FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience...

27
June 5, 2014 FEMA NonRegulatory Products Our Experience – QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

Transcript of FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience...

Page 1: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

June 5, 2014

FEMA Non‐Regulatory ProductsOur Experience – QA/QC Processes

Onur Celik, CFMAmol Daxikar, CFM, GISP

ASFPM 2014

Page 2: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

OUTLINE BACKGROUND/HISTORY:

• Introduction and  Standard Implementation• Overview of Products

OUR APPROACH:• Deliverables and their timing in Region 1• Coastal Products/Community Feedback

OUR CHALLENGES AND SOLUTIONS:• Procedural and Technical Challenges• Stakeholder Response• QA/QC

Non‐Regulatory Products

Page 3: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

BACKGROUNDNon‐Regulatory Products

Products introduced in 2010

The intent was to:

• Supplement Regulatory products

• Enable more comprehensive understanding of risks at watershed level by the local officials

Page 4: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

BACKGROUNDNon‐Regulatory Products

Available Guidance Includes:

DRAFT Appendices N, O

Draft Memorandum for Coastal 

and Dam Analyses 

Page 5: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

BACKGROUNDNon‐Regulatory Products

Flood Risk Products consist of 3 main components:

• Flood Risk Database (FRD), Report (FRR) and Map (FRM)

These are created by the following datasets:  • Changes Since Last FIRM (CSLF)• Flood Depth and Analysis Grids• Flood Risk Assessment Dataset• Areas of Mitigation Interest (AOMI) 

Page 6: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

PRODUCT OVERVIEW ‐ CSLFNon‐Regulatory Products

Page 7: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

PRODUCT OVERVIEW – DEPTH/VELOCITY GRIDSNon‐Regulatory Products

Page 8: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

PRODUCT OVERVIEW – RISK ASSESSMENTNon‐Regulatory Products

Page 9: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

PRODUCT OVERVIEW ‐ AOMINon‐Regulatory Products

Page 10: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

DELIVERABLES/TIMING IN REGION INon‐Regulatory Products

• FEMA Region I was one of among few Regions to adopt underEarly Demonstration Projects (EDP)

• Products were Funded under FY10 Task Orders  

• Included full suite of FRPs (or RMPs) for Riverine as well ascoastal projects

• Watershed products were completed in February 2011

Page 11: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

DELIVERABLES/TIMING IN REGION INon‐Regulatory Products

• Watershed project included incorporation of a revisedfloodplain for Shawsheen River in Middlesex County, MA

• Shawsheen River was restudied under HMTAP contract back in2006‐2008

• Middlesex County DFIRM study had began under Map Modprogram and the county became effective in 2010 without the inclusion of Shawsheen River study

Page 12: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

DELIVERABLES/TIMING IN REGION INon‐Regulatory Products

• Thus Shawsheen became a prime target to implement FRPs at the same time getting the revised floodplain incorporated

• Shawsheen River FRP was completed in less than 5 months

• FEMA held an outreach meeting to introduce these products  and discuss the HMTAP study after the preliminary issuance

• Products included complete suite of FRPs that were conceived as a Risk MAP solution

Page 13: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

DELIVERABLES/TIMING IN REGION INon‐Regulatory Products

• We took extensive GIS data collection efforts to explore what communities can provide

• Most communities provided their GIS data that included basic infrastructure layers in addition to parcels and building footprints

• We included most of this data in these products

Page 14: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

DELIVERABLES/TIMING IN REGION INon‐Regulatory Products

• First example maps were shown to FEMA and MA DCR to get their feedback

• State and FEMA both objected velocity grids as these grids showed the variations in velocity across stream corridors that was questionable

• All other products were revised to include their comments which were mostly cosmetic 

Page 15: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

DELIVERABLES/TIMING IN REGION INon‐Regulatory Products

• These products were well received at the outreach meeting

• Most community officials found changes since last map product to be most useful to understand the differences b/w current and preliminary maps

• Building footprints were shown on the CSLF and all participants thought that this information can be misused by the general citizens

Page 16: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

DELIVERABLES/TIMING IN REGION INon‐Regulatory Products

• Subsequently FEMA decided not to show building footprints on the future products

• While this was going on, many coastal studies throughout R1were going through FSR meeting 

• In many cases, FSR meeting led to the changes in transect placement and subsequently went through changes in coastal analysis in some locations

Page 17: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

DELIVERABLES/TIMING IN REGION INon‐Regulatory Products

• Due to this fact, all stakeholders thought that the timing of the products (after preliminary issuance) was better suited to introduce these products as against presenting at the FSR meeting

• FEMA decided to universally adopt this approach for all studies

• Since then all studies (2011‐present) were done this way

Page 18: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

DELIVERABLES/TIMING IN REGION INon‐Regulatory Products

• At the FSR meeting it was decided that we will show linework format work map product

• This included showing linework of new floodplain analysis in the changes since last map format

• FEMA requested that we provide an introduction of the FRPs during this meeting showing complete examples

Page 19: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

COASTAL PRODUCTS IN REGION INon‐Regulatory Products

• Coastal FRPs needed some enhancement as development in coastal areas of Region I is widespread and sensitive

• FEMA decided to include the basic components of the FRP suite but added Wave Height Grids in lieu of Depth Grids

• Furthermore, FEMA added coastal hazard id map that depicts the dominant engineering factors that are the decision points in coastal risk mapping

Page 20: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

COASTAL PRODUCTS IN REGION INon‐Regulatory Products

• Wave Height grids depicted wave heights in 3 different categories: > 3 ft, 1.5‐3 ft and less than 1.5 ft

• This was selected due to the LiMWA guidance that was implemented on all coastal studies

• Depth of 1.5‐3 ft represented LiMWA areas where some states regulate the coastal construction

Page 21: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

COASTAL PRODUCTS IN REGION INon‐Regulatory Products

Page 22: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

COASTAL PRODUCTS IN REGION INon‐Regulatory Products

Page 23: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

COMMUNITY FEEDBACK IN REGION INon‐Regulatory Products

• Generally positive acceptance of the products

• Most communities liked CSLF more so than the other products

• FRD is a hit with the communities who possess GIS capabilities

• Stakeholders requested building footprints are to be excluded from showing them on any maps (but ok for the analysis)

Page 24: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

OUR CHALLENGESNon‐Regulatory Products

• Limited guidance especially for coastal

• Non‐Existent Experience with the real‐world usability, dissemination and  functionality as these products were being launched first time

• Quality issues due to free‐form nature

Page 25: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

OUR SOLUTIONSNon‐Regulatory Products

Scope was tailored for particular use (coastal vs. inland)

• Coastal Wave Height Grids instead of Depth Grids

• Building footprints excluded as requested

• Products released at the CCO Meeting

Page 26: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

OUR SOLUTIONSNon‐Regulatory Products

Additional Quality Control steps were implemented. 

Automation through production and QC scripts

Assign right staff to each product review

Supplement the automated checks with manual 

reviews of anomalies 

Page 27: FEMA Non Regulatory Products Onur - floodsJune 5, 2014 FEMA Non‐Regulatory Products Our Experience –QA/QC Processes Onur Celik, CFM Amol Daxikar, CFM, GISP ASFPM 2014

CONCLUSION/QUESTIONSNon‐Regulatory Products

As a result, products are:

Compliant with FEMA requirements and expectations

Positive Stakeholder feedback

QUESTIONS/COMMENTS?