Performance improvement initiative: prevention of surgical ...
Facilities Process Improvement Initiative 5-1-09
Transcript of Facilities Process Improvement Initiative 5-1-09
5/1/09 1
PROCESS IMPROVEMENT INITIATIVEPROCESS IMPROVEMENT INITIATIVE
Work System OwnerEd Curry
Work System Enabling Leader
Dane Theodore, Director
FACILITIES SERVICES /
DISTRICT & SCHOOL SECURITY
5/1/09 2
INITIATIVE CATEGORIES
• Facilities Key Priority and Work Processes
• Facilities and Student Performance Relationship
• Facilities Balanced Approach
•Key Priority Process Owners
• Facilities Key Priority Processes Relationship To District Work Systems
• District Strategic Plan and Key Priority Indicator Relationships
• Facilities / District Strategic Plan and District Key Performance Indicator Direct Relationship Matrix.
5/1/09 3
The Facilities and Student Performance Relationship
BPS Facilities recognizes the impact that high quality learning spaces have on the performance of students.
The Facilities Wheel explains the relationship between high quality learning spaces, funding and the increased student performance as a result of high quality facilities.
Since the start of the ten-year new construction, renovation and remodeling and maintenance program in FY 2006, BPS is on tract to invest over $$750,000,000 to improve over 11,000,000 square feet of school and ancillary infrastructure.
5/1/09 4
Facilities Balanced Approach
BPS Facilities utilizes a Balanced approach to sustain the results of the 10-Year Facilities Improvement Program.
Continuous improvements are realized through the deployment of
Six Sigma (DMAIC) process improvement tools and
methodologies.
5/1/09 6
Facilities / Security Key Priority Process Owners
Planning – Mike Gaffney, ManagerDesign – Anibal Caussade, Project ManagerConstruction – Dennis Bonny, Project ManagerPlant Maintenance & Operations – Walt Petters, DirectorEnvironmental, Health, Safety and Code Compliance – Jim Powers, Env. Engr.Resource Conservation – Art Johnson, Project ManagerDistrict and School Security - Andrea Alford, Director
5/1/09 7
District Key Priority Processes Relationship To District Work Systems
The Enabling Work System 5 Facilities priority processes
provide the Student Achievement Work
System with adequate and appropriate facilities
that are First in Nation Schools. District facilities
provides the backbone from which all other
District Work Systems can achieve the goals
and objectives set forth in the District Strategic
Plan and Key Performance Indicators.
5/1/09 8
District Strategic Plan and District Key Performance Indicator Relationships
The BPS Strategic Plan contains eighty (80) objectives in four goal categories, with 16 of these objectives being Key Performance Indicators (KPIs).
Objective Categories:
• Goal 1 Student Achievement (38 Objectives / 11 KPIs)
• Goal 2 Safe and Healthy Learning and Work Environment (17 Objectives / 1 KPI)
• Goal 3 Capable and Engaged Workforce (11 Objectives / 2 KPIs)
• Goal 4 Fiscal Responsibility and Financial and Organizational Effectiveness (14 Objectives / 2 KPI)
5/1/09 9
District Strategic Plan and District Key Performance Indicator Relationships
Out of the BPS Strategic Plan eighty (80) objectives and sixteen (16) KPIs in four goal categories, the Facilities Key Priority Processes have eleven (11) direct and Sixty-nine (69) indirect relationships. There is one Facilities direct relationships involving a KPI.
Direct Relationships:
• Goal 2.1.1 Finalize and implement and annual comprehensive safety and security audit in every school by 2009-2010.
• Goal 2.1.2 Review and update school safety and security plans in accordance with Safe School Standards by June 30,2009.
• Goal 2.1.3 Conduct training using federal guidelines for emergency response and crisis management preparation, mitigation, response and recovery for all district personnel and administrators at leadership team meetings by June 30, 2009.
• Goal 2.1.4 Develop a timeline for implementation of appropriate Review for Safety and Security Committee recommendations by June 2009.
• Goal 2.1.5 Develop and implement a 5 Star Comprehensive Review for Safety and Security by June 2009.
• Goal 2.2.1 Create adequate classroom space including relocatable classrooms to meet the requirements imposed by Class Size Reduction (CSR), Growth Management (SB360) Legislation, and Secondary Schools of National Prominence (SSNP) with redistricting, new permanent and/or relocatable space by 2011 – 2012.
5/1/09 10
District Strategic Plan and District Key Performance Indicator Relationships
(Continued)
Direct Relationships:
• Goal 2.2.2 Provide facility improvements to support the new Secondary Schools of National Prominence (SSNP) by 2012 –2013.
• Goal 2.2.3 Develop a plan to achieve 100% level of service by 2011-2012.
• Goal 2.3.1 Create and implement a scheduled Maintenance Improvement Plan by January 2009 to provide adequate teaching/learning environments for all schools to complement the 10-Year Facility improvement Plan initiative.
• Goal 2.3.2 Implement a plan by January 2009 to improve the exterior appearance of all schools / district support sites as part of the implementation of the 10-Year Facilities Improvement Plan.
• Goal 2.3.3 Develop and implement a district-wide energy reduction plan by October 1, 2008 to deal with rising statewide energy costs.
• Goal 4.3.1 (KPI) Brevard Public Schools will attain Malcolm Baldrige Award by June 2010.
5/1/09 11
Facilities / District Strategic Plan and District Key Performance Indicator Direct Relationship Matrix
The indirect relationship between the seven (7) Facilities Key Priority Processes and the sixty-nine (69) strategic plan goals and objectives lies the fact that high quality facility learning spaces contribute to accomplishment of all District goals and objectives.
GOAL 2: SAFE AND HEALTHY LEARNING AND WORK ENVIRONMENTStrategic Plan References > SP 2.1.1 SP 2.1.2 SP 2.1.3 SP 2.1.4 SP 2.1.5 SP 2.2.1 SP 2.2.2 SP 2.2.3 SP 2.3.1 SP 2.3.2 SP 2.3.3
Facilities Key Priority ProcessesPlanning X X X
Design X X XConstruction X X X
Plant Operation and Maintenance X X XX X
Resource Conservation X XDistrict and School Security X X X X X
Environmental Health, Safety and Code Compliance
5/1/09 12
Facilities / Security Flow Chart
OUTPUT MEASURESQ1 - FISH Data Accuracy
Q2 -Facility Design Capacity Utilization (%)
Q3 - Construction Critical Path Milestones (% Variance from Construction Schedule)
Q4 - Construction Budget vs. Actual Construction Costs (% Variance)
Q5 - Operations Cost Per GSF
Q6 - Maintenance Cost Per GSF
Q7 - Regulatory And Code Compliance Inspection Milestones
Q8 - Regulatory And Code Compliance Annual Reports Milestones
Q9 - Reduce Electrical Usage 10% By End Of FY 08/09
Q10 - Reduce Water Usage By 10% By End Of FY 09/10
Q11 - Reduce Gas / Heating Oil Usage By 10% By End Of FY 09/10
Q12 - Reduce The Volume Of Trash Hauled 10%By End Of FY 09/10
Q13 - Compliance With Federal, State, Local And School Board Requirements
Q14 - Prevent School Violence ( SESIR Incident Ratio - # Criminal Incidents / Student Population)
Q15 - Reduce Security Risks And Liability
(# Planned Security Training Session / # Actual Security Training Sessions)
Q16 - Improve School - Community Relations On School Security (# Site Or Community Visits Conducted / # Site Or Community Visits Planned)
5/1/09 13
Facilities / Security Process Improvement Initiative
FACILITIES / DISTRICT & SCHOOL SECURITY KEY PRIORITY PROCESS FLOW CHARTS
NEED FACILITYPLANNING
?
?
YES
NODELIVERABLES:D1. FISH CertificationD2. Growth Management ProjectionsD3. 5-Year Facility PlanD4. School Concurrency ApplicationD5. Educational Plant SurveyD6. Student Accommodation PlanD7. Boundary Change Recommendations
INVOLVES STATE &LOCAL GOV’T?
NEED ISMET
MAINTAIN &CERTIFY
BPS FISH DATA
To ensure adequate and appropriate educational facilities to accommodate projected student membership and program offerings
FACILITIES SERVICES PLANNING 5/1/09
STATUTORYREQUIREMENTS?
YES
NO
KWP8
KWP5
KWP4
KWP7
KWP3
KWP6
KWP2
KWP1
WHO
STEP
MacroProcess: Process Owner:
BPS SCHOOLBOARD
BPS FACILITIESPLANNING
STATE ANDLOCAL
GOVERNMENT
BPSDEPARTMENTS
& SCHOOLS
OBTAIN DISTRICT / FINANCESTUDENT PROJECTIONS
MANAGE IMPACT FEE ACTIVITIES
DEVELOP & PUBLISHEDUCATIONAL
PLANT SURVEY
PERFORM SCHOOL CONCURRENCY ACTIVITIES
DEVELOP & PUBLISH BOUNDARY CHANGES
DEVELOP & PUBLISH5-YEAR FACILITY PLAN
DEVELOP & PUBLISHSTUDENT ACCOMMODATION PLAN
DEVELOP & PUBLISH GROWTH MANAGEMENT PROJECTIONS
MAINTAIN OTHER PLANNING DATA
NEED
DEVELOP &PUBLISH
MAINTAIN &CERTIFY
DEVELOP &PUBLISH
DEVELOP, PUBLISH &
OBTAIN
QUESTION
QUESTION
MANAGE
BOUNDARYCHANGES
DEVELOP &PUBLISH
PERFORM
MANAGED
MANAGEFACILITIES PLANNING D. THEODORE
P1 - Data Accuracy
Q1 - FISH Data Accuracy
Q2 - State and Local Submittals On Time
Q3 - BPS Submittals On Time
Q4 - Facility Design Capacity Utilization (%)
BA
BA
BA
BA
BA
Legend: BA - Board Approval Required for SubmittalsFISH - Florida Inventory of School Houses SAP - School Accommodation Plan SCA - School Concurrency Activities EPS - Educational Plant Survey
P2 - Growth Management Projections Schedule Milestones
P3 - 5-Year Facility Plan Schedule Milestones
P6 - Student Accommodation Plan Schedule Milestones
P7 - Boundary Changes Schedule Milestones
P8 - Educational Plant Survey Schedule Milestones
P9 - Impact Fee Activity Schedule Milestone
P4 - # School Concurrency Applications P5- Application Review Cycle Time
D4
D5
D6
D7
D3
D2
D1
NEED PROJECTDESIGN
?
?
DELIVERABLES:D1. Construction Scope of WorkD2. Bid DocumentsD3. Design Criteria PackageD4. Project PlansD5. Project SpecificationsD6. Approved Plans and Specifications
Q1 - Cost of Errors & Omissions as a % of Total Construction Cost
Q2 - % Variance from Design Schedule
Design / Build (D/B) Project?
Design / Bid /Build Project?
Q3 - % Variance from Design Budget
P1 - Pre-Design Schedule Milestones
NEED ISMET
SUPPORT BID & PERMIT ACTIVITIES
SUPPORT CONSTRUCTION & CONSTRUCTION CLOSEOUT ACTIVITIES
CONSTRUCTION &CLOSEOUT COMPLETE?
PROJECT DESIGN COMPLETE?
A&E CONTRACTCLOSEOUT COMPLETE?
?
?
?
YES
YES
YES
NO
NO
NO
P4 - Bid & Permit Support Schedule Milestones
P2 - Project Design Schedule Milestones
P3 - Cost Variance @ Design Deliverable Milestones
P7 - A&E Contract Closeout Schedule Milestones
P5 - Construction & Construction Closeout Support Schedule Milestones
P6 - Cost of Errors & Omissions as % of Construction Costs at Schedule Milestones
M/E/P Construction <$50,000 or Placement / Hookup of
Relocatable Units?
CLOSEOUT A&E CONTRACT
PERFORM PROGRAM DEVELOPMENT
DEVELOP BUDGET
DESIGN PROJECT
APPROVAL BYBOARD
PROGRAMBUDGETDCP
PROGRAMBUDGET
A&EAPPROVAL BY
BOARD
DEVELOP DESIGN CRITERIA PACKAGE
SELECT DESIGN / BUILDCONTRACTOR
SELECT A & E
D3
D4D5
D6
YESNO
?
GO TOFACILITIES
CONSTRUCTIONFLOW CHART
DEVELOP BID DOCUMENTS
APPROVAL BYBOARD
D1D2
YES
NOBOARD
APPROVALREQUIRED?
KWP 1
KWP 5
KWP 6
KWP 7
KWP 8
KWP 9
KWP 3
KWP 4
KWP 4
KWP 2
WHO
STEP
BPS SCHOOLBOARD
BPS FACILITIESSERVICES
BPS EDUCATIONALDEPARTMENTSAND SCHOOLS
CONTRACTARCHITECT & ENGINEER
Key PriorityProcess (2): Process Owner:
APPROVAL BY BOARD
NEED
PERFORM
DEVELOP
DEVELOP
DEVELOP
QUESTION
QUESTION
APPROVE
APPROVE
APPROVE
QUESTION
DESIGN
SELECT
QUESTION
SUPPORT
SUPPORT
QUESTION
QUESTION
CLOSEOUT
MANAGED
MANAGEFACILITIES DESIGN D. THEODORE
FACILITIES SERVICES DESIGN 5/1/09
ISSUENOTICE TOPROCEED
NEED PROJECTCONSTRUCTED
PERFORM SUBSTANTIAL COMPLETION ACTIVITIES
SELECTCONTRACTOR
PERFORM PRE-CONSTRUCTION ACTIVITIES
?
?
?
?
?
?
?
PRE-CONSTRUCTIONREQUIREMENTS MET?
BOARD APPROVED?
CONSTRUCTIONCLOSEOUT COMPLETE?
CAN ACERTIFICATE
OF OCCUPANCY(CO) BE ISSUED?
YES
YES
YES
NO
NO
NO
YES
NO
NEED ISMET
OBTAIN CFI
DELIVERABLES:
D1. Certificate of Occupancy (CO)
D2. Projects Constructed per BPS Design Specifications, Florida Building Code, and State Requirements for Educational Facilities
D3. Certificate of Final Inspection (CFI)
D4. As-Built Project Plans
Q1 - Actual Sales Tax Savings / Possible Sales Tax Savings (%)
Q2 - Construction Critical Path Milestones (% Variance from Construction Schedule)
Q3 - Construction Budget vs. Actual Construction Costs (% Variance)
Q4 - Construction-Related SESIR Incidents
Q5 - Construction Safety JLA Security Incidents
Q6 - Warranty Actions
Manage Project P IndicatorsP2 - Construction Critical Path Milestones
P3 -
P4 - Cumulative Sales Tax Savings as a % of Construction Cost
P5 - Monthly Construction Budget vs. Actual Construction Cost Variance
P6 - Construction-Related School Environmental Number of Safety Incident Report (SESIR) Incidents Involving Students and School Staff
P7 - Number of Construction Worker Safety Incidents
P8 - Number of Jessica Lundsford Act (JLA) Incidents
Cumulative Use of Estimated Contingency Funds as a Percent (%) of Cumulative Construction Costs
P1 - Pre-Construction Activity Milestones
P10 - Construction Closeout Activity Milestones
P9 - Substantial Completion Activity Milestones
P11 - Administrative Closeout Activity Milestones
P12 - Number Warranty Requests
? ADMINISTRATIVE
CLOSEOUT COMPLETE?
NO
YES
PERFORM ADMINISTRATIVE CLOSEOUT ACTIVITIES
PROJECT VALUE <$200K?
APPROVE CONTRACTOR BY BOARD
BOARDAPPROVAL
REQUIRED?
D1
D2
D3
D4
MANAGE PROJECT
HAS THE CONTRACTOR MET SUBSTANTIAL
COMPLETION REQUIREMENTS?
YES
YES
YES
NO
NO
NO
PERFORM CONSTRUCTION CLOSEOUT ACTIVITIES
KWP1
KWP2
KWP3
KWP4
KWP5
KWP6
KWP7
WHO
STEP
Key PriorityProcess (3): Process Owner:
ISSUE CO
START WARRANTY
QUESTION
NEED
PERFORM
APPROVE
SELECT
QUESTION
QUESTION
ISSUE
QUESTION
MANAGE
PERFORM
QUESTION
START
ISSUE
QUESTION
QUESTION
MANAGED
QUESTION
PERFORM
PERFORM
OBTAIN
MANAGEFACILITIES CONSTRUCTION D. THEODORE
BPS FACILITIES SERVICES CONTRACTOR
BPS SCHOOL BOARD
FACILITIES SERVICES CONSTRUCTION 5-1-09
PROVIDE WELL MAINTAINED, SAFE AND COMFORTABLE FACILITIESTO SUPPORT THE BPS EDUCATIONAL PROCESS.
OPENFACILITY
OPERATE FACILITY
PROCESS WORK ORDER(S)
?
?
?
?
?
?
?
YES
YES
YES
YES
YES
NO
NO
NO
NO
NO
DELIVERABLES:D1- MONTHLY WORK ORDER REPORT
D2 - ANNUAL FACILITY CONDITION ASSESSMENT REPORT
Q1 - Operations Cost Per GSF
Q2 - Maintenance Cost Per GSF
Q3 - Total (Operations + Maintenance) Cost Per GSF
Q4 - PM and W/O Activity Per Year
Q5 - W/O Backlog Per Year
Q6 - PM / Service W/O Ratio
Q7 - PO&M / Facility-Generated W/O Ratio
Q8 - PM Work Order Backlog Per Year
PREVENTATIVE MAINTENANCE (PM)
WORK NEEDED?
PERFORMPM WORK
IS THE FACILITY OPERATING AS PLANNED?
PROBLEM FIXED?
WORK ORDERCLOSED?
FIXPROBLEM
YES
YES
NO
NO
END OF NORMALFACILITY OPERATION?
END OF EXTENDEDFACILITY OPERATION?
CLOSE FACILITY
P1 - Operational Systems Monitoring Hours of Operation
P2 - PM Work Per Month
P3 - School-Generated W/O Per Month P4 - Service W/O Per Month P5 - PO&M-Generated W/O Per Month P6 - # W/O Opened / Closed Per Month P7 - # Backlogged W/O Per Month P8 - Aging W/O Per Month P9 - Operations Cost Per MonthP10 - Maintenance Cost Per Month
CAN PROBLEM BE FIXEDBY FACILITY’S CUSTODIAL STAFF?
FACILITIES SERVICES PLANT OPERATIONS AND MAINTENANCE 5-1-09
NEED ISMET
NEED
MONITOR FACILITYOPERATIONAL SYSTEMS
WHO
STEP
Key PriorityProcess (4): Process Owner:
NEED
MONITOR
OPERATE
OPEN
PERFORM
QUESTION
QUESTION
QUESTION
FIX
QUESTION
QUESTION
QUESTION
QUESTION
QUESTION
PROCESS
CLOSE
MANAGED
MANAGE FACILITIES OPERATIONS AND
MAINTENANCE( 9562) WALT PETTERS
BPS SCHOOLS ANDDEPARTMENTS
FACILITIES OPERATIONSAND MAINTENANCE
BPS SCHOOL BOARD
Note: This chart represents a typical daily operation process. Theschool principal operates the facility in conjunction with PO&M.
KWP3
KWP2
KWP1
MANAGE ENVIRONMENTAL &CODE COMPLIANCE
Deliverables: D1 - School Inspection Findings Report D2 - Annual Comprehensive Fire, Safety, Casualty, & Sanitation Report D3 - Annual Custodial Assessment Report D4 - Annual Building & Code Compliance Activity Report
?
?
Regulatory Compliance
Activity?
Facilities in Compliance?
YES
YES
NO
NO
INSPECT FACILITIES &INFRASTRUCTURE
ISSUE INSPECTIONREPORTS
MONITOR &COMMUNICATE
REGULATORY / CODE NON-COMPLIANCE
MONITOR &COMMUNICATE
REGULATORY / CODE COMPLIANCE
PERFORMCUSTODIALSUPPORT
NEED ISMET
P2 # OF COMPREHENSIVE FIRE SAFETY CASUALTY SANITATION INSPECTIONS PERFORMED
P3 SERVICE RESPONSE TIME TO COMPLETE BUILDING FIELDINSPECTIONS.
P4 - TIME TO ISSUED TEMP CO(OEF 110B)
P5 - TIME TO COMPLETE FINALINSPECTIONS.
P6 - TIME TO ISSUE CERTIFICATE OFFINAL INSPECTION (OEF 209)
P7 - # ENVIRONMENTAL INSPECTIONS PERFORMED
P8 # OF CUSTODIANS TRAINED
P9 # OF FACILITY CUSTODIAL ANNUAL &BI-ANNUAL ASSESSMENTS CONDUCTED
P10 # OF CLEAN CAMPUS REPORTSRECEIVED
P11 CLEAN CAMPUS REPORT RECEIVED,REVIEWED, AND ACTIONS TAKEN
P12 # Of Unplanned IncidentsResponses
P13 Unplanned Incident Response Time
P14 # Of Training Classes Conducted
P15 # Unplanned Life Safety Evaluations Requested
PREPARE ENV/ SAFETY& CODE COMPLIANCE
DOCUMENTS
P1 - # POLICIES, PROCEDURES, PLANS, TRAINING
COURSES, CHECKLISTS, MANUALS, SURVEYS,
HANDBOOKS AND PAMPHLETS DEVELOPED,
REVIEWED & UPDATED
KWP1
KWP2
KWP3
KWP5
KWP4P16 # Meetings Held
P17 #work Orders Issued
P18 # Reinspections Completed
P19 Capital Deficiency Report Schedule Milestones
P20 Comprehensive Environmental, SafetyCasulty And Code Compliance Report Report Schedule Milestones
WHO
STEPBPS SCHOOL
BOARDBPS
PO&M OTHER
BPSENVIRONMENTAL &CODE COMPLIANCE
Key PriorityProcess (5): Process Owner:
QUESTION
PREPAREUPDATE
QUESTION
ISSUE
NEED
MONITOR
INSPECT
PERFORM
MANAGED
MONITOR
MANAGE ENVIRONMENTAL,SAFETY & CODE
COMPLIANCE
FACILITIES SERVICES ENVIRONMENTAL, HEALTH, SAFETY AND CODE COMPLIANCE 5/1/09
Q1 - All Schools Custodial Assessment Rating Of 90%
Q2 - 75% School Custodians Certified Level 1 & 50% School Custodians Certified Level 2
Q3 - Regulatory And Code Compliance Inspection Milestones
Q4 - Regulatory And Code Compliance Annual Reports Milestones
J. POWERS
NEED ISMET
Deliverables: D1 - MONTHLY FACILITY AUDIT & INSPECTION REPORTS D2 - COST BENEFIT ANALYSIS REPORTS D3 - MONTHLY FACILITY AND BEHAVIORAL MODIFICATION IMPROVEMENT RECOMMENDATIONS LIST D4 - MONTHLY SENIOR STAFF RESOURCE CONSERVATION BOX SCORE D5 - MONTHLY DISTRICT AND SCHOOL RESOURCE CONSERVATION BOX SCORE
Identify district wide resource conservationinitiatives to reduce facility operation costs related toelectrical, water, and gas usage, trash disposal and facilityefficiencies.
?
?
?
?
IS FUNDINGAVAILABLE?
CAPITALPROJECT?
IS THE RECOMMENDATIONA FACILITY IMPROVEMENT?
IS THE FACILITYRECOMMENDATION
COMPLEX?
YES
YES
YES
NO
NO
NO
PREPARE RESOURCECONSERVATION DOCUMENTS
PERFORM BEHAVIORALMODIFICATION TRAINING
IMPLEMENT NON-COMPLEX FACILITY IMPROVEMENT
MANAGE DISTRICT & SCHOOLRESOURCE CONSERVATION
P1 - # POLICIES, PROCEDURES, PLANS, TRAINING
COURSES, CHECKLISTS, MANUALS, SURVEYS,
HANDBOOKS AND PAMPHLETS DEVELOPED,
REVIEWED & UPDATED
P18 - % SITES USING BREVARD ENERGY
ACTION TEAM ENERGY MANAGEMENT
GUIDELINES AND TIPS FOR PATROL
LEADERS.
P2 - # OF UTILITY CONSUMPTION
REPORTS / BILLS COLLECTED
P3 - # OF MONTHLY FACILITY INSPECTIONS AND QUARTERLY
AUDITS PERFORMED
P4 - # OF MONTHLY INSPECTION REPORTS AND
QUARTERLY AUDIT REPORTS PUBLISHED
P5 - # OF MONTHLY CONSUMPTION DATA ANALYSIS
PERFORMED
P6 - # OF MONTHLY FACILITY INSPECTION AND QUARTERLY
AUDIT DATA ANALYSIS PERFORMED
P7 - # FACILITY RECOMMENDATIONS ISSUED
P8 -# OF BEHAVIORAL MODIFICATION IMPROVEMENTS
ISSUED
P9 - # OF SCHOOL RECEIVING A BEHAVIORAL MODIFICATION
RATING SCORE EQUAL TO OR GREATER THAN 90%
P10 - # NON-COMPLEX FACILITY IMPROVEMENTS
COMPLETED.
P11 - # OF COST BENEFIT ANALYSIS COMPLETED
P12 - # COMPLEX FACILITY PROJECTS ADDED
TO DEFERRED MAINTENANCE LIST
P13 - # OF COMPLEX FACILITY DEFERRED
MAINTENANCE
PROJECTS THAT WERE COMPLETED
P14 - # COMPLEX FACILITY PROJECTS
ADDED TO THE CAPITAL PROJECT LIST
P15 - # OF COMPLEX FACILITY PROJECTS
THAT WERE COMPLETED.
P16 - # OF WORK ORDERS
SUBMITTED
P17 - # FACILITY IMPROVEMENT AND
BEHAVIOR MODIFICATION TRAINING
ANALYSIS AFTER ACTION
REPORTS PUBLISHED.
CREATE COSTBENEFIT
ANALYSIS
ADD TO UNFUNDED RCPROJECT LIST
ADD TO CAPITAL PROJECT LIST
SUBMITWORK ORDER
IDENTIFICATION OF FACILITY& BEHAVIORAL MODIFICATION
IMPROVEMENTS &RECOMMENDATIONS
KWP2
KWP1
MONITOR & ANALYZEFAC IMP PROJECTS
& BM TRAININGRESULTS
KWP6
Note: CBC Includes5-Year Pay Back
Analysis
KWP5
KWP4
KWP3
YES
NO
KWP = Key Work Process
WHO
STEPBPS SCHOOL
BOARD SCHOOLFACILITIES RESOURCE
CONSERVATION
Key PriorityProcess (6): Process Owner:
PREPARE
QUESTION
QUESTION
NEED
IDENTIFYRECOMMEND
PERFORM
IMPLEMENT
MANAGED
MONITORANALYZE
SUBMIT
QUESTION
QUESTION
ADD
ADD
CREATE
MANAGE DISTRICTRESOURCE
CONSERVATION
FACILITIES SERVICES RESOURCE CONSERVATION 5/1/09
Q1 - REDUCE ELECTRICAL USAGE 10% BY END OF FY 08/09
Q2 - REDUCE WATER USAGE BY 10% BY END OF FY 09/10
Q3 - REDUCE GAS / HEATING OIL USAGE BY 10% BY END OF FY 09/10
Q4 - REDUCE THE VOLUME OF TRASH HAULED 10%BY END OF FY 09/10
A. JOHNSON
MANAGE DISTRICT & SCHOOL SECURITY
NEED ISMET
DEVELOP DISTRICT AND SCHOOL SECURITY DOCUMENTATION
P5 - EQUIPMENT REQUIREMENTS MET (% OF FACILITIES)
P13 - # CODES BROADCAST
P14 - # MEETINGS HELD
P11 - # ID BADGES ISSUED
P12 - LEVEL II BACKGROUND CHECK CYCLE TIME (Planned vs. Actual)
P10 - # BACKGROUND CHECKS COMPLETED
P8 - SCHOOLS WITH SRO (%)
P9 - # SECURITY ASSESSMENTS REQUESTED
P2 - # INVESTIGATIONS PERFORMED PER DISTRICT & SCHOOL SITE
P3 - # EXPULSIONS PER MONTH
CONDUCT BACKGROUND SCREENING
MONITOR & COORDINATE DISTRICT &SCHOOL SITE SECURITY
BROADCAST INCIDENT CODES
INTERFACE WITH LAW ENFORCEMENT AGENCIES
P1 - # POLICIES, PROCEDURES, PLANS, TRAINING COURSES,
CHECKLISTS, MANUALS, SURVEYS, HANDBOOKS AND PAMPHLETS
DEVELOPED, REVIEWED & UPDATED
MANAGE SECURITY EQUIPMENT
PERFORM SECURITY INVESTIGATIONS
P4 - # EQUIPMENT REQUIREMENTS DEVELOPED,
REVIEWED & UPDATED
P7 - # TRAINED PERSONNEL PER COURSE
P6 - # TRAINING COURSES CONDUCTED
P15 - # OF Criminal SESIR REPORTS RECEIVED IN WRITING
P16 - SECURITY BEST PRACTICES (OPPOGA) SELF-ASSESSMENT
MILESTONES (Milestones Planned vs. Actual Accomplished)
P17 - # 5 STAR SELF- ASSESSMENT FINDINGS
MONITOR SESIR REPORTS
PERFORM 5 STAR SECURITY SELF-ASSESSMENT
Legend: KWP - Key Work ProcessOPPAGA - Office of Program Policy Analysis and Government Accountability SCIRM - School Critical Incident Response Manual SESIR - School Environmental Safety Incident Report
Safety & Security Deliverables: D1 - School Safety Plan D2 - School Safety Reports D3 - School Critical Incident Response Manual D4 - Employee, Volunteer, and Contractor Level II Background Checks D5 - Employee, Volunteer, and Contractor ID Badges
CONDUCT TRAINING
WHO
STEP
MacroProcess: Process Owner:
BPS SCHOOLBOARD SCHOOL OTHER
DISTRICT & SCHOOL SECURITY
MANAGE
NEED
CONDUCT
CONDUCT
INTERFACE
DEVELOP
PERFORM
MONITOR &COORDINATE
BROADCAST
MONITOR
PERFORM
MANAGED
MANAGE DISTRICT & SCHOOL SECURITY
FACILITIES SERVICES SECURITY 5/1/09
Q1 - COMPLIANCE WITH FEDERAL, STATE, LOCAL AND SCHOOL BOARD REQUIREMENTS
Q2 - PREVENT SCHOOL VIOLENCE ( SESIR INCIDENT RATIO - # CRIMINAL INCIDENTS / STUDENT POPULATION)
Q3 - REDUCE SECURITY RISKS AND LIABILITY(# PLANNED SECURITY TRAINING SESSION / # ACTUAL SECURITY TRAINING SESSIONS)
Q4 - IMPROVE SCHOOL - COMMUNITY RELATIONS ON SCHOOL SECURITY (# SITE OR COMMUNITY VISITS CONDUCTED / # SITE OR COMMUNITY VISITS PLANNED)
A. ALFORD
KWP 1
KWP 2
KWP 3
KWP 4
KWP 5
KWP 6
KWP 7
KWP 8
KWP 9
KWP 10