FIC 01 Cost Centers

download FIC 01 Cost Centers

of 16

Transcript of FIC 01 Cost Centers

  • 8/3/2019 FIC 01 Cost Centers

    1/16

    Project: Global ERP Logistics and Finance Phase 1

    System: SAP-ECC 5.0

    Qualification Type: IQ OQ PQ Unit

    Test Script Name: FIC_01_Cost_Centers

    Original Script Number: (N/A manual)

    Test Script ID Number: N/A

    Test Script Date: Enter Finished Date

    Version: 1.0

    Regulatory Classification: cGxP non-cGxP

    Author: Final authors name

    1

  • 8/3/2019 FIC 01 Cost Centers

    2/16

    Pre-Execution Approvals[Approval signifies that the test script has been reviewed and is approved for execution]

    Role Functional Area Electronic Signature Date

    Validation

    Approval

    Eugene Zsuffa

    Validation Engineer

    Information Technology

    [Refer to Electronic Signature Page]

    IT

    Approval

    Don Shaff

    Manager, SAP ApplicationsInformation Technology

    [Refer to Electronic Signature Page]

    QA

    Approval

    Steve Henderson:

    Global SAP QM Network LeaderQuality Operations

    [Refer to Electronic Signature Page]

    Post-Execution Approval[Approval signifies that the executed test script is complete and conforms to Warner Chilcott procedures and quality standards]

    Role Functional Area Electronic Signature Date

    Validation

    Approval

    Eugene Zsuffa

    Validation Engineer

    Information Technology

    [Refer to Electronic Signature Page]

    IT

    Approval

    Don Shaff

    Manager, SAP Applications

    Information Technology

    [Refer to Electronic Signature Page]

    QA

    Approval

    Steve Henderson:Global SAP QM Network Leader

    Quality Operations

    [Refer to Electronic Signature Page]

    Note: Pre and Post Execution Approval by the Quality Organization is not required for non cGxP test scripts.

    2

  • 8/3/2019 FIC 01 Cost Centers

    3/16

    Test Identification

    Run Number:

    1

    Date/Time Started:Date: ______________

    Time: ______________

    Environment:

    QA2-021

    Date/Time Finished:Date: ______________

    Time: ______________

    Server Name:n/a

    Test Objectives

    Objectives

    1. Successful upload of data from PGP extract (input file). NOTE: Where upload is Manual this shouldread: Successful manual input/upload of data using source data input file.

    2. Ability to view/modify object using relevant transaction(s).

    3. Reconcile number of uploaded records (source input file vs. actual records loaded)

    4. Test data integrity from samples taken per WCRX Quality Standards according to Sampling Guidelines as

    defined in the Data Migration Strategy and Plan (CS01792R10-MP)5. [additional specific objectives to be added by functional teams as relevant to this particular test]

    3

  • 8/3/2019 FIC 01 Cost Centers

    4/16

    Overall Assessment of Test Results

    Executed Test Script Pass/Fail Tester Signature/Date

    Successfully verifies that test objectives stated above were met

    Comments (if applicable)

    Screenshots for Test Step Numbers:

    Attachments (If applicable)

    Overall Post Execution Review[Note this is for an independent review and the reviewer may not be the same person(s) who executed the test script.]

    Reviewer Name Pass/Fail Signature Date

    Comments (if applicable)

    4

  • 8/3/2019 FIC 01 Cost Centers

    5/16

    Business Owner Reviewer Name Signature Date

    Comments (if applicable)

    Business Owner Review is required for PQ Test Scripts that are NOT executed by a representative from the Business Owner.

    Prerequisites:

    The following prerequisite scripts have been completed

    successfully:

    Verified by / Date

    Enter immediately preceding Test Scripts

    Enter immediately preceding Test Scripts

    Setup:

    1. Clean upload file

    2. Test Users have been created

    3. Data Sheet with variables is available (if applicable, otherwise remove this line

    5

  • 8/3/2019 FIC 01 Cost Centers

    6/16

    Tester Instructions:

    1. Complete the Pre-requisites verification (above). Tester to sign above in space provided to signify verification was

    completed, including cases where pre-requisites are N/A.

    2. Complete the Variables Table before starting test execution

    3. For each test step, perform the specified instructions and record the result in the Actual Results column. Compare each recorded result

    with the description found in the Expected Results column and classify each step as either Pass or Fail in the Pass/Fail column. For

    any steps marked "Fail", follow the appropriate procedures detailed in the test protocol.

    4. Attach and label all hardcopy printouts (for example, reports) to the end of this test script.

    SCREENSHOTS

    TAKE SCREENSHOT OF ACTUAL RESULTS

    5. Ensure that the task bar at the bottom is expanded to display the TIME, DAY, AND DATE.

    6. If more than one monitor is active at the testing station, STOP. Your hardware is not suitable to perform this test script.

    7. Screen shots can be properly taken ONLY IF a single monitor is active. If more than one monitor is active, then the TIME, DAY, AND

    DATE will not be possible to capture without capturing all screens within one screen shot. If necessary, disable all monitors except one

    before continuing.

    8. Take a Screenshot where indicated in the test script at the time the step is completed in order to document the actual results of the test

    step.

    9. Prepare a word document that is formatted in Landscape and 1 margins on all 4 sides. Paste the screen shot into the landscape

    template. The screenshot should fill the entire page. Print screenshots in color, landscape orientation, one screenshot per page, and

    include header information.10. Initial and date each screenshot page with handwritten initials and date.

    11. Check the Screenshot Attached box after attaching the annotated screenshot behind the test script.

    12. THEN proceed to the next step.

    6

  • 8/3/2019 FIC 01 Cost Centers

    7/16

    SIGNATURE LOG

    Description: All test personnel must supply the information and signature requested in the table below prior to the performance of any

    test procedure in this qualification whether it applies to a new qualification or a modification to the system.

    Requirements: Each signature in the table below indicates that the tester has read and understands the documentation and executionprocedures and any appropriate Warner Chilcott SOPs that are identified in this document.

    Name

    (Printed)Date Company Title Initials Signature

    7

  • 8/3/2019 FIC 01 Cost Centers

    8/16

    Step Test Step Instruction Expected Result(s) Actual Result(s) Pass FailInitials

    /Date

    Unless indicated otherwise, all transactions will be performed on a desktop terminal

    1

    .

    1

    Identify clean extract file from QuickR.

    Path in QuickR:

    SAP-ERP Project Documents --> WorkingTeam Folder --> Data Management --> EXTRACT 3 CLEAN FILES - QA2 Load

    Clean file was identified in QuickR

    corresponding with the Test Script Name

    As Expected

    Additional Information

    2

    .Perform visual check of file for correct

    format as required by upload program.File conforms to expected format.

    As Expected

    Additional Information

    3

    .

    Data Migration Team member logs into

    SAP to run Upload Program.

    Log-in as

    Log-in successful.As Expected

    Additional Information

    4

    .Run upload program: 23 cost centers will

    be done manuallyProgram ran successfully.

    As Expected

    Additional Information

    5

    .Reconcile record count from source to

    target.Same number was loaded.

    As Expected

    Additional Information

    6

    . Check log if there were errors. No errors found.As Expected

    Additional Information

    7

    . Logs out of SAPSuccessfully logged out of system.

    As Expected

    Additional Information

    8

  • 8/3/2019 FIC 01 Cost Centers

    9/16

    Step Test Step Instruction Expected Result(s) Actual Result(s) Pass FailInitials

    /Date

    Unless indicated otherwise, all transactions will be performed on a desktop terminal

    8

    . Check log if there were warnings.

    No warnings or nature of warnings found do

    not impact data load and do not require re-

    testing.

    As Expected

    Additional Information

    9

    . Logs out of SAPSuccessfully logged out of system.

    As Expected

    Additional Information

    1

    0

    .

    [From this point on, additional

    specific steps are to be added by

    functional teams as relevant to thisparticular test.

    Rows below highlighted in grey are

    samples. PLEASE DELTE THESEROWS IF NOT RELEVANT FOR

    THIS TEST]

    As Expected

    Additional Information

    Screenshot attached

    1

    1.

    PRINT OUT REPORT,

    INITIAL AND DATE, ATTACH

    Printout is initialed and dated andattached to test script

    As Expected

    Additional Information

    Printout Attached

    9

  • 8/3/2019 FIC 01 Cost Centers

    10/16

    Step Test Step Instruction Expected Result(s) Actual Result(s) Pass FailInitials

    /Date

    Unless indicated otherwise, all transactions will be performed on a desktop terminal

    1

    2

    .

    5

    Record material Document Number

    Take a screenshot of the actual

    result.

    Screenshot displaying time and date is

    captured and initialed & dated.

    As Expected

    Additional Information

    Screen shot

    attached

    Material Document

    __________________ posted.

    1

    3

    .

    User fills out the required fields and clicks

    the Save icon to create new material

    1

    4

    .

    Record new material number.

    Take a screenshot of the actual

    result.

    END OF TEST SCRIPT

    10

  • 8/3/2019 FIC 01 Cost Centers

    11/16

    ATTACHMENT 1 Deviation and Exception Report Form

    1 Deviation and Exception Report Form

    General Information

    Deviation # Step # Run #

    Environment DEV VAL PRD

    Deviation Cause Script Error Tester Error Screenshot Error System Other

    Deviation Description

    Reported By: Date:

    Action Plan/Resolution Description

    Reported By: Date:

    Action Plan/Resolution Review

    IT Validation Signature: Date:

    Retest Results (if applicable)

    11

  • 8/3/2019 FIC 01 Cost Centers

    12/16

    Reported By: Date:

    Approvals

    Test Coordinator: Signature: Date:

    IT Manager: Signature: Date:

    Quality Operations: Signature: Date:

    12

  • 8/3/2019 FIC 01 Cost Centers

    13/16

    ATTACHMENT 2 Deviation and Exception Log

    Run Number:Page ___ of ___

    Deviation # Test Step # Summary of Incident and ResolutionDate

    ClosedInitials / Date

    13

  • 8/3/2019 FIC 01 Cost Centers

    14/16

    14

  • 8/3/2019 FIC 01 Cost Centers

    15/16

    Version History Log

    15

    Version Date Originator Revision Description

    1.0 Initial Release for Execution

  • 8/3/2019 FIC 01 Cost Centers

    16/16

    Test Script Number CS######-*QS Test Step # Page 16 of 16

    Initials Date

    16