EXTERNAL FINISHES SCHEDULE - projectcorp.com.auprojectcorp.com.au/wordpress/projectfiles/Narellan...

1
Issue Amendment Date Drawn Chk'd C 1. DO NOT SCALE FROM DRAWINGS. USE WRITTEN DIMENSIONS ONLY. 2. BUILDER TO CHECK & VERIFY ALL DIMENSIONS & LEVELS PRIOR TO COMMENCEMENT OF WORK. 3. IT IS THE OWNERS RESPONSIBILITY TO ENSURE THAT THE ENGINEER HAS INVESTIGATED SUBSOIL CONDITIONS & DESIGNED ALL STRUCTURAL ELEMENTS TO SUIT. 4. THE DESIGN & DETAILS CONTAINED ON THIS DRAWING IS SUPPLIED IN CONFIDENCE & IS NOT TO BE USED FOR ANY OTHER PURPOSE, EXCEPT THAT AUTHORISED BY DEANGELIS TAYLOR AND ASSOCIATES Drawing No. A401 Amend't A No. of sheets Job No. 16015 Drawn: MP.MS CC Scale: As shown @ B1 Project: Dwg Name: Address: Nominated Architects CAD File: #File Path Project North: NSW Architects Registration Board No. Daniel Donai 9068, Glorio DeAngelis 3808, Steve Taylor 7414 COPYRIGHT 2016 - DE ANGELIS TAYLOR + ASSOCIATES PTY LTD AMENITIES BUILDING LOT 100 DP.1107591, LOT 8 DP.1132349, LOT 1 DP.829852 NARELLAN SPORTS HUB , NARELLAN , NSW , 2567 SECTIONS JUL 16 Date: Client: de angelis taylor + associates 88 bathurst street liverpool nsw 2170 australia po box 68 liverpool bc nsw 1871 t: 61 2 9601 1011 f: 61 2 9821 2213 w: www.dta.net.au e: [email protected] architects A TENDER ISSUE 27-06-16 CC,MP,MS DD 4 5 7 2 1 6 3 4 A602 6 A603 70.193 3,800 2,743 307 279 471 1,170 BASEMENT LEVEL - RL 68.040 GROUND FLOOR LEVEL - RL 71.840 CEILING LEVEL - RL 74.583 U/S OF RAFTER - RL 74.890 U/S OF RAFTER ON GRID 2 - RL 75.640 RIDGE LEVEL - RL 76.810 U/S OF RAFTER ON GRID 2 - 75.640 RIDGE LEVEL - 76.487 847 TOP OF BEAM ON GRID 4 - RL 75.169 Gutter and downpipe to Hyd. eng's detail Galvanised steel sliding gate. Paint finish Stainless steel wall projection Concrete slab and footings to struct. eng's detail Skylight to spec. Metal roof sheeting on steel structure Finished ground level Balustrade and handrail to detail Capping to detail Handrail to detail Metal wall cladding to finishes schedule Galvanised steel column & concrete base to struct. eng's detail Stainless steel wall projection D02 RS4 RS8 MS FB FB MS CR2 CR1 FHR Metal soffit lining, install to manufactures details. 7 5 4 2 1 6 3 1 A602 2 A602 1 A603 5 A603 3,800 2,743 307 279 471 BASEMENT LEVEL - RL 68.040 GROUND FLOOR LEVEL - RL 71.840 CEILING LEVEL - RL 74.583 U/S OF RAFTER - RL 74.890 U/S OF RAFTER ON GRID 2 - RL 75.640 TOP OF BEAM ON GRID 4 - RL 75.169 5.00° 2.50° Galvanised steel column & concrete base to struct. eng's detail Existing ground level shown dotted Concrete slab and footings to struct. eng's detail Skylight to spec. Metal roof sheeting on steel structure Finished ground level Suspended concrete slab to struct. eng's detail Balustrade and handrail to detail Capping to detail Gutter and downpipe to Hyd. eng's detail Conc. block retaining wall to struct. eng's detail Suspended plasterboard ceiling, paint finish Atlantis drainage cell & pipe drain Atlantis drainage cell & pipe drain D10 W08 D32 NETBALL COMPETITION CONTROL NETBALL STORE HALLWAY NETBALL ADMINISTRATION ATHLETICS MEETING ROOM Compacted fill to structural eng's detail WET WALL CHAMBER WET WALL CHAMBER Metal soffit lining, install to manufactures details. 7 5 4 2 1 6 3 2 A601 3 A601 3,800 2,743 307 279 1,641 BASEMENT LEVEL - RL 68.040 GROUND FLOOR LEVEL - RL 71.840 CEILING LEVEL - RL 74.583 U/S OF RAFTER - RL 74.890 RIDGE LEVEL - RL 76.810 TOP OF BEAM ON GRID 4 - RL 75.169 5.00° Galvanised steel column & concrete base to struct. eng's detail Existing ground level shown dotted Concrete slab and footings to struct. eng's detail Metal roof sheeting on steel structure Finished ground level Skylight to spec. Balustrade to detail Conc. block wall to struct. eng's detail Gutter and downpipe to Hyd. eng's detail Conc. block wall to struct. eng's detail Suspended conc. slab to struct. eng's detail Conc. beam to struct. eng's detail Raked plasterboard ceiling, paint finish Galv. steel gate powdercoat finish Atlantis drainage cell & pipe drain plasterboard lined bulkhead plasterboard lined bulkhead D29 D06 NETBALL CLUB ROOM ATHLETIC STORE WET WALL CHAMBER Compacted fill to structural eng's detail CDB CDB CB 4 5 7 1 2 3 6 3,800 2,743 307 750 1,170 BASEMENT LEVEL - RL 68.040 GROUND FLOOR LEVEL - RL 71.840 CEILING LEVEL - RL 74.583 U/S OF RAFTER - RL 74.890 U/S OF RAFTER ON GRID 2 - RL 75.640 RIDGE LEVEL - RL 76.810 5.00° 2.50° Galvanised steel column & concrete base to struct. eng's detail Concrete slab and footings to struct. eng's detail Metal roof sheeting on steel structure ML2 Building behind Finished ground level Balustrade to detail Skylight to spec. Gutter and downpipe to Hyd. eng's detail W08 D06 CR3 CR3 CR4 CR2 FHR Metal soffit lining, install to manufactures details. Capping to detail Indicative sign shown, toilet signage to be as specified 7 5 4 2 1 6 3 10 A604 7 A603 3,800 2,743 307 279 1,641 BASEMENT LEVEL - RL 68.040 GROUND FLOOR LEVEL - RL 71.840 CEILING LEVEL - RL 74.583 U/S OF RAFTER - RL 74.890 RIDGE LEVEL - RL 76.810 TOP OF BEAM ON GRID 4 - RL 75.169 5.00° Galvanised steel column & concrete base to struct. eng's detail Concrete slab and footings to struct. eng's detail Skylight to spec. Metal roof sheeting on steel structure Steel structure Metal wall cladding to finishes schedule Wash trough to detail Gutter and downpipe to Hyd. eng's detail Finished ground level GB CR3 CR3 FC FB FB CT CT CR1 Metal soffit lining, install to manufactures details. Capping to detail Indicative sign shown, toilet signage to be as specified 7 5 4 2 1 6 3 1 A601 3,800 2,743 307 279 1,641 BASEMENT LEVEL - RL 68.040 GROUND FLOOR LEVEL - RL 71.840 CEILING LEVEL - RL 74.583 U/S OF RAFTER - RL 74.890 RIDGE LEVEL - RL 76.810 TOP OF BEAM ON GRID 4 - RL 75.169 5.00° Galvanised steel column & concrete base to struct. eng's detail Concrete slab and footings to struct. eng's detail Skylight to spec. Metal roof sheeting on steel structure Galvanized steel column Finished ground level ML2 Gutters and downpipes to hyd. eng's detail MALE TOILETS FEMALE TOILETS EDB Metal soffit lining, install to manufactures details. Capping to detail LEGEND ABC ABRASIVE BLASTED CONCRETE B-1 WALL HUNG BASIN B-2 WALL HUNG BASIN - DISABLE COMPLIANT BFC BROOM FINISHED CONCRETE BCS BABY CHANGE STATION CAP CEILING ACCESS PANEL CH CLOTHES HOOK CR1 CEMENT RENDERED FINISH COLOUR 1 CR2 CEMENT RENDERED FINISH COLOUR 2 CR3 CEMENT RENDERED FINISH COLOUR 3 CR4 CEMENT RENDERED FINISH COLOUR 4 CS CLEANERS SHELF CT CERAMIC TILES CT-1 CERAMIC TILES COLOUR 1 CT-2 CERAMIC TILES COLOUR 2 CT-3 CERAMIC TILES COLOUR 3 CT-4 CERAMIC TILES COLOUR 4 CT-5 CERAMIC TILES COLOUR 5 CT-6 CERAMIC TILES COLOUR 6 C/W COMPLETE WITH DP DOWNPIPE - PFC DPS DOWNPIPE & SPREADER - COLORBOND. EAC EXPOSED AGGREGATE CONCRETE EDB ELECT. DISTRIBUTION BOARD, REFER TO ELECT. DOCUMENTS F FRIDGE BY OTHERS FG FIXED GLASS FHR FIRE HOSE REEL REFER TO HYDRAULUC ENGINEERS DETAILS FW FLOOR WASTE GD GRATED DRAIN GPO-S SINGLE GENERAL PURPOSE OUTLET GPO-D DOUBLE GENERAL PURPOSE OUTLET GR GRAB RAIL HC HONED CONCRETE HD HAND DRYER HWU HOT WATER UNIT HYD HYDRANT REFER TO HYDRAULUC ENGINEERS DETAILS LF LAMINATED BENCH TOP & CUPBOARDS M1 MIRROR M2 MIRROR - DISABLE COMPLIANT MBS MOP & BROOM SHELF ML1 METAL LOUVRES TYPE 1 ML2 METAL LOUVRES TYPE 2 MW MICROWAVE OVEN NS-CT NON-SLIP CERAMIC TILE PB PLASTERBOARD LINING PTD PAPER TOWEL DISPENSER SCR SHOWER CURTAIN RAIL SC COLUMN TO STRUCTURAL ENGINEERS DETAILS SD SOAP DISPENSER SH WALL SHELF SK-1 KITCHENETTE SINK SK-2 CLEANER SINK SK-3 CANTEEN SINK SMR SHEET METAL ROOF STF STEEL TROWEL FINISHED CONCRETE TGSI TACTILE INDICATOR TP TOILET PARTITIONS TPH TOILET PAPER HOLDER TS-1 TAP SET - BBQ, CANTEEN, BABY CHANGE TS-2 TAP SET - DISABLE COMPLIANT TS-3 TAP SET - WASHTROUGH,PARENT/CHILD TS-4 TAP SET - CLEANERS TS-5 TAP SET - CANTEEN/BBQ SINK TS-6 TAP SET - SHOWER DISABLES TS-7 TAP SET - SHOWER FEMALE V VINYL VTY VANITY UNIT WC-1 TOILET PAN / SUITE WC-2 TOILET PAN / SUIT DISABLE COMPLIANT WC-3 CHILD TOILET PAN / SUITE WT WASH TROUGH WU-1 WALL HUNG URINAL AL1 Aluminium framed glazed windows & doors - powdercoat finish AL2 Aluminium framed solid core doors BAL Galvanised steel balustrade CB Concrete block wall CDB Concrete designer block wall CR1 Cement render - paint finish - colour 1 CR2 Cement render - paint finish - colour 2 CR3 Cement render - paint finish - colour 3 CR4 Cement render - paint finish - colour 4 DP PVC down pipe - paint finish FB Face brick GB Glazed brick FC Fibre cement, set joints, paint finish HR Handrail - stainless steel ML1 Metal louvres - powdercoat finish ML2 Metal louvres - powdercoat finish MS Metal wall cladding RS Roller shutter SC Steel column - galvanised finish SG Galvanised steel silding gate - powdercoat finish SL Metal soffit lining SM Exposed structural members - galvanised finish with timber infill SMR Sheet metal roof WP Wall projection - stainless steel EXTERNAL FINISHES SCHEDULE 6 SECTION 6 1:100 5 SECTION 5 1:100 4 SECTION 4 1:100 3 SECTION 3 1:100 2 SECTION 2 1:100 1 SECTION 1 1:100 B B TENDER ISSUE 05-07-16 MP DD C C 13-07-16 CC,MP DD TENDER ISSUE

Transcript of EXTERNAL FINISHES SCHEDULE - projectcorp.com.auprojectcorp.com.au/wordpress/projectfiles/Narellan...

Page 1: EXTERNAL FINISHES SCHEDULE - projectcorp.com.auprojectcorp.com.au/wordpress/projectfiles/Narellan Sports Hub Ame… · finishes schedule Galvanised steel column & concrete base to

Issue Amendment Date Drawn Chk'd

C

1. DO NOT SCALE FROM DRAWINGS. USE WRITTEN DIMENSIONS ONLY.2. BUILDER TO CHECK & VERIFY ALL DIMENSIONS & LEVELS PRIOR TO COMMENCEMENT OF WORK.3. IT IS THE OWNERS RESPONSIBILITY TO ENSURE THAT THE ENGINEER HAS INVESTIGATED SUBSOIL CONDITIONS & DESIGNED ALL STRUCTURAL ELEMENTS TO SUIT.4. THE DESIGN & DETAILS CONTAINED ON THIS DRAWING IS SUPPLIED IN CONFIDENCE & IS NOT TO BE USED FOR ANY OTHER PURPOSE, EXCEPT THAT AUTHORISED BY DEANGELIS TAYLOR AND ASSOCIATES

Drawing No.

A401Amend't

ANo. of sheets

Job No.

16015Drawn:MP.MS

CC

Scale:

As shown @ B1

Project:

Dwg Name:

Address:

Nominated ArchitectsCAD File: #File Path

Project North:

NSW Architects Registration Board No.Daniel Donai 9068, Glorio DeAngelis 3808, Steve Taylor 7414COPYRIGHT 2016 - DE ANGELIS TAYLOR + ASSOCIATES PTY LTD

AMENITIES BUILDINGLOT 100 DP.1107591, LOT 8 DP.1132349, LOT 1 DP.829852NARELLAN SPORTS HUB , NARELLAN , NSW , 2567SECTIONS

JUL 16

Date:

Client:de angelis taylor + associates88 bathurst street liverpool nsw 2170 australia

po box 68 l i verpool bc nsw 1 8 7 1

t: 6 1 2 9 6 0 1 1 0 1 1 f : 6 1 2 9 8 2 1 2 2 1 3

w: www.dta.net.au e: [email protected]

architects

A TENDER ISSUE 27-06-16 CC,MP,MS DD

457 2 16 3

4A602

6A603

70.193

3,80

02,

743

307

279

471

1,17

0

BASEMENT LEVEL - RL 68.040

GROUND FLOOR LEVEL - RL 71.840

CEILING LEVEL - RL 74.583

U/S OF RAFTER - RL 74.890

U/S OF RAFTER ON GRID 2 - RL 75.640

RIDGE LEVEL - RL 76.810

U/S OF RAFTER ON GRID 2 - 75.640

RIDGE LEVEL - 76.487

847

TOP OF BEAM ON GRID 4 - RL 75.169

Gutter anddownpipe to Hyd.

eng's detail

Galvanised steel slidinggate. Paint finish

Stainless steelwall projection

Concrete slab andfootings to struct.

eng's detail

Skylight to spec.

Metal roofsheeting on steelstructure

Finishedground level

Balustradeand handrailto detail

Capping to detail

Handrail todetail

Metal wallcladding to

finishes schedule

Galvanised steel column &concrete base to struct. eng's detail

Stainless steelwall projection

D02

RS4 RS8

MS

FBFB

MS

CR2CR1

FHR

Metal soffit lining, install tomanufactures details.

7 5 4 2 16 3

1A602

2A602

1A6035

A603

3,80

02,

743

307

279

471

BASEMENT LEVEL - RL 68.040

GROUND FLOOR LEVEL - RL 71.840

CEILING LEVEL - RL 74.583

U/S OF RAFTER - RL 74.890

U/S OF RAFTER ON GRID 2 - RL 75.640

TOP OF BEAM ON GRID 4 - RL 75.169

5.00°

2.50°

Galvanised steel column &concrete base to struct. eng's

detail

Existing groundlevel showndotted

Concrete slaband footings tostruct. eng'sdetail

Skylight to spec.

Metal roofsheeting on steelstructure

Finishedgroundlevel

Suspendedconcrete slab tostruct. eng'sdetail

Balustradeandhandrail todetail

Capping to detail

Gutter anddownpipe to Hyd.eng's detail

Conc. block retainingwall to struct. eng's

detail

Suspendedplasterboardceiling, paintfinish

Atlantis drainagecell & pipe drain

Atlantis drainagecell & pipe drain

D10 W08

D32

NETBALLCOMPETITION

CONTROL

NETBALL STORE

HALLWAY NETBALLADMINISTRATION ATHLETICS

MEETING ROOM

Compacted fill tostructural eng's detail

WET

WA

LLC

HA

MB

ER

WET

WA

LLC

HA

MB

ER

Metal soffit lining, install tomanufactures details.

7 5 4 2 16 3

2A601

3A601

3,80

02,

743

307

279

1,64

1

BASEMENT LEVEL - RL 68.040

GROUND FLOOR LEVEL - RL 71.840

CEILING LEVEL - RL 74.583

U/S OF RAFTER - RL 74.890

RIDGE LEVEL - RL 76.810

TOP OF BEAM ON GRID 4 - RL 75.169

5.00°

Galvanised steel column &concrete base to struct. eng's

detail

Existing groundlevel shown

dotted

Concrete slab andfootings to struct.eng's detail

Metal roofsheeting onsteel structure

Finished groundlevel

Skylight tospec.

Balustrade to detail

Conc. block wall tostruct. eng's detail

Gutter anddownpipe to Hyd.eng's detail

Conc. block wall tostruct. eng's detail Suspended conc.

slab to struct.eng's detail

Conc. beam to struct.eng's detail

Raked plasterboardceiling, paint finish

Galv. steel gatepowdercoat finish

Atlantis drainagecell & pipe drain

plasterboardlined bulkhead

plasterboardlined bulkhead

D29

D06

NETBALLCLUB ROOM

ATHLETIC STORE

WET

WA

LLC

HA

MB

ER

Compacted fill tostructural eng's detail

CDB

CDBCB

4 5 71 2 3 6

3,80

02,

743

307

750

1,17

0

BASEMENT LEVEL - RL 68.040

GROUND FLOOR LEVEL - RL 71.840

CEILING LEVEL - RL 74.583

U/S OF RAFTER - RL 74.890

U/S OF RAFTER ON GRID 2 - RL 75.640

RIDGE LEVEL - RL 76.810

5.00°

2.50°

Galvanised steel column &concrete base to struct. eng'sdetail

Concrete slaband footings tostruct. eng'sdetail

Metal roofsheeting on steelstructure

ML2

Building behind

Finished groundlevel

Balustrade to detail

Skylight tospec.

Gutter anddownpipe to Hyd.eng's detail

W08

D06

CR3 CR3

CR4

CR2

FHR

Metal soffit lining, install tomanufactures details.

Capping to detail

Indicative sign shown,toilet signage to be as

specified

7 5 4 2 16 3

10A604

7A603

3,80

02,

743

307

279

1,64

1

BASEMENT LEVEL - RL 68.040

GROUND FLOOR LEVEL - RL 71.840

CEILING LEVEL - RL 74.583

U/S OF RAFTER - RL 74.890

RIDGE LEVEL - RL 76.810

TOP OF BEAM ON GRID 4 - RL 75.169

5.00°

Galvanised steel column & concretebase to struct. eng's detail

Concrete slaband footings tostruct. eng'sdetail

Skylight to spec. Metal roofsheeting on steelstructure

Steel structure

Metal wall cladding tofinishes schedule

Wash troughto detail

Gutter anddownpipe to Hyd.eng's detail

Finished groundlevel

GB

CR3 CR3

FC

FB FB

CTCT

CR1

Metal soffit lining, install tomanufactures details.

Capping to detail

Indicative sign shown,toilet signage to be as

specified

7 5 4 2 16 3

1A601

3,80

02,

743

307

279

1,64

1

BASEMENT LEVEL - RL 68.040

GROUND FLOOR LEVEL - RL 71.840

CEILING LEVEL - RL 74.583

U/S OF RAFTER - RL 74.890

RIDGE LEVEL - RL 76.810

TOP OF BEAM ON GRID 4 - RL 75.169

5.00°

Galvanised steel column &concrete base to struct. eng's detail

Concrete slaband footings tostruct. eng'sdetail

Skylight to spec.Metal roofsheeting on steelstructure

Galvanized steelcolumn

Finishedgroundlevel

ML2

Gutters anddownpipes tohyd. eng's detail

MALE TOILETSFEMALE TOILETS EDB

Metal soffit lining, install tomanufactures details.

Capping to detail

LEGENDABC ABRASIVE BLASTED CONCRETEB-1 WALL HUNG BASINB-2 WALL HUNG BASIN - DISABLE COMPLIANTBFC BROOM FINISHED CONCRETEBCS BABY CHANGE STATIONCAP CEILING ACCESS PANELCH CLOTHES HOOKCR1 CEMENT RENDERED FINISH COLOUR 1CR2 CEMENT RENDERED FINISH COLOUR 2CR3 CEMENT RENDERED FINISH COLOUR 3CR4 CEMENT RENDERED FINISH COLOUR 4CS CLEANERS SHELFCT CERAMIC TILESCT-1 CERAMIC TILES COLOUR 1CT-2 CERAMIC TILES COLOUR 2CT-3 CERAMIC TILES COLOUR 3CT-4 CERAMIC TILES COLOUR 4CT-5 CERAMIC TILES COLOUR 5CT-6 CERAMIC TILES COLOUR 6C/W COMPLETE WITHDP DOWNPIPE - PFCDPS DOWNPIPE & SPREADER - COLORBOND.EAC EXPOSED AGGREGATE CONCRETEEDB ELECT. DISTRIBUTION BOARD, REFER TO ELECT. DOCUMENTSF FRIDGE BY OTHERSFG FIXED GLASSFHR FIRE HOSE REEL REFER TO HYDRAULUC ENGINEERS DETAILSFW FLOOR WASTEGD GRATED DRAINGPO-S SINGLE GENERAL PURPOSE OUTLETGPO-D DOUBLE GENERAL PURPOSE OUTLETGR GRAB RAILHC HONED CONCRETEHD HAND DRYERHWU HOT WATER UNITHYD HYDRANT REFER TO HYDRAULUC ENGINEERS DETAILSLF LAMINATED BENCH TOP & CUPBOARDSM1 MIRRORM2 MIRROR - DISABLE COMPLIANTMBS MOP & BROOM SHELFML1 METAL LOUVRES TYPE 1ML2 METAL LOUVRES TYPE 2MW MICROWAVE OVENNS-CT NON-SLIP CERAMIC TILEPB PLASTERBOARD LININGPTD PAPER TOWEL DISPENSERSCR SHOWER CURTAIN RAILSC COLUMN TO STRUCTURAL ENGINEERS DETAILSSD SOAP DISPENSERSH WALL SHELFSK-1 KITCHENETTE SINKSK-2 CLEANER SINKSK-3 CANTEEN SINKSMR SHEET METAL ROOFSTF STEEL TROWEL FINISHED CONCRETETGSI TACTILE INDICATORTP TOILET PARTITIONSTPH TOILET PAPER HOLDERTS-1 TAP SET - BBQ, CANTEEN, BABY CHANGETS-2 TAP SET - DISABLE COMPLIANTTS-3 TAP SET - WASHTROUGH,PARENT/CHILDTS-4 TAP SET - CLEANERSTS-5 TAP SET - CANTEEN/BBQ SINKTS-6 TAP SET - SHOWER DISABLESTS-7 TAP SET - SHOWER FEMALEV VINYLVTY VANITY UNITWC-1 TOILET PAN / SUITEWC-2 TOILET PAN / SUIT DISABLE COMPLIANTWC-3 CHILD TOILET PAN / SUITEWT WASH TROUGHWU-1 WALL HUNG URINAL

AL1 Aluminium framed glazed windows & doors - powdercoat finishAL2 Aluminium framed solid core doorsBAL Galvanised steel balustradeCB Concrete block wallCDB Concrete designer block wallCR1 Cement render - paint finish - colour 1CR2 Cement render - paint finish - colour 2CR3 Cement render - paint finish - colour 3CR4 Cement render - paint finish - colour 4DP PVC down pipe - paint finishFB Face brickGB Glazed brickFC Fibre cement, set joints, paint finishHR Handrail - stainless steelML1 Metal louvres - powdercoat finishML2 Metal louvres - powdercoat finishMS Metal wall claddingRS Roller shutterSC Steel column - galvanised finishSG Galvanised steel silding gate - powdercoat finishSL Metal soffit liningSM Exposed structural members - galvanised finish with timber infillSMR Sheet metal roofWP Wall projection - stainless steel

EXTERNAL FINISHES SCHEDULE

6 SECTION 61:1005 SECTION 5

1:100

4 SECTION 41:1003 SECTION 3

1:100

2 SECTION 21:1001 SECTION 1

1:100

B

B TENDER ISSUE 05-07-16 MP DD

C

C 13-07-16 CC,MP DDTENDER ISSUE