Film schedule
-
Upload
aminulmedia -
Category
Documents
-
view
157 -
download
0
Transcript of Film schedule
A2 Media Studies: Filming Schedule
Title of Film: Blank
Group Members: Rhys, Safah and Aminul
Dates of Filming: 25th November - 1st December 2013
LOCATION Shot number
Time
Desired
Description Cast needed Props needed Lighting Weather Other requirements
1 1-6
15-16
23rd Nov 3pm
30th Nov4pm
The opening of the short film.
Final stages of the short film.
'Joe''Robert'
'Joe' 'Jack'
Fake Knife Fake Blood
Fake Knife
Desirable
N/A
N/A
N/A
N/A
All characters must be in track suits. Joe track suit colour preferred to be black.
Jack must be in track suit costume and Joe in casual wear. (If change is needed peoples can change in Swiss Cottage library toilets).
2 7-12 25th Nov4pm
Present section of the film where Sarah and Joe talk about their future.
'Joe''Sarah'
Mobile Phone N/A N/A Casual wear for Sarah and Joe character.
3 13-14 25th Nov4:30pm
Section where Joe hallucinates and finds out Joe's brother Jack is after him.
'Joe''Sarah'
Fake Gun
Desirable
N/A N/A Casual wear for Sarah and Joe character.
Name of production company: Kinetic Films (Aminul Islam)Script providers/Assistant Director: Rhys Smith and Safah Shaikh Director/Editor: Aminul Islam Actors: Ali Alsafar (Joe), Sarah Bucinca (Sarah), Jack Bannantyne (Jack) and Rhys Smith (Robert).
Location reminders: 1. Taplow Estate car park 2. Side of leisure centre 3. Pathway leading to Taplow estate car park.