FINAL A1 [ed]

1
Electricity (No electricity) Wind heavy wind traffic condition medium/ heavy condition No Pedestrian Adjunct structure 1 METER LEVEL DIFFERENCE AT LEFT SIDE OF PRINCES EXIST PRINCES FREEWAY PRINCES EXIST 3m 16m 10m 2975 1424 TRUCK CAR SPEED SITE DIMENSION DRIVING DIRECTION VEHICLE TYPE&AVERAGE DIMENSION SITE VEGETATION 7AM, 0⁰ 10AM, 15⁰ 12AM, 29⁰ 15AM, 15⁰ 17AM, 5⁰ WINTER SEASON SUN POSITION SUMMER SEASON SUN POSITION 5AM, 0⁰ 9AM, 45⁰ 12PM, 70⁰ 15PM, 50⁰ 17PM, 29⁰ 18PM, 13⁰ 19PM, 6⁰ ‘SOMETHING NEW’ SCALE 1: 2000 SOMETHING NEW” is an epitome of a city in terms of its large scale and dynamics. The project was involved new technology specifi- cally parametric design generates new design notion and interpretation of Gateway project. Driven innovative idea will announce the en- try point into metropolitan Melbourne, at the western interchange and forming a gateway to the city. The project creates a unique view with its height as well as granting a visual access through to the interior and exterior of the design. Experience of various materials during the design process, as a result, 795 pieces of welded steel mesh work together with the overlapping design to perform as a new visual icon for the highway for Wyndham City Council. ideas: learning from the past generating new concept Spacing of layers: 200mm Number of layers : 26 Rod ø 12mm Length: 2400mm; Quantity: 11520; Span: 780mm Welded mesh in plan Welded mesh in elevation Night view day view raining- water shadow effect rusting overlaping mesh MODEL EXPERIEMENT Square Adding layers expandig dimension different experience (3 parts) developing entries details of the entry scale changing overlapping trim creating space “rolling in the deep” tunnel adding layers simplify enclosure ABPL 30048 ARCHITECTURE DESIGN STUDIO AIR DEGUO HOU 387313, YIFANG YIN 387291, SABRINA SHUK KWAN FUNG 374433, JUNYAN QI 345247 timeline in the gateway internal experience site plan shadow effect construction

description

DEGUO HOU 387313

Transcript of FINAL A1 [ed]

Page 1: FINAL A1 [ed]

• Electricity (No electricity)

• Wind heavy wind

• traffic condition medium/ heavy condition

• No Pedestrian • Adjunct

structure • 1 METER LEVEL

DIFFERENCE AT LEFT SIDE OF PRINCES EXIST

PRINCES FREEWAY PRINCES EXIST

3m 16m

10m

2975

1424

TRUCK CAR

SPEED

SITE DIMENSION

DRIVING DIRECTION

VEHICLE TYPE&AVERAGE DIMENSION

SITE VEGETATION

7AM, 0⁰

10AM, 15⁰

12AM, 29⁰

15AM, 15⁰

17AM, 5⁰

WINTER SEASON SUN POSITION SUMMER SEASON SUN POSITION

5AM, 0⁰

9AM, 45⁰

12PM, 70⁰

15PM, 50⁰

17PM, 29⁰

18PM, 13⁰

19PM, 6⁰

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

‘SOMETHING NEW’

SCALE 1: 2000

“SOMETHING NEW” is an epitome of a city in terms of its large scale and dynamics. The project was involved new technology specifi-cally parametric design generates new design notion and interpretation of Gateway project. Driven innovative idea will announce the en-try point into metropolitan Melbourne, at the western interchange and forming a gateway to the city. The project creates a unique view with its height as well as granting a visual access through to the interior and exterior of the design. Experience of various materials during the design process, as a result, 795 pieces of welded steel mesh work together with the overlapping design to perform as a new visual icon for the highway for Wyndham City Council.

ideas: learning from the past

generating new concept

Spacing of layers: 200mmNumber of layers : 26

Rod ø 12mm Length: 2400mm; Quantity: 11520; Span: 780mm

Welded mesh in plan

Welded mesh in elevation

Night view day view

raining- water

shadow effect

rusting overlaping mesh

MODEL EXPERIEMENTSquare Adding layers expandig dimension different experience(3 parts)

developing entries details of the entry

scale changing overlapping trim creating space “rolling in the deep”

tunnel adding layers simplify enclosure

ABPL 30048 ARCHITECTURE DESIGN STUDIO AIR DEGUO HOU 387313, YIFANG YIN 387291, SABRINA SHUK KWAN FUNG 374433, JUNYAN QI 345247

timeline in the gateway

internal experiencesite plan

shadow effect

construction