FACET UpdatePage 2

The FACET Project

Facilities for Accelerator science and Experimental Test beams.

FACET

ESA

ESB

Beam at FACET

FACET UpdatePage 3

At IP

• FACET uses the first two-thirds of the linac• Energy = 23 GeV• 3.2 nC• Sigma x = 14 um• Sigma y = 6 um• Sigma z = 14 um minimum (20 um typical)• Bunch length can be increased up to a factor of 3• Electron beam (2011)

The Facility

FACET UpdatePage 4

Stairway in Sector 19

User Trailer Experiments Dump

Towards end of linacBeam Direction

Plan – THz and IP Tables

FACET UpdatePage 5

• Optical Tables for experimenters to mount hardware

• Optics set up for each experiment• Small beam spots in IP region

THz Table (Experimental Area 1)

IP Table (Experimental Area 2)

Beam Direction

THz and IP Optical Tables

FACET UpdatePage 6

THz Table (looking east towards dump)

IP Table (looking east towards dump)

• Photos taken Feb 11 (Mark Hogan)

• Magnets installed since then.

March…

• Some magnets installed in sector 20 – photo taken March 16th :

FACET UpdatePage 7

THz Table (looking east towards dump)

IP Table

April…

• All magnets in sector 20 – photo taken last Tuesday :

FACET UpdatePage 8

THz Table (looking east towards dump)

IP Table

Close-up of THz

• Beamline almost complete

FACET UpdatePage 9

Initial THz diagnostics with OTR foils (1um titanium)

Cubes

Beam here large in x (>1mm)

Future location of Smith-Purcell experiment.

Close-up of IP Table

• Could be complete end of next week

FACET UpdatePage 10

IP experiments located here (second table to come).

For tuning, vacuum drifts, wire scanner and OTR screens.

SAREC Final Report

• SLAC Accelerator Research Experimental program Committee• Convened in January to review 8 proposals• 6 proposals accepted as Experimental Programs• 1 proposal incorporated into FACET diagnostics (ODR)• 1 letter of intent – requested to present two proposals in the next

round.• 1 expression of interest – asked to make preliminary

measurements this summer (THz).

• Second call for proposals this fall for the spring 2012 and 2013 runs

• SAREC review in the early winter of 2012.

FACET UpdatePage 11

Plasma Wakefield Acceleration

FACET UpdatePage 12

• Continuation of very successful FFTB experiments

• Heat-pipe oven to be installed this July• Lithium metal vaporized at 800ºC• Length of plasma controllable by controlling

heaters and pressure of helium buffer gas• Phase One: Begin with single electron

bunch in field ionized lithium plasma.• Phase Two: Single bunch in field ionized

cesium plasma.• Phase Three: Use Notch Collimator.• Phase Four: Two electron bunches (drive

and witness) in field ionized cesium plasma.• After first year, pre-ionized plasma,

positrons, positrons and electrons.

Smith Purcell

FACET UpdatePage 13

• Bunch Time Profile measurements with Coherent Smith-Purcell Radiation

• Moderate band-width terahertz

• Beam passes by grating which has a dispersive effect

• Continuation of experiment at ESA

• Not sensitive to beam spot size (will be situated upstream of IP).

• Non-destructive (parasitic running).

Wakefield Acceleration in Dielectric Structures

FACET UpdatePage 14

• GV/m class DWA for use in linear colliders and future light sources.

• Previous work at FFTB/SLAC, UCLA, BNL.• High gradient regime at FACET.• FACET beam sent through prototype

dielectric wakefield acceleration structures.• Parametric breakdown studies and lifetime

effects.• Vary structures (dimensions, materials etc). • Use drive and witness bunches to observe

acceleration.• Use coherent Cerenkov radiation• Next year, use protons.

Ultrafast Magnetic Switching

• Continuation of FFTB work.• Change in magnetization of a sample on ultrafast

timescales• Change pulse-lengths with constant Q - do longer

pulse-lengths have more energy deposition?• Expose sample to electron bunch• Then image with spin-sensitive scanning electron

microscope.• Different patterns on same film indicate different

physical processes.• Chaos cannot be explained• Need to rule out experimental artefacts.

FACET UpdatePage 15

2.3ps

70fs

Additional Experiments• Metallic Periodic Structures (Accepted Proposal)

– Short-pulse, high fields to study breakdown physics.• High gradient dielectric wakefield measurements (Accepted Proposal)

– dielectric based collimating systems• CLIC Studies (letter of intent)

– Dispersion-free steering – Accelerating structure Wakefield Studies– Collimator Wakefield Studies

• THz extraction (expression of interest)– Extract radiation to an experimental area

FACET UpdatePage 16

30cm High Power test structure (CLIC Studies)

Suggested extraction of THz

Short Metallic Accelerating Structure

Schedule 2011

• Construction Phase 1 will be complete in May.• Beam Commissioning starts June 13th

• Experiments are installed July 5th- July 14th • Experimental program in August• Users meeting August 29th /30th • Next round of proposals coming up (fall)

• Construction Phase 2… positron arm of the bunch compressor in S10• Experimental PPS zone

FACET UpdatePage 17

Schedule 2012 and Beyond

• FACET will run for 4 months each year for the next five years.• In 2012 the 4 months are likely to be February - June.• Electron beams and positron beams will be available to the

experimenters.

• 2013? Phase Three: positron arm of the bunch compressor in S20 (aka the sailboat chicane) for simultaneous electron and positron beams

FACET UpdatePage 18

Summary

• FACET is currently near the end of its primary construction phase.• First Beam June 13th

• Approximately 3 weeks of beam commissioning, some User assistance.• User aided commissioning / experiment commissioning program,

August.• New round of proposals for 2012 due (provisionally) October.• 4 months of FACET running in 2012 and every year until 2017.

FACET UpdatePage 19