Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System...

30
Figure L3 Quincy FHP Battery Plant G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigL3_Quincy_BatteryPlant.vsd 04/12/13 Vendor Shall install new battery in existing rack. Page L7 of 7 97

Transcript of Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System...

Page 1: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

Figure L3Quincy FHP

Battery PlantG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigL3_Quincy_BatteryPlant.vsd

04/12/13

Vendor Shall install new battery in

existing rack.

Page L7 of 7 97

Page 2: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Appendix M – Tallahassee FHP

98

Page 3: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Page M2 of 6

Appendix M – Table of Contents – Figures and Drawings

Figure M1 – Tallahassee FHP Shelter Floor Plan .................................................... M4 of 6

Figure M2 – Tallahassee FHP -48VDC Power Distribution Rack Profile .................. M5 of 6

Figure M3 – Tallahassee FHP Battery Plant Photo .................................................. M6 of 6

99

Page 4: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Page M3 of 6

Tallahassee FHP Site Requirements

The Vendor shall furnish and install the following equipment at the Tallahassee FHP site located at 2100 Mahan Drive (US-90), Tallahassee, FL.

A. One Exide Absolyte GP series battery plant model number M87-024-09007-014TALV shall

be installed in accordance with this Appendix and Section 2.2 of this Scope of Services.

The new battery plant shall be installed in the same location as the removed battery plant.

The battery modules shall be installed on the existing load spreading plate. Existing battery

cabling between the existing battery plant and DC load center may be reused, provided

sufficient length is available and cable is in good condition. NO SPLICING SHALL BE

PERMITTED. The Vendor shall replace the existing cable with like cable if new or additional

length is required. The cable from the DC load center to battery plant shall be 2/0 AWG

stranded. Red jacketed cable shall be used for -48 VDC connections and black jacketed

cable shall be used for the return.

B. The Generex BACS battery management system shall be installed in accordance with this

Appendix and Section 2.3 of this Scope of Services.

IP Address: 172.16.2.22

Subnet Mask: 255.255.254.0

Gateway: 172.16.2.19

TABLE M1 – MAJOR EQUIPMENT LIST

Model Number Description QTY.

M87-024-09007-014TALV Exide Battery 1

AMGBACS 1001 24-2V Master Kit

Generex BACS management system including webmanager, C40 modules with temperature sensor, measuring cables, and bus cables

1

TCL 024-112DC TracoPower DC/DC Converter 1

DR 24500 Atlantic Scientific DIN Rail to Mount BACS Webmanager

1

ZB24540 Atlantic Scientific Ethernet SPD 2

100

Page 5: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigM1_TallahasseeFHP_ShelterFloorPlan.vsd7/19/2013

Scale: 3/8" = 1'-0"

GE MASTR II System

ChannelBankRackBR4

DVM6-45Terminal

Radio RackBR6

DVM6-45Terminal

Radio RackBR5

MAS Call Box Base Station/RWIS

Dept. of Agriculture

Radio

Tabl

e

-48 Volt DCBatteryPlant

+

Workstation DeskCPU

&UPS

CPU&

UPS

ASN/DACC Rack

-48 VDCDistribution

Rack

Passport 15000

Rack (FR4)

Page M4 of 6

BPS 2000 Location

101

Page 6: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigM2_TallahasseeFHP_-48VDCPowerDistributionRack_20130109.vsd

04/12/13

Scale: 1 1/4" = 1'-0"

Figure M2

Tallahassee FHP (3-3424)

-48VDC Power Distribution Rack

Page M5 of 6

BACS

WebManager

DC/DC Converter

102

Page 7: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

Figure M3Tallahassee FHP

Battery PlantG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix\FigM3_Tallahassee_BatteryPlant.vsd

03/12/13

Vendor Shall install new battery on existing load spreading plate.

Positive Terminal Shall be at the top right in accordance with original installation

Negative Terminal

Shall be at the top left

in accordance

with original installation

Page M6 of 6 103

Page 8: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Appendix N – Monticello DOT

104

Page 9: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Page N2 of 7

Appendix N – Table of Contents – Figures and Drawings

Figure N1 – Monticello DOT Shelter Floor Plan........................................................ N5 of 7

Figure N2 – Monticello DOT -48VDC Power Distribution Rack Profile ...................... N6 of 7

Figure N3 – Monticello DOT Battery Plant Photo ..................................................... N7 of 7

105

Page 10: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Page N3 of 7

Monticello DOT Site Requirements

The Vendor shall furnish and install the following equipment at the Monticello DOT site located 0.5 miles north of US-19 and I-10 interchange at maintenance yard in Monticello, FL.

A. One Exide Absolyte GP series battery plant model number M87-024-05007-R19AALV shall

be installed in accordance with this Appendix and Section 2.2 of this Scope of Services.

The new battery plant shall be installed in the same location as the removed battery plant.

The Vendor shall replace the existing cable with 1/0 AWG stranded. Red jacketed cable

shall be used for -48 VDC connections and black jacketed cable shall be used for the return.

B. The Generex BACS battery management system shall be installed in accordance with this

Appendix and Section 2.3 of this Scope of Services.

IP Address: 172.16.68.22

Subnet Mask: 255.255.254.0

Gateway: 172.16.68.19

C. One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix

and Section 2.4 of this Scope of Services. The new rectifier system shall be installed in the

same location as the removed rectifier system. The two rectifiers shall be wired to separate

20A double pole Square D circuit breakers appropriate for the Square D model

QO140L200G load center. The main load center circuit breakers shall be furnished and

installed by the Vendor. All wiring shall be new and installed. Conduit may be reused.

IP Address: 172.16.68.20

Subnet Mask: 255.255.254.0

Gateway: 172.16.68.19

106

Page 11: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Page N4 of 7

TABLE N1 – MAJOR EQUIPMENT LIST

Model Number Description QTY.

M87-024-05007-R19AALV Exide Battery 19" rack mount 1

AMGBACS 1001 24-2V Master Kit

Generex BACS management system including webmanager, C40 modules with temperature sensor, measuring cables, and bus cables

1

TCL 024-112DC TracoPower DC/DC Converter 1

DR 24500 Atlantic Scientific DIN Rail to Mount BACS Webmanager

1

Q4820N-F19DB01-VC Integrated Power System 1

225840 Flatpack2 FP2-48/150A 2B 4L LVBD 2AC

1

502666 100A Battery Disconnect breaker 1

502658 35A Circuit breaker 1

241115.105 Flatpack2 Rectifier 2

236408 Flatpack2 Blind Panels 2

507173 LUG, #1AWG, 2 hole 2

LG1D2A8A110 LUG,DH, 5/8" SP,1/4 STUD, 2/0AWG 2

ZB24540 Atlantic Scientific Ethernet SPD 4

107

Page 12: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigN1_MonticelloDOT_ShelterFloorPlan.vsd7/19/2013

Scale: 1/2" = 1'-0"

-48 VDCDistribution Center

Motorola MSF 5000

DVM6-45 MW Radio

Rack (AR-2)

DVM6-45 MW Radio

Rack (AR-3)

Channel Bank Rack

(AR-7)

NMS Rack (AR-6)

3

2

1

MASCALL BOXSYSTEM

GE MASTR II

Page N5 of 7

BPS 2000 Location

108

Page 13: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

Scale: 1 1/4" = 1'-0"

Figure N2Monticello DOT

-48VDC Power Distribution RackG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigN2_Monticello-PwrPlantRack_20130723.vsd

07/24/13

1 10 11 12 24

2 9 14 13 23

+

3 8 15 16 22

4 7 18 17 21

5 6 X 19 20

-

Page N6 of 7

BACS

WebManager

DC/DC Converter

PCP -48 VDC Power Systems

2 RU Blank Panel

Smart Pack BATT LOAD

Flatpack2

Rectifier System

109

Page 14: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

Figure N3Monticello DOT

Battery PlantG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigN3_Monticello_BatteryPlant.vsd

04/12/13

Vendor Shall install new battery in existing rack.

Page N7 of 7 110

Page 15: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Appendix O – Greenville

111

Page 16: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Page O2 of 7

Appendix O – Table of Contents – Figures and Drawings

Figure O1 – Greenville DOT Shelter Floor Plan ....................................................... O5 of 7

Figure O2 – Greenville -48VDC Power Distribution Rack Profile .............................. O6 of 7

Figure O3 – Greenville Battery Plant Photo .............................................................. O7 of 7

112

Page 17: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Page O3 of 7

Greenville Site Requirements

The Vendor shall furnish and install the following equipment at the Greenville site located on the north side of I-10, 0.6 miles west of the intersection of I-10 and US-221.

A. One Exide Absolyte GP series battery plant model number M87-024-05005-R19AALV shall

be installed in accordance with this Appendix and Section 2.2 of this Scope of Services.

The new battery plant shall be installed in the same location as the removed battery plant.

The Vendor shall replace the existing cable with 1/0 AWG stranded. Red jacketed cable

shall be used for -48 VDC connections and black jacketed cable shall be used for the return.

B. The Generex BACS battery management system shall be installed in accordance with this

Appendix and Section 2.3 of this Scope of Services.

IP Address: 172.16.66.22

Subnet Mask: 255.255.254.0

Gateway: 172.16.66.19

C. One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix

and Section 2.4 of this Scope of Services. The new rectifier system shall be installed in the

same location as the removed rectifier system. The two rectifiers shall be wired to separate

20A double pole Square D circuit breakers appropriate for the Square D model

QO140L200G load center. The main load center circuit breakers shall be furnished and

installed by the Vendor. All wiring shall be new and installed. Conduit may be reused. The

Vendor shall furnish and install blank panels between existing distribution panels and the

Flatpack2 as appropriate and in accordance with this Appendix.

IP Address: 172.16.66.20

Subnet Mask: 255.255.254.0

Gateway: 172.16.66.19

113

Page 18: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Page O4 of 7

TABLE O1 – MAJOR EQUIPMENT LIST

Model Number Description QTY.

M87-024-05005-R19AALV Exide Battery 19" rack mount 1

AMGBACS 1001 24-2V Master Kit

Generex BACS management system including webmanager, C40 modules with temperature sensor, measuring cables, and bus cables

1

TCL 024-112DC TracoPower DC/DC Converter 1

DR 24500 Atlantic Scientific DIN Rail to Mount BACS Webmanager

1

Q4820N-F19DB01-VC Integrated Power System 1

225840 Flatpack2 FP2-48/150A 2B 4L LVBD 2AC

1

502666 100A Battery Disconnect breaker 1

502658 35A Circuit breaker 1

241115.105 Flatpack2 Rectifier 2

236408 Flatpack2 Blind Panels 2

507173 LUG, #1AWG, 2 hole 2

LG1D2A8A110 LUG,DH, 5/8" SP,1/4 STUD, 2/0AWG 2

ZB24540 Atlantic Scientific Ethernet SPD 4

114

Page 19: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

BPS 2000 Location

SCALE: 1/2"=1'

MASMinute ManEnterprise

E750

A/C

Channel Bank/ BPS Network

Rack

DVM6-45RadioRack

-48 VoltPower Plant& Batteries

Figure O1Greenville

Shelter Floor Plan

G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigO1_Greenville As Built Floor Plan.vsd07/19/13

Page O5 of 7

115

Page 20: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

Scale: 1 1/4" = 1'-0"

Figure O2Greenville

-48VDC Power Distribution RackG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigO2_Greenville-PwrPlantRack_20130724.vsd

07/24/13

Absolyte Battery Bank

Absolyte Battery Bank

Absolyte Battery Bank

Absolyte Battery Bank81 9 16 17 24

72 10 15 18 23

63 11 14 19 22

54 12 13 20 21

+-

Page O6 of 7

BACS

WebManager

DC/DC Converter

Flatpack2

Rectifier System

2RU Blank Panel

Smart Pack BATT LOAD

7RU Blank Panel

116

Page 21: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

Figure O3Greenville

Battery Plant

G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigO3_Greenville_BatteryPlant.vsd04/12/13

Vendor Shall install new battery in existing rack.

Page O7 of 7 117

Page 22: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Appendix P – Jacksonville FHP

118

Page 23: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Page P2 of 6

Appendix P – Table of Contents – Figures and Drawings

Figure P1 – Jacksonville FHP Shelter Floor Plan ..................................................... P4 of 6

Figure P2 – Jacksonville FHP -48VDC Power Distribution Rack Profile ................... P5 of 6

Figure P3 – Jacksonville FHP Battery Plant Photo……………………………………… P6 of 6

119

Page 24: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Page P3 of 6

Jacksonville FHP Site Requirements

The Vendor shall furnish and install the following equipment at the Jacksonville site located at 7322 Normandy Blvd., Jacksonville, FL.

A. One Exide Absolyte GP series battery plant model number M87-024-09009-014TALV shall

be installed in accordance with this Appendix and Section 2.2 of this Scope of Services.

The new battery plant shall be installed in the same location as the removed battery plant.

Existing battery cabling between the existing battery plant and DC load center may be

reused, provided sufficient length is available and cable is in good condition. NO SPLICING

SHALL BE PERMITTED. The Vendor shall replace the existing cable with like cable if new

or additional length is required. The cable from the DC load center to battery plant shall be

2/0 AWG stranded. Red jacketed cable shall be used for -48 VDC connections and black

jacketed cable shall be used for the return.

B. The Generex BACS battery management system shall be installed in accordance with this

Appendix and Section 2.3 of this Scope of Services.

IP Address: 172.16.64.22

Subnet Mask: 255.255.254.0

Gateway: 172.16.64.19

TABLE P1 – MAJOR EQUIPMENT LIST

Model Number Description QTY.

M87-024-09009-014TALV Exide Battery 1

AMGBACS 1001 24-2V Master Kit

Generex BACS management system including webmanager, C40 modules with temperature sensor, measuring cables, and bus cables

1

TCL 024-112DC TracoPower DC/DC Converter 1

DR 24500 Atlantic Scientific DIN Rail to Mount BACS Webmanager

1

ZB24540 Atlantic Scientific Ethernet SPD 2

120

Page 25: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

BPS 2000 Location

SCALE: 3/8"=1'

GroundingStrip

MWRadio Rack

AG2

MWRadio Rack

AG1

MW RadioTerminal

AG3

+

-48 Volt DCBatteryPlant

-48V DCDistribution

Rack

D2 Fiber Rack

Radio

MASCallbox

Network/Fiber Rack

DACCs& ChannelBank Rack

G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigP1_Jacksonville As Built Floor Plan.vsd07/19/13

Page P4 of 6

New Passport

Rack

121

Page 26: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

G:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix A\FigP2_JacksonvilleFHP_-48VDCPowerDistributionRack_20130109.vsd

04/12/13

Figure P2

Jacksonville FHP

-48VDC Power Distribution Rack

Scale: 1 1/4" = 1'-0"

Page P5 of 6

BACS

WebManager

DC/DC Converter

122

Page 27: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

Figure P3Jacksonville FHP

Battery PlantG:\FDOTGC\Battery Replacement\I-10 Replacement 2013\Appendix\FigP3_Jacksonville_BatteryPlant.vsd

03/12/13

Vendor Shall install new battery on existing load spreading plate.

Positive Terminal Shall be at the top right in accordance with original installation

Negative Terminal

Shall be at the top left

in accordance

with original installation

Page P6 of 6 123

Page 28: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Appendix Q – ITS Facility Management System Form

124

Page 29: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

FLORIDA DEPARTMENT OF TRANSPORTATION

I-10 BATTERY PLANT REPLACEMENT

Appendix Q – Table of Contents – Figures and Drawings

Figure Q1 – ITS FM Electric DC Power Attribute Form ............................................ Q3 of 3

125

Page 30: Figure L3 Quincy FHP - Florida · Figure L3 Quincy FHP ... One Eltek Flatpack2 Rectifier System shall be installed in accordance with this Appendix and Section 2.4 of this Scope of

Items shown in ITALICS are considered optional information Page ____ of ____

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

ITS Facility Management System Electric DC Power Attribute Form

ITSFM054 Page 1 of 1 Rev. 11/12

Date:

Inspector:

Site Identification Name:

Information for DC Power Installed at this Site DC Power Distribution Equipment

Manufacturer:

Model:

Serial Number:

NIC Card Installed: Yes No

IP Address:

MAC Address:

Input Voltage: 12 VDC 24 VDC - 48 VDC

120 VAC POE Unknown

Output Voltage: 12 VDC 24 VDC - 48 VDC

120 VAC POE Unknown

Load/Draw (Amp):

Number of Rectifier Positions:

Number of Breaker Positions: Rectifier DC-DC Converter

Rectifier Type:

Number of Rectifier(s):

Manufacturer:

Model:

DC-DC Converter Shelf Installed: Yes No

Number of Converter(s):

Number of Converter Positions:

Manufacturer:

Model: Control Panel Battery

Manufacturer:

Model:

Serial Number:

Battery Pack Installed: Yes No

Battery Type: Flooded AGM Gel

Date Battery Installed / Replace:

Manufacturer:

Model/Size: Qty:

EXAM

PLE

126