SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida
Financial Project Number: 428753-1-32-01
February 11, 2016
TPO Board Presentation
Begin Project
End Project
Project Limits (MP 17.552 to MP 26.226) Begin 200 feet north of US 192 (5th Avenue) End 600 feet north of SR 404 (Pineda Causeway) Approximately 8.7 miles.
Project Limits – US 192 to SR 404 (428753-1)
Municipalities Indiatlantic Melbourne Indian Harbour Beach Satellite Beach Brevard County
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements
Project Improvements
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Eliminate Auxiliary Lanes 9. Extend Turn Lane
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements
Project Improvements
HIGHWAY A1A
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements
Intersections 1. Grosse Point Avenue 2. Paradise Boulevard 3. Holy Name Way 4. Eau Gallie Boulevard 5. Palm Springs Boulevard 6. Pine Tree Drive 7. DeSoto Parkway 8. Cassia Boulevard 9. Jackson Avenue 10. Scorpion Court 11. Shearwater Parkway 12. Berkley Street 13. Ocean Boulevard
Project Improvements
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements
Project Wide 1. Improve Curb Ramp (signalized intersections) 2. Add Directional Warning Devices
Project Improvements
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements
Project Wide 1. Replace Ditches with Pipe 2. Upgrade Inlet Grates to meet ADA Standards 3. Replace Deteriorated Structures 4. Install Railings
Project Improvements
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements
Project Wide 1. Construct Bus Pads (43 Locations)
Project Improvements
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements
Project Wide Connect Isolated Transit Stops
Project Improvements
Intersections 1. Grosse Point Avenue 2. Paradise Boulevard* 3. Holy Name Way 4. Eau Gallie Boulevard 5. Palm Springs Boulevard* 6. Pine Tree Drive* 7. DeSoto Parkway* 8. Cassia Boulevard* 9. Jackson Avenue* 10. Scorpion Court* 11. Shearwater Parkway* 12. Berkley Street 13. Ocean Boulevard
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane
Project Improvements
*Upgrade to Mast Arm
Project Improvements
*Upgrade to Mast Arm
Nearest Intersection
1. Wallace Avenue* 2. Satellite Avenue 3. Sunrise Avenue 4. Magellan Avenue 5. Royal Palm Boulevard 6. Ellwood Avenue 7. Grant Avenue**
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings (Beach Access) 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane
Project Improvements
*Subject to Approval
**Access Change
Typical Mid-Block Crossing
SR A1A
COQUINA POINT GOODWILL COMMERCIAL SHOPS
BUCCANEER BUCCANEER
Sidewalk Limits
1. Transit Stop Connectivity 2. Glenwood Avenue to Ellwood Avenue 3. Grant Avenue to Jackson Street 4. Jackson Street to Scorpion Court (west side) 5. Scorpion Court to Shearwater Parkway (west side) 6. Ocean Boulevard to Beach Park (east side)
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane
Project Improvements
Sodding and Curbing 1. Mid-block Crossing Locations 2. Convert Existing Traffic Separators
DeSoto Parkway Intersection Scorpion Court Intersection Shearwater Parkway Intersection
3. Shearwater Parkway to Satellite Beach City Limits
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane
Project Improvements
Intersections 1. Grosse Point Avenue 2. Paradise Boulevard 3. Holy Name Way 4. Eau Gallie Boulevard 5. Palm Springs Boulevard 6. Pine Tree Drive 7. DeSoto Parkway 8. Cassia Boulevard 9. Jackson Avenue 10. Scorpion Court 11. Shearwater Parkway 12. Berkley Street 13. Ocean Boulevard
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane
Project Improvements
*Add Northside Crossing to Intersection
Project Improvements
SR A1A
Convert Concrete Traffic Separator to Grassed Median
Transit Stop: Construct Bus Pad
Construct Sidewalk To Connect Transit Stop
Transit Stop: Construct Bus Pad
Convert Concrete Traffic Separator to Grassed Median
Add New Crosswalk Leg
Improve Curb Ramps
Improve Curb Ramps
Boarding and Alighting Areas
1. SE 1st 2. Seaview Plaza (Ocean Blvd)
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane
Project Improvements
Bicycle Markings
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane
Project Improvements
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane
Project Improvements Locations
1. Southbound from Sunrise Avenue
2. Southbound from Jackson Street
3. Northbound at Sandpiper Condominiums
4. Northbound Continuous Green at Pineda Causeway
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane
Project Improvements
Locations
Southbound Right Turn Lane to Scorpion Court
SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida
Financial Project Number: 428753-1-32-01
Schedule & Estimated Construction Cost Plans Complete – March 2016
Construction Begin – Fall 2016
2016 Construction Cost Estimate – $10.6M*