3 Federal Aviation Administration Materials Meeting – NBS / OSU Updates October 21 st & 22 nd, Mini-Study ‘Mini-Study’ Complete –4 Labs In All –Two Honeycomb Panels S-SCCP (Brown) Marker Panel (White) OSU –Peak Heat Release Rate –2 minute Total Heat Release Rate –Time To Peak NBS –Maximum Specific Optical Density (4 Minute)

Transcript of Federal Aviation Administration OSU NBS Updates 2008 October Materials Meeting Materials Working...

Page 1: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

Federal AviationAdministrationOSU & NBS Updates

2008 October Materials Meeting

Materials Working Group

Michael Burns, FAA Tech Center

October 21st & 22nd, 2008

Page 2: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

2 2Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Agenda1. “Mini” European Round Robin Results2. NBS Update

• Photometric System Round Robin• Experimental Furnace

3. Visit To Vatell Corp.• Calibration Method• Recoating Techniques

4. New FAA Equipment5. Maintenance Tips & Reminders6. Next Steps

Page 3: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

3 3Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

2008 Mini-Study • ‘Mini-Study’ Complete

– 4 Labs In All– Two Honeycomb Panels

• S-SCCP (Brown)• Marker Panel (White)

• OSU– Peak Heat Release Rate– 2 minute Total Heat Release Rate– Time To Peak

• NBS– Maximum Specific Optical Density (4 Minute)

Page 4: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

4 4Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Schneller Panel - Peak HRR% Standard Deviation = 22.0%

(44.9) (55.7) (59.9) (76.3)

0

10

20

30

40

50

60

70

80

90

A B C D

Lab Code

Peak

kW

/m2

Page 5: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

5 5Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Schneller Panel - Time to Peak HRR% Standard Deviation = 17.4%

(40) (42) (42) (57)

0

10

20

30

40

50

60

D A C B

Lab Code

Seco

nds

Page 6: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

6 6Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Schneller - 2 minute Total HRR% Standard Deviation = 48.9%

(37.6) (41.8) (45.0) (94.7)

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

B C A D

Lab Code

(kW

/m2)

Min

Page 7: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

7 7Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Marker Panel - Peak HRR% Standard Deviation = 40.7%

(34.7) (36.1) (42.6) (75.6)

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

B A C D

Lab Code

kW/m

2

Page 8: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

8 8Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Marker Panel - Time to Peak HRR% Standard Deviation = 32.5%

(15) (30) (32) (35)

0

5

10

15

20

25

30

35

40

C D A B

Lab Code

Seco

nds

Page 9: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

9 9Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Marker Panel - 2 Min Total HRR% Standard Deviation = 57.6%

(30.7) (40.2) (47.2) (101.1)

0.0

20.0

40.0

60.0

80.0

100.0

120.0

C B A D

Lab Code

(kW

/m2)

min

Page 10: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

10 10Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Schneller Panel - Max Ds during 4 minutes% Standard Deviation = 15.8%

(141.8)

(182.7)

(193.4)

0.0

50.0

100.0

150.0

200.0

250.0

D A C

Lab Code

Ds

Page 11: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

11 11Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

NBS Photometric System Round Robin

• FAA Is Currently Conducting A Round Robin Check Out Of The NBS Photometric System Using Neutral Density Light Filters

• These Filters Provide A Linearity Check Of Five Data Points

Page 12: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

12 12Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

NBS Photometric System Round Robin• No Furnace Heat Or Pilot Burner Required • Zero Then Span system

• Gradually Slide Filter Over Lower Glass Window• 12 Domestic Labs Have Participated To Date• Filter Information:

• Edmund Optics• http://www.edmundoptics.com/onlinecatalog/Display

Product.cfm?productid=1523• Filters Available For International Lab Testing Within

The Next Few Weeks.

Page 13: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

13 13Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

NBS Furnace• NBS Furnace Upgrade

– Longer Service Life Of Heating Element.• Experimental Furnace Endurance Testing Progress

– Incoloy Vs. Inconel– Approx. 742 Hours Of Operation– 43 Cycles– 28 Samples

Page 14: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

14 14Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Visit To Vatell Corp.• Calibration Method

• Differed From What The FAA Has Been Doing Ramping Heat Up During Calibration Vs. Down

• New Study In Progress To Measure Any Differences Between Procedures

• Observed Re-Coating Techniques• 1000 - 1B’s (Lower Range, Most Common)

• Black Velvet• 1000 - 1A’s

• Krylon• Visit To Medtherm Corp. Slated For Early 2009

Page 15: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

15 15Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

New FAA Equipment• FAA Has Recently Purchased A New:

OSU Heat Release Rate Apparatus– Fire Test Technology Ltd.

NBS Smoke Chamber– Newport Scientific, Inc.

• Due To Arrive In the Next Few Weeks• Facility Being Painted• Installed Once Complete• Original Equipment Will Remain Available For Special

Testing And Occasional Training

Page 16: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

16 16Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Maintenance Tips & Reminders• OSU

- Inspect And Clean Lower Air Distribution Plate On A Regular Basis

- Keep The Upper Cone Walls And Chimney Clean• NBS

- Remember To Clean Windows Before Each Test (Top Then Bottom)

- Ensure Proper Alignment Of Pilot Tubes To Sample Face

Page 17: Federal Aviation Administration OSU  NBS Updates 2008 October Materials Meeting Materials Working Group Michael Burns, FAA Tech Center October 21 st

17 17Federal AviationAdministration

Materials Meeting – NBS / OSU UpdatesOctober 21st & 22nd, 2008

Next Steps• International Labs Who Would Like To Participate In

The NBS Photometric System Round Robin Please Contact The FAA

• Complete Study To Measure Any Differences Between Heat Flux Gage Calibrating Procedures

• FAA Remains In The Process Of Updating Chapter 6 Of The FAA Handbook (NBS)

• Thank You For Comments On Chapter 6 Updates• FAA Contact Information:

Michael Burns At [email protected] +1 (609) 485-4985