC Conduit Material Submittal 3 15-Jun-15 17-Jun-15 Ofoq 50M11000101056 Wires for Power and Lighting Material Submittal 10 19-Jul-15 30-Jul-15 Ofoq 69M11000101058 External & Facade Lighting Fixture Material Submittal 12 19-Jul-15 02-Aug-15 N/A 46

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

17-Sep-15, Finishing Material

13-Oct-15, Finishing Mat

20-Oct-15, MEP Materi

16-Aug-15, Material Submittal16-Aug-15, Electrical Material Submit

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 4 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 5: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M11000101060 Structured Cable for Data System Material Submittal 18 19-Jul-15 09-Aug-15 Ofoq 49M11000101062 Distribution Board DB1, DB4 Material Submittal 18 19-Jul-15 09-Aug-15 Ofoq 46M11000101064 CCTV Cameras Material Submittal 18 19-Jul-15 09-Aug-15 N/A 30M11000101066 Floor Box Submittal 18 27-Jul-15 16-Aug-15 Ofoq 40M11000101068 Public Address Loud Speaker Material Submittal 18 27-Jul-15 16-Aug-15 N/A 36

Mechanical MateriaMechanical Material Submittal 12 19-Jul-15 02-Aug-15 32M11000101070 FD,AD, PD Material Submittal 6 19-Jul-15 26-Jul-15 Ofoq 1M11000101072 Fire Hydrant Material Submittal 6 19-Jul-15 26-Jul-15 Ofoq 38M11000101074 Siamese Connection Material Submittal 6 19-Jul-15 26-Jul-15 Ofoq 35M11000101076 Fountains and Water Fall Accessories Material Submittal 6 27-Jul-15 02-Aug-15 N/A 32

Material ApprovalMaterial Approval 55 18-Jun-15 23-Aug-15 55Electrical Material AElectrical Material Approval 55 18-Jun-15 23-Aug-15 55

M11000101078 PVC Conduit Material Approval 6 18-Jun-15 24-Jun-15 SCG 50M11000101080 Wires for Power and Lighting Material Approval 6 01-Aug-15 06-Aug-15 SCG 69M11000101082 External & Facade Lighting Fixture Material Approval 6 03-Aug-15 09-Aug-15 SCG 46M11000101084 Structured Cable for Data System Material Approval 6 10-Aug-15 16-Aug-15 SCG 49M11000101086 Distribution Board DB1, DB4 Material Approval 6 10-Aug-15 16-Aug-15 SCG 46M11000101088 CCTV Cameras Material Approval 6 10-Aug-15 16-Aug-15 SCG 30M11000101090 Floor Box Material Approval 6 17-Aug-15 23-Aug-15 SCG 40M11000101092 Public Address Loud Speaker Material Approval 6 17-Aug-15 23-Aug-15 SCG 36

Mechanical MateriaMechanical Material Approval 12 27-Jul-15 09-Aug-15 32M11000101094 FD,AD, PD Material Approval 6 27-Jul-15 02-Aug-15 SCG 1M11000101096 Fire Hydrant Material Approval 6 27-Jul-15 02-Aug-15 SCG 38M11000101098 Siamese Connection Material Approval 6 27-Jul-15 02-Aug-15 SCG 35M11000101100 Fountains and Water Fall Accessories Material Approval 6 03-Aug-15 09-Aug-15 SCG 32

Material P.OMaterial P.O 52 25-Jun-15 26-Aug-15 55Electrical Material Electrical Material P.O 52 25-Jun-15 26-Aug-15 55

M110001010102 PVC Conduit Material P.O 3 25-Jun-15 28-Jun-15 Ofoq 50M110001010104 Wires for Power and Lighting Material P.O 3 08-Aug-15 10-Aug-15 Ofoq 69M110001010106 External & Facade Lighting Fixture Material P.O 3 10-Aug-15 12-Aug-15 N/A 46M110001010108 Structured Cable for Data System Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 49M110001010110 Distribution Board DB1, DB4 Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 46M110001010112 CCTV Cameras Material P.O 3 17-Aug-15 19-Aug-15 N/A 30M110001010114 Floor Box Material P.O 3 24-Aug-15 26-Aug-15 Ofoq 40M110001010116 Public Address Loud Speaker Material P.O 3 24-Aug-15 26-Aug-15 N/A 36

Mechanical MateriaMechanical Material P.O 12 03-Aug-15 16-Aug-15 32M110001010118 FD,AD, PD Material P.O 6 03-Aug-15 09-Aug-15 Ofoq 1M110001010120 Fire Hydrant Material P.O 6 03-Aug-15 09-Aug-15 Ofoq 38M110001010122 Siamese Connection Material P.O 6 03-Aug-15 09-Aug-15 Ofoq 35

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

02-Aug-15, Mechanical Material Submitta

23-Aug-15, Material Approval23-Aug-15, Electrical Material Appr

09-Aug-15, Mechanical Material Appr

26-Aug-15, Material P.O26-Aug-15, Electrical Material P.O

16-Aug-15, Mechanical Material P.O

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 5 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 6: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M110001010124 Fountains and Water Accessories Fall Material P.O 6 10-Aug-15 16-Aug-15 N/A 32Material DeliveryMaterial Delivery 91 29-Jun-15 20-Oct-15 34

Electrical Material Electrical Material Delivery 91 29-Jun-15 20-Oct-15 34M110001010126 PVC Conduit Material Delivery 3 29-Jun-15 01-Jul-15 Ofoq 50M110001010128 Wires for Power and Lighting Material Delivery 12 11-Aug-15 24-Aug-15 Ofoq 69M110001010130 Structured Cable for Data System Material Delivery 26 20-Aug-15 19-Sep-15 Ofoq 49M110001010132 External & Facade Lighting Fixture Material Delivery 36 13-Aug-15 27-Sep-15 N/A 46M110001010134 Distribution Board DB1, DB4 Material Delivery 36 20-Aug-15 04-Oct-15 Ofoq 46M110001010136 Floor Box Material Delivery 36 27-Aug-15 12-Oct-15 Ofoq 40M110001010138 Public Address Loud Speaker Material Delivery 36 27-Aug-15 12-Oct-15 N/A 36M110001010140 CCTV Cameras Material Delivery 48 20-Aug-15 20-Oct-15 N/A 30

Mechanical MateriaMechanical Material Delivery 52 10-Aug-15 13-Oct-15 38M110001010144 FD,AD, PD Material Delivery 20 10-Aug-15 01-Sep-15 Ofoq 1M110001010142 Fountains and Water Fall Accessories Material Delivery 45 17-Aug-15 12-Oct-15 N/A 32M110001010146 Fire Hydrant Material Delivery 52 10-Aug-15 13-Oct-15 Ofoq 38M110001010148 Siamese Connection Material Delivery 52 10-Aug-15 13-Oct-15 Ofoq 35

ConstructionConstruction 112 15-Jul-15 30-Nov-15 1

M1P1000 Removal of Temporary offices 6 22-Aug-15 27-Aug-15 HW ECIP 3Structural WorkStructural Work 36 15-Jul-15 27-Aug-15 65

M110001010150 Existing Planters to be demolished 6 01-Aug-15 06-Aug-15 HW ECIP 21M110001010350 Gas Room Ready to Receive Gas Facility 18 15-Jul-15 06-Aug-15 HW ECIP 83M110001010152 Stair form Upper Basement to Plaza Level to be demolished 12 01-Aug-15 13-Aug-15 HW ECIP 3M110001010154 Planters to be added above existing stair 12 01-Aug-15 13-Aug-15 HW ECIP 15M110001010156 Slab to be removed 12 01-Aug-15 13-Aug-15 HW ECIP 3M110001010158 New Planters to be added 12 01-Aug-15 13-Aug-15 HW ECIP 12M110001010160 Existing Slab to be opened 3 15-Aug-15 17-Aug-15 HW ECIP 12M110001010270 Expansion Joints 18 29-Jul-15 18-Aug-15 HW ECIP 12M110001010162 New Slab to be added 18 01-Aug-15 20-Aug-15 HW ECIP 9M110001010164 Two opening has been canceled and to be closed 18 01-Aug-15 20-Aug-15 HW ECIP 9M110001010166 Concrete slab to be added instead of demolished stair 12 15-Aug-15 27-Aug-15 HW ECIP 3M110001010168 Two New Stairs with a Ramp To Be Added 12 15-Aug-15 27-Aug-15 HW ECIP 3

MEP WorkMEP Work 87 30-Jul-15 14-Nov-15 15

Electrical WorksElectrical Works 62 29-Aug-15 14-Nov-15 15M110001010170 PVC conduits Raceway for Electrical Power outlets 6 29-Aug-15 03-Sep-15 SCG Ofoq 3M110001010174 PVC conduits Raceway for Data System 6 29-Aug-15 03-Sep-15 SCG Ofoq 3M110001010172 PVC conduits Raceway for External Lighting Fixture 6 29-Aug-15 03-Sep-15 SCG Ofoq 5M110001010176 PVC conduits Raceway for Public Address System (Sound

System)6 29-Aug-15 03-Sep-15 SCG Ofoq 5

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

20-Oct-15, Material De20-Oct-15, Electrical Ma

13-Oct-15, Mechanical M

30-Nov-15, Co

27-Aug-15, Structural Work

14-Nov-15, MEP W

14-Nov-15, Electri

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 6 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 7: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M110001010178 PVC conduits Raceway for CCTV System 6 29-Aug-15 03-Sep-15 SCG Ofoq 5M110001010180 Back Box for Floor Box 2 05-Sep-15 06-Sep-15 SCG Ofoq 3M110001010182 Wires for External Lighting Fixture 3 05-Sep-15 07-Sep-15 SCG Ofoq 60M110001010184 Wires for Electrical Power outlets 3 07-Sep-15 09-Sep-15 SCG Ofoq 64M110001010186 Structured Cable for Data System 3 20-Sep-15 26-Sep-15 SCG Ofoq 49M110001010192 Facade Lighting Fixtures Erection 6 29-Sep-15 05-Oct-15 SCG Ofoq 47M110001010188 Floor Box erection 2 05-Nov-15 07-Nov-15 SCG Ofoq 21M110001010190 External Lighting Fixture Erection 6 05-Nov-15 11-Nov-15 SCG Ofoq 15M110001010194 Public Address (Sound System) Erection 6 05-Nov-15 11-Nov-15 SCG Ofoq 17M110001010196 CCTV Erection 6 05-Nov-15 11-Nov-15 SCG Ofoq 17M110001010198 Distribution Board DB1, DB4 Erection 2 12-Nov-15 14-Nov-15 SCG Ofoq 15

Mechanical WorksMechanical Works 86 30-Jul-15 12-Nov-15 16M110001010200 Builder Work And Core Drill for Drainage 6 30-Jul-15 05-Aug-15 SCG Ofoq 24M110001010260 Gas Facility Network 12 08-Aug-15 20-Aug-15 SCG Gas 83M110001010202 Floor Drains first fix 6 02-Sep-15 08-Sep-15 SCG Ofoq 1M110001010204 Floor Drains second fix 3 04-Oct-15 07-Oct-15 SCG Ofoq 44M110001010208 Fire Hydrant 3 19-Oct-15 21-Oct-15 SCG Ofoq 35M110001010210 Siamese Connection 6 15-Oct-15 21-Oct-15 SCG Ofoq 35M110001010206 Floor Drains final fix 2 05-Nov-15 07-Nov-15 SCG Ofoq 21M110001010212 Irrigation for Main Road Island landscape 2 11-Nov-15 12-Nov-15 SCG Ofoq 12

Finishing WorkFinishing Work 76 29-Aug-15 30-Nov-15 1

M110001010214 Boundary wall (Travco Side) 18 29-Aug-15 17-Sep-15 HW ECIP 59M110001010216 Temporary Fence 10 05-Nov-15 16-Nov-15 T.B N/A 13Hard scapeHard scape 66 09-Sep-15 30-Nov-15 1

M110001010218 Insulation work for Plaza 18 09-Sep-15 03-Oct-15 HW ECIP 1M110001010300 Remove Facade Cladding for Facade Lighting Fixture Erec 7 28-Sep-15 05-Oct-15 T.B Kemet 47M110001010224 Walkways Filling Interlock 12 03-Oct-15 18-Oct-15 T.B N/A 35M110001010232 Driveway Filling Interlock & Bazalt Tiles 12 03-Oct-15 18-Oct-15 T.B N/A 38M110001010234 Driveway Boarders Bazalt tiles 12 03-Oct-15 18-Oct-15 T.B N/A 38M110001010220 Screed over Insulation 12 04-Oct-15 19-Oct-15 HW ECIP 1M110001010222 Flooring Filling Engineered Stone / Porcelain / Granite 15 19-Oct-15 04-Nov-15 T.B N/A 1M110001010238 Main Road Island hardscape 5 05-Nov-15 10-Nov-15 T.B N/A 12M110001010240 Planter Copping 6 05-Nov-15 11-Nov-15 T.B N/A 11M110001010242 Stairs Covering 6 05-Nov-15 11-Nov-15 T.B N/A 17M110001010228 Building Boarders Granite 12 05-Nov-15 18-Nov-15 T.B N/A 11M110001010230 Plaza Boarders Granite 12 05-Nov-15 18-Nov-15 T.B N/A 11M110001010226 Granite for Fountains 12 05-Nov-15 18-Nov-15 T.B N/A 1M110001010236 Fountains and Water Fall Accessories Erection 10 19-Nov-15 30-Nov-15 T.B N/A 1

Soft scapeSoft scape 6 12-Nov-15 18-Nov-15 11

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

12-Nov-15, Mecha

30-Nov-15, Fin

30-Nov-15, Ha

18-Nov-15, Soft s

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 7 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 8: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M110001010246 Main Road Island softscape 4 14-Nov-15 17-Nov-15 T.B MIAC 12M110001010244 Plaza softscape 6 12-Nov-15 18-Nov-15 T.B MIAC 11

Upper BasementUpper Basement 164 15-Jun-15 31-Dec-15 0

GeneralGeneral 0 07-Jul-15 07-Jul-15 15

M1P2760 Client Clear Vision about Security Issues as (CCTV, Access Control...)

0 07-Jul-15 Client 6

M1P2770 Client Clear Vision about Data Issues as (Central, IT requirements...)

0 07-Jul-15 Client 15

DesignDesign 78 15-Jun-15 15-Sep-15 17

Architectural DesArchitectural Design 24 15-Jun-15 12-Jul-15 0

M1P1020 Final Architectural Dimensional Plan for Upper Basement 6 15-Jun-15 21-Jun-15 T.B 0M1P1010 Final Parking Layout for Upper Basement 0 28-Jun-15 Client 0M1P1030 Final Architectural Package for Upper Basement 12 29-Jun-15 12-Jul-15 HW 0

Structural DesignStructural Design 6 09-Sep-15 15-Sep-15 17

M1P2750 Structural Design for Equipment Foundation (Child Pump , Supply and Exhaust Fans........)

6 09-Sep-15 15-Sep-15 HW 17

MEP DesignMEP Design 30 22-Jun-15 28-Jul-15 6

Electrical SystemsElectrical Systems 24 29-Jun-15 28-Jul-15 6Power SystemPower System 6 29-Jun-15 05-Jul-15 4

M1P1060 Updated Design for Power System 6 29-Jun-15 05-Jul-15 SCG 4Lighting SystemLighting System 6 29-Jun-15 05-Jul-15 4

M1P1070 Updated Design for Lighting System 6 29-Jun-15 05-Jul-15 SCG 4Fire Alarm SystemFire Alarm System 6 13-Jul-15 20-Jul-15 0

M1P1680 Updated Design for Fire Alarm System 6 13-Jul-15 20-Jul-15 C/SCG 0Parking SystemParking System 18 29-Jun-15 20-Jul-15 0

M1P1450 Updated Design for Parking System 18 29-Jun-15 20-Jul-15 C/SCG 0CCTV SystemCCTV System 6 13-Jul-15 20-Jul-15 2

M1P1040 Updated Design for CCTV System 6 13-Jul-15 20-Jul-15 C/SCG 2Data SystemData System 6 13-Jul-15 20-Jul-15 11

M1P1050 Updated Design for Data System 6 13-Jul-15 20-Jul-15 C/SCG 11BMS SystemBMS System 6 21-Jul-15 28-Jul-15 6

M1P2000 Updated Design for BMS System 6 21-Jul-15 28-Jul-15 SCG 6Mechanical SystemsMechanical Systems 24 22-Jun-15 20-Jul-15 12

HVAC SystemHVAC System 6 13-Jul-15 20-Jul-15 0M1P1080 HVAC Updated Design for Upper Basement 6 13-Jul-15 20-Jul-15 SCG 0

Fire Fighting SysteFire Fighting System 6 22-Jun-15 28-Jun-15 19M1P1130 Fire Fighting Updated Design for Upper Basement 6 22-Jun-15 28-Jun-15 SCG 19

Plumbing SystemPlumbing System 6 27-Jun-15 02-Jul-15 26

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

31-Dec-

07-Jul-15, General

15-Sep-15, Design

12-Jul-15, Architectural Design

15-Sep-15, Structural Design

28-Jul-15, MEP Design

28-Jul-15, Electrical Systems05-Jul-15, Power System

05-Jul-15, Lighting System

20-Jul-15, Fire Alarm System

20-Jul-15, Parking System

20-Jul-15, CCTV System

20-Jul-15, Data System

28-Jul-15, BMS System

20-Jul-15, Mechanical Systems20-Jul-15, HVAC System

28-Jun-15, Fire Fighting System

02-Jul-15, Plumbing System

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 8 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 9: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

Drainage SystemDrainage System 6 27-Jun-15 02-Jul-15 20M1P1090 Final Update for Upper Basement Drainage System 6 27-Jun-15 02-Jul-15 SCG 20

Irrigation SystemIrrigation System 6 27-Jun-15 02-Jul-15 26M1P1100 Final Update for Plaza Irrigation System 6 27-Jun-15 02-Jul-15 SCG 26

Fountains and WateFountains and Water Fall 6 27-Jun-15 02-Jul-15 26M1P1110 Fountains Design 6 27-Jun-15 02-Jul-15 SCG 26M1P1120 Water Fall Design 6 27-Jun-15 02-Jul-15 SCG 26

Shop DrawingsShop Drawings 84 22-Jun-15 03-Oct-15 17

Architectural ShoArchitectural Shop Drawing 12 13-Jul-15 28-Jul-15 0

M1P1140 Upper Basement Architectural Shop Drawing Submittal 6 13-Jul-15 20-Jul-15 ECIP 0M1P1150 Upper Basement Architectural Shop Drawing Approval 6 21-Jul-15 28-Jul-15 HW 0

Structural Shop DStructural Shop Drawing 68 11-Jul-15 03-Oct-15 17

M1P1160 Upper Basement Construction , Expansion Joints Details Shop Drawing Submittal

6 11-Jul-15 16-Jul-15 ECIP 60

M1P1170 Upper Basement Construction , Expansion Joints Details Shop Drawing Approval

6 19-Jul-15 26-Jul-15 HW 60

M1P2780 Upper Basement Equipment Foundations shop drawings Submittal

6 16-Sep-15 26-Sep-15 ECIP 17

M1P2790 Upper Basement Equipment Foundations shop drawings Approval

6 27-Sep-15 03-Oct-15 HW 17

Electrical SystemsElectrical Systems 36 06-Jul-15 18-Aug-15 0

Power SystemPower System 12 06-Jul-15 20-Jul-15 4M1P1180 Upper Basement Power System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 4M1P1190 Upper Basement Power System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 4

Lighting SystemLighting System 12 06-Jul-15 20-Jul-15 4M1P1200 Upper Basement Lighting System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 4M1P1210 Upper Basement Lighting System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 4

Fire Alarm SystemFire Alarm System 12 21-Jul-15 04-Aug-15 12M1P1690 Upper Basement Fire Alarm System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 12M1P1700 Upper Basement Fire Alarm System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 12

Parking SystemParking System 12 21-Jul-15 04-Aug-15 0M1P1430 Upper Basement Parking System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0M1P1440 Upper Basement Parking System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0

CCTV SystemCCTV System 12 21-Jul-15 04-Aug-15 2M1P1220 Upper Basement CCTV System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 2M1P1230 Upper Basement CCTV System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 2

Data SystemData System 12 21-Jul-15 04-Aug-15 11M1P1240 Upper Basement Data System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 11M1P1250 Upper Basement Data System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 11

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

02-Jul-15, Drainage System

02-Jul-15, Irrigation System

02-Jul-15, Fountains and Water Fall

03-Oct-15, Shop Drawings

28-Jul-15, Architectural Shop Drawing

03-Oct-15, Structural Shop

18-Aug-15, Electrical Systems

20-Jul-15, Power System

20-Jul-15, Lighting System

04-Aug-15, Fire Alarm System

04-Aug-15, Parking System

04-Aug-15, CCTV System

04-Aug-15, Data System

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 9 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 10: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

BMS SystemBMS System 12 05-Aug-15 18-Aug-15 0M1P2010 Upper Basement BMS System Layout Submittal 6 05-Aug-15 11-Aug-15 Ofoq 0M1P2020 Upper Basement BMS System Layout Approval 6 12-Aug-15 18-Aug-15 SCG 0

Mechanical SysteMechanical Systems 66 22-Jun-15 08-Sep-15 17

HVAC SystemHVAC System 66 22-Jun-15 08-Sep-15 17M1P2210 HVAC Static Calculations for Child Water Pump Submittal 6 22-Jun-15 28-Jun-15 Ofoq 0M1P2230 Fans Static Pressure Calculations Submittal 6 22-Jun-15 28-Jun-15 Ofoq 28M1P2220 HVAC Static Calculations for Child Water Pump Approval 6 29-Jun-15 05-Jul-15 SCG 0M1P2240 Fans Static Pressure Calculations Approval 6 29-Jun-15 05-Jul-15 SCG 28M1P3560 Builder Work for Shaft Opening Layout Submittal 3 06-Jul-15 08-Jul-15 Ofoq 28M1P3570 Builder Work for Shaft Opening Layout Approval 6 09-Jul-15 15-Jul-15 HW 28M1P1260 Upper Basement HVAC System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0M1P1270 Upper Basement HVAC System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0M1P2730 Upper Basement Fan Room Details Submittal 6 29-Jul-15 04-Aug-15 Ofoq 41M1P2740 Upper Basement Fan Room Details Approval 6 05-Aug-15 11-Aug-15 SCG 41M1P2190 Upper Basement Plant Room Details Submittal 6 26-Aug-15 01-Sep-15 Ofoq 17M1P2200 Upper Basement Plant Room Details Approval 6 02-Sep-15 08-Sep-15 SCG 17

Fire Fighting SystemFire Fighting System 12 29-Jun-15 12-Jul-15 19M1P1280 Upper Basement Fire Fighting System Layout Submittal 6 29-Jun-15 05-Jul-15 Ofoq 19M1P1290 Upper Basement Fire Fighting System Layout Approval 6 06-Jul-15 12-Jul-15 SCG 19

Plumbing SystemPlumbing System 12 04-Jul-15 16-Jul-15 26Drainage SystemDrainage System 12 04-Jul-15 16-Jul-15 26

M1P1300 Upper Basement Drainage System Layout Submittal 6 04-Jul-15 09-Jul-15 Ofoq 26M1P1310 Upper Basement Drainage System Layout Approval 6 11-Jul-15 16-Jul-15 SCG 26

Irrigation SystemIrrigation System 12 04-Jul-15 16-Jul-15 26M1P1320 Upper Basement Irrigation System for Plaza Layout Submit 6 04-Jul-15 09-Jul-15 Ofoq 26M1P1330 Upper Basement Irrigation System for Plaza Layout Appro 6 11-Jul-15 16-Jul-15 SCG 26

Fountains and WateFountains and Water Fall 12 04-Jul-15 16-Jul-15 26M1P1340 Upper Basement Fountains and Water Fall System Layout

Submittal6 04-Jul-15 09-Jul-15 Ofoq 26

M1P1350 Upper Basement Fountains and Water Fall System Layout Approval

6 11-Jul-15 16-Jul-15 SCG 26

Composite DrawiComposite Drawing 12 19-Aug-15 01-Sep-15 0

M1P1360 Upper Basement MEP Composite Drawing Submittal 6 19-Aug-15 25-Aug-15 Ofoq 0M1P1370 Upper Basement MEP Composite Drawing Approval 6 26-Aug-15 01-Sep-15 SCG 0

MaterialsMaterials 146 15-Jun-15 09-Dec-15 6

Finishing MateriaFinishing Materials 35 27-Jul-15 05-Sep-15 58

Material SubmittalMaterial Submittal 20 27-Jul-15 18-Aug-15 58

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

18-Aug-15, BMS System

08-Sep-15, Mechanical Systems

08-Sep-15, HVAC System

12-Jul-15, Fire Fighting System

16-Jul-15, Plumbing System16-Jul-15, Drainage System

16-Jul-15, Irrigation System

16-Jul-15, Fountains and Water Fall

01-Sep-15, Composite Drawing

09-Dec-15, M

05-Sep-15, Finishing Materials

18-Aug-15, Material Submittal

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 10 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 11: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M110001206 Expansion Joints Submittal 6 27-Jul-15 02-Aug-15 ECIP 60M1P1380 False Ceiling Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 17M1P1390 Flooring Tiles Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 41M1P1400 Paint Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 29M1P1410 Curb Stone Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 46M1P1420 Interlock Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 58M1P3920 Doors Submittal 18 29-Jul-15 18-Aug-15 ECIP 58M1P3930 Raised Floor Submittal (Expected in IT & Main IT Room) 18 29-Jul-15 18-Aug-15 ECIP 47

Material ApprovalMaterial Approval 20 03-Aug-15 25-Aug-15 58M110001216 Expansion Joints Approval 6 03-Aug-15 09-Aug-15 HW 60M1P1460 False Ceiling Material Approval 6 19-Aug-15 25-Aug-15 HW 17M1P1470 Flooring Tiles Material Approval 6 19-Aug-15 25-Aug-15 HW 41M1P1480 Paint Material Approval 6 19-Aug-15 25-Aug-15 HW 29M1P1490 Curb Stone Material Approval 6 19-Aug-15 25-Aug-15 HW 46M1P1500 Interlock Material Approval 6 19-Aug-15 25-Aug-15 HW 58M1P3940 Doors Approval 6 19-Aug-15 25-Aug-15 HW 58M1P3950 Raised Floor Approval (Expected in IT & Main IT Room) 6 19-Aug-15 25-Aug-15 HW 47

Material P.OMaterial P.O 17 10-Aug-15 29-Aug-15 58M110001226 Expansion Joints P.O 3 10-Aug-15 12-Aug-15 ECIP 60M1P1510 False Ceiling Material P.O 3 26-Aug-15 29-Aug-15 ECIP 17M1P1520 Flooring Tiles Material P.O 3 26-Aug-15 29-Aug-15 ECIP 41M1P1530 Paint Material P.O 3 26-Aug-15 29-Aug-15 ECIP 29M1P1540 Curb Stone Material P.O 3 26-Aug-15 29-Aug-15 ECIP 46M1P1550 Interlock Material P.O 3 26-Aug-15 29-Aug-15 ECIP 58M1P3960 Doors P.O 3 26-Aug-15 29-Aug-15 ECIP 58M1P3970 Raised Floor P.O (Expected in IT & Main IT Room) 3 26-Aug-15 29-Aug-15 ECIP 47

Material DeliveryMaterial Delivery 20 13-Aug-15 05-Sep-15 58M110001236 Expansion Joints Delivery 6 13-Aug-15 19-Aug-15 ECIP 60M1P1560 False Ceiling Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 17M1P1570 Flooring Tiles Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 41M1P1580 Paint Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 29M1P1590 Curb Stone Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 46M1P1600 Interlock Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 58M1P3980 Doors Delivery 6 30-Aug-15 05-Sep-15 ECIP 58M1P3990 Raised Floor Delivery (Expected in IT & Main IT Room) 6 30-Aug-15 05-Sep-15 ECIP 47

MEP MaterialsMEP Materials 146 15-Jun-15 09-Dec-15 6

Material SubmittalMaterial Submittal 72 15-Jun-15 08-Sep-15 46Electrical Material SElectrical Material Submittal 72 15-Jun-15 08-Sep-15 20

M10 PVC , EMT Conduit with Accessories Material Submittal 3 15-Jun-15 17-Jun-15 Ofoq 48

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

25-Aug-15, Material Approval

29-Aug-15, Material P.O

05-Sep-15, Material Delivery

09-Dec-15, M

08-Sep-15, Material Submittal08-Sep-15, Electrical Material Su

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 11 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 12: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M100 Cable Trays Submittal 6 15-Jun-15 21-Jun-15 Ofoq 86M20 Wires for Power and Lighting Material Submittal 6 21-Jul-15 28-Jul-15 Ofoq 52M30 Lighting Fixture Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 40M90 Wiring Devices Submittal 12 21-Jul-15 04-Aug-15 Ofoq 15M110 Fire Alarm Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 0M40 Structured Cable for Data System Material Submittal 4 05-Aug-15 09-Aug-15 Ofoq 11M50 Distribution Board Material Submittal 16 21-Jul-15 09-Aug-15 Ofoq 4M60 CCTV Cameras Material Submittal 4 05-Aug-15 09-Aug-15 N/A 2M80 Parking System Material Submittal 18 05-Aug-15 25-Aug-15 N/A 0M420 LV Cables Submittal 6 02-Sep-15 08-Sep-15 Ofoq 12M450 BMS Submittal 18 19-Aug-15 08-Sep-15 Ofoq 1Electrical EquipmentElectrical Equipment 54 15-Jun-15 18-Aug-15 10

M1P1620 R.M.U Submittal 18 15-Jun-15 05-Jul-15 Ofoq 34M1P1630 MVSG Submittal 18 15-Jun-15 05-Jul-15 Ofoq 34M1P1710 UPS Submittal 26 15-Jun-15 14-Jul-15 Ofoq 12M1P1610 Generator Submittal 18 29-Jun-15 20-Jul-15 Ofoq 2M1P1640 Transformer Submittal 18 29-Jun-15 20-Jul-15 Ofoq 22M1P1650 MDB Submittal 18 21-Jul-15 11-Aug-15 Ofoq 4M1P1660 EMDB Submittal 18 21-Jul-15 11-Aug-15 Ofoq 4M1P1720 MCC Submittal 18 21-Jul-15 11-Aug-15 Ofoq 10M1P1670 ATS Submittal 6 12-Aug-15 18-Aug-15 Ofoq 10

Mechanical MateriaMechanical Material Submittal 72 15-Jun-15 08-Sep-15 46HVAC System SubmHVAC System Submittal 54 15-Jun-15 18-Aug-15 58

M1P2030 Galvanized Duct Submittal 6 15-Jun-15 21-Jun-15 Ofoq 46M1P2070 Child Water Pipes Submittal 6 15-Jun-15 21-Jun-15 Ofoq 76M1P2080 Child Water Insulation Submittal 6 15-Jun-15 21-Jun-15 Ofoq 106M1P2040 Volume Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P2050 Fire Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P2060 Fire Smoke Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P2090 Supply Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46M1P2100 Exhaust Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46

Fire Fighting SystemFire Fighting System Submittal 48 13-Jul-15 08-Sep-15 3M1P2800 Seamless Black Steel Pipes Submittal 3 13-Jul-15 15-Jul-15 Ofoq 26M1P2810 Fire Fighting Network Valves (O.S&Y gate valve, Check

valve, Alarm Check Valve) Submittal6 13-Jul-15 20-Jul-15 Ofoq 29

M1P2820 Sprinklers Submittal 6 13-Jul-15 20-Jul-15 Ofoq 20M1P2850 Fire Hose Stations Submittal 6 13-Jul-15 20-Jul-15 Ofoq 28M1P2860 Fire Hose Real Stations Submittal 6 13-Jul-15 20-Jul-15 Ofoq 28M1P2870 Fire Extinguishers Submittal 6 13-Jul-15 20-Jul-15 Ofoq 19

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

18-Aug-15, Electrical Equipment

08-Sep-15, Mechanical Material S18-Aug-15, HVAC System Submittal

08-Sep-15, Fire Fighting System S

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 12 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 13: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P2830 FM200 System for (MVSG Room, RMU Room, Transformer Room, Telecom Room, Security Room,LV Room, IT&Main IT Room)Submittal

12 19-Aug-15 01-Sep-15 Ofoq 4

M1P2840 Foam Fire System for (Generator Room, Feul Tank Room) Submittal

12 26-Aug-15 08-Sep-15 Ofoq 3

Plumbing System SPlumbing System Submittal 18 19-Jul-15 09-Aug-15 72M1P3150 PPR Domestic Water Pipes Submittal 6 19-Jul-15 26-Jul-15 Ofoq 54M1P3170 UPVC for Drainage System Submittal 6 19-Jul-15 26-Jul-15 Ofoq 48M1P3180 PVC for Forced Main Line Submittal 6 19-Jul-15 26-Jul-15 Ofoq 66M1P3190 Irrigation System PVC Submittal 6 19-Jul-15 26-Jul-15 Ofoq 66M1P3200 Valves Submittal 6 19-Jul-15 26-Jul-15 Ofoq 72M1P3210 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Submittal 6 19-Jul-15 26-Jul-15 Ofoq 36M1P3220 Hose Bibbs Submittal 6 19-Jul-15 26-Jul-15 Ofoq 84M1P3140 HDPE Domestic Water Pipes Submittal 12 19-Jul-15 02-Aug-15 Ofoq 72M1P3160 HDPE for Drainage , Waste , Vent, Storm Systems Submitta 12 19-Jul-15 02-Aug-15 Ofoq 72M1P3120 Fountains Tank Submittal 18 19-Jul-15 09-Aug-15 N/A 40M1P3130 Water Fall Tank Submittal 18 19-Jul-15 09-Aug-15 N/A 40

Mechanical EquipmMechanical Equipment Submittal 36 06-Jul-15 18-Aug-15 60HVAC EquipmentHVAC Equipment Submittal 36 06-Jul-15 18-Aug-15 60

M1P2150 Child Water Pumps Submittal 12 06-Jul-15 20-Jul-15 Ofoq 0M1P2160 Exhaust Fans Submittal 12 06-Jul-15 20-Jul-15 Ofoq 41M1P2170 Supply Fans Submittal 12 06-Jul-15 20-Jul-15 Ofoq 41M1P2110 Fuel Oil Storage Tank Submittal 12 05-Aug-15 18-Aug-15 Ofoq 2M1P2120 AC DX Split Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 60M1P2130 Heat Exchangers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 2M1P2140 Expansion and Compression Tanks Submittal 12 05-Aug-15 18-Aug-15 Ofoq 2M1P2180 Fan Coil Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 17

Material ApprovalMaterial Approval 87 18-Jun-15 03-Oct-15 34Electrical Material AElectrical Material Approval 87 18-Jun-15 03-Oct-15 8

M70 PVC , EMT Conduit with Accessories Conduit Material Approval

6 18-Jun-15 24-Jun-15 SCG 48

M120 Cable Trays Approval 6 22-Jun-15 28-Jun-15 SCG 86M130 Wires for Power and Lighting Material Approval 6 29-Jul-15 04-Aug-15 SCG 52M140 Lighting Fixture Material Approval 6 05-Aug-15 11-Aug-15 SCG 40M150 Wiring Devices Approval 6 05-Aug-15 11-Aug-15 SCG 15M160 Fire Alarm Material Approval 6 05-Aug-15 11-Aug-15 SCG 0M170 Structured Cable for Data System Material Approval 6 10-Aug-15 16-Aug-15 SCG 11M180 Distribution Board Material Approval 6 10-Aug-15 16-Aug-15 SCG 24M190 CCTV Cameras Material Approval 6 10-Aug-15 16-Aug-15 SCG 2

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

09-Aug-15, Plumbing System Submittal

18-Aug-15, Mechanical Equipment Su18-Aug-15, HVAC Equipment Submi

03-Oct-15, Material Appro03-Oct-15, Electrical Mater

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 13 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 14: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M200 Parking System Material Approval 6 26-Aug-15 01-Sep-15 SCG 0M410 LV Cables Approval 6 09-Sep-15 15-Sep-15 SCG 12M460 BMS Approval 18 09-Sep-15 03-Oct-15 SCG 1Electrical EquipmentElectrical Equipment 42 06-Jul-15 25-Aug-15 10

M1P1740 R.M.U Approval 6 06-Jul-15 12-Jul-15 SCG 34M1P1750 MVSG Approval 6 06-Jul-15 12-Jul-15 SCG 34M1P1800 UPS Approval 6 15-Jul-15 22-Jul-15 SCG 12M1P1730 Generator Approval 6 21-Jul-15 28-Jul-15 SCG 2M1P1760 Transformer Approval 6 21-Jul-15 28-Jul-15 SCG 22M1P1770 MDB Approval 6 12-Aug-15 18-Aug-15 SCG 4M1P1780 EMDB Approval 6 12-Aug-15 18-Aug-15 SCG 4M1P1810 MCC Approval 6 12-Aug-15 18-Aug-15 SCG 16M1P1790 ATS Approval 6 19-Aug-15 25-Aug-15 SCG 10

Mechanical MateriaMechanical Material Approval 72 22-Jun-15 15-Sep-15 46HVAC System ApproHVAC System Approval 54 22-Jun-15 25-Aug-15 58

M1P2250 Galvanized Duct Approval 6 22-Jun-15 28-Jun-15 SCG 46M1P2290 Child Water Pipes Approval 6 22-Jun-15 28-Jun-15 SCG 76M1P2300 Child Water Insulation Approval 6 22-Jun-15 28-Jun-15 SCG 106M1P2260 Volume Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P2270 Fire Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P2280 Fire Smoke Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P2310 Supply Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46M1P2320 Exhaust Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46

Fire Fighting SystemFire Fighting System Approval 51 16-Jul-15 15-Sep-15 3M1P2880 Seamless Black Steel Pipes Approval 6 16-Jul-15 25-Jul-15 SCG 26M1P2890 Fire Fighting Network Valves (O.S&Y gate valve, Check

valve, Alarm Check Valve) Approval6 21-Jul-15 28-Jul-15 SCG 29

M1P2900 Sprinklers Approval 6 21-Jul-15 28-Jul-15 SCG 20M1P2910 Fire Hose Stations Approval 6 21-Jul-15 28-Jul-15 SCG 28M1P2920 Fire Hose Real Stations Approval 6 21-Jul-15 28-Jul-15 SCG 28M1P2930 Fire Extinguishers Approval 6 21-Jul-15 28-Jul-15 SCG 19M1P2940 FM200 System for (MVSG Room, RMU Room,

Transformer Room, Telecom Room, Security Room,LV Room, IT&Main IT Room)Approval

6 02-Sep-15 08-Sep-15 SCG 4

M1P2950 Foam Fire System for (Generator Room, Feul Tank Room) Approval

6 09-Sep-15 15-Sep-15 SCG 3

Plumbing System APlumbing System Approval 18 27-Jul-15 16-Aug-15 72M1P3230 PPR Domestic Water Pipes Approval 6 27-Jul-15 02-Aug-15 SCG 54M1P3240 UPVC for Drainage System Approval 6 27-Jul-15 02-Aug-15 SCG 48

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

25-Aug-15, Electrical Equipment

15-Sep-15, Mechanical Materia25-Aug-15, HVAC System Approval

15-Sep-15, Fire Fighting System

16-Aug-15, Plumbing System Approva

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 14 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 15: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P3250 PVC for Forced Main Line Approval 6 27-Jul-15 02-Aug-15 SCG 66M1P3260 Irrigation System PVC Approval 6 27-Jul-15 02-Aug-15 SCG 66M1P3270 Valves Approval 6 27-Jul-15 02-Aug-15 SCG 72M1P3280 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Approval 6 27-Jul-15 02-Aug-15 SCG 36M1P3290 Hose Bibbs Approval 6 27-Jul-15 02-Aug-15 SCG 84M1P3300 HDPE Domestic Water Pipes Approval 6 03-Aug-15 09-Aug-15 SCG 72M1P3310 HDPE for Drainage , Waste , Vent, Storm Systems Approval 6 03-Aug-15 09-Aug-15 SCG 72M1P3320 Fountains Tank Approval 6 10-Aug-15 16-Aug-15 SCG 40M1P3330 Water Fall Tank Approval 6 10-Aug-15 16-Aug-15 SCG 40

Mechanical EquipmMechanical Equipment Approval 30 21-Jul-15 25-Aug-15 60HVAC EquipmentHVAC Equipment Approval 30 21-Jul-15 25-Aug-15 60

M1P2370 Child Water Pumps Approval 6 21-Jul-15 28-Jul-15 SCG 0M1P2380 Exhaust Fans Approval 6 21-Jul-15 28-Jul-15 SCG 41M1P2390 Supply Fans Approval 6 21-Jul-15 28-Jul-15 SCG 41M1P2330 Fuel Oil Storage Tank Approval 6 19-Aug-15 25-Aug-15 SCG 2M1P2340 AC DX Split Units Approval 6 19-Aug-15 25-Aug-15 SCG 60M1P2350 Heat Exchangers Approval 6 19-Aug-15 25-Aug-15 SCG 2M1P2360 Expansion and Compression Tanks Approval 6 19-Aug-15 25-Aug-15 SCG 2M1P2400 Fan Coil Units Approval 6 19-Aug-15 25-Aug-15 SCG 17

Material P.OMaterial P.O 84 25-Jun-15 07-Oct-15 34Electrical Material Electrical Material P.O 84 25-Jun-15 07-Oct-15 12

M210 PVC , EMT Conduit with Accessories Conduit Material P.O 3 25-Jun-15 28-Jun-15 Ofoq 48M220 Cable Trays P.O 3 29-Jun-15 01-Jul-15 Ofoq 86M230 Wires for Power and Lighting Material P.O 3 05-Aug-15 08-Aug-15 Ofoq 52M240 Lighting Fixture Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 40M250 Wiring Devices P.O 3 12-Aug-15 15-Aug-15 Ofoq 15M260 Fire Alarm Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 0M270 Structured Cable for Data System Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 11M280 Distribution Board Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 24M290 CCTV Cameras Material P.O 3 17-Aug-15 19-Aug-15 N/A 2M300 Parking System Material P.O 3 02-Sep-15 05-Sep-15 N/A 0M430 LV Cables P.O 3 16-Sep-15 19-Sep-15 Ofoq 12M470 BMS P.O 3 04-Oct-15 07-Oct-15 Ofoq 1Electrical EquipmentElectrical Equipment 39 13-Jul-15 29-Aug-15 42

M1P1830 R.M.U P.O 3 13-Jul-15 15-Jul-15 Ofoq 78M1P1840 MVSG P.O 3 13-Jul-15 15-Jul-15 Ofoq 40M1P1890 UPS P.O 3 25-Jul-15 27-Jul-15 Ofoq 12M1P1820 Generator P.O 3 29-Jul-15 01-Aug-15 Ofoq 2M1P1850 Transformer P.O 3 29-Jul-15 01-Aug-15 Ofoq 60

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

25-Aug-15, Mechanical Equipment A25-Aug-15, HVAC Equipment Appr

07-Oct-15, Material P.O07-Oct-15, Electrical Mater

29-Aug-15, Electrical Equipment

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 15 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 16: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P1860 MDB P.O 3 19-Aug-15 22-Aug-15 Ofoq 10M1P1870 EMDB P.O 3 19-Aug-15 22-Aug-15 Ofoq 16M1P1900 MCC P.O 3 19-Aug-15 22-Aug-15 Ofoq 16M1P1880 ATS P.O 3 26-Aug-15 29-Aug-15 Ofoq 10

Mechanical MateriaMechanical Material P.O 69 29-Jun-15 19-Sep-15 46HVAC System P.OHVAC System P.O 51 29-Jun-15 29-Aug-15 58

M1P2410 Galvanized Duct P.O 3 29-Jun-15 01-Jul-15 Ofoq 46M1P2450 Child Water Pipes P.O 3 29-Jun-15 01-Jul-15 Ofoq 76M1P2460 Child Water Insulation P.O 3 29-Jun-15 01-Jul-15 Ofoq 106M1P2420 Volume Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10M1P2430 Fire Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10M1P2440 Fire Smoke Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10M1P2470 Supply Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46M1P2480 Exhaust Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46

Fire Fighting SystemFire Fighting System P.O 48 26-Jul-15 19-Sep-15 3M1P2960 Seamless Black Steel Pipes P.O 3 26-Jul-15 28-Jul-15 Ofoq 26M1P2970 Fire Fighting Network Valves (O.S&Y gate valve, Check

valve, Alarm Check Valve) P.O3 29-Jul-15 01-Aug-15 Ofoq 29

M1P2980 Sprinklers P.O 3 29-Jul-15 01-Aug-15 Ofoq 20M1P2990 Fire Hose Stations P.O 3 29-Jul-15 01-Aug-15 Ofoq 28M1P3000 Fire Hose Real Stations P.O 3 29-Jul-15 01-Aug-15 Ofoq 28M1P3010 Fire Extinguishers P.O 3 29-Jul-15 01-Aug-15 Ofoq 19M1P3020 FM200 System for (MVSG Room, RMU Room,

Transformer Room, Telecom Room, Security Room,LV Room, IT&Main IT Room)P.O

3 09-Sep-15 12-Sep-15 Ofoq 4

M1P3030 Foam Fire System for (Generator Room, Feul Tank Room) P 3 16-Sep-15 19-Sep-15 Ofoq 3Plumbing System PPlumbing System P.O 15 03-Aug-15 19-Aug-15 72

M1P3340 PPR Domestic Water Pipes P.O 3 03-Aug-15 05-Aug-15 Ofoq 54M1P3350 UPVC for Drainage System P.O 3 03-Aug-15 05-Aug-15 Ofoq 48M1P3360 PVC for Forced Main Line P.O 3 03-Aug-15 05-Aug-15 Ofoq 66M1P3370 Irrigation System PVC P.O 3 03-Aug-15 05-Aug-15 Ofoq 66M1P3380 Valves P.O 3 03-Aug-15 05-Aug-15 Ofoq 72M1P3390 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D P.O 3 03-Aug-15 05-Aug-15 Ofoq 36M1P3400 Hose Bibbs P.O 3 03-Aug-15 05-Aug-15 Ofoq 84M1P3410 HDPE Domestic Water Pipes P.O 3 10-Aug-15 12-Aug-15 Ofoq 72M1P3420 HDPE for Drainage , Waste , Vent, Storm Systems P.O 3 10-Aug-15 12-Aug-15 Ofoq 72M1P3430 Fountains Tank P.O 3 17-Aug-15 19-Aug-15 N/A 40M1P3440 Water Fall Tank P.O 3 17-Aug-15 19-Aug-15 N/A 40

Mechanical EquipmMechanical Equipment P.O 30 29-Jul-15 01-Sep-15 60

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

19-Sep-15, Mechanical Materi29-Aug-15, HVAC System P.O

19-Sep-15, Fire Fighting System

19-Aug-15, Plumbing System P.O

01-Sep-15, Mechanical Equipment

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 16 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 17: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

HVAC EquipmentHVAC Equipment P.O 30 29-Jul-15 01-Sep-15 60M1P2530 Child Water Pumps P.O 6 29-Jul-15 04-Aug-15 Ofoq 0M1P2540 Exhaust Fans P.O 6 29-Jul-15 04-Aug-15 Ofoq 52M1P2550 Supply Fans P.O 6 29-Jul-15 04-Aug-15 Ofoq 52M1P2490 Fuel Oil Storage Tank P.O 6 26-Aug-15 01-Sep-15 Ofoq 2M1P2500 AC DX Split Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 60M1P2510 Heat Exchangers P.O 6 26-Aug-15 01-Sep-15 Ofoq 2M1P2520 Expansion and Compression Tanks P.O 6 26-Aug-15 01-Sep-15 Ofoq 2M1P2560 Fan Coil Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 17

Material DeliveryMaterial Delivery 134 29-Jun-15 09-Dec-15 6Electrical Material Electrical Material Delivery 121 29-Jun-15 24-Nov-15 1

M310 PVC , EMT Conduit with Accessories Conduit Material Delivery

6 29-Jun-15 05-Jul-15 Ofoq 48

M320 Cable Trays Delivery 6 02-Jul-15 08-Jul-15 Ofoq 86M330 Wires for Power and Lighting Material Delivery 6 09-Aug-15 15-Aug-15 Ofoq 52M340 Lighting Fixture Material Delivery 18 16-Aug-15 05-Sep-15 N/A 40M370 Structured Cable for Data System Material Delivery 18 20-Aug-15 09-Sep-15 Ofoq 11M350 Wiring Devices Delivery 36 16-Aug-15 29-Sep-15 Ofoq 15M390 CCTV Cameras Material Delivery 45 20-Aug-15 17-Oct-15 N/A 2M360 Fire Alarm Material Delivery 52 16-Aug-15 20-Oct-15 Ofoq 0M380 Distribution Board Material Delivery 52 20-Aug-15 25-Oct-15 Ofoq 24M440 LV Cables Delivery 26 20-Sep-15 25-Oct-15 Ofoq 12M400 Parking System Material Delivery 45 06-Sep-15 02-Nov-15 N/A 0M480 BMS Delivery 40 08-Oct-15 24-Nov-15 Ofoq 1Electrical EquipmentElectrical Equipment 90 16-Jul-15 05-Nov-15 14

M1P1920 R.M.U Delivery 26 16-Jul-15 17-Aug-15 Ofoq 78M1P1940 Transformer Delivery 26 02-Aug-15 31-Aug-15 Ofoq 60M1P1930 MVSG Delivery 52 16-Jul-15 16-Sep-15 Ofoq 40M1P1950 MDB Delivery 52 23-Aug-15 27-Oct-15 Ofoq 10M1P1960 EMDB Delivery 52 23-Aug-15 27-Oct-15 Ofoq 16M1P1990 MCC Delivery 52 23-Aug-15 27-Oct-15 Ofoq 16M1P1980 UPS Delivery 78 28-Jul-15 01-Nov-15 Ofoq 12M1P1970 ATS Delivery 52 30-Aug-15 03-Nov-15 Ofoq 10M1P1910 Generator Delivery 78 02-Aug-15 05-Nov-15 Ofoq 2

Mechanical MateriaMechanical Material Delivery 131 02-Jul-15 09-Dec-15 6HVAC System DelivHVAC System Delivery 60 02-Jul-15 12-Sep-15 52

M1P2570 Galvanized Duct Delivery 6 02-Jul-15 08-Jul-15 Ofoq 46M1P2610 Child Water Pipes Delivery 6 02-Jul-15 08-Jul-15 Ofoq 76M1P2620 Child Water Insulation Delivery 6 02-Jul-15 08-Jul-15 Ofoq 106M1P2580 Volume Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

01-Sep-15, HVAC Equipment P.O

09-Dec-15, M24-Nov-15, Elec

05-Nov-15, Electrica

09-Dec-15, M12-Sep-15, HVAC System Delive

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 17 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 18: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P2590 Fire Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10M1P2600 Fire Smoke Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10M1P2630 Supply Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46M1P2640 Exhaust Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46

Fire Fighting SystemFire Fighting System Delivery 85 29-Jul-15 10-Nov-15 15M1P3040 Seamless Black Steel Pipes Delivery 6 29-Jul-15 04-Aug-15 Ofoq 26M1P3050 Fire Fighting Network Valves (O.S&Y gate valve, Check

valve, Alarm Check Valve) Delivery18 02-Aug-15 22-Aug-15 Ofoq 29

M1P3070 Fire Hose Stations Delivery 36 02-Aug-15 12-Sep-15 Ofoq 28M1P3080 Fire Hose Real Stations Delivery 36 02-Aug-15 12-Sep-15 Ofoq 28M1P3060 Sprinklers Delivery 45 02-Aug-15 26-Sep-15 Ofoq 20M1P3090 Fire Extinguishers Delivery 78 02-Aug-15 05-Nov-15 Ofoq 19M1P3100 FM200 System for (MVSG Room, RMU Room,

Transformer Room, Telecom Room, Security Room,LV Room, IT&Main IT Room)Delivery

45 13-Sep-15 09-Nov-15 Ofoq 4

M1P3110 Foam Fire System for (Generator Room, Feul Tank Room) Delivery

40 20-Sep-15 10-Nov-15 Ofoq 3

Plumbing System DPlumbing System Delivery 30 06-Aug-15 09-Sep-15 60M1P3450 PPR Domestic Water Pipes Delivery 6 06-Aug-15 12-Aug-15 Ofoq 54M1P3460 UPVC for Drainage System Delivery 6 06-Aug-15 12-Aug-15 Ofoq 48M1P3470 PVC for Forced Main Line Delivery 6 06-Aug-15 12-Aug-15 Ofoq 66M1P3480 Irrigation System PVC Delivery 6 06-Aug-15 12-Aug-15 Ofoq 66M1P3490 Valves Delivery 6 06-Aug-15 12-Aug-15 Ofoq 72M1P3500 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Delivery 6 06-Aug-15 12-Aug-15 Ofoq 36M1P3510 Hose Bibbs Delivery 6 06-Aug-15 12-Aug-15 Ofoq 84M1P3520 HDPE Domestic Water Pipes Delivery 12 13-Aug-15 26-Aug-15 Ofoq 72M1P3530 HDPE for Drainage , Waste , Vent, Storm Systems Delivery 12 13-Aug-15 26-Aug-15 Ofoq 72M1P3540 Fountains Tank Delivery 18 20-Aug-15 09-Sep-15 N/A 40M1P3550 Water Fall Tank Delivery 18 20-Aug-15 09-Sep-15 N/A 40

Mechanical EquipmMechanical Equipment Delivery 104 05-Aug-15 09-Dec-15 6HVAC EquipmentHVAC Equipment Delivery 104 05-Aug-15 09-Dec-15 6

M1P2660 AC DX Split Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 60M1P2720 Fan Coil Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 17M1P2700 Exhaust Fans Delivery 52 05-Aug-15 08-Oct-15 Ofoq 52M1P2710 Supply Fans Delivery 52 05-Aug-15 08-Oct-15 Ofoq 52M1P2650 Fuel Oil Storage Tank Delivery 78 02-Sep-15 07-Dec-15 Ofoq 2M1P2670 Heat Exchangers Delivery 78 02-Sep-15 07-Dec-15 Ofoq 2M1P2680 Expansion and Compression Tanks Delivery 78 02-Sep-15 07-Dec-15 Ofoq 2M1P2690 Child Water Pumps Delivery 104 05-Aug-15 09-Dec-15 Ofoq 0

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

10-Nov-15, Fire Fig

09-Sep-15, Plumbing System Del

09-Dec-15, M09-Dec-15, H

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 18 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 19: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

ConstructionConstruction 137 16-Jul-15 31-Dec-15 0

Structural WorkStructural Work 112 16-Jul-15 01-Dec-15 0

M1P3580 Openings for Duct Shafts 12 16-Jul-15 01-Aug-15 HW ECIP 28M1P3590 Completion of All demolishing and remodeling in Plaza Leve 0 27-Aug-15 HW ECIP 53M1P3600 Expansion Joints 12 29-Aug-15 10-Sep-15 HW ECIP 53M1P3890 Equipments Concrete Foundations 12 04-Oct-15 19-Oct-15 HW ECIP 17M1P4000 Upper Basement Screed 12 18-Nov-15 01-Dec-15 HW ECIP 0

MEP WorkMEP Work 98 02-Sep-15 31-Dec-15 0

Electrical WorksElectrical Works 98 02-Sep-15 31-Dec-15 0Power SystemPower System 71 02-Sep-15 29-Nov-15 2

M1P3610 Upper Basement PVC Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P3620 Upper Basement EMT Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P3630 Upper Basement Cable Trays for LV Cables 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P3640 Wires for Upper Basement Power Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 41M1P3660 Laying Upper Basement DB Panels 2 26-Oct-15 27-Oct-15 SCG Ofoq 24M1P3650 Laying Upper Basement LV Cables 6 26-Oct-15 01-Nov-15 SCG Ofoq 12M1P3790 Wiring Devices Erection and termination 12 02-Nov-15 15-Nov-15 SCG Ofoq 12M1P3670 Termination Upper Basement DB Panels 6 11-Nov-15 17-Nov-15 SCG Ofoq 12Power EquipmentPower Equipment 35 20-Oct-15 29-Nov-15 2

M1P3700 Laying Upper Basement Transformer 2 20-Oct-15 21-Oct-15 SCG Ofoq 23M1P3720 Laying R.M.U 2 20-Oct-15 21-Oct-15 SCG Ofoq 29M1P3740 Laying MVSG 2 20-Oct-15 21-Oct-15 SCG Ofoq 17M1P3730 Termination R.M.U 6 22-Oct-15 28-Oct-15 SCG Ofoq 29M1P3680 Laying Upper Basement MCC's 2 28-Oct-15 29-Oct-15 SCG Ofoq 16M1P3830 Laying EMDB 2 28-Oct-15 29-Oct-15 SCG Ofoq 16M1P3900 Laying MDB 2 28-Oct-15 29-Oct-15 SCG Ofoq 10M1P3860 Laying UPS 2 02-Nov-15 03-Nov-15 SCG Ofoq 12M1P3710 Termination Upper Basement Transformer 12 22-Oct-15 04-Nov-15 SCG Ofoq 23M1P3850 Laying ATS 2 04-Nov-15 05-Nov-15 SCG Ofoq 10M1P3760 Laying Generator Package 2 07-Nov-15 08-Nov-15 SCG Ofoq 2M1P3750 Termination MVSG 18 22-Oct-15 11-Nov-15 SCG Ofoq 17M1P3690 Termination Upper Basement MCC's 12 31-Oct-15 12-Nov-15 SCG Ofoq 16M1P3840 Termination EMDB 12 31-Oct-15 12-Nov-15 SCG Ofoq 16M1P3880 Termination UPS 12 04-Nov-15 17-Nov-15 SCG Ofoq 12M1P3870 Termination ATS 12 07-Nov-15 19-Nov-15 SCG Ofoq 10M1P3910 Termination MDB 18 31-Oct-15 19-Nov-15 SCG Ofoq 10M1P3770 Termination of Generator 18 09-Nov-15 29-Nov-15 SCG Ofoq 2

Lighting SystemLighting System 36 02-Sep-15 19-Oct-15 25

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

31-Dec-

01-Dec-15, Str

31-Dec-

31-Dec-29-Nov-15, Pow

29-Nov-15, Pow

19-Oct-15, Lighting Sys

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 19 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 20: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P3800 Upper Basement PVC Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 25M1P3810 Upper Basement EMT Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 25M1P3820 Wires for Upper Basement Lighting Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 25M1P3780 Lighting Fixture Erection and termination 18 27-Sep-15 19-Oct-15 SCG Ofoq 25

Low Current SysteLow Current Systems 98 02-Sep-15 31-Dec-15 0Fire Alarm SystemFire Alarm System 98 02-Sep-15 31-Dec-15 0

M1P4010 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 19M1P4020 Fire Alarm Cable 18 21-Oct-15 10-Nov-15 SCG Ofoq 0M1P4030 Fire Alarm Devices 18 11-Nov-15 01-Dec-15 SCG Ofoq 0M1P4040 Testing And Precommissioning 25 02-Dec-15 31-Dec-15 SCG Ofoq 0

Data SystemData System 98 02-Sep-15 31-Dec-15 0M1P4050 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 0M1P4060 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 0M1P4070 Face Plates Devices 18 20-Oct-15 09-Nov-15 SCG Ofoq 0M1P4080 Testing And Precommissioning 44 10-Nov-15 31-Dec-15 SCG Ofoq 0

CCTV SystemCCTV System 98 02-Sep-15 31-Dec-15 0M1P4090 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 0M1P4100 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 0M1P4110 Cameras Devices 18 20-Oct-15 09-Nov-15 SCG Ofoq 0M1P4120 Testing And Precommissioning 44 10-Nov-15 31-Dec-15 SCG Ofoq 0

BMS SystemBMS System 97 02-Sep-15 30-Dec-15 1M1P4130 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 32M1P4140 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 32M1P4150 BMS System with FACP Termination 12 25-Nov-15 08-Dec-15 SCG Ofoq 1M1P4160 Testing And Precommissioning 18 09-Dec-15 30-Dec-15 SCG Ofoq 1

Parking SystemParking System 98 02-Sep-15 31-Dec-15 0M1P4170 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 12M1P4180 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 12M1P4190 Parking System 20 03-Nov-15 25-Nov-15 SCG Ofoq 0M1P4200 Testing And Precommissioning 30 26-Nov-15 31-Dec-15 SCG Ofoq 0

Mechanical WorksMechanical Works 98 02-Sep-15 31-Dec-15 0HVAC SystemHVAC System 98 02-Sep-15 31-Dec-15 0

M1P4210 Galvanized Duct Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 1M1P4230 Child Water Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 31M1P4220 Volume Dampers , Fire Dampers and Fire Smoke Dampers

Erection12 27-Sep-15 11-Oct-15 SCG Ofoq 1

M1P4250 Child Water Pipes Test and Flushing 12 27-Sep-15 11-Oct-15 SCG Ofoq 31M1P4290 Fan Coil Unit Erection 12 07-Oct-15 21-Oct-15 SCG Ofoq 17M1P4240 Duct Smoke Test 12 12-Oct-15 26-Oct-15 SCG Ofoq 1M1P4270 Child Water Pipes Insulation 12 12-Oct-15 26-Oct-15 SCG Ofoq 31

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

31-Dec-31-Dec-

31-Dec-

31-Dec-

30-Dec-

31-Dec-

31-Dec-31-Dec-

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 20 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 21: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P4260 Duct Insulation 12 27-Oct-15 09-Nov-15 SCG Ofoq 1M1P4280 Air Grill Supply and Exhaust 18 10-Nov-15 30-Nov-15 SCG Ofoq 1HVAC EquipmentHVAC Equipment 72 07-Oct-15 31-Dec-15 0

M1P4300 AC DX Split Units Erection 12 07-Oct-15 21-Oct-15 SCG Ofoq 60M1P4310 Exhaust Fans Erection 18 10-Oct-15 31-Oct-15 SCG Ofoq 52M1P4320 Supply Fans Erection 18 10-Oct-15 31-Oct-15 SCG Ofoq 52M1P4330 Fuel Oil Storage Tank Erection 18 08-Dec-15 29-Dec-15 SCG Ofoq 2M1P4340 Heat Exchangers Erection 18 08-Dec-15 29-Dec-15 SCG Ofoq 2M1P4350 Expansion and Compression Tanks Erection 18 08-Dec-15 29-Dec-15 SCG Ofoq 2M1P4360 Child Water Pumps Erection 18 10-Dec-15 31-Dec-15 SCG Ofoq 0

Fire Fighting SysteFire Fighting System 95 02-Sep-15 28-Dec-15 3M1P4370 Seamless Black Steel Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 2M1P4380 Fire Fighting Network Valves (O.S&Y gate valve, Check

valve, Alarm Check Valve) Erection6 27-Sep-15 03-Oct-15 SCG Ofoq 2

M1P4450 Pipe Testing and Flushing 12 04-Oct-15 19-Oct-15 SCG Ofoq 2M1P4390 Fire Hose Stations Erection 36 13-Sep-15 29-Oct-15 SCG Ofoq 28M1P4400 Fire Hose Real Stations Erection 36 13-Sep-15 29-Oct-15 SCG Ofoq 28M1P4420 Fire Extinguishers 3 07-Nov-15 09-Nov-15 SCG Ofoq 19M1P4410 Sprinklers Erection 45 20-Oct-15 10-Dec-15 SCG Ofoq 2M1P4430 FM200 System for (MVSG Room, RMU Room,

Transformer Room, Telecom Room, Security Room,LV Room, IT&Main IT Room)

40 10-Nov-15 27-Dec-15 SCG Ofoq 4

M1P4440 Foam Fire System for (Generator Room, Feul Tank Room) Erection

40 11-Nov-15 28-Dec-15 SCG Ofoq 3

Plumbing SystemPlumbing System 54 02-Sep-15 09-Nov-15 19M1P4510 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Erection 12 02-Sep-15 15-Sep-15 SCG Ofoq 19M1P4460 PPR Domestic Water Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 37M1P4490 Irrigation System PVC Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 49M1P4500 Valves Erection 6 27-Sep-15 03-Oct-15 SCG Ofoq 37M1P4520 Hose Bibbs Erection 6 27-Sep-15 03-Oct-15 SCG Ofoq 49M1P4470 UPVC for Drainage System Erection 18 16-Sep-15 11-Oct-15 SCG Ofoq 19M1P4570 Testing Domestic Network 6 04-Oct-15 11-Oct-15 SCG Ofoq 37M1P4550 Fountains Tank Erection 26 10-Sep-15 15-Oct-15 SCG N/A 40M1P4560 Water Fall Tank Erection 26 10-Sep-15 15-Oct-15 SCG N/A 40M1P4530 HDPE Domestic Water Pipes Erection 6 12-Oct-15 19-Oct-15 SCG Ofoq 37M1P4480 PVC for Forced Main Line Erection 12 12-Oct-15 26-Oct-15 SCG Ofoq 19M1P4580 Testing for Drainage Network 6 27-Oct-15 02-Nov-15 SCG Ofoq 19M1P4540 HDPE for Drainage , Waste , Vent, Storm Systems Erection 6 03-Nov-15 09-Nov-15 SCG Ofoq 19

Finishing WorkFinishing Work 126 29-Jul-15 29-Dec-15 2

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

31-Dec-

28-Dec-

09-Nov-15, Plumbi

29-Dec-

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 21 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 22: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P4660 Block Work Completion for Equipments / Service / Stores Rooms

12 29-Jul-15 11-Aug-15 HW ECIP 0

M1P4670 Plaster Work Applied for Equipments / Service / Stores Roo 12 12-Aug-15 25-Aug-15 HW ECIP 0M1P4620 Curb Stone Material Erection 12 06-Sep-15 19-Sep-15 HW ECIP 46M1P4680 MEP 1st Fix for Equipments / Service / Stores Rooms 26 26-Aug-15 28-Sep-15 SCG Ofoq 0M1P4630 Interlock Material Erection 12 20-Sep-15 07-Oct-15 HW ECIP 46M1P8420 Paint 1st and 2nd Coat for Ceiling and Walls in Upper

Basement26 06-Sep-15 10-Oct-15 HW ECIP 54

M1P4590 False Ceiling Erection for Equipments / Service / Stores Rooms

12 29-Sep-15 13-Oct-15 HW ECIP 0

M1P4610 Paint Applied for Equipments / Service / Stores Rooms 12 15-Oct-15 28-Oct-15 HW ECIP 0M1P4650 Raised Floor Erection (Expected in IT & Main IT Room) 6 29-Oct-15 04-Nov-15 HW ECIP 6M1P4600 Flooring Tiles Applied for Equipments / Service / Stores Roo 12 29-Oct-15 11-Nov-15 HW ECIP 0M1P4640 Doors Erection for Equipments / Service / Stores Rooms 12 12-Nov-15 25-Nov-15 HW ECIP 5M1P4690 MEP Final Fix for Equipments / Service / Stores Rooms 12 12-Nov-15 25-Nov-15 SCG Ofoq 0M1P8430 Final Coat of Paint for Walls and Ceiling 12 12-Dec-15 26-Dec-15 HW 2M1P8440 Epoxi Paint for Flooring 12 15-Dec-15 29-Dec-15 HW 2

Lower BasementLower Basement 164 15-Jun-15 31-Dec-15 0

GeneralGeneral 0 07-Jul-15 07-Jul-15 15

M1P6450 Client Clear Vision about Secuirty Issues as (CCTV, Access Control...)

0 07-Jul-15 Client 6

M1P6460 Client Clear Vision about Data Issues as (Central, IT requirements...)

0 07-Jul-15 Client 15

DesignDesign 60 15-Jun-15 25-Aug-15 41

Architectural DesArchitectural Design 24 15-Jun-15 12-Jul-15 0

M1P4700 Final Parking Layout for Lower Basement 0 28-Jun-15 Client 0M1P4710 Final Architectural Dimensional Plan for Lower Basement 12 15-Jun-15 28-Jun-15 T.B 0M1P4720 Final Architectural Package for Lower Basement 12 29-Jun-15 12-Jul-15 HW 0

Structural DesignStructural Design 6 19-Aug-15 25-Aug-15 41

M1P6440 Structural Design for Equipment Foundation (Fire Pump , Supply and Exhaust Fans........)

6 19-Aug-15 25-Aug-15 HW 41

MEP DesignMEP Design 24 29-Jun-15 28-Jul-15 6

Electrical SystemsElectrical Systems 24 29-Jun-15 28-Jul-15 6Power SystemPower System 6 29-Jun-15 05-Jul-15 15

M1P4750 Updated Design for Power System 6 29-Jun-15 05-Jul-15 SCG 15Lighting SystemLighting System 6 29-Jun-15 05-Jul-15 15

M1P4760 Updated Design for Lighting System 6 29-Jun-15 05-Jul-15 SCG 15Fire Alarm SystemFire Alarm System 6 13-Jul-15 20-Jul-15 0

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

31-Dec-

07-Jul-15, General

25-Aug-15, Design

12-Jul-15, Architectural Design

25-Aug-15, Structural Design

28-Jul-15, MEP Design

28-Jul-15, Electrical Systems05-Jul-15, Power System

05-Jul-15, Lighting System

20-Jul-15, Fire Alarm System

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 22 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 23: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P5370 Updated Design for Fire Alarm System 6 13-Jul-15 20-Jul-15 C/SCG 0Parking SystemParking System 18 29-Jun-15 20-Jul-15 0

M1P5140 Updated Design for Parking System 18 29-Jun-15 20-Jul-15 C/SCG 0CCTV SystemCCTV System 6 13-Jul-15 20-Jul-15 2

M1P4730 Updated Design for CCTV System 6 13-Jul-15 20-Jul-15 C/SCG 2Data SystemData System 6 13-Jul-15 20-Jul-15 11

M1P4740 Updated Design for Data System 6 13-Jul-15 20-Jul-15 C/SCG 11BMS SystemBMS System 6 21-Jul-15 28-Jul-15 6

M1P5690 Updated Design for BMS System 6 21-Jul-15 28-Jul-15 SCG 6Mechanical SystemsMechanical Systems 18 29-Jun-15 20-Jul-15 6

HVAC SystemHVAC System 6 13-Jul-15 20-Jul-15 0M1P4770 HVAC Updated Design for Lower Basement 6 13-Jul-15 20-Jul-15 SCG 0

Fire Fighting SysteFire Fighting System 6 29-Jun-15 05-Jul-15 3M1P4820 Fire Fighting Updated Design for Lower Basement 6 29-Jun-15 05-Jul-15 SCG 3

Plumbing SystemPlumbing System 6 13-Jul-15 20-Jul-15 6Drainage SystemDrainage System 6 13-Jul-15 20-Jul-15 6

M1P4780 Final Update for Lower Basement Drainage System 6 13-Jul-15 20-Jul-15 SCG 6

Shop DrawingsShop Drawings 60 29-Jun-15 08-Sep-15 41

Architectural ShoArchitectural Shop Drawing 12 13-Jul-15 28-Jul-15 4

M1P4830 Lower Basement Architectural Shop Drawing Submittal 6 13-Jul-15 20-Jul-15 ECIP 4M1P4840 Lower Basement Architectural Shop Drawing Approval 6 21-Jul-15 28-Jul-15 HW 4

Structural Shop DStructural Shop Drawing 50 11-Jul-15 08-Sep-15 41

M1P4850 Lower Basement Construction , Expansion Joints Details Shop Drawing Submittal

6 11-Jul-15 16-Jul-15 ECIP 64

M1P4860 Lower Basement Construction , Expansion Joints Details Shop Drawing Approval

6 19-Jul-15 26-Jul-15 HW 64

M1P6470 Lower Basement Equipments Foundations shop drawings Submittal

6 26-Aug-15 01-Sep-15 ECIP 41

M1P6480 Lower Basement Equipments Foundations shop drawings Approval

6 02-Sep-15 08-Sep-15 HW 41

Electrical SystemsElectrical Systems 36 06-Jul-15 18-Aug-15 0

Power SystemPower System 12 06-Jul-15 20-Jul-15 15M1P4870 Lower Basement Power System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 15M1P4880 Lower Basement Power System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 15

Lighting SystemLighting System 12 06-Jul-15 20-Jul-15 15M1P4890 Lower Basement Lighting System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 15M1P4900 Lower Basement Lighting System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 15

Fire Alarm SystemFire Alarm System 12 21-Jul-15 04-Aug-15 12M1P5380 Lower Basement Fire Alarm System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 12

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

20-Jul-15, Parking System

20-Jul-15, CCTV System

20-Jul-15, Data System

28-Jul-15, BMS System

20-Jul-15, Mechanical Systems20-Jul-15, HVAC System

05-Jul-15, Fire Fighting System

20-Jul-15, Plumbing System20-Jul-15, Drainage System

08-Sep-15, Shop Drawings

28-Jul-15, Architectural Shop Drawing

08-Sep-15, Structural Shop Draw

18-Aug-15, Electrical Systems

20-Jul-15, Power System

20-Jul-15, Lighting System

04-Aug-15, Fire Alarm System

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 23 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 24: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P5390 Lower Basement Fire Alarm System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 12Parking SystemParking System 12 21-Jul-15 04-Aug-15 0

M1P5120 Lower Basement Parking System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0M1P5130 Lower Basement Parking System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0

CCTV SystemCCTV System 12 21-Jul-15 04-Aug-15 2M1P4910 Lower Basement CCTV System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 2M1P4920 Lower Basement CCTV System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 2

Data SystemData System 12 21-Jul-15 04-Aug-15 11M1P4930 Lower Basement Data System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 11M1P4940 Lower Basement Data System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 11

BMS SystemBMS System 12 05-Aug-15 18-Aug-15 0M1P5700 Lower Basement BMS System Layout Submittal 6 05-Aug-15 11-Aug-15 Ofoq 0M1P5710 Lower Basement BMS System Layout Approval 6 12-Aug-15 18-Aug-15 SCG 0

Mechanical SysteMechanical Systems 42 29-Jun-15 18-Aug-15 41

HVAC SystemHVAC System 42 29-Jun-15 18-Aug-15 41M1P5920 Fans Static Pressure Calculations Submittal 6 29-Jun-15 05-Jul-15 Ofoq 21M1P5930 Fans Static Pressure Calculations Approval 6 06-Jul-15 12-Jul-15 SCG 21M1P7250 Builder Work for Shaft Opening Layout Submittal 3 13-Jul-15 15-Jul-15 Ofoq 22M1P7260 Builder Work for Shaft Opening Layout Approval 6 16-Jul-15 25-Jul-15 HW 22M1P4950 Lower Basement HVAC System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 0M1P4960 Lower Basement HVAC System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 0M1P6420 Lower Basement Fan Room Details Submittal 6 05-Aug-15 11-Aug-15 Ofoq 41M1P6430 Lower Basement Fan Room Details Approval 6 12-Aug-15 18-Aug-15 SCG 41

Fire Fighting SystemFire Fighting System 12 06-Jul-15 20-Jul-15 3M1P4970 Lower Basement Fire Fighting System Layout Submittal 6 06-Jul-15 12-Jul-15 Ofoq 3M1P4980 Lower Basement Fire Fighting System Layout Approval 6 13-Jul-15 20-Jul-15 SCG 3

Plumbing SystemPlumbing System 12 21-Jul-15 04-Aug-15 11Drainage SystemDrainage System 12 21-Jul-15 04-Aug-15 11

M1P4990 Lower Basement Drainage System Layout Submittal 6 21-Jul-15 28-Jul-15 Ofoq 11M1P5000 Lower Basement Drainage System Layout Approval 6 29-Jul-15 04-Aug-15 SCG 11

Composite DrawiComposite Drawing 12 19-Aug-15 01-Sep-15 0

M1P5050 Lower Basement MEP Composite Drawing Submittal 6 19-Aug-15 25-Aug-15 Ofoq 0M1P5060 Lower Basement MEP Composite Drawing Approval 6 26-Aug-15 01-Sep-15 SCG 0

MaterialsMaterials 149 15-Jun-15 13-Dec-15 3

Finishing MateriaFinishing Materials 35 27-Jul-15 05-Sep-15 58

Material SubmittalMaterial Submittal 20 27-Jul-15 18-Aug-15 58M110001246 Expansion Joints Submittal 6 27-Jul-15 02-Aug-15 ECIP 64M1P5070 False Ceiling Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 21

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

04-Aug-15, Parking System

04-Aug-15, CCTV System

04-Aug-15, Data System

18-Aug-15, BMS System

18-Aug-15, Mechanical Systems

18-Aug-15, HVAC System

20-Jul-15, Fire Fighting System

04-Aug-15, Plumbing System04-Aug-15, Drainage System

01-Sep-15, Composite Drawing

13-Dec-15,

05-Sep-15, Finishing Materials

18-Aug-15, Material Submittal

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 24 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 25: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P5080 Flooring Tiles Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 45M1P5090 Paint Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 33M1P5100 Curb Stone Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 46M1P5110 Interlock Material Submittal 18 29-Jul-15 18-Aug-15 ECIP 58M1P7610 Doors Submittal 18 29-Jul-15 18-Aug-15 ECIP 58

Material ApprovalMaterial Approval 20 03-Aug-15 25-Aug-15 58M110001256 Expansion Joints Approval 6 03-Aug-15 09-Aug-15 HW 64M1P5150 False Ceiling Material Approval 6 19-Aug-15 25-Aug-15 HW 21M1P5160 Flooring Tiles Material Approval 6 19-Aug-15 25-Aug-15 HW 45M1P5170 Paint Material Approval 6 19-Aug-15 25-Aug-15 HW 33M1P5180 Curb Stone Material Approval 6 19-Aug-15 25-Aug-15 HW 46M1P5190 Interlock Material Approval 6 19-Aug-15 25-Aug-15 HW 58M1P7630 Doors Approval 6 19-Aug-15 25-Aug-15 HW 58

Material P.OMaterial P.O 17 10-Aug-15 29-Aug-15 58M110001266 Expansion Joints P.O 3 10-Aug-15 12-Aug-15 ECIP 64M1P5200 False Ceiling Material P.O 3 26-Aug-15 29-Aug-15 ECIP 21M1P5210 Flooring Tiles Material P.O 3 26-Aug-15 29-Aug-15 ECIP 45M1P5220 Paint Material P.O 3 26-Aug-15 29-Aug-15 ECIP 33M1P5230 Curb Stone Material P.O 3 26-Aug-15 29-Aug-15 ECIP 46M1P5240 Interlock Material P.O 3 26-Aug-15 29-Aug-15 ECIP 58M1P7650 Doors P.O 3 26-Aug-15 29-Aug-15 ECIP 58

Material DeliveryMaterial Delivery 20 13-Aug-15 05-Sep-15 58M110001276 Expansion Joints Delivery 6 13-Aug-15 19-Aug-15 ECIP 64M1P5250 False Ceiling Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 21M1P5260 Flooring Tiles Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 45M1P5270 Paint Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 33M1P5280 Curb Stone Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 46M1P5290 Interlock Material Delivery 6 30-Aug-15 05-Sep-15 ECIP 58M1P7670 Doors Delivery 6 30-Aug-15 05-Sep-15 ECIP 58

MEP MaterialsMEP Materials 149 15-Jun-15 13-Dec-15 3

Material SubmittalMaterial Submittal 72 15-Jun-15 08-Sep-15 40Electrical Material SElectrical Material Submittal 72 15-Jun-15 08-Sep-15 20

M490 PVC , EMT Conduit with Accessories Material Submittal 3 15-Jun-15 17-Jun-15 Ofoq 48M570 Cable Trays Submittal 6 15-Jun-15 21-Jun-15 Ofoq 86M530 Wires for Power and Lighting Material Submittal 6 21-Jul-15 28-Jul-15 Ofoq 56M520 Lighting Fixture Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 44M560 Wiring Devices Submittal 12 21-Jul-15 04-Aug-15 Ofoq 15M580 Fire Alarm Material Submittal 12 21-Jul-15 04-Aug-15 Ofoq 0M500 Structured Cable for Data System Material Submittal 4 05-Aug-15 09-Aug-15 Ofoq 11

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

25-Aug-15, Material Approval

29-Aug-15, Material P.O

05-Sep-15, Material Delivery

13-Dec-15,

08-Sep-15, Material Submittal08-Sep-15, Electrical Material Su

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 25 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 26: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M510 Distribution Board Material Submittal 16 21-Jul-15 09-Aug-15 Ofoq 24M540 CCTV Cameras Material Submittal 4 05-Aug-15 09-Aug-15 N/A 2M550 Parking System Material Submittal 18 05-Aug-15 25-Aug-15 N/A 0M900 LV Cables Submittal 6 02-Sep-15 08-Sep-15 Ofoq 12M930 BMS Submittal 18 19-Aug-15 08-Sep-15 Ofoq 1Electrical EquipmentElectrical Equipment 18 21-Jul-15 11-Aug-15 16

M1P5410 MCC Submittal 18 21-Jul-15 11-Aug-15 Ofoq 16Mechanical MateriaMechanical Material Submittal 30 13-Jul-15 18-Aug-15 58

HVAC System SubmHVAC System Submittal 12 05-Aug-15 18-Aug-15 58M1P5720 Galvanized Duct Submittal 6 05-Aug-15 11-Aug-15 Ofoq 4M1P5760 Child Water Pipes Submittal 6 05-Aug-15 11-Aug-15 Ofoq 34M1P5770 Child Water Insulation Submittal 6 05-Aug-15 11-Aug-15 Ofoq 64M1P5730 Volume Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P5740 Fire Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P5750 Fire Smoke Dampers Submittal 12 05-Aug-15 18-Aug-15 Ofoq 10M1P5780 Supply Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46M1P5790 Exhaust Air Grill Submittal 12 05-Aug-15 18-Aug-15 Ofoq 46

Fire Fighting SystemFire Fighting System Submittal 6 21-Jul-15 28-Jul-15 23M1P6490 Seamless Black Steel Pipes Submittal 3 21-Jul-15 25-Jul-15 Ofoq 20M1P6500 Fire Fighting Network Valves (O.S&Y gate valve, Check

valve, Alarm Check Valve) Submittal6 21-Jul-15 28-Jul-15 Ofoq 23

M1P6510 Sprinklers Submittal 6 21-Jul-15 28-Jul-15 Ofoq 14M1P6540 Fire Hose Stations Submittal 6 21-Jul-15 28-Jul-15 Ofoq 22M1P6550 Fire Hose Real Stations Submittal 6 21-Jul-15 28-Jul-15 Ofoq 22M1P6560 Fire Extinguishers Submittal 6 21-Jul-15 28-Jul-15 Ofoq 13

Plumbing System SPlumbing System Submittal 6 05-Aug-15 11-Aug-15 64M1P6840 PPR Domestic Water Pipes Submittal 6 05-Aug-15 11-Aug-15 Ofoq 46M1P6860 UPVC for Drainage System Submittal 6 05-Aug-15 11-Aug-15 Ofoq 40M1P6870 PVC for Forced Main Line Submittal 6 05-Aug-15 11-Aug-15 Ofoq 58M1P6890 Valves Submittal 6 05-Aug-15 11-Aug-15 Ofoq 64M1P6900 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Submittal 6 05-Aug-15 11-Aug-15 Ofoq 28

Mechanical EquipmMechanical Equipment Submittal 30 13-Jul-15 18-Aug-15 35HVAC EquipmentHVAC Equipment Submittal 30 13-Jul-15 18-Aug-15 35

M1P5850 Exhaust Fans Submittal 12 13-Jul-15 28-Jul-15 Ofoq 21M1P5860 Supply Fans Submittal 12 13-Jul-15 28-Jul-15 Ofoq 21M1P5810 AC DX Split Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 35M1P5870 Fan Coil Units Submittal 12 05-Aug-15 18-Aug-15 Ofoq 17

Fire Fighting EquFire Fighting Equipment Submittal 6 21-Jul-15 28-Jul-15 3M1P8450 Fire Pumps Submittal 6 21-Jul-15 28-Jul-15 Ofoq 3

Plumbing EquipmPlumbing Equipment Submittal 6 05-Aug-15 11-Aug-15 11

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

11-Aug-15, Electrical Equipment

18-Aug-15, Mechanical Material Subm18-Aug-15, HVAC System Submittal

28-Jul-15, Fire Fighting System Submittal

11-Aug-15, Plumbing System Submittal

18-Aug-15, Mechanical Equipment Su18-Aug-15, HVAC Equipment Submi

28-Jul-15, Fire Fighting Equipment Submi

11-Aug-15, Plumbing Equipment Subm

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 26 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 27: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P8460 Domestic Water Pump Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11M1P8470 Irrigation Pump Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11M1P8480 Waste Water Submersible Pumps Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11M1P8490 Sewage Water Submersible Pumps Submittal 6 05-Aug-15 11-Aug-15 Ofoq 11

Material ApprovalMaterial Approval 87 18-Jun-15 03-Oct-15 28Electrical Material AElectrical Material Approval 87 18-Jun-15 03-Oct-15 8

M590 PVC , EMT Conduit with Accessories Conduit Material Approval

6 18-Jun-15 24-Jun-15 SCG 48

M670 Cable Trays Approval 6 22-Jun-15 28-Jun-15 SCG 86M630 Wires for Power and Lighting Material Approval 6 29-Jul-15 04-Aug-15 SCG 56M620 Lighting Fixture Material Approval 6 05-Aug-15 11-Aug-15 SCG 44M660 Wiring Devices Approval 6 05-Aug-15 11-Aug-15 SCG 15M680 Fire Alarm Material Approval 6 05-Aug-15 11-Aug-15 SCG 0M600 Structured Cable for Data System Material Approval 6 10-Aug-15 16-Aug-15 SCG 11M610 Distribution Board Material Approval 6 10-Aug-15 16-Aug-15 SCG 24M640 CCTV Cameras Material Approval 6 10-Aug-15 16-Aug-15 SCG 2M650 Parking System Material Approval 6 26-Aug-15 01-Sep-15 SCG 0M890 LV Cables Approval 6 09-Sep-15 15-Sep-15 SCG 12M940 BMS Approval 18 09-Sep-15 03-Oct-15 SCG 1Electrical EquipmentElectrical Equipment 6 12-Aug-15 18-Aug-15 16

M1P5500 MCC Approval 6 12-Aug-15 18-Aug-15 SCG 16Mechanical MateriaMechanical Material Approval 27 26-Jul-15 25-Aug-15 58

HVAC System ApproHVAC System Approval 12 12-Aug-15 25-Aug-15 58M1P5940 Galvanized Duct Approval 6 12-Aug-15 18-Aug-15 SCG 4M1P5980 Child Water Pipes Approval 6 12-Aug-15 18-Aug-15 SCG 34M1P5990 Child Water Insulation Approval 6 12-Aug-15 18-Aug-15 SCG 64M1P5950 Volume Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P5960 Fire Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P5970 Fire Smoke Dampers Approval 6 19-Aug-15 25-Aug-15 SCG 10M1P6000 Supply Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46M1P6010 Exhaust Air Grill Approval 6 19-Aug-15 25-Aug-15 SCG 46

Fire Fighting SystemFire Fighting System Approval 9 26-Jul-15 04-Aug-15 23M1P6570 Seamless Black Steel Pipes Approval 6 26-Jul-15 01-Aug-15 SCG 20M1P6580 Fire Fighting Network Valves (O.S&Y gate valve, Check

valve, Alarm Check Valve) Approval6 29-Jul-15 04-Aug-15 SCG 23

M1P6590 Sprinklers Approval 6 29-Jul-15 04-Aug-15 SCG 14M1P6620 Fire Hose Stations Approval 6 29-Jul-15 04-Aug-15 SCG 22M1P6630 Fire Hose Real Stations Approval 6 29-Jul-15 04-Aug-15 SCG 22M1P6640 Fire Extinguishers Approval 6 29-Jul-15 04-Aug-15 SCG 13

Plumbing System APlumbing System Approval 6 12-Aug-15 18-Aug-15 64

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

03-Oct-15, Material Appro03-Oct-15, Electrical Mater

18-Aug-15, Electrical Equipment

25-Aug-15, Mechanical Material Ap25-Aug-15, HVAC System Approval

04-Aug-15, Fire Fighting System Approv

18-Aug-15, Plumbing System Approv

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 27 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 28: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P6950 PPR Domestic Water Pipes Approval 6 12-Aug-15 18-Aug-15 SCG 46M1P6970 UPVC for Drainage System Approval 6 12-Aug-15 18-Aug-15 SCG 40M1P6980 PVC for Forced Main Line Approval 6 12-Aug-15 18-Aug-15 SCG 58M1P7000 Valves Approval 6 12-Aug-15 18-Aug-15 SCG 64M1P7010 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Approval 6 12-Aug-15 18-Aug-15 SCG 28

Mechanical EquipmMechanical Equipment Approval 24 29-Jul-15 25-Aug-15 35HVAC EquipmentHVAC Equipment Approval 24 29-Jul-15 25-Aug-15 35

M1P6070 Exhaust Fans Approval 6 29-Jul-15 04-Aug-15 SCG 21M1P6080 Supply Fans Approval 6 29-Jul-15 04-Aug-15 SCG 21M1P6030 AC DX Split Units Approval 6 19-Aug-15 25-Aug-15 SCG 35M1P6090 Fan Coil Units Approval 6 19-Aug-15 25-Aug-15 SCG 17

Fire Fighting EquFire Fighting Equipment Approval 6 29-Jul-15 04-Aug-15 3M1P8500 Fire Pumps Approval 6 29-Jul-15 04-Aug-15 SCG 3

Plumbing EquipmPlumbing Equipment Approval 6 12-Aug-15 18-Aug-15 11M1P8540 Domestic Water Pump Approval 6 12-Aug-15 18-Aug-15 SCG 11M1P8550 Irrigation Pump Approval 6 12-Aug-15 18-Aug-15 SCG 11M1P8560 Waste Water Submersible Pumps Approval 6 12-Aug-15 18-Aug-15 SCG 11M1P8570 Sewage Water Submersible Pumps Approval 6 12-Aug-15 18-Aug-15 SCG 11

Material P.OMaterial P.O 84 25-Jun-15 07-Oct-15 28Electrical Material Electrical Material P.O 84 25-Jun-15 07-Oct-15 8

M690 PVC , EMT Conduit with Accessories Conduit Material P.O 3 25-Jun-15 28-Jun-15 Ofoq 48M770 Cable Trays P.O 3 29-Jun-15 01-Jul-15 Ofoq 86M730 Wires for Power and Lighting Material P.O 3 05-Aug-15 08-Aug-15 Ofoq 56M720 Lighting Fixture Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 44M760 Wiring Devices P.O 3 12-Aug-15 15-Aug-15 Ofoq 15M780 Fire Alarm Material P.O 3 12-Aug-15 15-Aug-15 Ofoq 0M700 Structured Cable for Data System Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 11M710 Distribution Board Material P.O 3 17-Aug-15 19-Aug-15 Ofoq 24M740 CCTV Cameras Material P.O 3 17-Aug-15 19-Aug-15 N/A 2M750 Parking System Material P.O 3 02-Sep-15 05-Sep-15 N/A 0M910 LV Cables P.O 3 16-Sep-15 19-Sep-15 Ofoq 12M950 BMS P.O 3 04-Oct-15 07-Oct-15 Ofoq 1Electrical EquipmentElectrical Equipment 3 19-Aug-15 22-Aug-15 16

M1P5590 MCC P.O 3 19-Aug-15 22-Aug-15 Ofoq 16Mechanical MateriaMechanical Material P.O 27 02-Aug-15 01-Sep-15 55

HVAC System P.OHVAC System P.O 9 19-Aug-15 29-Aug-15 58M1P6100 Galvanized Duct P.O 3 19-Aug-15 22-Aug-15 Ofoq 4M1P6140 Child Water Pipes P.O 3 19-Aug-15 22-Aug-15 Ofoq 34M1P6150 Child Water Insulation P.O 3 19-Aug-15 22-Aug-15 Ofoq 64M1P6110 Volume Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

25-Aug-15, Mechanical Equipment A25-Aug-15, HVAC Equipment Appr

04-Aug-15, Fire Fighting Equipment App

18-Aug-15, Plumbing Equipment App

07-Oct-15, Material P.O07-Oct-15, Electrical Mater

22-Aug-15, Electrical Equipment

01-Sep-15, Mechanical Material P29-Aug-15, HVAC System P.O

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 28 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 29: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P6120 Fire Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10M1P6130 Fire Smoke Dampers P.O 3 26-Aug-15 29-Aug-15 Ofoq 10M1P6160 Supply Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46M1P6170 Exhaust Air Grill P.O 3 26-Aug-15 29-Aug-15 Ofoq 46

Fire Fighting SystemFire Fighting System P.O 6 02-Aug-15 08-Aug-15 23M1P6650 Seamless Black Steel Pipes P.O 3 02-Aug-15 04-Aug-15 Ofoq 20M1P6660 Fire Fighting Network Valves (O.S&Y gate valve, Check

valve, Alarm Check Valve) P.O3 05-Aug-15 08-Aug-15 Ofoq 23

M1P6670 Sprinklers P.O 3 05-Aug-15 08-Aug-15 Ofoq 14M1P6700 Fire Hose Stations P.O 3 05-Aug-15 08-Aug-15 Ofoq 22M1P6710 Fire Hose Real Stations P.O 3 05-Aug-15 08-Aug-15 Ofoq 22M1P6720 Fire Extinguishers P.O 3 05-Aug-15 08-Aug-15 Ofoq 13

Plumbing System PPlumbing System P.O 3 19-Aug-15 22-Aug-15 64M1P7060 PPR Domestic Water Pipes P.O 3 19-Aug-15 22-Aug-15 Ofoq 46M1P7080 UPVC for Drainage System P.O 3 19-Aug-15 22-Aug-15 Ofoq 40M1P7090 PVC for Forced Main Line P.O 3 19-Aug-15 22-Aug-15 Ofoq 58M1P7110 Valves P.O 3 19-Aug-15 22-Aug-15 Ofoq 64M1P7120 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D P.O 3 19-Aug-15 22-Aug-15 Ofoq 28

Mechanical EquipmMechanical Equipment P.O 24 05-Aug-15 01-Sep-15 35HVAC EquipmentHVAC Equipment P.O 24 05-Aug-15 01-Sep-15 35

M1P6230 Exhaust Fans P.O 6 05-Aug-15 11-Aug-15 Ofoq 21M1P6240 Supply Fans P.O 6 05-Aug-15 11-Aug-15 Ofoq 21M1P6190 AC DX Split Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 35M1P6250 Fan Coil Units P.O 6 26-Aug-15 01-Sep-15 Ofoq 17

Fire Fighting EquFire Fighting Equipment P.O 3 05-Aug-15 08-Aug-15 3M1P8510 Fire Pumps P.O 3 05-Aug-15 08-Aug-15 Ofoq 3

Plumbing EquipmPlumbing Equipment P.O 3 19-Aug-15 22-Aug-15 11M1P8580 Domestic Water Pump P.O 3 19-Aug-15 22-Aug-15 Ofoq 11M1P8590 Irrigation Pump P.O 3 19-Aug-15 22-Aug-15 Ofoq 11M1P8600 Waste Water Submersible Pumps P.O 3 19-Aug-15 22-Aug-15 Ofoq 11M1P8610 Sewage Water Submersible Pumps P.O 3 19-Aug-15 22-Aug-15 Ofoq 11

Material DeliveryMaterial Delivery 137 29-Jun-15 13-Dec-15 3Electrical Material Electrical Material Delivery 121 29-Jun-15 24-Nov-15 1

M790 PVC , EMT Conduit with Accessories Conduit Material Delivery

6 29-Jun-15 05-Jul-15 Ofoq 48

M870 Cable Trays Delivery 6 02-Jul-15 08-Jul-15 Ofoq 86M830 Wires for Power and Lighting Material Delivery 6 09-Aug-15 15-Aug-15 Ofoq 56M820 Lighting Fixture Material Delivery 18 16-Aug-15 05-Sep-15 N/A 44M800 Structured Cable for Data System Material Delivery 18 20-Aug-15 09-Sep-15 Ofoq 11M860 Wiring Devices Delivery 36 16-Aug-15 29-Sep-15 Ofoq 15

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

08-Aug-15, Fire Fighting System P.O

22-Aug-15, Plumbing System P.O

01-Sep-15, Mechanical Equipment01-Sep-15, HVAC Equipment P.O

08-Aug-15, Fire Fighting Equipment P.O

22-Aug-15, Plumbing Equipment P.O

13-Dec-15, 24-Nov-15, Elec

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 29 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 30: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M840 CCTV Cameras Material Delivery 45 20-Aug-15 17-Oct-15 N/A 2M880 Fire Alarm Material Delivery 52 16-Aug-15 20-Oct-15 Ofoq 0M810 Distribution Board Material Delivery 52 20-Aug-15 25-Oct-15 Ofoq 24M920 LV Cables Delivery 26 20-Sep-15 25-Oct-15 Ofoq 12M850 Parking System Material Delivery 45 06-Sep-15 02-Nov-15 N/A 0M960 BMS Delivery 40 08-Oct-15 24-Nov-15 Ofoq 1Electrical EquipmentElectrical Equipment 52 23-Aug-15 27-Oct-15 16

M1P5680 MCC Delivery 52 23-Aug-15 27-Oct-15 Ofoq 16Mechanical MateriaMechanical Material Delivery 107 05-Aug-15 13-Dec-15 3

HVAC System DelivHVAC System Delivery 18 23-Aug-15 12-Sep-15 52M1P6260 Galvanized Duct Delivery 6 23-Aug-15 29-Aug-15 Ofoq 4M1P6300 Child Water Pipes Delivery 6 23-Aug-15 29-Aug-15 Ofoq 34M1P6310 Child Water Insulation Delivery 6 23-Aug-15 29-Aug-15 Ofoq 64M1P6270 Volume Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10M1P6280 Fire Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10M1P6290 Fire Smoke Dampers Delivery 12 30-Aug-15 12-Sep-15 Ofoq 10M1P6320 Supply Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46M1P6330 Exhaust Air Grill Delivery 12 30-Aug-15 12-Sep-15 Ofoq 46

Fire Fighting SystemFire Fighting System Delivery 81 05-Aug-15 12-Nov-15 13M1P6730 Seamless Black Steel Pipes Delivery 6 05-Aug-15 11-Aug-15 Ofoq 20M1P6740 Fire Fighting Network Valves (O.S&Y gate valve, Check

valve, Alarm Check Valve) Delivery18 09-Aug-15 29-Aug-15 Ofoq 23

M1P6780 Fire Hose Stations Delivery 36 09-Aug-15 19-Sep-15 Ofoq 22M1P6790 Fire Hose Real Stations Delivery 36 09-Aug-15 19-Sep-15 Ofoq 22M1P6750 Sprinklers Delivery 45 09-Aug-15 03-Oct-15 Ofoq 14M1P6800 Fire Extinguishers Delivery 78 09-Aug-15 12-Nov-15 Ofoq 13

Plumbing System DPlumbing System Delivery 6 23-Aug-15 29-Aug-15 64M1P7170 PPR Domestic Water Pipes Delivery 6 23-Aug-15 29-Aug-15 Ofoq 46M1P7190 UPVC for Drainage System Delivery 6 23-Aug-15 29-Aug-15 Ofoq 40M1P7200 PVC for Forced Main Line Delivery 6 23-Aug-15 29-Aug-15 Ofoq 58M1P7220 Valves Delivery 6 23-Aug-15 29-Aug-15 Ofoq 64M1P7230 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Delivery 6 23-Aug-15 29-Aug-15 Ofoq 28

Mechanical EquipmMechanical Equipment Delivery 104 09-Aug-15 13-Dec-15 3HVAC EquipmentHVAC Equipment Delivery 52 12-Aug-15 17-Oct-15 27

M1P6350 AC DX Split Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 35M1P6410 Fan Coil Units Delivery 26 02-Sep-15 05-Oct-15 Ofoq 17M1P6390 Exhaust Fans Delivery 52 12-Aug-15 17-Oct-15 Ofoq 21M1P6400 Supply Fans Delivery 52 12-Aug-15 17-Oct-15 Ofoq 21

Fire Fighting EquFire Fighting Equipment Delivery 104 09-Aug-15 13-Dec-15 3M1P8520 Fire Pumps Delivery 104 09-Aug-15 13-Dec-15 Ofoq 3

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

27-Oct-15, Electrical E

13-Dec-15, 12-Sep-15, HVAC System Delive

12-Nov-15, Fire Fi

29-Aug-15, Plumbing System Delive

13-Dec-15, 17-Oct-15, HVAC Equip

13-Dec-15,

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 30 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 31: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

Plumbing EquipmPlumbing Equipment Delivery 78 23-Aug-15 26-Nov-15 11M1P8620 Domestic Water Pump Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11M1P8630 Irrigation Pump Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11M1P8640 Waste Water Submersible Pumps Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11M1P8650 Sewage Water Submersible Pumps Delivery 78 23-Aug-15 26-Nov-15 Ofoq 11

ConstructionConstruction 138 15-Jul-15 31-Dec-15 0

Structural WorkStructural Work 119 15-Jul-15 08-Dec-15 4

M1P8340 Lower Basement PC Slab On Grade 18 15-Jul-15 06-Aug-15 HW ECIP 71M1P7270 Openings for Duct Shafts 12 26-Jul-15 08-Aug-15 HW ECIP 22M1P7290 Expansion Joints 12 20-Aug-15 02-Sep-15 HW ECIP 64M1P7580 Equipments Concrete Foundations 12 09-Sep-15 26-Sep-15 HW ECIP 41M1P7690 Lower Basement RC Slab On Grade 18 18-Nov-15 08-Dec-15 HW ECIP 4

MEP WorkMEP Work 98 02-Sep-15 31-Dec-15 0

Electrical WorksElectrical Works 98 02-Sep-15 31-Dec-15 0Power SystemPower System 61 02-Sep-15 17-Nov-15 12

M1P7300 Lower Basement PVC Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P7310 Lower Basement EMT Conduites for Power Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P7320 Lower Basement Cable Trays for LV Cables 12 02-Sep-15 15-Sep-15 SCG Ofoq 41M1P7330 Wires for Lower Basement Power Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 41M1P7350 Laying Lower Basement DB Panels 2 26-Oct-15 27-Oct-15 SCG Ofoq 24M1P7340 Laying Lower Basement LV Cables 6 26-Oct-15 01-Nov-15 SCG Ofoq 12M1P7480 Wiring Devices Erection and termination 12 02-Nov-15 15-Nov-15 SCG Ofoq 12M1P7360 Termination Lower Basement DB Panels 6 11-Nov-15 17-Nov-15 SCG Ofoq 12Power EquipmentPower Equipment 14 28-Oct-15 12-Nov-15 16

M1P7370 Laying Lower Basement MCC's 2 28-Oct-15 29-Oct-15 SCG Ofoq 16M1P7380 Termination Lower Basement MCC's 12 31-Oct-15 12-Nov-15 SCG Ofoq 16

Lighting SystemLighting System 36 02-Sep-15 19-Oct-15 29M1P7490 Lower Basement PVC Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 29M1P7500 Lower Basement EMT Conduites for Lighting Outlets 12 02-Sep-15 15-Sep-15 SCG Ofoq 29M1P7510 Wires for Lower Basement Lighting Outlets 6 16-Sep-15 26-Sep-15 SCG Ofoq 29M1P7470 Lighting Fixture Erection and termination 18 27-Sep-15 19-Oct-15 SCG Ofoq 29

Low Current SysteLow Current Systems 98 02-Sep-15 31-Dec-15 0Fire Alarm SystemFire Alarm System 98 02-Sep-15 31-Dec-15 0

M1P7700 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 19M1P7710 Fire Alarm Cable 18 21-Oct-15 10-Nov-15 SCG Ofoq 0M1P7720 Fire Alarm Devices 18 11-Nov-15 01-Dec-15 SCG Ofoq 0M1P7730 Testing And Precommissioning 25 02-Dec-15 31-Dec-15 SCG Ofoq 0

Data SystemData System 98 02-Sep-15 31-Dec-15 0M1P7740 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 0

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

26-Nov-15, Plum

31-Dec-

08-Dec-15, S

31-Dec-

31-Dec-17-Nov-15, Power

12-Nov-15, Power

19-Oct-15, Lighting Sys

31-Dec-31-Dec-

31-Dec-

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 31 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 32: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P7750 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 0M1P7760 Face Plates Devices 18 20-Oct-15 09-Nov-15 SCG Ofoq 0M1P7770 Testing And Precommissioning 44 10-Nov-15 31-Dec-15 SCG Ofoq 0

CCTV SystemCCTV System 98 02-Sep-15 31-Dec-15 0M1P7780 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 0M1P7790 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 0M1P7800 Cameras Devices 18 20-Oct-15 09-Nov-15 SCG Ofoq 0M1P7810 Testing And Precommissioning 44 10-Nov-15 31-Dec-15 SCG Ofoq 0

BMS SystemBMS System 97 02-Sep-15 30-Dec-15 1M1P7820 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 32M1P7830 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 32M1P7840 BMS System Erection & Termination 12 25-Nov-15 08-Dec-15 SCG Ofoq 1M1P7850 Testing And Precommissioning 18 09-Dec-15 30-Dec-15 SCG Ofoq 1

Parking SystemParking System 98 02-Sep-15 31-Dec-15 0M1P7860 EMT Conduites 18 02-Sep-15 26-Sep-15 SCG Ofoq 12M1P7870 Structured Data Cable 18 27-Sep-15 19-Oct-15 SCG Ofoq 12M1P7880 Parking System 20 03-Nov-15 25-Nov-15 SCG Ofoq 0M1P7890 Testing And Precommissioning 30 26-Nov-15 31-Dec-15 SCG Ofoq 0

Mechanical WorksMechanical Works 95 02-Sep-15 28-Dec-15 3HVAC SystemHVAC System 72 02-Sep-15 30-Nov-15 1

M1P7900 Galvanized Duct Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 1M1P7920 Child Water Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 31M1P7910 Volume Dampers , Fire Dampers and Fire Smoke Dampers

Erection12 27-Sep-15 11-Oct-15 SCG Ofoq 1

M1P7940 Child Water Pipes Test and Flushing 12 27-Sep-15 11-Oct-15 SCG Ofoq 31M1P7980 Fan Coil Unit Erection 12 07-Oct-15 21-Oct-15 SCG Ofoq 17M1P7930 Duct Smoke Test 12 12-Oct-15 26-Oct-15 SCG Ofoq 1M1P7960 Child Water Pipes Insulation 12 12-Oct-15 26-Oct-15 SCG Ofoq 31M1P7950 Duct Insulation 12 27-Oct-15 09-Nov-15 SCG Ofoq 1M1P7970 Air Grill Supply and Exhaust 18 10-Nov-15 30-Nov-15 SCG Ofoq 1HVAC EquipmentHVAC Equipment 26 07-Oct-15 07-Nov-15 21

M1P8000 AC DX Split Units Erection 12 07-Oct-15 21-Oct-15 SCG Ofoq 35M1P8040 Exhaust Fans Erection 18 18-Oct-15 07-Nov-15 SCG Ofoq 21M1P8050 Supply Fans Erection 18 18-Oct-15 07-Nov-15 SCG Ofoq 21

Fire Fighting SysteFire Fighting System 95 02-Sep-15 28-Dec-15 3M1P8060 Seamless Black Steel Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 2M1P8070 Fire Fighting Network Valves (O.S&Y gate valve, Check

valve, Alarm Check Valve) Erection6 27-Sep-15 03-Oct-15 SCG Ofoq 2

M1P8140 Pipe Testing and Flushing 12 04-Oct-15 19-Oct-15 SCG Ofoq 2M1P8110 Fire Hose Stations Erection 36 20-Sep-15 05-Nov-15 SCG Ofoq 22

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

31-Dec-

30-Dec-

31-Dec-

28-Dec-30-Nov-15, HV

07-Nov-15, HVAC E

28-Dec-

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 32 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 33: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P8120 Fire Hose Real Stations Erection 36 20-Sep-15 05-Nov-15 SCG Ofoq 22M1P8130 Fire Extinguishers 3 14-Nov-15 16-Nov-15 SCG Ofoq 13M1P8080 Sprinklers Erection 45 20-Oct-15 10-Dec-15 SCG Ofoq 2Fire Fighting EquipFire Fighting Equipment 12 14-Dec-15 28-Dec-15 3

M1P8530 Fire Pumps Erection 12 14-Dec-15 28-Dec-15 SCG Ofoq 3Plumbing SystemPlumbing System 87 02-Sep-15 17-Dec-15 11

M1P8240 F.D , F.F.D , P.D , F.C.O , A.D , G.D , T.D Erection 12 02-Sep-15 15-Sep-15 SCG Ofoq 25M1P8180 PPR Domestic Water Pipes Erection 18 02-Sep-15 26-Sep-15 SCG Ofoq 43M1P8230 Valves Erection 6 27-Sep-15 03-Oct-15 SCG Ofoq 43M1P8200 UPVC for Drainage System Erection 18 16-Sep-15 11-Oct-15 SCG Ofoq 25M1P8260 Testing Domestic Network 6 04-Oct-15 11-Oct-15 SCG Ofoq 43M1P8210 PVC for Forced Main Line Erection 12 12-Oct-15 26-Oct-15 SCG Ofoq 25M1P8270 Testing for Drainage Network 6 27-Oct-15 02-Nov-15 SCG Ofoq 25Plumbing EquipmePlumbing Equipment 18 28-Nov-15 17-Dec-15 11

M1P8660 Domestic Water Pump Erection 18 28-Nov-15 17-Dec-15 SCG Ofoq 11M1P8670 Irrigation Pump Erection 18 28-Nov-15 17-Dec-15 SCG Ofoq 11M1P8680 Waste Water Submersible Pumps Erection 18 28-Nov-15 17-Dec-15 SCG Ofoq 11M1P8690 Sewage Water Submersible Pumps Erection 18 28-Nov-15 17-Dec-15 SCG Ofoq 11

Finishing WorkFinishing Work 126 29-Jul-15 29-Dec-15 2

M1P8350 Block Work Completion for Equipments / Service / Stores Rooms

12 29-Jul-15 11-Aug-15 HW ECIP 4

M1P8360 Plaster Work Applied for Equipments / Service / Stores Roo 12 12-Aug-15 25-Aug-15 HW ECIP 4M1P8310 Curb Stone Material Erection 12 06-Sep-15 19-Sep-15 HW ECIP 46M1P8370 MEP 1st Fix for Equipments / Service / Stores Rooms 26 26-Aug-15 28-Sep-15 SCG Ofoq 4M1P8320 Interlock Material Erection 12 20-Sep-15 07-Oct-15 HW ECIP 46M1P8390 Paint 1st and 2nd Coat for Ceiling and Walls in Lower

Basement26 06-Sep-15 10-Oct-15 HW ECIP 54

M1P8280 False Ceiling Material Erection for Equipments / Service / Stores Rooms

12 29-Sep-15 13-Oct-15 HW ECIP 4

M1P8300 Paint Material Applied for Equipments / Service / Stores Rooms

12 15-Oct-15 28-Oct-15 HW ECIP 4

M1P8290 Flooring Tiles Material Applied for Equipments / Service / Stores Rooms

12 29-Oct-15 11-Nov-15 HW ECIP 4

M1P8330 Doors Erection for Equipments / Service / Stores Rooms 12 12-Nov-15 25-Nov-15 HW ECIP 5M1P8380 MEP Final Fix for Equipments / Service / Stores Rooms 12 12-Nov-15 25-Nov-15 SCG Ofoq 4M1P8400 Final Coat of Paint for Walls and Ceiling 12 12-Dec-15 26-Dec-15 HW ECIP 2M1P8410 Epoxi Paint for Flooring 12 15-Dec-15 29-Dec-15 HW ECIP 2

Building 1Building 1 154 15-Jun-15 19-Dec-15 10

DesignDesign 43 15-Jun-15 05-Aug-15 33

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

28-Dec-

17-Dec-15,

17-Dec-15,

29-Dec-

19-Dec-15

05-Aug-15, Design

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 33 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 34: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P8700 Interior Design Package 1 15-Jun-15 15-Jun-15 EK 17M1P8710 Updated MEP Design Package 1 29-Jun-15 29-Jun-15 SCG 17M1P9030 Updated MEP Design Package for 1st & Ground Floors 18 15-Jun-15 05-Jul-15 SCG 1M1P9170 Top Roof Equipment Foundation Design 12 22-Jul-15 05-Aug-15 HW 33

Shop DrawingsShop Drawings 55 16-Jun-15 20-Aug-15 65

5th Floor Shop D5th Floor Shop Drawings 18 16-Jun-15 06-Jul-15 24

M1P8720 5th Floor MEP Composite Drawing 0 02-Jul-15 SCG E/Ofoq 17M1P8730 5th Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24

4th Floor Shop D4th Floor Shop Drawings 18 16-Jun-15 06-Jul-15 24

M1P8740 4th Floor MEP Composite Drawing 0 02-Jul-15 SCG E/Ofoq 23M1P8750 4th Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24

3rd Floor Shop D3rd Floor Shop Drawings 18 16-Jun-15 06-Jul-15 24

M1P8760 3rd Floor MEP Composite Drawing 0 02-Jul-15 SCG E/Ofoq 23M1P8770 3rd Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24

2nd Floor Shop D2nd Floor Shop Drawings 18 16-Jun-15 06-Jul-15 24

M1P8780 2nd Floor MEP Composite Drawing 0 02-Jul-15 SCG E/Ofoq 23M1P8790 2nd Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24

1st Floor Shop Dr1st Floor Shop Drawings 49 16-Jun-15 13-Aug-15 1

M1P8810 1st Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24M1P9040 1st Floor Electrical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Ofoq 1M1P9050 1st Floor Mechanical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Delta 1M1P8800 1st Floor MEP Composite Drawing 0 13-Aug-15 SCG E/Ofoq 1

Ground Floor ShoGround Floor Shop Drawings 49 16-Jun-15 13-Aug-15 1

M1P8830 Ground Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24M1P9060 1st Floor Electrical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Ofoq 1M1P9070 1st Floor Mechanical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Delta 1M1P8820 Ground Floor MEP Composite Drawing 0 13-Aug-15 SCG E/Ofoq 1

Upper Basement Upper Basement Floor Shop Drawings 49 16-Jun-15 13-Aug-15 1

M1P8850 Upper Basement Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24M1P9100 1st Floor Electrical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Ofoq 1M1P9110 1st Floor Mechanical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Delta 1M1P8840 Upper Basement Floor MEP Composite Drawing 0 13-Aug-15 SCG E/Ofoq 1

Lower Basement Lower Basement Floor Shop Drawings 49 16-Jun-15 13-Aug-15 1

M1P8870 Lower Basement Floor Interior Shop Drawing 18 16-Jun-15 06-Jul-15 EK MI 24M1P9120 1st Floor Electrical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Ofoq 1M1P9130 1st Floor Mechanical Shop Drawings and Approvals 26 06-Jul-15 06-Aug-15 SCG E/Delta 1M1P8860 Lower Basement MEP Composite Drawing 0 13-Aug-15 SCG E/Ofoq 1

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

20-Aug-15, Shop Drawings

06-Jul-15, 5th Floor Shop Drawings

06-Jul-15, 4th Floor Shop Drawings

06-Jul-15, 3rd Floor Shop Drawings

06-Jul-15, 2nd Floor Shop Drawings

13-Aug-15, 1st Floor Shop Drawings

13-Aug-15, Ground Floor Shop Drawin

13-Aug-15, Upper Basement Floor Sho

13-Aug-15, Lower Basement Floor Sho

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 34 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 35: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

Roof Floor Shop Roof Floor Shop Drawings 18 02-Jul-15 26-Jul-15 60

M1P8880 Roof Floor MEP Composite Drawing 0 02-Jul-15 SCG E/Ofoq 35M1P8890 Roof Floor Architecture Shop Drawing 18 04-Jul-15 26-Jul-15 T.B ECIP 60

Shafts DetailsShafts Details 6 15-Aug-15 20-Aug-15 45

M1P8900 Electrical Risers Shaft Details 6 15-Aug-15 20-Aug-15 SCG E/Ofoq 45M1P8910 Mechanical Risers Shaft Details 6 15-Aug-15 20-Aug-15 SCG E/Delta 45

Stairs DetailsStairs Details 12 27-Jul-15 09-Aug-15 75

M1P8920 Stairs Shop Drawings 12 27-Jul-15 09-Aug-15 EK MI 75

MaterialMaterial 128 15-Jun-15 18-Nov-15 10

M1P8930 Remainging 1st Fix Electrical Materials Delivery 26 15-Jun-15 14-Jul-15 E/Ofoq 7M1P8950 Remainging 1st Fix Mechanical Materials Delivery 26 15-Jun-15 14-Jul-15 E/Delta 7M1P8970 Interior Materials Delivery 78 07-Jul-15 12-Oct-15 MI 24M1P8940 Remainging Final Fix Electrical Materials Delivery 52 15-Aug-15 19-Oct-15 E/Ofoq 1M1P8960 Remainging Final Fix Mechanical Materials Delivery 52 15-Aug-15 19-Oct-15 E/Delta 1M1P8980 Mechanical Equipments 78 15-Aug-15 18-Nov-15 E/Delta 10

CostructionCostruction 128 15-Jul-15 19-Dec-15 10

5th Floor5th Floor 106 15-Jul-15 23-Nov-15 1

M1P8990 MEP 1st Fix Completion 18 15-Jul-15 06-Aug-15 E/D/O 7M1P9220 Finishing Work 52 08-Aug-15 11-Oct-15 MI 7M1P9230 MEP Final Fix 18 20-Oct-15 09-Nov-15 E/D/O 1M1P9240 Final Finishing and Fixtures 12 10-Nov-15 23-Nov-15 MI 1

4th Floor4th Floor 106 15-Jul-15 23-Nov-15 7

M1P9000 MEP 1st Fix Completion 18 15-Jul-15 06-Aug-15 E/D/O 13M1P9250 Finishing Work 52 08-Aug-15 11-Oct-15 MI 13M1P9260 MEP Final Fix 18 20-Oct-15 09-Nov-15 E/D/O 7M1P9270 Final Finishing and Fixtures 12 10-Nov-15 23-Nov-15 MI 7

3rd Floor3rd Floor 106 15-Jul-15 23-Nov-15 7

M1P9010 MEP 1st Fix Completion 18 15-Jul-15 06-Aug-15 E/D/O 13M1P9280 Finishing Work 52 08-Aug-15 11-Oct-15 MI 13M1P9290 MEP Final Fix 18 20-Oct-15 09-Nov-15 E/D/O 7M1P9300 Final Finishing and Fixtures 12 10-Nov-15 23-Nov-15 MI 7

2nd Floor2nd Floor 106 15-Jul-15 23-Nov-15 7

M1P9020 MEP 1st Fix Completion 18 15-Jul-15 06-Aug-15 E/D/O 13M1P9310 Finishing Work 52 08-Aug-15 11-Oct-15 MI 13M1P9320 MEP Final Fix 18 20-Oct-15 09-Nov-15 E/D/O 7M1P9330 Final Finishing and Fixtures 12 10-Nov-15 23-Nov-15 MI 7

1st Floor1st Floor 88 15-Aug-15 30-Nov-15 1

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

26-Jul-15, Roof Floor Shop Drawings

20-Aug-15, Shafts Details

09-Aug-15, Stairs Details

18-Nov-15, Mater

19-Dec-15

23-Nov-15, 5th F

23-Nov-15, 4th F

23-Nov-15, 3rd

23-Nov-15, 2nd

30-Nov-15, 1st

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 35 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 36: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P9080 MEP 1st Fix Completion 18 15-Aug-15 03-Sep-15 E/D/O 1M1P9340 Finishing Work 40 05-Sep-15 26-Oct-15 MI 1M1P9350 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P9360 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1

Ground FloorGround Floor 88 15-Aug-15 30-Nov-15 1

M1P9090 MEP 1st Fix Completion 18 15-Aug-15 03-Sep-15 E/D/O 1M1P9370 Finishing Work 40 05-Sep-15 26-Oct-15 MI 1M1P9380 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P9390 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1

Upper Basement Upper Basement Core Area 88 15-Aug-15 30-Nov-15 1

M1P9140 MEP 1st Fix Completion 18 15-Aug-15 03-Sep-15 E/D/O 1M1P9400 Finishing Work 40 05-Sep-15 26-Oct-15 MI 1M1P9410 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P9420 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1

Lower Basement Lower Basement Core Area 88 15-Aug-15 30-Nov-15 1

M1P9150 MEP 1st Fix Completion 18 15-Aug-15 03-Sep-15 E/D/O 1M1P9430 Finishing Work 40 05-Sep-15 26-Oct-15 MI 1M1P9440 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P9450 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1

RoofRoof 128 15-Jul-15 19-Dec-15 10

M1P9160 MEP 1st Fix Completion 18 15-Jul-15 06-Aug-15 E/D/O 32M1P9180 Roof Equipment Foundation 18 08-Aug-15 27-Aug-15 ECIP 32M1P9190 Roof Insulation 26 29-Aug-15 30-Sep-15 ECIP 32M1P9200 Roof Flooring 18 01-Oct-15 24-Oct-15 ECIP 32M1P9210 Roof Equipment installation 26 19-Nov-15 19-Dec-15 E/D/O 10

ShaftsShafts 26 05-Sep-15 08-Oct-15 45

M1P9460 Electrical Risers 26 05-Sep-15 08-Oct-15 E/Ofoq 45M1P9470 Mechanical Risers 26 05-Sep-15 08-Oct-15 E/Delta 45

StairsStairs 18 10-Nov-15 30-Nov-15 1

M1P9480 Stairs Finishing 18 10-Nov-15 30-Nov-15 MI 1ElevatorsElevators 50 20-Sep-15 22-Nov-15 8

M1P9490 Elevator Well Ready for Work 0 20-Sep-15 HW ECIP 8M1P9485 Elevator Material At Site 1 20-Sep-15 20-Sep-15 SCG Kone 8M1P9510 Elevator Mechanical Work 20 21-Sep-15 19-Oct-15 SCG Kone 8M1P9520 Elevator Electrical Work 12 20-Oct-15 02-Nov-15 SCG Kone 8M1P9530 Electrical Power Source 1 03-Nov-15 03-Nov-15 SCG Kone 8M1P9540 Elevator Tests 10 04-Nov-15 15-Nov-15 SCG Kone 8M1P9550 Elevator Final Completion 6 16-Nov-15 22-Nov-15 SCG Kone 8

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

30-Nov-15, Gr

30-Nov-15, Up

30-Nov-15, Lo

19-Dec-15

08-Oct-15, Shafts

30-Nov-15, Sta

22-Nov-15, Elev

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 36 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 37: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

Building 4Building 4 154 15-Jun-15 19-Dec-15 10

DesignDesign 74 15-Jun-15 10-Sep-15 10

M1P9560 Interior Design Package 18 15-Jun-15 05-Jul-15 EK 1M1P9890 MEP Design Package for Building 4 18 06-Jul-15 28-Jul-15 SCG 1M1P10030 Top Roof Equipment Foundation Design 12 29-Aug-15 10-Sep-15 HW 10

Shop DrawingsShop Drawings 80 06-Jul-15 13-Oct-15 23

2nd Floor Shop D2nd Floor Shop Drawings 42 06-Jul-15 25-Aug-15 1

M1P9650 2nd Floor Interior Shop Drawing 18 06-Jul-15 28-Jul-15 EK MI 13M1P10420 2nd Floor Electrical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Ofoq 1M1P10430 2nd Floor Mechanical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Delta 1M1P9640 2nd Floor MEP Composite Drawing 0 25-Aug-15 SCG E/Ofoq 1

1st Floor Shop Dr1st Floor Shop Drawings 42 06-Jul-15 25-Aug-15 1

M1P9670 1st Floor Interior Shop Drawing 18 06-Jul-15 28-Jul-15 EK MI 13M1P9900 1st Floor Electrical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Ofoq 1M1P9910 1st Floor Mechanical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Delta 1M1P9660 1st Floor MEP Composite Drawing 0 25-Aug-15 SCG E/Ofoq 1

Ground Floor ShoGround Floor Shop Drawings 42 06-Jul-15 25-Aug-15 1

M1P9690 Ground Floor Interior Shop Drawing 18 06-Jul-15 28-Jul-15 EK MI 13M1P9920 1st Floor Electrical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Ofoq 1M1P9930 1st Floor Mechanical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Delta 1M1P9680 Ground Floor MEP Composite Drawing 0 25-Aug-15 SCG E/Ofoq 1

Upper Basement Upper Basement Floor Shop Drawings 42 06-Jul-15 25-Aug-15 1

M1P9710 Upper Basement Floor Interior Shop Drawing 18 06-Jul-15 28-Jul-15 EK MI 13M1P9960 1st Floor Electrical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Ofoq 1M1P9970 1st Floor Mechanical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Delta 1M1P9700 Upper Basement Floor MEP Composite Drawing 0 25-Aug-15 SCG E/Ofoq 1

Lower Basement Lower Basement Floor Shop Drawings 42 06-Jul-15 25-Aug-15 1

M1P9730 Lower Basement Floor Interior Shop Drawing 18 06-Jul-15 28-Jul-15 EK MI 13M1P9980 1st Floor Electrical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Ofoq 1M1P9990 1st Floor Mechanical Shop Drawings and Approvals 18 29-Jul-15 18-Aug-15 SCG E/Delta 1M1P9720 Lower Basement MEP Composite Drawing 0 25-Aug-15 SCG E/Ofoq 1

Roof Floor Shop Roof Floor Shop Drawings 30 20-Aug-15 28-Sep-15 16

M1P9740 Roof Floor MEP Composite Drawing 0 20-Aug-15 SCG E/Ofoq 10M1P9750 Roof Floor Architecture Shop Drawing 18 05-Sep-15 28-Sep-15 T.B ECIP 16

Shafts DetailsShafts Details 6 26-Aug-15 01-Sep-15 35

M1P9760 Electrical Risers Shaft Details 6 26-Aug-15 01-Sep-15 SCG E/Ofoq 35

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

19-Dec-15

10-Sep-15, Design

13-Oct-15, Shop Drawing

25-Aug-15, 2nd Floor Shop Drawing

25-Aug-15, 1st Floor Shop Drawings

25-Aug-15, Ground Floor Shop Dra

25-Aug-15, Upper Basement Floor S

25-Aug-15, Lower Basement Floor S

28-Sep-15, Roof Floor Shop

01-Sep-15, Shafts Details

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 37 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 38: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P9770 Mechanical Risers Shaft Details 6 26-Aug-15 01-Sep-15 SCG E/Delta 35Stairs DetailsStairs Details 12 29-Sep-15 13-Oct-15 23

M1P9780 Stairs Shop Drawings 12 29-Sep-15 13-Oct-15 EK MI 23

MaterialMaterial 120 15-Jun-15 09-Nov-15 26

M1P9790 1st Fix Electrical Materials Delivery 18 15-Jun-15 05-Jul-15 E/Ofoq 43M1P9810 1st Fix Mechanical Materials Delivery 18 15-Jun-15 05-Jul-15 E/Delta 43M1P9800 Final Fix Electrical Materials Delivery 40 26-Aug-15 17-Oct-15 E/Ofoq 9M1P9820 Fix Mechanical Materials Delivery 40 26-Aug-15 17-Oct-15 E/Delta 9M1P9830 Interior Materials Delivery 78 29-Jul-15 02-Nov-15 MI 13M1P9840 Mechanical Equipments 60 26-Aug-15 09-Nov-15 E/Delta 26

CostructionCostruction 98 22-Aug-15 19-Dec-15 10

2nd Floor2nd Floor 78 26-Aug-15 30-Nov-15 1

M1P9880 MEP 1st Fix Completion 18 26-Aug-15 15-Sep-15 E/D/O 1M1P10170 Finishing Work 30 16-Sep-15 26-Oct-15 MI 1M1P10180 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P10190 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1

1st Floor1st Floor 78 26-Aug-15 30-Nov-15 1

M1P9940 MEP 1st Fix Completion 18 26-Aug-15 15-Sep-15 E/D/O 1M1P10200 Finishing Work 30 16-Sep-15 26-Oct-15 MI 1M1P10210 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P10220 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1

Ground FloorGround Floor 78 26-Aug-15 30-Nov-15 1

M1P9950 MEP 1st Fix Completion 18 26-Aug-15 15-Sep-15 E/D/O 1M1P10230 Finishing Work 30 16-Sep-15 26-Oct-15 MI 1M1P10240 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P10250 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1

Upper Basement Upper Basement Core Area 78 26-Aug-15 30-Nov-15 1

M1P10000 MEP 1st Fix Completion 18 26-Aug-15 15-Sep-15 E/D/O 1M1P10260 Finishing Work 30 16-Sep-15 26-Oct-15 MI 1M1P10270 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P10280 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1

Lower Basement Lower Basement Core Area 78 26-Aug-15 30-Nov-15 1

M1P10010 MEP 1st Fix Completion 18 26-Aug-15 15-Sep-15 E/D/O 1M1P10290 Finishing Work 30 16-Sep-15 26-Oct-15 MI 1M1P10300 MEP Final Fix 18 27-Oct-15 16-Nov-15 E/D/O 1M1P10310 Final Finishing and Fixtures 12 17-Nov-15 30-Nov-15 MI 1

RoofRoof 98 22-Aug-15 19-Dec-15 10

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

13-Oct-15, Stairs Details

09-Nov-15, Materia

19-Dec-15

30-Nov-15, 2nd

30-Nov-15, 1st

30-Nov-15, Gr

30-Nov-15, Up

30-Nov-15, Lo

19-Dec-15

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 38 of 39 TASK filter: All Activities

© Primavera Systems, Inc.

Page 39: Final Majarrah rev 0

Activity ID Activity Name OriginalDuration

Start Finish Consultant Contractor TotalFloat

M1P10020 MEP 1st Fix Completion 18 22-Aug-15 10-Sep-15 E/D/O 10M1P10040 Roof Equipment Foundation 18 12-Sep-15 05-Oct-15 ECIP 10M1P10050 Roof Insulation 26 07-Oct-15 07-Nov-15 ECIP 10M1P10060 Roof Flooring 18 08-Nov-15 28-Nov-15 ECIP 10M1P10070 Roof Equipment installation 18 29-Nov-15 19-Dec-15 E/D/O 10

ShaftsShafts 26 16-Sep-15 21-Oct-15 35

M1P10320 Electrical Risers 26 16-Sep-15 21-Oct-15 E/Ofoq 35M1P10330 Mechanical Risers 26 16-Sep-15 21-Oct-15 E/Delta 35

StairsStairs 18 15-Oct-15 04-Nov-15 23

M1P10340 Stairs Finishing 18 15-Oct-15 04-Nov-15 MI 23ElevatorsElevators 50 20-Sep-15 22-Nov-15 8

M1P10350 Elevator Well Ready for Work 0 20-Sep-15 HW ECIP 8M1P10360 Elevator Material At Site (There is No Contract/Obligation)

and This item Subjected to Client1 20-Sep-15 20-Sep-15 Client 8

M1P10370 Elevator Mechanical Work 20 21-Sep-15 19-Oct-15 Client 8M1P10380 Elevator Electrical Work 12 20-Oct-15 02-Nov-15 Client 8M1P10390 Electrical Power Source 1 03-Nov-15 03-Nov-15 Client 8M1P10400 Elevator Tests 10 04-Nov-15 15-Nov-15 Client 8M1P10410 Elevator Final Completion 6 16-Nov-15 22-Nov-15 Client 8

Jun Jul Aug Sep Oct Nov Dec Jan eb2015 2016

21-Oct-15, Shafts

04-Nov-15, Stairs

22-Nov-15, Elev

Majarrah Business Complex Classic Schedule Layout 22-Jun-15 14:36

Actual WorkRemaining Work

Critical Remaining WorkMilestone

Summary Page 39 of 39 TASK filter: All Activities

© Primavera Systems, Inc.