FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51...

12
FACILITIES DESIGN & CONSTRUCTION SEALED BID NO.: DATE: 5/23/16 PROJECT: 4917/A4L-400 TIME: 2:00 P.M. PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $3,000,000 CONTRACTOR'S NAME LUMP SUM CITY - TIME REC'D BID YES NO BASE BID TOTAL Dempsey Construction, Inc. $8,361 San Diego - 1:51 p.m. Align Builders, Inc. $11,755 Carlsbad - 1:55 p.m. Hearne Construction $14,500 San Diego - 1:57 p.m. Barnhart Reese $6,985 San Diego - 1:58 p.m. ALTERNATE NO. 1 Alternate No. 1: Furnish and install all labor and materials for Signage. Signage requirements are described in Specification Section 10431 and the following Drawing Sheets: A805a, A805b, A805c, and A901. $2,560,947 $2,870,555 $1 X 10 $10 $2,882,320 $2,552,576 $1 X 10 $10 $10 $2,646,931 X $2,805,944 $2,639,936 $1 X $2,791,434 $1 X 10 $10 ROBINSON BUILDING COMPLEX SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION X X X 10 PREQUALIFIED DAILY RATE OF COMPENSATION X 10 MULTIPLIER

Transcript of FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51...

Page 1: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

FACILITIES DESIGN & CONSTRUCTION

SEALED BID NO.: DATE: 5/23/16

PROJECT: 4917/A4L-400 TIME: 2:00 P.M.

PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $3,000,000

CONTRACTOR'S NAME LUMP SUMCITY - TIME REC'D BID YES NO BASE BID TOTAL

Dempsey Construction, Inc. $8,361

San Diego - 1:51 p.m.Align Builders, Inc. $11,755

Carlsbad - 1:55 p.m.Hearne Construction $14,500

San Diego - 1:57 p.m.Barnhart Reese $6,985

San Diego - 1:58 p.m.

ALTERNATE NO. 1

Alternate No. 1: Furnish and install all labor and materials for Signage. Signage requirements are described in Specification Section 10431 and the following Drawing Sheets: A805a, A805b, A805c, and A901.

$2,560,947

$2,870,555 $1 X 10 $10 $2,882,320

$2,552,576 $1 X 10 $10

$10 $2,646,931

X

$2,805,944

$2,639,936 $1 X

$2,791,434 $1 X 10 $10

ROBINSON BUILDING COMPLEX SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION

X

X

X 10

PREQUALIFIED DAILY RATE OF COMPENSATIONX 10 MULTIPLIER

Page 2: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

ROBINSON BUILDING COMPLEX SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME: Dempsey Construction, Inc.

Bidder will use Subcontractors for the Work:

Yes~ No

Project No. : 4917/ML-400/962470

If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical, concrete)

Final Cleaning

Demolition

Cast In Place Concrete

Finish Carpentry

Insulation

Acoustical Wall Panels

Doors, Frames & Hrdwr

Glass Wall Cladding

Steel Studs Drywall

Tile

Acoustical Ceilings & Wood

-· -Painting

Signage

Fire Extinguishers

April 29, 2015 LF/BF/MP-BF

Subcontractor Name of Business Location of Business

(City)

Construction Cleaning Bonita

Clancy Contracting San Diego

Certified Concrete Escondido

Finishing Touch Millwork Carlsbad

AL CAL Escondido

GP Acoustics Carlsbad

Doortek San Diego

Double Play San Marcos

Heritage Construction San Diego

Commerical Furnishings San Diego

CousticGlo Simi Valley

An-_., -"~ ... ~ ··-

General Coatings San Diego

Stanford Sign & Awning Chula Vista

Anita Fire Hose Company Lemon Grove

(Note: Add additional pages if required.)

5

License No.

948781

932968

790075

848525

815286

605515

950524

941941

943757

600264

585006

-- - ====------ - -

527547

863570

CA Fire: E2321

Bid Form Revised 5/11/16, Addendum 2

Page 3: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

ROBINSON BUILDING COMPLEX Project No.: 4917/ML-400/962470 SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME: Dempsey Construction, Inc.

Bidder will use Subcontractors for the Work:

Yes~ No

If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical, concrete)

Toilet Partitions & Access.

Window Treatments

Fire Sprinklers

Plumbing

HVAC

Electrical

Fire Alarm

Telecom

Security & CCTV

\==-loor i r- "I

April 29, 2015 LF/BF/MP-BF

-.../

Subcontractor Name of Business Location of Business

(City)

Caldwell Specialty Poway

Contract Door Decor, Inc Thousand Palms

Simplex Grinnell San Diego

Helix Mechanical El Cajon

Alpha Mechanical San Diego

Ace Electric San Diego

Tyco San Diego

Communication Wiring Spec. San Diego

Tyco San Diego

~(u~n~~ 1 ()"" Q,. .....

I I

(Note : Add additional pages if required.)

5

License No.

981923

646748

986047

834736

847444

835109

986047

623901

986047

7'i 0 .s "\Z_

Bid Form Revised 5/11/16, Addendum 2

Page 4: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

ROBINSON BUILDING COMPLEX Project No.: 4917/ML-400/962470 SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

1 a.a LIST OF CHANGES IN SUBCONTRACTORS DUE TO AL TERNA TES

BIDDING COMPANY'S NAME: Dempsey Construction, Inc .

The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of one-half of 1 t f . t t ' t t I b'd oercen o onme con rac ors o a I .

Alternate No.

1

April 29, 2015 LF/BF/MP-BF

Subcontractor Portion of the Work Name Location

Activity (City) (e.g. electrical,

mechanical, concrete)

Sign age Stanford Sign & Awning Chula Vista

(Note: Add additional rows if required.)

6

License No.

863570

Bid Form Revised 5/11 /16, Addendum 2

Page 5: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

ROBINSON BUILDING COMPLEX Project No.: 4917/ML-400/962470 SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME: Barnhart-Reese Construction, Inc.

Bidder will use Subcontractors for the Work:

Yes _.2$_ No

If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, In an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical, concrete)

Demolition

fi11a I (,I ~n

Concrete Polishina

<@ - - - - -II.JI Ir"-- ....

~ G!:RemeRtel Metal

~ )~athing

April 29, 2015 LF/BF/MP-BF

Subcontractor Name of Business Location of Business

(City)

r.lancuv l ~Vl 't)jt!!An i!"'iL 0 .

f:D115iv\;;J. n1.4niYlll ~. Pxt-iira, /'A I

Ct.tAn fofrt'! CllrP. Oiai 1-:A I v ,

(Note: Add additional pages if required .)

5

License No.

95'2'7tp.P

t:f 4<:/7~J

371GIL/)

Bid Fonn Revised 5/1 1/16, Addendum 2

Page 6: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

ROBINSON BUILDING COMPLEX SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OE SUBCONTRACTORS

BIDDING COMPANY'S NAME: Barnhart-Reese Construction, Inc.

Bidder will use Subcontractors for the Work:

Yes _lL No

Project No.: 4917/ML-400/962470

If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as Is defined by the prime contractor in its bid.

Subcontractor Portion of the Work Name of Business Location of Business License No.

Activity (City) (e.g. electrical,

mechanical, concrete) SteReief'd Steel SeeFS

~ -- -I - -

nofljf!_ -e....--·.or Hv,(i,t~ , . ,

. d?~"-'"1i V--., I •

yp um Boar~ ~""'\ ...

Tiling

@ . ,,;::: - - -- -. -.

6 ,n ~ •• _JI ____ ,_

Aprll 29, 2015 LF/BF/MP-BF

E:li k.i hnno_ W i IV 1'. 11r I,,., i r .1>r

Uw-\~~J lDt.L·f.. ,~n Diean I" .Jr a <.) ,

DFS rltiaV11tzr ~n Dt~.::JO r~

J J

(Note: Add additional pages if required.)

5

t:t2-?->2bY

'll./67?7

"f1 °I DLflLJ

Bid Fonn Revised 5/11/16, Addendum 2

Page 7: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

ROBINSON BUILDING COMPLEX Project No.: 4917/ML-400/962470 SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME: Barnhart-Reese Construction, Inc.

Bidder will use Subcontractors for the Work:

Yes _L No

If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical, concrete

@ Acoustical V\tall ~;nels

~ Rsii&F 5hades

April 29, 2015 LF/BF/MP-BF

Name of Business Subcontractor

Location of Business (City)

(Note: Add additional pages if required.)

5

License No.

6Si> OD(p

Bid Form Revised 5/11/16, Addendum 2

Page 8: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

ROBINSON BUILDING COMPLEX Project No.: 4917/A4L-400/962470 SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME: Barnhart-Reese Construction, Inc.

Bidder will use Subcontractors for the Work:

Yes _K_ No

If "yes,n provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical, concrete

Electrical

HVAC

Apnl 29, 2015 LF/BF/MP-BF

Name of Business Subcontractor

Location of Business (City)

(Note: Add additional pages if required.)

5

License No.

'ia;,10

7

Bid Form Revised 5/11/16, Addendum 2

Page 9: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

ROBINSON BUILDING COMPLEX SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

Project No.: 4917/AAL-400/962470

10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES

BIDDING COMPANY'S NAME: Barnhart-Reese Construction, Inc.

The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of one-half of 1 f ' I percent o prime contractors tota bid.

Subcontractor Alternate Portion of the Work Name Location

No. Activity (City) (e.g. electrical,

mechanical, concrete)

(Note: Add additional rows if required.)

April 29, 2015 LF/BF/MP-BF 6

License No.

Bid Form Revised 5/11/16, Addendum 2

Page 10: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

ROBINSON BUILDING COMPLEX Project No.: 4917/ML-400/962470 SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME: HEARNE CONSTRUCTION, A DIVISION OF W.E. O'NEIL

Bidder will use Subcontractors for the Work:

Yes~ No

If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid , (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g.~~~ ~ mechanical, concrete)

CONCRETE POLISHING

-____ fr

r.:1 AC:C:/r.: I A71Nt::

DRYWALL

TILE

0<11tol 1 4' 'o V\

ACOUSTICAL CEILINGS

FLOOR COVERINGS

PAINTING

TOILET PART/ACCESS

~ {" "°) einct ~~'lt(o·

April 29, 2015 LF/BF/MP-BF

Subcontractor Name of Business Location of Business

Gla11ey Cgi:it cact ia~ Secdces ~ (City)

Sai:i Diega CA J(?

Surfacing Solutions Inc Temecula

El1'te: ~ U:::J~ i.cii'\e ... J"f "4- .) ~ 6f 9HF IA'- 4/i?... ....§eMae.. .....12

~""'~' C>-\ ~ £.-1 eC'lJ o(L'\. . -· -re - .. . .(:. ·-

Silva General Construction Inc Poway

Sllverado Tiie & Stone Inc Siverado

C\ct1-1cy l',;>i.dr.:icf.~ St·vi t>1 t·~c;; cA -Coustic-Glo Simi Valley

Prospectra Contract Flooring Poway

General Coatings Corporation San Diego

Caldwell Specialties Inc. Poway

A;e__,,ft>S Le.. ~1t6ye\\.

(Note: Add additional pages if required .)

5

License No.

. 9ii~e'11 J~

555537

'1:t:: .>:t:b>~ ...\~ -~:jf

7 7qlf~ .~ -.. (' --681508

965952

c1 ~z'r<og S85006

740392

527547

981923

10t.v71t--

Bid Form Revised 5/11 /16, Addendum 2

Page 11: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

ROBINSON BUILDING COMPLEX Project No.: 4917/ML-400/962470 SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME: HEARNE CONSTRUCTION, A DIVISION OF W.E. O'NEIL

Bidder will use Subcontractors for the Work:

Yes L_ No

If "yes," provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity ~

( 'MNd£1«.Gi~illllS mechanical, concrete)

FIRE PROTECTION

PLUMBING

HVAC

-·--- -....... :NII il l

YUl\.C l\l~U LJl\ 11\

April 29, 2015 LF/BF/MP-BF

Name of Business

.ff Cwstooa h;teriors by 1igzel IRc.

Titan Fire Protection, Inc.

Helix Mechanical, Inc.

Luber Mechanical Corporation

11.r .. c1-.... : ~ lnr

.. -

Specialists Inc

Cu~ J.M:ft'r,•Y"~ b., '11•1.rc1 f.",I ~c

.J

Subcontractor Location of Business

(City)

~ fr

Vista

El Cajon

Poway

~ - . -- - -.. -:.an u1ego

(Note: Add additional pages if required.)

5

License No.

989280

834736

910942

---- 1-.

Bid Form Revised 5/11 /16, Addendum 2

Page 12: FACILITIES DESIGN & CONSTRUCTIONrmp-public.ucsd.edu/fdc/Bid Results/4917 Bid... · San Diego - 1:51 p.m. Align Builders, Inc. $11,755: Carlsbad - 1:55 p.m. Hearne Construction $14,500

ROBINSON BUILDING COMPLEX Project No.: 4917/ML-400/9624 70 SCHOOL OF GLOBAL POLICY & STRATEGY (GPS) RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES

BIDDING COMPANY'S NAME: HEARNE CONSTRUCTION, A DIVISION OF W.E. O'NEIL

The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of one-half of 1 f . I b'd percent o prime contractors tota I .

Subcontractor Alternate Portion of the Work Name Location License No.

No. Activity (City) (e.g. electrical,

mechanical, concrete)

\ S1'~•ta~ \J,~,i....k)ie. (?r::~hh: 4 ck-ffsw -,.~,e'\ l'-1~5C:£ - "JJ

April 29, 2015 LF/BF/MP-BF

(Note: Add additional rows if required .)

6 Bid Form

Revised 5/11/16, Addendum 2