Feature & Parameter Activation Test Template

6
Test Objectives Improve HSUPA throughput to 5.76mbps. Object (parameter Category) Parameters UCORRMALGOSWITCH MAPSWITCH Measurement Counters * CS & PS CSSR (Call Setup Success Rate). Also HSDPA & HSUPA. * RRC & RAB Setup Failures Drill Down. Specifically Congestion * Number of RRC & RABs (Att & Succ). * Traffic metrics (Erlangs, Data Volumes, Num of HSxPA/FACH/PC * FACH/RACH Metrics: Congestion in FACH; Number of Users in FA * PAGING Metrics: PCH Congestion.... * Channel Switching Metrics: Number of Reconfigurations per ty Feature Details including dependencies Test 1.0 Feature Name and Feature ID: Activation of HSUPA 2ms TTI Feature/ Functionality (Include all associated parameters and license for the feature to function as required)

description

Feature and parameters

Transcript of Feature & Parameter Activation Test Template

Sheet1Test 1.0 Feature Name and Feature ID: Activation of HSUPA 2ms TTITest Objectives Improve HSUPA throughput to 5.76mbps.

Feature/FunctionalityObject (parameter Category)ParametersCurrent StatusStep 1 to be testedStep 2 to be testedNotes(Include all associated parameters and license for the feature to function as required)UCORRMALGOSWITCHMAPSWITCHMAP_HSUPA_TTI_2MS_SWITCH-0MAP_HSUPA_TTI_2MS_SWITCH-1

MeasurementMetrics/KPIsNotesCounters* CS & PS CSSR (Call Setup Success Rate). Also HSDPA & HSUPA.The trial requires complete Monitoring of the* RRC & RAB Setup Failures Drill Down. Specifically Congestion due to DL Power.Performance:* Number of RRC & RABs (Att & Succ).* Retainability Metrics* Traffic metrics (Erlangs, Data Volumes, Num of HSxPA/FACH/PCH/URA Users, ENU) at cell & carrier level.* Integrity Metrics* FACH/RACH Metrics: Congestion in FACH; Number of Users in FACH;...* Mobility Metrics* PAGING Metrics: PCH Congestion....* Capacity Metrics* Channel Switching Metrics: Number of Reconfigurations per type, Success rate,...

Feature Details including dependencies

Feature Activation & Deactivation Procedure

Feature Verification

Expected Results/Impact

Sheet2

Sheet3