Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

13
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015

Transcript of Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

Page 1: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

Fermilab PIP Booster Accelerator RF Cavity Refurbishment

Matt Slabaugh

ARW 2015

27 April 2015

Page 2: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

Topics

• Proton Improvement Plan (PIP)• Booster Radio Frequency (RF) Cavities• Cavity Refurbishment• Tuner Refurbishment• Planning for failure• Testing and Summary

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment2

Page 3: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

3

Click icon to add picture

Booster RF Cavity

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment

Circa. 1969bid drawing(obsolete)

Critical advantage: Access to retired personnel with development knowledge

Page 4: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

4

Cavity Refurbishment- Scope

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment

Vacuum

Misc.

RF Contact

Cavities are radioactive and fragile!

Page 5: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

5

Cavity Refurbishment- RF Contact

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment

Milling improved quality, reduced time and distance (dose). ~ 7 days2 days

Insufficient contact= heat and RF leakage

Page 6: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

6

Cavity Refurbishment- Vacuum Repair and Upgrade

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment

Leaking “pie-tin” quick disconnect flange

Removal with Wach’s tool

Replace with solid flange

Page 7: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

7

Cavity Refurbishment

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment

Water cooling repair/upgrade

Alignment fiducials installedImprovised repair tooling

Internal sparking and damage

Page 8: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

8

Tuner Refurbishment

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment

Contact surfaces

Cones

Cooling lines

Each tuner:• 500+ pieces • 150ft+ tubing • 50+ water connections• 44in long • 650lbs

Ferrite

Page 9: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

9

Tuner Refurbishment

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment

Page 10: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

10

Tuner Refurbishment- Risk

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment

Page 11: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

11

Tuner Refurbishment- Procurement and challenges

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment

• Difficult procurement– Stock items not stock (tube sizes)– Common processes no longer

common– Unusual materials

• Original drawings not updated– Undocumented revisions– All hand drawings, no CAD

• Little data available for optimizing design changes or benchmarking

Page 12: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

12

Tuner Refurbishment- Planning for failure

• Have begun building new tuner assemblies• Potentially replace all refurbished tuners with new

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment

Page 13: Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

13

Cavity Testing and Summary

• Each assembly tested for two weeks prior to install• Thermal sensors near critical surfaces for real time data• Beginning production of two spare cavities

4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment

• 17 of 20 cavities installed

• 50 tuners refurbished

• 3 tuners built new