Figure 116026-10 - Preferred Route Option · Project No: Date: 04/11/2016 Report on Consultation...
1
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Title: Project: Drawn by: Drawing: LT91 EM 116026/ROC/1 Reproduced by permission of Ordnance Survey on behalf of HMSO. Crown copyright and database right 2015 all rights reserved. Ordnance Survey Licence number EL273236. Project No: Date: 04/11/2016 Report on Consultation Figure 1 Preferred Route Option Fort Augustus - Skye Project Key: Corridor Section Divider Route Options Preferred Route Option 0 4 8 12 ,16 20 Kilometers Scale - 1:400,000 120 120000m. E 130 130 140 140 150 150 160 160 170 170 180 180 190 190 200 200 210 210 220 220 230 230 240 240 7 60 000m. N 760 770 770 780 780 790 790 800 800 810 810 820 820 830 830 840 840 850 850 860 860
Transcript of Figure 116026-10 - Preferred Route Option · Project No: Date: 04/11/2016 Report on Consultation...
Section 1
Section 2
Section 3
Section 4
Section 5
Section 6
Title:
Project:
Drawn by:
Drawing:
LT91
EM
116026/ROC/1
Reproduced by permission of Ordnance Survey on behalf of HMSO.Crown copyright and database right 2015 all rights reserved.
Ordnance Survey Licence number EL273236.
Project No:
Date: 04/11/2016
Report on Consultation
Figure 1
Preferred Route Option
Fort Augustus - Skye Project
Key:
Corridor
Section Divider
Route Options
Preferred Route Option
0 4 8 12 ,16 20Kilometers
Scale - 1:400,000
120
120000m.E
130
130
140
140
150
150
160
160
170
170
180
180
190
190
200
200
210
210
220
220
230
230
240
240
760
000m
. N
760
770 770
780 780
790 790
800 800
810 810
820 820
830 830
840 840
850 850
860 860