Fermilab PIP Booster Accelerator RF

Cavity Refurbishment

Matt Slabaugh

ARW 2015

27 April 2015

Page 2: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Topics

• Proton Improvement Plan (PIP)

• Booster Radio Frequency (RF) Cavities

• Cavity Refurbishment

• Tuner Refurbishment

• Planning for failure

• Testing and Summary

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 2

Page 3: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Booster RF Cavity

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 3

Circa. 1969 bid drawing (obsolete)

Critical advantage: Access to retired personnel with development knowledge

Page 4: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Cavity Refurbishment- Scope

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4

Vacuum

Misc.

RF Contact

Cavities are radioactive and fragile!

Page 5: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Cavity Refurbishment- RF Contact

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 5

Milling improved quality, reduced time and distance (dose). ~ 7 days2 days

Insufficient contact = heat and RF leakage

Page 6: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Cavity Refurbishment- Vacuum Repair and Upgrade

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 6

Leaking “pie-tin” quick disconnect flange

Removal with Wach’s tool

Replace with solid flange

Page 7: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Cavity Refurbishment

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 7

Water cooling repair/upgrade

Alignment fiducials installed Improvised repair tooling

Internal sparking and damage

Page 8: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Tuner Refurbishment

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 8

Contact surfaces

Cones

Cooling lines

Each tuner:

• 500+ pieces

• 150ft+ tubing

• 50+ water connections

• 44in long

• 650lbs

Ferrite

Page 9: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Tuner Refurbishment

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 9

Page 10: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Tuner Refurbishment- Risk

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 10

Page 11: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Tuner Refurbishment- Procurement and challenges

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 11

• Difficult procurement

– Stock items not stock (tube sizes)

– Common processes no longer

common

– Unusual materials

• Original drawings not updated

– Undocumented revisions

– All hand drawings, no CAD

• Little data available for optimizing

design changes or benchmarking

Page 12: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Tuner Refurbishment- Planning for failure

• Have begun building new tuner assemblies

• Potentially replace all refurbished tuners with new

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 12

Page 13: Fermilab PIP Booster Accelerator RF Cavity Refurbishment · Booster RF Cavity 3 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 4/27/2015 Circa. 1969 bid drawing

Cavity Testing and Summary

• Each assembly tested for two weeks prior to install

• Thermal sensors near critical surfaces for real time data

• Beginning production of two spare cavities

4/27/2015 M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment 13

• 17 of 20 cavities

installed

• 50 tuners

refurbished

• 3 tuners built new