FACILITIES DESIGN & CONSTRUCTION
SEALED BID NO.: 4516/A4L-435/966211 DATE: 6/22/17
PROJECT: MCH CENTRAL PLANT STEAM LINE REPLACEMENT TIME: 2:00 PM
PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $2,200,000
CONTRACTOR'S NAME LUMP SUMCITY - TIME REC'D BID YES NO BASE BID
Jackson & Blanc
San Diego, CA 1:35pmUniversity Mechanical & Engineering Contractors
El Cajon, CA 1:50pmW.E. O`Neil
San Diego, CA 1:58pmAlternate No. 1 - Provide sound absorptive panels at ceiling and walls in mechanical rooms L-101 and L-104 as indicated on drawing sheet A4.1 and sheet A9.2. See Specifications Section 09841 Acoustical Wall Panels for quality of materials, products and workmanship.Alternate No. 2 - Abandon existing 6 inch HPS pipe in-place. Weld steel plate covers at end of pipes and branch fittings after pipe is abandoned.Alternate No. 3 - Decrease contract time by sixty (60) calendar days. Alternate Contract time will be two hundred fifteen (215) calendar days.
-$23,501 -$90,000$113,03110 $15,000 $3,491,530$1,500 Xx $3,477,000
$5,000
TOTALALTERNATENO. 1
$87,000
$72,120
$2,790,702
$2,869,380
ALTERNATENO. 2
-$13,000
-$23,501
ALTERNATENO. 3
$60,000
$0
PREQUALIFIED DAILY RATE OF COMPENSATION
X 10 MULTIPLIER
$2,651,702 $500 X 10 $5,000x
$2,815,761 $500 X 10 x
MCH CENTRAL PLANT STEAM LINE REPLACEMENT UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO
9.0 LIST OF SUBCONTRACTORS
BIDDING COMPANY'S NAME: 'J'" Ad..5o"" + ~~ c...
Bidder will use Subcontractors for the Work:
Yes L No
Project No.: 4516/ML-435/966211
If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid .
Portion of the Work Activity
(e.g . electrical, mechanical, concrete)
~ Dl)l (;},...WolS
l!le-e..fntll-L
{.J,,,.tY-d c.
{')<)VI'~
l/hl 'I} f(..M·n~ , rri !i1t ~ 7,_?.,..
/j iJ •r /.J.tw-D w .u C.
S'Tun wiwl w .... ~ 1'~/?.f..'.k_ lr\StJ~<.
April 29, 2015 LF/BF/MP-BF
Subcontractor Name of Business Location of Business License No.
(City)
! ltFth~,, ..f S::A..... \) "~" 0 ?S-'67q(.
fV\I~ ~ .... ~1.t'!co '1'1ct1f7,..
;,,~,,,_~, .2. Pow-+-'< 007 8tJll7
/) l~ ---"""''> !'- p.,t,J~ Oo...., 80'1)
f) ,.~~r:>~ (J /) lrJ""" do i f5 o 'I I
F4-rWtJI- ~~b..uo g¥5"'C,~2.
h1.4.~JL r" "" A- "<' 001 Ko<11
j) t.IJ. ~ 1>-.d ~ (J " t--6 A- "( 001 So 'l_-,
tin"'~~~ ~c>r-<-. ~~ tl--hn lq'?o'"'J ,
(Note: Add additional pages if required .)
Bid Form 6
(
MCH CENTRAL PLANT STEAM LINE REPLACEMENT UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No.: 4516/ML-435/966211
10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES
BIDDING COMPANY'S NAME: J A<.tS o.-.. 1-- 7I (A.....c
The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of one-half of f · 1 percent o prime contractor's total bid.
Alternate No.
/ /
I /
April 29, 2015 LF/BF/MP-BF
Subcontractor Portion of the Work Name Location
Activity (City) (e.g. electrical,
mechanical, concrete)
/ /
/ /
_)/ ali ~
'l /
ti/ /
/ /
(Note: Add additional pages if required.)
7
License No.
~
,/ ~
Bid Form
MCH CENTRAL PLANT STEAM LINE REPLACEMENT UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO
9.0 LIST OF SUBCONTRACTORS
Project No. : 4516/ML-435/966211
BIDDING COMPANY'S NAME: University Mechanical & Engineering Contractors, Inc.
Bidder will use Subcontractors for the Work:
Yes~ No
If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid , (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid .
Portion of the Work Activity
(e.g . electrical, mechanical , concrete)
Boiler
Insulation
Controls
General Constructic n
Electrical
April 29, 2015 LF/BF/MP-BF
Subcontractor Name of Business Location of Business License No.
(City)
None shown
Farwest San Diego , CA 845682
Siemens San Diego, CA 758796
Diamond One Poway, CA 366468
Fuller San Diego, CA 494752
(Note: Add additional pages if required .)
Bid Form 6
MCH CENTRAL PLANT STEAM LINE REPLACEMENT UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No.: 4516/ML-435/966211
10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES
BIDDING COMPANY'S NAME: University Mechanical & Engineering Contractors, Inc.
The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of one-half of 1 f . I b"d percent o prime contractors tota I .
Subcontractor Alternate Portion of the Work Name Location
No. Activity (City) (e.g. electrical,
mechanical, concrete)
(Note: Add additional pages if required.)
April 29, 2015 LF/BF/MP-BF 7
License No.
Bid Form
MCH CENTRAL PLANT STEAM LINE REPLACEMENT UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No.: 4516/ML-435/966211
9.0 LIST OF SUBCONTRACTORS
BIDDING COMPANY'S NAME: HEARNE CONSTRUCTION, A Division of W.E. O'Neil
Bidder will use Subcontractors for the Work:
Yes2_ No
If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who wi ll perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid .
Portion of the Work Activity
(e.g. electrical , mechanical, concrete)
Boiler
Testing & Inspection Services
Landscaping
Cast-In-Place Concrete
Structural Steel
Painting
HVAC
Electrical
April 29, 2015 LF/BF/MP-BF
Subcontractor Name of Business Location of Business License No.
(City)
University Mechanical El Cajon 460213
MTGL San Diego 33843
Broyles San Diego 598161
Concrete In-Counters Lemon Grove 539075
Muhlhauser Steel Bloomington 585760
MC Painting Vista 695478
University Mechanical El Cajon 460213
Cacy Electric Santee 780158
(Note: Add additiona l pages if required.)
Bid Form 6
MCH CENTRAL PLANT STEAM LINE REPLACEMENT UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO
Project No.: 4516/ML-435/966211
9.0 LIST OF SUBCONTRACTORS
BIDDING COMPANY'S NAME: HEARNE CONSTRUCTION, A Division of W.E. O'Neil
Bidder will use Subcontractors for the Work:
Yes~ No
If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.
Portion of the Work Activity
(e.g. electrical, mechanical, concrete)
April 29, 2015 LF/BF/MP-BF
Subcontractor Name of Business Location of Business License No.
(City)
(Note: Add additional pages if required.)
Bid Form 6
MCH CENTRAL PLANT STEAM LINE REPLACEMENT UCSD MEDICAL CENTER - HILLCREST
Project No.: 4516/A4L-435/966211
UNIVERSITY OF CALIFORNIA, SAN DIEGO
10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO AL TERNA TES
BIDDING COMPANY'S NAME: HEARNE CONSTRUCTION, A Division ofW.E. O'Neil
The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of one-half of 1 f I b"d percent o prime contractors tota I .
Subcontractor Alternate Portion of the Work Name Location
No. Activity (City) (e .g. electrical,
mechanical, concrete)
(Note: Add additional pages if required .)
April 29, 2015 LF/BF/MP-BF 7
License No.
Bid Form